About this file

The document is an Invitation For Bid (IFB) issued by the Montana Fish, Wildlife and Parks (FWP) for a stream restoration project at Long Creek near Dillon, Montana. The project involves reactivating an abandoned side-channel as the new main channel of Long Creek and converting the old channel into a seasonally flooded side channel that collects flows above 40 CFS. A mandatory pre-bid tour was scheduled for September 3, 2021, at 1:30 pm, with the bid opening on September 13, 2021, at 5:00 PM MDT. The project is expected to last through November 2021 and includes services such as channel realignment/construction (3,060 linear feet), streambank treatment (500 linear feet), upstream and downstream channel plugs, riffle narrowing (150 feet), and excess material hauling.

The bid requires vendors to demonstrate extensive experience in stream channel restoration, specifically in wetland and stream corridor environments under challenging conditions. Bidders must provide documentation of at least 5 years of applied stream and spring creek restoration experience and details of at least 3 similar previous projects. The service line items include mobilization/demobilization, various channel construction and treatment activities, and a 10% construction contingency. The commodity code for this project is 1619 for Environmental Services - Stream Restoration, with the contract to be awarded in US Dollars. Contact persons for the bid are Chloe Katsilas and Amanda Battin from the Montana state government.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 October 2021

Long Creek Side Channel Reactivation FWP is seeking a vendor to provide stream restorations services at Long Creek near Dillon, MT this fall. See detailed specifications for more information.

14 October 2021

Open 8/30/2021 2:00 PM MDT Type Invitation For Bid Close 9/13/2021 5:00 PM MDT Number FWP-IFB-22-0021 Currency US Dollar

Sealed Until 9/14/2021 1:30 PM MDT

14 October 2021

Contacts Chloe Katsilas Chloe.Katsilas@mt.gov

Phone +40 64953241

Amanda Battin Amanda.Battin@mt.gov

Phone +1 406-495-3276

14 October 2021

Commodity Codes Commodity Code Description 1619 Environmental Services - Stream Restoration

14 October 202114 October 202114 October 202114 October 202114 October 202114 October 202114 October 202114 October 202114 October 2021 mailto:Chloe.Katsilas@mt.gov mailto:Amanda.Battin@mt.gov

FWP is a seeking a vendor to reactivate an abandoned side-channel as the new main channel of Long Creek and to convert the old channel into a seasonally flooded side channel that collects all flows above 40 CFS. There will be a mandatory pre-bid walk through on September 3, 2021 at 1:30 pm. We will meet at the corrals located on the Long Creek-Ruby divide road 1.2 miles north of North Valley Road (south of Dillon, MT). A map of this location will be uploaded into the pre-requisites section. This project is expected to last through November, 2021.

Description

Required to View Event

Prerequisites Required to Enter Bid

14 October 2021

1. Review and accept the Single Point of Contact information.

2. Review and accept the Mandatory Pre-Proposal / Pre-Bid Walk-Through information.

3.

Please review and accept the draft personal service contract as provided. Contractors requesting additions or exceptions to the contract terms must submit them to the procurement officer listed above by the Q&A deadline. The State reserves the right to address nonmaterial requests for exceptions to the standard terms and conditions and contract language with the lowest bid during contract negotiation.

4. Review and accept the Q & A Board information.

5. Review and accept the Vendor Registration information.

6. Review and accept the Montana Time Zone information.

7. Review and accept the Registration with the Secretary of State information.

8. Review and accept the Debarment information

9. Review and accept the IFB General Information.

10. Review and accept the IFB Specifications information.

11. Review and Accept the State and Federal Standard Terms & Conditions

12. Review and accept the Montana Prevailing Wage Requirements information.

14 October 202114 October 202114 October 202114 October 202114 October 202114 October 202114 October 2021

Buyer Attachments

1. Dillon to Long Creek.pdf

2. Elk Springs to Long Creek.pdf

3. TNC Long Creek Restoration Plans Final.pdf

14 October 202114 October 202114 October 202114 October 202114 October 202114 October 2021 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1029227-1127563272Dillon%20to%20Long%20Creek.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1697298190&Signature=sPID07DrzuLjOlowtjQL35EQ4BY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1029227-1127564122Elk%20Springs%20to%20Long%20Creek.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1697298190&Signature=%2B%2BeSaNVD9OHDYRoKC23agNEaPpM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1029227-1133033734TNC%20Long%20Creek%20Restoration%20Plans%20Final.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1697298190&Signature=a2Eaqpag4w7O0HC8O8938mM47s8%3D

Questions Required Questions

Group 1:

Instructions:

1.1 You acknowledge that there is a a mandatory pre-bid tour that will be conducted of the project area on Friday, September 3, 2021, at 1:30 p.m. The tour will meet at the corrals located on the Long Creek-Ruby divide road 1.2 miles north of Valley Road.

1.2 Contract must fill out and upload their contact information.

1.3

Please provide documentation of past experience that illustrates high level of competence building stream channel geometry and corresponding natural bed form features such as pools and riffles and appropriate grading and contouring skills in a natural, low gradient (<0.003 ft/ft) stream environment. Experience must be working in wetland and stream corridor environments under wet, cold, and 'backcountry' conditions.

1.4 Please provide documentation of a minimum of 5 years of applied stream and spring creek restoration experience.

1.5 Please provide documentation of minimum experience of 3 similar spring creek restoration projects. Please provide the following for each previous project: 1) Contact name 2) Company name 3) Address 4) Telephone number 5) Email address 6) Project name 7) Project description

14 October 202114 October 202114 October 202114 October 202114 October 2021

Product Line Items Product Line Items

There are no Items added to this event.

14 October 202114 October 202114 October 202114 October 2021

Service Line Items Service Line Items

1.

# Item Name, Commodity Code, Description Allow

Alternates Qty. UOM Requested Service Delivery

S1 Mobilization/Demobilization 1 LS - Lump Sum

S2 Channel Realignment/Construction 1

3060 Linear Feet

S3 Streambank Treatment 1

500 Linear Feet

S4 Upstream Channel Plug 1 EA - Each

S5 Downstream Channel Plug 1 EA - Each

S6 Riffle Narrowing 1

150 feet

S7 Excess Material Hauling 8 HR - Hour

Cost per hour.

S8 Construction Contingency Costs 1

10%