10125 PWS.pdf

PDF 268 KB Posted

Attached to
Digital and Real-Time Radiography Preventative Maintenance Federal contract opportunity
Solicitation number
FA822723QDRRT
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a combined synopsis/solicitation for digital and real-time radiography preventative maintenance services at Hill Air Force Base in Utah. The 709th Maintenance Support Squadron requires two preventative maintenance visits, one emergency visit, and telephone support on specified digital x-ray and real-time x-ray machines. The sole source contractor will be AECIS LLC DBA ADAPTIVE ENERGY. The one-year base period of performance begins in April 2023 with four optional one-year extensions. Offerors must submit capability statements and experience with identical or similar work by March 13, 2023. Lowest price technically acceptable criteria will be used to evaluate offers. The contractor must comply with standard clauses on business ethics, whistleblower protections, system for award management registration, and prohibitions on contracting with entities requiring internal confidentiality agreements. The performance work statement details requirements for preventative maintenance, repairs, training, safety, security, and quality assurance.

View the file

Other files for this federal contract opportunity

Other files attached to Digital and Real-Time Radiography Preventative Maintenance, newest first.
File Type Posted
10125 CDRL A001 Service Report.pdf PDF
10125 CDRL A006 Quality Control Plan.pdf PDF
10125 CDRL A002 Deficiency Report.pdf PDF
Combined Synopsis Solicitation SS - DR and Real-Time.docx DOCX document
10125 CDRL A003 Cost Breakdown.pdf PDF
10125 CDRL A005 Safety Plan.pdf PDF
10125 CDRL A004 Software Updates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT (PWS)

DIGITAL AND REAL-TIME RADIOGRAPHY SYSTEMS

MAINTENANCE

U.S AIR FORCE

309th Maintenance Support Group (MXSG)

709th Maintenance Support Squadron (MXSS)

1/3/2023

Digital and Real-time Radiography Systems Maintenance i

TABLE OF CONTENTS

1 DESCRIPTION OF SERVICES

2 BASIC SERVICES

3 SERVICE SUMMARY

4 CDRL SUMMARY

5 ADDITIONAL REQUIREMENTS

5.2 Government provided support

5.3 Quality Control Plan

5.4 Quality Assurance

5.5 Base Access

5.8 Network Access: ............................................................. Error! Bookmark not defined.

5.9 Security Requirements

6 SECURITY: ........................................................................... Error! Bookmark not defined.

7 CONFLICTS OF INTEREST

8 GENERAL INFORMATION

8.1 Hours of Operation

8.2 Conservation of Utilities

9 ENVIRONMENTAL CONTROLS

9.1 Hazardous Work Environment

9.2 Notification of Environmental Spills

9.3 Safety Program

10 GOVERNMENT OBSERVATIONS

11 FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL

12 ENVIRONMENTAL:

Appendix A – ACRONYMS AND ABBREVIATIONS appendix B – EQUIPMENT LISTING

Appendix C – SAFETY

1 DESCRIPTION OF SERVICES

1.1 The contractor shall provide all required personnel, equipment, tools, materials, lodging, transportation, supervision and maintenance services necessary to maintain and repair Digital and Real-time Radiography Systems listed on appendix B, and return to the

Original Equipment Manufacturers (OEM) specifications, with a record of what repairs were made (CDRL A001). Repairs will be performed in a classified area to support the

309th Maintenance Support Group (MXSG), Hill Air Force Base (AFB), Utah, Building

238W.

2 BASIC SERVICES

2.1 The equipment and accessories specified in Appendix B shall be serviced and repaired by a contractor-trained field engineer on-site. The Contractor shall perform preventative maintenance (PM) and run the systems to determine the As Found condition in accordance with (IAW) OEM manuals. Based on the As Found condition the Contractor shall provide a report, listing deficiencies, to the 809 MXSS/MXDEA Engineer and 709

MXSS/MXDTAC Shop Supervisor within 48 hours of assessment completion (CDRL

A002). The Contractor shall perform PM, troubleshooting, repair, and software updates/upgrades to bring systems to current OEM specification and functional.

