WWTP Phase 1B
Solicitation number
30-24-075
Issued by
Whatcom County, Washington

About this file

This is a Scope of Work document for the City of Spokane, Washington's Wastewater Treatment Plant (WWTP) Phase 1B project. The project encompasses the construction of a new UV disinfection system, two pump stations with associated buildings, a 50 million gallon lined lagoon, irrigation pivots, chlorination and dechlorination systems, two creek crossings, diesel generators, over 1,000 feet of yard piping ranging from 4-inch to 30-inch diameter, controls upgrades, and electrical upgrades. Prequalification is required for all bidders. The scope of work details the technical specifications, design standards, and construction requirements necessary to complete these wastewater treatment infrastructure improvements. The project involves coordination with existing city systems and compliance with applicable regulatory standards for wastewater treatment facilities.

The document establishes the technical and performance requirements that contractors must meet to successfully execute the WWTP Phase 1B project. Specific attention is given to the quality standards for materials, installation procedures, testing protocols, and operational parameters for all constructed systems. The prequalification requirement ensures that only contractors with demonstrated experience and financial capacity in wastewater infrastructure construction are eligible to bid on this significant municipal project. Contractors must meet defined criteria related to previous experience, bonding capacity, and technical capabilities prior to submitting final bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .