This document outlines a federal contract opportunity to provide construction services for correcting HVAC deficiencies at Building 110A of the Hampton VA Medical Center in Hampton, Virginia. The solicitation number is 36C24622R0007_1 and is seeking offers for the Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110. The scope of work includes architectural, mechanical, electrical, and plumbing services to address HVAC issues in the Sterile Processing Service area of the building, as specified in the attached plans and specifications. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction Safety Handbook.pdf | ||
| 36C24622R0007_1.docx | DOCX document | |
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
VA HAMPTON
CAMPUS
PROJECT
LOCATION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:2
:2
A
M
G-001
COVER
1 4GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
CORRECT HVAC DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667
VA PROJECT #: 590-19-110 APOGEE PROJECT #: 19-025
WVS
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-002 CAMPUS MAP 2 4
G-003 GROUND FLOOR OVERALL PLAN 3 4
G-004 ICRA 4 4
ARCHITECTURAL
A-100 ARCHITECTURAL SYMBOLS, ABBREVIATIONS, NOTES AND DETAILS 1 2
A-101 PARTIAL PLANS - GROUND FLOOR DEMOLITION AND NEW WORK 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 7
M-101 GROUND FLOOR AND ROOF MECHANICAL PLANS 2 7
M-401 ENLARGED MECHANICAL PLANS 3 7
M-501 MECHANICAL DETAILS 4 7
M-502 MECHANICAL DETAILS 5 7
M-503 MECHANICAL CONTROLS 6 7
M-601 MECHANICAL SCHEDULES 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
EP101 GROUND FLOOR LIGHTING AND POWER PLAN 2 6
EP102 ROOF POWER PLAN 3 6
E-401 ELECTRICAL ENLARGEMENTS 4 6
E-501 ELECTRICAL DETAILS 5 6
E-601 ELECTRICAL SINGLE LINE DIAGRAM AND SCHEDULES 6 6
APPROVALS_______________________________________________________________
COR-ILSM & ICRA COMPLETED DATE:
REVIEWED: AFGE DATE:
REVIEWED: NAGE DATE:
APPROVED: INFECTION CONTROL DATE:
APPROVED: CONSTRUCTION SAFETY MANAGER DATE:
APPROVED: SAFETY MANAGER DATE:
APPROVED: CHIEF, POLICE SERVICE DATE:
APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:
APPROVED: SUPERVISORY PROJECT ENGINEER DATE:
APPROVED: ENGINEERING DIVISION MANAGER DATE:
APPROVED: CHIEF, ENVIORNMENTAL MANAGEMENT SERVICE DATE:
CONTRACTORS SHALL USE THE ONLINE DOCUMENT
EXCHANGE SYSTEM " SUBMITTAL EXCHANGE " FOR ALL
SUBMITTALS REQUIRED BY SPECIFICATIONS FOR THIS
PROJECT. CONTRACTOR IS RESPONSIBLE TO INCUR ALL
COSTS REQUIRED TO ALLOW FULL ACCESS AND USER
CAPABILITY FOR ALL CONTRACTORS.
WEBSITE FOR PROGRAM IS:
HTTP://WWW.SUBMITTALEXCHANGE.COM/PUBLIC/
WEBSITE REPRESENTATIVE IS :
FRANK PULEO: FRANK.PULEO@ORACLE.COM
PHONE: 610-729-3460 - 484-919-1012
APPROVALS_______________________________________________________________
APPROVED: CHIEF, ENGINEERING DATE:
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DEPUTY CHIEF OF STAFF DATE:
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:
DocuSign Envelope ID: 5E8C1CBA-9998-499A-B9FF-90195024005A
2/22/2021
27 28 31
114 115
110A
43 71
110B
137C
137A 137B
148-T
148-A
148-S
148-B
148-C
148-D
138 138A
STAGING AREA AND (1)TEMPORARY
RESTROOM FOR PROJECT TO BE LOCATED
HERE. COORDINATE EXACT LOCATION WITH
COR
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
T H
O M
P S
O N
S T
R E
E T
AVERILL AVENUE
AVERILL AVENUE
AVERILL AVENUE
A M
E S
S T
R E
E T
W O
O D
F
IN
S T R
E E
T
HARRIS AVENUE HARRIS AVENUE
H A
R R
IS
AVENUE
K N
O X S
T R
E E
T
BLACK AVENUE
M C
C L E
L L A
N A
V E
N U
E
S E
W E
LL A
V
E N
U E
HARRIS AVENUE
M A R
TIN
L K
IN
G
JR
B O U
LV
E A R D
M A
R T
IN
L
K
IN
G J
R B
O U
L E
V A
R D
FRANKLIN BOULEVARD
FRANKLIN
BOULEVARD
LEGEND:
BUILDING LINE
BUILDING NUMBER110
AREA OF WORK
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
A
M
G-002
CAMPUS MAP
2 4WVS GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
Scale: 1" = 100'-0"
CAMPUS MAP 0 10050 200
NORTH
TRUE
TO
BLDG 110
BTO
BLDG 110
D
TO BLDG 110 A
TO BLDG 110 B
TO BLDG 110 B TO BLDG 110 A
TO BLDG 110
TO BLDG 110 A
TO BLDG 110 C
TO BLDG 110 B
BG22B
BG22A
BG25 BG23 BG21
BG19
BG15B1
BG15B
BG15A
BG15
BG13
SGB2
CGB-2
EBG-10
BG13A
BG11
BG09A
BG09
BG05
CGB-1
CGB-4
BG03
BG01
BG02
BG06
BG06A
BG08
BG10
BG12
BG12A
BG14A
BG14
BG16A
BG16B
BG16C
BG16D
BG16I
BG16M
BG16P
BG16R
BG16T
SGB5
BG16U
BG16Q
BG16S
BG16N1 BG16N
BG16KBG16J
BG16H
CGB-3
BG16EBG16Q
BG16F.1
BG16F
BG16
BG22EBG22D
BG22
BG22C
SGD4
DG01B
DG01C
DG02
DG04
DG06
DG10
DG12
DG14
DG16
DG01
DG01A
DG01D
DG05A
DG05B
DG05CDG05C.1
DG05D.1 DG05D
DG13
DG05F DG05E
DG05G
DG05H
DG28
DG05H.1
DG05J.1 DG05J
DG05K
DG27
DG29
SGD3
DG21A
DG20
DG21
DG22
DG24
DG26
DG23SGC1
DG20A
CGC-1 CGD-3
CGD-5
EDG-6
DG05M
CGD-2 DG05
DG05N
DG05PCGD-1
CG01A
CG01
SGC-SUB
EBG-9 EBG-8
CG03
CGC-2
CG02A
BG15C
DG18
CG56B
CG56A
SCG7
CG56
CG56D
CG56C
CG49
CG47A
CG47
CG47B
CG44
CG46
CG113
CCG-3
ECG7
SCG6
CG42
CG48
CCG-4
CG58A
CG48A
CG48A.1
CG58E
CG48B.1
CG52
CG50
CG48B
CCG-5
CG58
CG54B
CG54
CG54A
CG57
CG58B CG58C
GD-127L
GD-127R
GD-129A
GD-127I
GD-127H
GD-127G
GD-127F
GD-127E
GD-127D
GD-126A.4
GD-126A.3
GD-126A.2
GD-126A.1
GD-122
GD-108A
GD-101D
GD-101C
GD-100
GD-123
GD-127N.1
GD-127N
GD-127M
GD-127K
GD-120
GD-122B
GD-103
GD-101B
GD-102
GD-127P
GD-127Q
GD-118
GD-108
GD-108B
GD-101A
GD-127J
GD-127
GD-127C.1
GD-127C
GD-127B
GD-127A
GD-130
GD-130A
GD-126B
GD-126
GD-125
GD-124
GD-121
GD-119
GD-117
GD-116
GD-115
GD-107
GD-106GD-105GD-104
GD-109
GD-110
CG-41
CG-41A
GD-128
GD-128E
GD-128F
GD-128G
CGD-2
CGD-42
CGA-14
CGA-3
CGA-7
GA-101
GA-102
GA-103
GA-100 GA-104 GA-106 GA-108 GA-110 GA-111 GA-112 GA-113
SGA2
GA-115
GA-117
GA-124
GA-125
GA-129
GA-130
GA-138
GA-139
GA-140
GA-137
GA-136
GA-141GA-142
GA-135
GA-134
GA-142A
GA-142B
CGA-9
CGA-8
GA-133
GA-121
GA-132
GA-122
GA-123
GA-131 GA-128
GA-127
GA-126
GA-118
GA-116
GA-114
GA-109
GA-119
GA-107
CGA-5
GA-105
GA-120
CGD-57
CGA-15
GA-152
GA-151
GA-153A
GA-153
GA-154
GA-155
GA-156
GA-157
GA-147
GA-148
GA-149
GA-150
CGA-11
GA-146
GA-145
GA-144
GA-143
CGB-17 CGB-16
CGB-18
GB-100
GB-101
GB-103 GB-105 GB-107
CGB-19
GB-109
GB-111
CGB-22
CGB-21
GB-113
GB-115
GB-110
GB-112
GB-114
GB-117
GB-106GB-104GB-102GB-126
GB-125
GB-124
CGB-23
GB-123
CGB-24
GC-114
GC-113
GC-100A
GC-100B
GC-100CGC-100DGC-112
CGD-38
GD-112GD-113A
GD-113
GD-114A
GD-114
GC-110 GC-109
CGC-35
GC-106
GC-105
GC-104
CGC-33
SGC4
CGC-30 GC-103A
GC-103 GC-102
GC-102A
CGC-28
GC-101C
GC-101B
GC-101A
GC-101
GC-100I
GC-100H
GC-100L
GC-108
GC-100G
GB-130
GB-121D
GB-121E
GC-121C
GB-121A
CGB-26
GB-121
SGB3
GB-121B
GB-118
CGB-25
GB-116
GB-119
GB-120
GB-123B
GB-123A
GB-122F
GB-122E GB-122
GB-122D
GB-122B
GB-122A
GB-122C
GB-121H
GB-121J GB-121K
GC-107
GB-108
GB-121I
GC-100
GC-102B
GC-103B
SGD1
EGC
EGD
GB-130F
GB-130HGB-130IGB-130J
CB-58
GB-130G
GB-130EGB-130D
GB-130C
GB-130B
GB-130A
GB-130
TRIAGE AREANEURO
EXAM RM EXAM RM EXAM RM EXAM RM
SPECIALITY
SOILED UTILITY
WOMEN'S
CLEAN
MED RM
CHECK OUT
DERM
NEURO/
PULM
DERMDERM
NEPH
NEPHTOILET
OFFICEOFFICE
STORAGE
CORRIDOR
NEPH
STAFF
SOCIAL MH AND BS
MALE
TOILET ELEV #10
SHOWER
LOCKER RM
STORAGE
MORGUE VACANT
CORRIDOR
VACANT
STAIRS #2
WHEELCHAIR
STORAGE
CREDIT
CREDIT
ESCORT OFFICE
CORRIDOR
CORRIDOR LACTATION RM
VESTIBULE
STAFF OFFICE
DATA
ELECT/DATA CLOSET
WHEELCHAIR
STORAGE
STORAGE
HAC
HAC
STAIRS #5
MECHANICAL
RM
STAIRS #1 DIALYSIS DATA
STAIRS #3
MECHANICAL RM
PUBLIC
CORRIDOR
CORRIDOR
PRIVATE
TOILET PRIVATE RM
PRIVATE
TOILET
PRIVATE RM
ELEV #6 MEDS RM
NURSE
CORRIDOR
DIALYSIS
NURSE
SOILED STAFF
CLEAN
PRIVATE
TOILET PRIVATE RM
PRIVATE RM
PRIVATE
TOILET
LINEN
NOURISHMENT
ELECTRICAL
VESTIBULE
RECEPTION/
STAIRS #4
CONFERENCE RM
PUBLIC
CHIEF NURSE
OFFICE
EXAM RM
EQUIPMENT
STORAGE
HAC
MALE
FEMALE
ELECT CLOSET
STAFF LOUNGE
STAFF TOILET
WATER
PREP
BIO MED EQUIP
TESTING
STORAGE RM
CORRIDOR
CORRIDOR
TELECO.
RM
EMS STORAGE
EMS STORAGE
STAIR
SUB-BASEMENT
ELEV #9 ELEV #8
MECH RM
CORRIDOR
LINEN
SHOOTOFFICE
MH AND BS
OFFICE
MORGUE STORAGE
WORKER
AUTOPSY AREA
UNION ATM
UNION ATM
STORAGE CLOSET
TOILET
PATIENT TRAINING RM
STATION 1
STATION 2
BAYS
NURSE STATION 3
SUPPLY RM
TOILETUTILITY RM
CLOSET
STORAGE
WAITING
TOILET
LOCKERS
LOCKERS
CONCENTRATE
PATIENT CLOTHING RM
EMS LOUNGECLOSETCLINIC WAITING
TOILET
UTILITY
SLEEP/PLUM
DERM
LOUNGE
DIALYSIS STORAGE
CLOSET
DATA
EQUIP
CORRIDOR
CORRIDOR
CORRIDOR
WOMENS SHOWER
ANTEROOM
HAC RM
MENS SHOWER
STERILIZER RM
RM
CONTAMINATION AREA
CLOSET RM
ELECTRICAL
BREAKOUT
STAIRS #7
CLEAN STORAGE
OFFICE
OFFICE
BREAK RM
RM
CORRIDOR
OFFICE
OFFICE
ASST CHIEF
ELECTRICAL RM
MECH RM
STAIRS #6
ELEV #7
CLEAN ANTEROOM
STERILIZER WORKRM
STERILE STORAGE
WOMENS TOILET
ANTEROOM
MENS TOILET
RECEIVING
ANTEROOM HAC
TELECOM
FEMALE
TOILET
ELECT
CORRIDOR
OB/TRT 6
OB/TRT 5
OB/TRT 4
OB/TRT 3
OB/TRT 2
OB/TRT 1
FT 4
FT 3
FT 2
FT 1
CORRIDOR
INTERVIEW
CORRIDOR
CORRIDOR
VESTIBULE
WAITING
OBSERV
RESTROOM
OSERV
OSERV
PROCEDURE
OXYGEN
STOR
CORRIDOR
MALE
RESTROOM
VESTIBULE
FEMALE
RESTROOM
LIFE
SUPPORT
OBSERVATION
FUTURE
RADIOLOGY
AOD
RECEPTION/
CONTROL
CORRIDOR
SOILED
UTIL
NURSE
STATION
RESTROOM
MULTI-
PURPOSE
MED
ROOM
HAC
STAFF
BREAK RM
TELECOMM.
PATIENT
TOILET
FAST TRACK
BEDS
FAST NURSE
STATION
STAFF
RESTROOM
CLEAN UTIL
STOR
STOR
TRIAGE 2
TRIAGE 1
STOR
OFFICENURSE SUPWAITING
CORRIDOR
VENDING
SHOP CORRIDOR
CORRIDOR
RECEPTION CONT
LAB CHECK IN
CORRIDOR
RECEPTION/CONT
NURSE
CORRIDOR
WAITINGPM AND RS RECEPTION
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
CORRIDOR
CORRIDOR
VOLUNTEER
WAITING
CORRIDOR
CLINICAL
NURSE
PHYSICIAN
OFFICE
PSYCH
NURSE
NURSE TRIAGE/
TREATMENT
PHYSICIAN
OFFICE/EXAM
NURSE TRIAGE/
TREATMENT
PHYSICIAN
OFFICE/EXAM
NURSE TRIAGE/
TREATMENT
PHYSICIAN
OFFICE/EXAM
NURSE TRIAGE/
EXAM
PHYSICIAN
OFFICE/EXAM
NURSE TRIAGE/
EXAM
PHYSICIAN
OFFICE/EXAM
NURSE
WORKSTATION
NURSE TRIAGE/
EXAM
PHYSICIAN
OFFICE
NURSE TRIAGE/
EXAM
NURSE
WORKSTATIONCONFERENCE RM
NURSE TRIAGE/
EXAM
STAFF LOUNGE
ELEC RM
NURSE TRIAGE
PHYSICIAN
OFFICE
TEL COMM
TOILET
HAC
NURSE TRIAGE
PHYSICIAN
OFFICE
NURSE
WORK RM
SOILED
UTILITY
CLEAN
UTILITY
MEDICATION
RM TELERETINA EXAM
RM
NURSE TRIAGE/
EXAM
TOILET
SHARED
PHYSICIAN
OFFICE
PHYSICIAN
OFFICE/EXAM PHYSICIAN
OFFICE
NURSE TRIAGE/
EXAM
NURSE
WORKSTATION
RM RM
EXAM/TREATMENT
NURSE TRIAGE/
EXAM
PHYSICIAN
OFFICE/EXAM
NURSE TRIAGE/
EXAM
NURSE
WORKSTATION
NURSE
WORKSTATION
PHARMACY
OFFICE
PHYSICIAN
OFFICE/EXAM
PHYSICIAN
OFFICE/EXAM
CHR PAIN
RENEWAL
NURSE TRIAGE/
EXAM
SPECIMEN
LAB STORAGE
TOILET
MENS TOILET
DIETICIAN
DIETICIAN
CLERK
AUDIOLOGY
OFFICE
EXAM
STAFF PHYS
EXAM
AO OFFICE
EDUC ADMIN
CHEF OFFICE
AUDIOLOGY BOOTH
STAFF LOUNGE
OFFICE
AUDIOLOGY
WOMEN
TOILET
MEN
TOILET
WORK EV TEAM
TRAINING
STORAGE
AUDIOLOGY BOOTHS
CARDIOPULELEC RM
TEL/COMM
TOILET
PHYSICAL THERAPY
PATIENT WAITING
EQUIPMENT STORAGE
TREATMENT
HUBBARD
DRESSING
DRESSING
W CH TOILET HAC
OCCUPATIONAL THERAPY
DAILY LIVING
KITCHEN
ADMIN
TRNG TOILET
STORAGE
SPLINTING RM
KINESIO THERAPY
EQUIPMENT STORAGE
ADMIN
SPEECH
THERAPY
EMG CLINIC
STAFF PHYS
ED FAST TRACK
PHARMACY
DRUG RECG
RX PICK UP
CONSULTANTCONSULTANT
CONTROLLED DRUG
STORAGE
TEMP AD MIXTURE/
CONFERENCE RM
HAC
WAITING
SECRETARY
CHIEF
ASST CHIEF
ONCOLOGY
MENS
LOCKER RM
STAFF MENS
TOILET
STAFF MENS
SHOWERWOMENS
LOCKER
STAFF WOMENS
TOILET
STAFF WOMENS
SHOWER
REPRODUCTION
OPER SUPER
MAIL DIST
ELEC RM
TELE/COMM
SOILED LINEN
ADP
EQUIPMENT
STORAGE
SCHED/TRAVEL
RX CASHIER
RECEPTION AREA
VISITORS
MEN'S
TOILET
VISITORS
WOMEN'S
TOILET
ELEVATOR
MACHINE RM
STAFF
WOMEN'S
TOILET
LOCKER RMSTAFF MEN'S
TOILET
LOCKER RM
POLICE OPERATIONS
DETECTIVE OFFICE
HOLDING RM
LOCKER RMSTAIRS #1
NURSE
PRACTITIONER
OFFICE
NURSE TRIAGE/
EXAM
STAIRS #2
STAIRS #4 STAIRS #3
ELEVATORS
DOUBLE
ELEVATORS
TRIAGE
STAFF
LAB
WOMENS
RECEPTION/
COFFEE
UNISEX
TRAINING
EQUIPMENT
DRIVERS
STAFF
STAFF
MRI RM MECH RMCONTROL RM
READING RM
OFFICE
CLOSET
RM 1 RM
WAITING RM
SOILED
UTILITY
CORRIDOR
TOILET
CHANGING CONSULTATION
UNISEXCHECK-IN/
ELECTRICAL
STORAGE
RAMP
LADDER
OPENING ABOVE
DN. TO
SUBBASEMENT
DN
UP
DN
DN
UP
UP
DN
LADDER TO
MEZZANINE
T R A S H
C O N T A
IN
E R
U N D E R
C O U N T E R
12 12
P/ P
24 24 20
24 24 20
32 4212 123842
32 42
32 42
42 38
42 42 42
M E
D
IC
IN
E
P A
S S
-T H
R O
U G
H M
E D
IC
IN
E
P A
S S
-T H
R O
U G
H
M E
D
IC
IN
E
F R
ID
G
E
ONCOLOGY CABINET
S
SS S
S
S S
S S
S
SS
S
SSS
S S
S S
S
S S
S S
A-101
1 _____ A-101
ABE
E
G
C
C
D
DF
CONSTRUCTION ROUTE -
CONSTRUCTION MATERIALS ROUTE
LEGEND
AREA OF WORK
PATH OF EGRESS
CODE DATA
APPLICABLE CODE:
NFPA 101 (2018)
IBC (2018)
OCCUPANCY CLASSIFICATION
(VA FIRE PROTECTION DESIGN MANUAL SECTION 4.1):
HEALTHCARE
NFPA A.6.1.5.1 HEALTHCARE
MEANS OF EGRESS:
STAIR ENCLOSURE : 2-HR (NFPA 101, A.7.1.3.2.1)
MIN. EXIT WIDTH: 32" CLEAR (IBC 2018, 1010.1.1)
HORIZ. EXITS: 2-HR ASSEMBLY (NFPA 101, 7.2.4.3.2)
GUARDS: 42" HT/4" CLR. SPACING (NFPA 101, 7.1.8)
HANDRAILS: 34-38" HT. (IBC 2018, 1014.1)
RAMPS: 1:20 SLOPE MAX. (PG-18-13)
OCCUPANT LOAD: (NFPA 101.7.3)
NO CHANGE IN EXISTING OCCUPANT LOAD
CAPACITY FACTORS: (NFPA 101.7.3.3)
STAIRS: 0.3
OTHER: 0.2
GENERAL NOTE:
PROVIDE 2-HR RATED FIRESTOPPING AT FLOOR
PENETRATIONS.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:3
:1
A
M
G-003
GROUND FLOOR OVERALL PLAN
3 4WVS GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
Scale: 3/64" = 1'-0"
GROUND FLOOR PLAN 0 84 16
NORTH
PLAN
N
KEY PLAN
SCALE: NO SCALE
GROUND FLOOR
A. CONTRACTOR SHALL PROTECT FLOORS AND
WALLS DURING CONSTRUCTION. PREWORK
CONDITIONS SHALL BE DOCUMENTED IN THE
PRESENCE OF THE COR WITH VIDEO/PICTURES
OF THE ENTIRE PATHWAY. CONTRACTOR
SHALL RETURN THE PATHWAY TO THE
PREWORK CONDITIONS BASED ON THE
PREWORK VIDEOS/PICTURES AT THE
CONCLUSION OF THE PROJECT.