2.2 Preventative Maintenance

2.2.1 The Contractor shall perform maintenance service (IAW OEM manuals) on-site at Hill AFB at least twice during the Period of Performance (POP), once within

30 days of award and the other approximately six months later. The Contractor shall coordinate on-site visits with 709 MXSS/MXDTAC Shop Supervisor and

COR.

2.3 Repairs

2.3.1 Scheduled Repair

2.3.1.1 If during scheduled preventative maintenance or during Telephone

Technical Support, it is determined the machine will require corrective maintenance to fix an issue, and the equipment is still in an operating status. The contractor shall provide a price breakdown (CDRL A003) for the total cost, including: labor, parts, travel and lodging, to 809

MXSS/MXDEA Engineer, 709 MXSS/MXDTAC Shop Supervisor and

COR before the start of any work. The contractor will coordinate and prioritize the timing of the repair as deemed necessary by the 809

MXSS/MXDEA Engineer and 709 MXSS/MXDTAC Shop Supervisor.

2.3.2 Emergency Repair

2.3.2.1 Should a system malfunction occur during the PoP and outside of the two regular maintenance service visits, which cannot be resolved via

Telephone Technical Support, the contractor shall provide one (1) emergency visit to repair equipment to OEM specifications. Contractor shall arrive on-site at HAFB within five (5) business days of notification of equipment breakdown by the 809 MXSS/MXDEA Engineer and 709

MXSS/MXDTAC Shop Supervisor.

2.3.2.2 The contractor shall provide a Deficiency Report (CDRL A002) to 809

MXSS/MXDEA Engineer and 709 MXSS/MXDTAC Shop Supervisor, detailing the deficiencies found in equipment within 48 hours of arrival at HAFB.

2.3.2.3 The contractor will not make any repairs to the equipment until the evaluation report has been approved by 809 MXSS/MXDEA Engineer, 709 MXSS/MXDTAC Shop Supervisor and COR.

2.3.3 Repair

2.3.3.1 After the deficiency report has been reviewed and approved by 809

MXSS/MXDEA Engineer and 709 MXSS/MXDTAC Shop Supervisor, the contractor shall have ten (10) business days from the day the parts are available, to complete all repairs necessary to bring equipment back to OEM specifications.

2.3.3.2 If the contractor does not have the ability to make necessary repairs during an on-site visit, the contractor shall be allowed to ship, receive and repair items at the contractor's facility, with the 809

MXSS/MXDEA engineer approval, in order to reduce downtime to an inoperable system.

2.3.3.3 After service and repair the contractor shall submit an invoice, the COR will process payment according to the 709 MXSS/MXDTAC Shop

Supervisor and 809 MXSS/MXDEA Engineer acceptance of work.

2.3.3.4 The contractor shall provide a service report, listing services performed to include: Preventative Maintenance, troubleshooting, deficiencies, repair, and software updates of each system within ten (10) business days of maintenance completion (CDRL A001).

2.4 Telephone Technical Support

2.4.1 The contractor shall provide telephone support in between PM visits. Telephone support shall include answering questions related to system, operator problems, and troubleshooting.

2.4.2 Telephone Technical Support shall be available between contractor’s normal operating business hours and a technician shall respond to Telephone Technical

Support within 24 hours of the request being placed by the government.

2.5 Software Updates

2.5.1 Any software updates available from the OEM are to be provided under this contract, and shall be installed on the first visit after update is available. Issues affecting function or ability to operate within the software will be addressed and corrected within 10 business days. Any issues, bugs, or improvement recommendations found will be identified to the contractor to be able to provide an update to the software on the next PM visit. All software updates shall be provided on CD/DVDs. Absolutely no flash memory devices or portable hard drives are permitted to connect to any Government computers. Professional copies of the current software versions on CD/DVD with keys shall be provided to the Government to permanently remain on site (CDRL A004). Any variations shall be authorized by the 809 MXSS/MXDEA engineer. Ensure all electronic devices are cleared through the 309 CMXG security office prior to entering the classified area by coordinating visit with 709 MXSS/MXDTAC Shop Supervisor and COR. Escorts will be provided by 709 MXSS/MXDTAC and are required to ensure compliance.

2.6 Replacement Parts and Labor

2.6.1 Contractor shall provide a detailed price for all replacement parts, labor, travel and lodging, to replace all components/parts determined to be defective in the deficiency report (CDRL A002) and deliver to 809 MXSS/MXDEA engineer, 709 MXSS/MXDTAC Shop Supervisor and COR for approval, prior to any work being started.

2.6.2 Replacement parts shall be of equivalent or superior performance to factory specifications at the time the equipment was originally purchased. The

Contractor shall use only OEM approved parts in making sure that the equipment is fully functional. The Contractor may use reconditioned parts as long as the

OEM deems them fully functional replacements and they meet the OEM’s specifications. Defective parts which have been replaced and are repairable will be reconditioned and returned to the 709 MXSS/MXDTAC Shop Supervisor for use at a later date. All parts needing replacement, shall be replaced within ten

(10) business days after the approval of the deficiency report. Components that must be returned to the manufacturer for repair, shall be shipped to the manufacturer’s site prepaid by the Contractor using the most economical method, to include packaging, insurance (required), and Free on Board (FOB) shipping costs. Components must be repaired and returned within 30 business days of material being received from OEM. After completion of repairs, the Contractor shall ship or otherwise deliver repaired item(s), prepaid and insured, most economical method via FOB Destination. Original and/or duplicate copy of paid freight bill or commercial bill of lading marked “paid” must be attached to invoice.

2.7 Travel and Lodging

2.7.1 If an out of cycle service visit is required, the contractor will provide a cost breakdown (CDRL A003) for travel, lodging and labor for approval, to 809

MXSS/MXDEA Engineer and 709 MXSS/MXDTAC Shop Supervisor and COR, prior to travel.

3 SERVICE SUMMARY

PWS

Paragraph Performance Objective

Performance Threshold

1.1 &

2.3.3.4

The contractor shall provide a service report, listing services performed to include: Preventative

Maintenance, troubleshooting, deficiencies, repair, and software updates of each system within ten

(10) calendar days of maintenance completion

Satisfactory when (CDRL A001) has been delivered within 10 days of service being provided at least 90 % of the time

2.1, 2.3.2.2

& 2.6.1

Based on the As Found condition the Contractor shall provide a report listing of deficiencies to the 809

MXSS/MXDEA Engineer and 709

MXSS/MXDTAC Shop Supervisor within 48 hours of assessment

Satisfactory when (CDRL A002) has been provided within 48 hours of deficiency being discovered at least 90 % of the time

2.2.1 Perform Preventative Maintenance two

(2) times per period of performance

Satisfactory when Preventative

Maintenance has been performed twice during PoP at least 90% of the time

2.3.2.1

Contractor will provide one (1)

Emergency Visit if needed within five

(5) business days of notification of equipment breakdown

Satisfactory when Emergency

Maintenance has been performed within five business days of notification of equipment breakdown during PoP at least 90% of the time

1.1, 2.1 &

2.3.2.2.1

Repair of Radiography system to OEM specifications within 10 from the day the parts are available

Satisfactory when all system function properly, and are calibrated to manufacturer specifications within 10 days after the parts are available 90% of the time

2.4.2 Respond to Telephone Technical

Support within 24 hours of request

Satisfactory when technician has responded to Telephone Technical

Support request within 24 hours of the request being placed by the government 90% of the time

2.5.1

Software updates available from the manufacturer will be installed on the first visit after they become available using CD/DVD

Satisfactory when software updates have been installed on the first visit after they become available 90% of the time

4 CDRL SUMMARY

Contract information data shall be delivered electronically in accordance to the corresponding requirement for each Data Item listed in Table 4-1 (below). The contractor shall have no more than one error per quarter for all CDRL submittals. The contractor shall submit CDRLs according to the due date indicated and have no more than one CDRL per quarter submitted after the identified due date. Grammatical errors do not count as an error. Substantive mistakes shall be corrected within two working days and corrective action taken to prevent recurrence of inaccurate late CDRLs.

Table 4-1

Exhibit Title PWS Paragraph

Delivery

A001

Service Report

1.1, 2.3.3.4 Within ten (10) calendar days of maintenance or repair completion

A002 Deficiency Report

2.1, 2.3.2.2, 2.6.1 Within 48 hours of assessment completion

A003 Cost Breakdown

2.3.1.1, 2.7.1 Before any scheduled or emergency repairs

A004 Software Updates

2.5.1 After any software

update

A005 Safety Plan

Appendix C

NLT fifteen (15) calendar days after contract award

A006 Quality Control Plan 5.3.1

NLT thirty (30) calendar days post contract award

5 ADDITIONAL REQUIREMENTS

5.1 Government Furnished Property (GFP)

5.1.1 GFP will be issued to the contractor for repair if/when repairs are needed. The contractor shall safeguard all GFP placed into the contractor’s care. GFP shall be shipped to the OEM facility and returned to the 809 MXSS/MXDEA Engineer by the contractor, at the contractor’s expense.

5.2 Government provided support

5.2.1 The Government will provide necessary working space, including heat, light, ventilation, and electrically powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be Hill

Air Force Base (AFB), UT.

5.2.2 Government telephones shall be used for official business only.

5.2.3 The contractor shall be responsible for safeguarding all Government property provided for contractor use.

5.3 Quality Control Plan

5.3.1 The contractor shall establish a complete Quality Control Plan (QCP) to ensure the requirements of this contract are provided as specified. The contractor's quality management program shall comply with the minimum quality management systems elements specified in the American National Standards

Institute (ANSI), American Standards Organization (ASO), and International

Standard Organization (ISO) family of standards. The report shall be submitted to the COR, NLT 30 days post contract award.

5.4 Quality Assurance

5.4.1 The COR will perform assessments of the contractor’s performance. Subsequent to contract award, specific name and contact information of the COR with a letter defining duties and authority will be furnished to the contractor.

5.4.2 The COR will inform the task manager in person when discrepancies occur and will request corrective action. The COR will make a notation of the discrepancy on the assessment checklist with the date and time the discrepancy was noted and will request the task manager (or authorized representative) to initial the entry on the checklist.

5.4.3 The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints.

5.4.4 Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO.

5.5 Base Access

5.5.1 Contractor will schedule all visits and coordinate Base entry by contacting 709

MXSS/MXDTAC Shop Supervisor or Lead at 801-775-3412. The contractor shall be escorted at all times.

5.6 Display of Identification

5.6.1 When contractor employees are inside a secure work area within building 238W at Hill AFB, they shall be issued and wear visible Government-provided identification either as a part of, or attached to their outer clothing. The identification shall clearly identify the individuals as needing an escort at all times.

5.7 Removal of Contractor Personnel

5.7.1 The contractor understands that any contractor employee may be summarily and immediately removed from or denied access to any Government property, facility, and installation at the sole discretion of competent Government authority if that authority determines such action is necessary to protect or preserve

Government property, safety, and security, or to maintain good order and discipline.

5.8 Security Requirements

5.8.1 The contractor shall comply with all Security, Force Protection, and

Antiterrorism requirements enforced at each installation. The contractor shall comply with local unit in and out-processing procedures for all contractor personnel to ensure proper security-related briefings, debriefings, and trainings are accomplished.

5.8.1.1 Security Manager (SM), contractor and/or COR will administer and maintain all individual training and records, for compliance purposes, associated with this SOW/PWS. Training records must be made available during self-inspections and other oversight activities.

5.8.2 All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees.

5.8.2.1 Contractors will not use any other form of identification to access any government installation while working on a government contract except the issued credentials associated with the awarded contract. Example:

using a military retiree card to access an installation to work on a contract.

