100 Percent Construction Drawings with Chiller Mod - 05-22-2017.pdf

PDF 5 MB Posted

Attached to
C1NB--INCREASE CHILLED WATER CAPACITY AE Project 565-25-153
Solicitation number
36C24625R0031
Issued by

About this file

These are 100% Construction Documents for a VA Medical Center chiller plant modification project in Fayetteville, North Carolina. The documents detail a design-build effort to increase the facility's chilled water capacity by 1000 tons, involving comprehensive architectural and engineering services for demolition, construction, and system upgrades. The project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a projected construction budget between $2-5 million and an anticipated construction award date around August 25, 2025. The design team is required to develop three alternative approaches for chilled water expansion, evaluate each option's cost, efficiency, and implementation feasibility, and provide full construction documentation, including Revit BIM drawings, specifications, cost estimates, and construction period services.

The solicitation requires a detailed Standard Form 330 submission evaluating the firm's specialized experience, professional qualifications, construction period services expertise, past performance, capacity, and local knowledge. Key deliverables include comprehensive design documents at 35%, 65%, 95%, and 100% completion stages, with specific review and submission requirements. The total contract period is estimated at 741 calendar days, including 196 days for design, 180 days for procurement, and 365 days for construction period services. The project will involve significant coordination with VA staff, on-site investigations, 3D scanning, and adherence to VA design standards and specifications.

View the file

Other files

File Type Posted
36C24625R0031 0002.docx DOCX document
36C24625R0031 0001.docx DOCX document
36C24625R0031_1.docx DOCX document
SF 330.pdf PDF
Past Performance Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

COVER

COVER

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

2300 RAMSEY STREET

FAYETTEVILLE, NC 28301

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-2.1

Chiller Plant Demolition and Construction

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-2.2

Building 3 and 10 Demolition and Construction

FAYETTEVILLE VA MEDICAL CTR

3 & 10

SG NN

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-5.2

HVAC Details #2

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-6.1

Equipment Schedule

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-7.1

Control Schematics and Sequences #1

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

MH-7.2

Control Schematics and Sequences #2

FAYETTEVILLE VA MEDICAL CTR

SG NN

FAYETTEVILLE VA MEDICAL CTR

CBL-0004

0.5 1 10 100 1K 10K

0.01

0.10

CURRENT IN AMPERES

CH-1.tcc Ref. Voltage: 480V Current in Amps x 10 CH-1.drw

T I M

E

I N

S

E C

O N

D S

NEW

CH-1

Rated kW 231.6 kW

LRA/FLA 6.5000

CH-1 FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HLD

Sensor/Trip 600.0 A

Plug 500.0 A

Settings Phase

LTPU (0.4-1.0 x P) 1 (500A)

LTD I2t (2-24 Sec.) 10

STPU (1.5-8 x LTPU) 7.6 (3800A)

STD (0.1-0.5 Sec.) 0.1 (I^s T Off)

INST (2-8 x P) 8 (4000A)

INST (1.0 x ST Fixed) Fixed (5500A)

TCC No. SC-6323-96, 6324-96

LRA/FLA 6.5000

CH-1 FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HLD

Sensor/Trip 600.0 A

Plug 500.0 A

Settings Phase

LTPU (0.4-1.0 x P) 1 (500A)

LTD I2t (2-24 Sec.) 10

STPU (1.5-8 x LTPU) 7.6 (3800A)

STD (0.1-0.5 Sec.) 0.1 (I^s T Off)

INST (2-8 x P) 8 (4000A)

INST (1.0 x ST Fixed) Fixed (5500A)

TCC No. SC-6323-96, 6324-96

EXIST

0.5 1 10 100 1K 10K

0.01

0.10

CURRENT IN AMPERES

CWP-1.tcc Ref. Voltage: 480V Current in Amps x 10 CWP-1.drw

T I M

E

C

O N

D S

NHDP-DIST2

Manufacturer SQUARE D

Frame/Model HJ

Sensor/Trip 100.0 A

Plug 0.0 A

Settings Phase

Fixed

TCC No. 50-1,2,3,4

CWP-1

Rated HP 40.0 hp

Rated kW 29.8 kW

RatedAmps 48.2 A

LRA/FLA 6.5000

TCC FLA 48.2 A

NHDP-DIST2

Manufacturer SQUARE D

Frame/Model HJ

Sensor/Trip 100.0 A

Plug 0.0 A

Settings Phase

Fixed

TCC No. 50-1,2,3,4

CWP-1

Rated HP 40.0 hp

Rated kW 29.8 kW

RatedAmps 48.2 A

LRA/FLA 6.5000

TCC FLA 48.2 A

NEW

NEW

TYPICAL FOR CWP-2 AND CWP-3

NHDP FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HND

Sensor/Trip 800.0 A

Plug 800.0 A

Settings Phase

LTPU (0.4-1.0 x P) 1 (800A)

LTD I4t (1-5 Sec.) 5

STPU (1.5-8 x LTPU) 7.4 (5920A)

STD (0.1-0.5 Sec.) 0.12 (I^s T Off)

INST (2-8 x P) 6 (4800A)

INST (16000A) Fixed (16000A)

TCC No. SC-6333-96, 6334-96

NHDP FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HND

Sensor/Trip 800.0 A

Plug 800.0 A

Settings Phase

LTPU (0.4-1.0 x P) 1 (800A)

LTD I4t (1-5 Sec.) 5

STPU (1.5-8 x LTPU) 7.4 (5920A)

STD (0.1-0.5 Sec.) 0.12 (I^s T Off)

INST (2-8 x P) 6 (4800A)

INST (16000A) Fixed (16000A)

TCC No. SC-6333-96, 6334-96

NEW

CBL-0002

CBL-0006

CBL-0005

0.5 1 10 100 1K 10K

0.01

0.10

CURRENT IN AMPERES

CHWP-1.tcc Ref. Voltage: 480V Current in Amps x 10

T I M

E

C

O N

D S

CHWP-1

Rated HP 125.0 hp

Rated kW 93.3 kW

LRA/FLA 6.5000

CHWP-1 BREAKER

Manufacturer SQUARE D

Frame/Model JJ

Sensor/Trip 250.0 A

Plug 250.0 A

Settings Phase

Ir (70-250A); tr (0.5-16s) 250 (250A); 16

Ii (1.5 - 12 x In) 10 (2500A)

TCC No. S1A814__00

NHDP FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HMDLB

Sensor/Trip 800.0 A

Plug 800.0 A

Settings Phase

LTPU (1.0 x P) Fixed (800A)

LTD (Fixed) Fixed

STPU (2-8 x P) 8 (6400A)

STD (Inst-300 ms) Inst (I^s T On)

INST (6800A) Fixed (6800A)

TCC No. SC-6913-98

CHWP-

Rated HP 125.0 hp

Rated kW 93.3 kW

LRA/FLA 6.5000

Manufacturer SQUARE D

Frame/Model JJ

Sensor/Trip 250.0 A

Plug 250.0 A

Settings Phase

Ir (70-250A); tr (0.5-16s) 250 (250A); 16

Ii (1.5 - 12 x In) 10 (2500A)

TCC No. S1A814__00

NHDP FDR BKR

Manufacturer CUTLER-HAMMER

Frame/Model HMDLB

Sensor/Trip 800.0 A

Plug 800.0 A

Settings Phase

LTPU (1.0 x P) Fixed (800A)

LTD (Fixed) Fixed

STPU (2-8 x P) 8 (6400A)

STD (Inst-300 ms) Inst (I^s T On)

INST (6800A) Fixed (6800A)

TCC No. SC-6913-98

NEW

NEW

NEW

TYPICAL FOR CHWP-2

TYPICAL FOR CH-2

EP-0.1

ABBREVIATIONS, LEGENDS

AND GENERAL NOTES

FAYETTEVILLE VA MEDICAL CTR

JD EQ

FAYETTEVILLE VA MEDICAL CTR

2300 RAMSEY STREET

FAYETTEVILLE, NC 28301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

EP-0.2

PARTIAL ONE-LINE DIAGRAM

JD EQ

FAYETTEVILLE VA MEDICAL CTRFAYETTEVILLE VA MEDICAL CTR

2300 RAMSEY STREET

FAYETTEVILLE, NC 28301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

EP-1.1

CHILLER PLANT & BUILDING 1

DEMOLITION PLANS

FAYETTEVILLE VA MEDICAL CTR

35 & 1

JD EQ

FAYETTEVILLE VA MEDICAL CTR

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VISN 6 ESPC VA701-16-F-0067

Project Director

05/22/2017Revisions: Date:

EP-2.1

CHILLER PLANT

CONSTRUCTION PLAN

FAYETTEVILLE VA MEDICAL CTR

JD EQ

FAYETTEVILLE VA MEDICAL CTR