101422 1066 Addendum 1.pdf

PDF 143 KB Posted

Attached to
RFQ for MRI-Compatible Virtual Reality Headset (PCS# 110400-01069-RFQ)
Solicitation number
S-580501-00004458
Issued by
Lane County, Oregon

About this file

This is Addendum #1 to an Invitation to Bid issued by the City of Silverton for the SILVERTON WWTP BLOWER REPLACEMENT PROJECT (Project #22-1066). The addendum was issued on October 14, 2022, and modifies the original ITB issued on September 22, 2022. The ITB closing date and time remains unchanged at Thursday, October 20, 2022, at 2:00 PM. The addendum addresses contractor questions regarding project execution and equipment specifications for the blower replacement work.

The addendum provides clarifications on three key aspects of the project: access to the blower building via a paved road leading to a roll-up door that accommodates forklift entry, with ceiling-mounted winch assistance for blower removal and installation; ambient air condition design specifications based on inlet air temperature of 100 degrees Fahrenheit with air humidity at 36%; and NEC classification for all instrumentation designated as Class 1, Division 2. No pricing information, set-asides, incumbent contractors, funding sources, or contract term details are included in this addendum document.

View the file

Other files

File Type Posted
Procurement Information~82.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

CITY OF SILVERTON

SILVERTON WWTP

BLOWER REPLACEMENT PROJECT

Addendum #1

Project # 22-1066

Addendum #1 Issue Date: Friday October 14, 2022

ITB Issue Date: Thursday September 22, 2022 ITB Closing Date and Time: Thursday October 20, 2022 at 2:00 PM

ITB Closing Date and Time: No Change

Project # 22-1066

This Addendum is issued to the above referenced ITB and forms a part of the contract documents and modifies the original scope of work, specifications and drawings, requirements and deadlines. Except as changed by this Addendum, all terms, conditions, scope of work, plans, specification, requirements and deadlines in the original ITB and previous addenda remain unchanged.

PLEASE NOTE THE FOLLOWING MODIFICATIONSTO THE ABOVE

REFERENCED ITB:

Answers to questions received from contractors are below.

Question Is there access to the blower building?

Answer: Yes. A paved access road leads to the building roll-up door which allows a forklift to enter the building. There is a winch attached to the ceiling to assist with removal and installation of the blowers.

Question What are the ambient air condition specifications for the blowers?

Answer: The design set point for the blowers is based on an inlet air temperature of 100 degree F with air humidity at 36%.

Question What is the NEC classification for the instrumentation?

Answer: NEC Classification for all instrumentation is Class 1, Division 2.

End of Addendum #1

INVITATION TO BID
Addendum #1
Project # 22-1066

End of Addendum #1

File details come from the government source that posted it. Updated .