5.8.3 Contractors shall accomplish 309 MXSG Unit Orientation Training within 30 calendar days of assignment IAW 309 MXSG OI 16-102, Security Requirements

Operating Instruction, provided by SM.

5.8.4 Security Incidents

Should a security incident occur, the contractor shall:

5.8.4.1 Immediately report to the site location Group Security Manager all available facts related to each instance.

5.8.4.2 Take such precautions as the Security Manager may reasonably require for security purposes.

5.8.4.3 Take reasonable and prudent action to establish control of the scene, prevent further violation, and to preserve evidence until released by proper authority.

5.8.4.4 Cooperate fully and assist Government personnel as the Government conducts an investigation of the violation.

5.8.4.5 Participation shall last until the investigation is complete.

5.8.5 Communications Security

5.8.5.1 All communications with DoD organizations are subject to

Communications Security (COMSEC) review.

5.8.5.2 The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

5.8.5.3 The Government advises the Contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to

COMSEC procedures.

5.8.5.4 The Contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.

5.8.6 Operations Security (OPSEC)

5.8.6.1 Contractors who have access to Ogden Air Logistics Complex (OO-

ALC) facilities or critical information shall have OPSEC training IAW

AFI 10-701, Operations Security (OPSEC), (Complete reference in

Appendix E). Initial training will be provided by Group SM within 30 calendar days of contract award, and lasts approximately one hour, with recurring annual training lasting approximately one-half hour.

Contractors shall immediately comply with Installation and Group

OPSEC programs.

5.8.6.2 Public release of any information is not authorized and, if requested, will comply with Public Affairs and all other OPSEC measures to ensure the best balance of lawful disclosure for the American public and denial of advantage for our adversaries.

5.8.6.3 No photography, or videotaping, is allowed on the installation without approval from the owning organizations Group Director/Commander on an approved photography letter from Public Affairs. This includes the use of personal cell phones with picture and video capability.

5.8.6.4 Critical Items/Information shall not be discussed outside normal contract conditions. A Critical Items/ Information List (CIL) can be provided and should not be considered all inclusive.

5.8.7 Controlled Unclassified Information (CUI) generated by the contract, and its employees, shall ensure protective measures are applied. ALL DoD unclassified information MUST BE REVIEWED AND APPROVED FOR RELEASE before it’s provided to the public in accordance with DoDD 5230.09, Reference J.

5.8.7.1 Disclosure of information is prohibited for release of unclassified information to the public without approval of the contracting activity.

5.8.7.2 Contractors will comply with CUI requirements detailed in DoD

Instruction 5200.48, Controlled Unclassified Information (CUI) and complete Initial training provided by Group SM within 30 calendar days of contract award, and lasts approximately one hour, with recurring annual training.

5.8.7.3 The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies.

6 CONFLICTS OF INTEREST

The Contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the

Contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.

7 GENERAL INFORMATION

7.1 Hours of Operation

7.1.1 Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0600-

1500 – EXCEPT FEDERAL HOLIDAYS and other base closures.

7.1.2 Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s

Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus

Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on

Saturday, it is observed on Friday and working hours are Monday through

Wednesday for that week. If the holiday falls on a Sunday, it is observed on

Monday. Any other circumstances that may prompt base closure, such as Days of

National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather-related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.

7.1.3 NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination;

however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.

7.1.4 Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.

7.1.5 Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.

7.2 Conservation of Utilities

Contractors shall be evaluated on the use/conservation of energy. The Contractor shall instruct employees in energy conservation practices. The Contractor shall be Responsible for operating under conditions which prevent the waste of utilities/energy. Reference: ISO 50001 4.5.7, AFSC

Manual (AFSCMAN) 21-102 4.1.6.10.

8 ENVIRONMENTAL CONTROLS

8.1 Hazardous Work Environment

8.1.1 The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The industrial complex at Hill AFB has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure is expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air

Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.

8.1.2 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and

Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.

8.2 Notification of Environmental Spills

If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the 709 MXSS/MXDTAC

Shop Supervisor. The liability for the spill or release of such substance’s rests solely with the contractor and its agent.

8.3 Safety Program

8.3.1 The contractor shall implement a safety program that ensures protection of

Government personnel and property. (See Appendix C)

8.3.2 In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the mishap / incident notification shall be sent within three calendar days to the 709

MXSS/MXDTAC Shop Supervisor and COR, COR will forward it to appropriate safety office.

9 GOVERNMENT OBSERVATIONS

During the period that the contractor is working on the Test Stands, Government personnel, other than CO, may, from time-to-time, observe contractor operations. However, these personnel may not interfere with contractor performance.

10 FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL

10.1 The contractor shall follow the applicable guidance in chapters/paragraphs/sections of AFI

AFSC MAN 21-102 and AFSC MAN 21-102 OO-ALCSUP

10.2 If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFSC MAN 21-102 OO-ALCSUP

10.9.1.1.3.

10.3 Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.

11 ENVIRONMENTAL:

Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.

12 APPENDICES

APPENDIX A: ACRONYMS AND ABBREVIATIONS

APPENDIX B: EQUIPMENT LISTING

APPENDIX C: SAFETY

APPENDIX A – ACRONYMS AND ABBREVIATIONS

Acronym/Abbreviations Definition

AF Air Force

AFB Air Force Base

AFI Air Force Instruction

AFMC Air Force Material Command

ANSI American National Standards Institute

ASO American Standards Organization

CAC Common Access Card

CAR Corrective Action Report

CDRL Contractor Data Requirements Listing

CFR Code of Federal Regulation

CMRA Contractor Manpower Reporting Application

CO Contract Officer

COR Contracting Officer Representative

DoD Department of Defense

EPA Environmental Protection Act

FAR Federal Acquisition Regulation

FE Facility Engineer

FOD Foreign Object Damage

HAFB Hill Air Force Base

IAW In Accordance With

IC Ion Chromatography

IEC International Electrotechnical Commission

ISO International Organization for Standardization

NELAP National Environmental Laboratory Accreditation Program

OEM Original Equipment Manufacturer

OSHA Occupational Safety and Health Act

PE Performance Evaluation

POP Period of Performance

PWS Performance-Based Work Statement

QCP Quality Control Plan

SS Service Summary

TO Technical Order

TCIR/DART Total Case Incident Rate/Days Away Restricted or Transferred

VPP Voluntary Protection Program

APPENDIX B – EQUIPMENT LISTING

Description PM Equipment Number Serial Numbers

Digital Radiography System 13063 AE 140331001

Real-time Radiography System 11872 WE-2261 (console) and

WE2263 (gantry)

APPENDIX C – SAFETY

SAFETY, FIRE PROTECTION AND HEALTH

SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

OGDEN AIR LOGISTICS COMPLEX

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

Digital and Real-Time Radiography Systems Maintenance

03 Jan 2023

Reviewed by:

Robert Pickett

OO-ALC/SE

801-586-4461

Control Number: RP230101

A. Safety Program Requirements

The contractor shall implement a safety program plan that ensures protection of

Government personnel and property. The program shall consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific

Requirements, and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.

3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

6. All contractor personnel shall be trained and qualified to perform their duties safely.

7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify OO-ALC/SE Workflow (OO-ALC.SE.Workflow@us.af.mil) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR

(Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally, if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance

Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

mailto:OO-ALC.SE.Workflow@us.af.mil

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force

Occupational Safety and Health Standards (AFOSH STD), to include DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety

Investigations and Reports, Contract Safety, and the protection of their employees.

Additionally, the contractor is responsible for the safety and health of all subcontractor employees.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note:

AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence.

The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA

Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.

http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

• Provide contact information for on-site personnel

• Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

• Identify employee safety and health training requirements and the documentation process

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic-controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians

DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.

MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive

5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4;

DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety

Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition:

AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.

HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in

OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.

File details come from the government source that posted it. Updated .