80 16 32
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT IS NOT LIMITED TO:
- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO ONE TILE PER 50 SQUARE FEET
- PAINTING (BUT NOT SANDING)
- WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER
THAN FOR VISUAL INSPECTION
TYPE B
TYPE C
TYPE D
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
- INSTALATION OF TELEPHONE AND COMPUTER CABLING
- ACCESS TO CHASE SPACES
- CUTTING OF WALLS OR CEILING WHERE DUST MITIGATION CAN BE CONTROLLED
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES, BUT IS NOT LIMITED TO:
- SANDING OF WALLS FOR PAINTING OR WALL COVERING
- REMOVAL OF FLOOR COVERINGS, CEILING TILES, AND CASEWORK
- NEW WALL CONSTRUCTION
- MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
- MAJOR CABLING ACTIVITIES
- ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM
- NEW CONSTRUCTION
PATIENT RISK GROUP TABLE
GROUP 1
LOW RISK
GROUP 2
MEDIUM RISK
GROUP 3
HIGH RISK
• OFFICE AREAS
• HALLWAYS
• CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI
• RESPITORY THERAPY
• THERAPY AREAS
• MENTAL HEALTH UNITS
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORIES (SPECIMEN)
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
GROUP 4
HIGHEST RISK
• ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION
ROOMS
• ONCOLOGY
• OPERATION ROOMS INCLUDING C-
SECTION ROOMS
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
TYPE A TYPE B TYPE C TYPE D
I
I
I
II
II
II
II
III/IV
II
III
III/IV
III/IV
III/IV
IV
IV
IV
PATIENT RISK GROUP
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV PROCEDURES ARE NECESSARY.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION
CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION
DURING CONSTRUCTION PROJECT
CL-I
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUCT FROM CONSTRUCTION OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED
FOR VISUAL INSPECTION.
UPON COMPLETION OF PROJECT
CLASS II
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM
DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA. REPLACE
USED MATS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
CLASS III
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD,
PLASTIC TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA-EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT
AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY
CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
CLASS IV
1. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNIT.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS
ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE
LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT
ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK
AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING
OF DEBRIS ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHLY
COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE OR ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK
WAS BEING PERFORMED.
GENERAL NOTES
1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK INCLUDING WALKING THE SITE, MEASURING EXISTING DIMMENSIONS, AND OBSERVING EXISTING CONDITIONS BEFOR BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION. CONTRACTOR TO FIELD VERIFY ALL DIMMENSIONS OF EXISTING SITE CONDTION PRIOR TO START OF WORK AND
ORDERING OF MATERIALS
2. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE SPECIFICATIONS
3. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, RE-PATCH, SAND SMOOTH AND
REFINISH TO MATCH EXISTING).
4. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.
5. CONTRACTOR SHALL INSTALL TEMPORARY MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA GUIDELINES WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS)
WITH THE VA COR PRIOR TO INSTALLATION.
INFECTION CONTROL RISK ASSESSMENT NOTES:
OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIT FILTRATION UNITS.
SEAL HOLES, PIPES, CONDUICTS, AND PUNCTURES APPROPRIATELY.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND THOROUGHLY CLEANED.
REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISENFECTANT. REMOVE ISOLATION OF HVAS SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSERS WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA REQUIREMENTS.
KEEP CONSTRUCTION SITE CLEAN AND NEAT AT ALL TIMES.
CONTRACTOR SHALL CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND FINAL CLEANING BY VA EMS STAFF
VA EMS STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING ANF SANITATION.
ABBREVIATIONS
(E) (N) N.I.C.
E.T.S.
N.T.S
SIM
BLDG.A.
PH.
INC.
S.
DL
GPM
O.C.
COR
PAMNS
IT
EXISTING
NEW
NOT IN CONTRACT
EXPOSED TO STRUCTURE
NOT TO SCALE
SIMILAR
BUILDING
PHONE
INCORPORATED
SOUTH
DEAD LEG
GALLONS PER MINUTE
ON CENTER
CONTRACTING OFFICER REPRESENTATIVE
PUBLIC ACCESS MASS NOTIFICATION SYSTEM
INFORMATION TECHNOLOGY
FO
SM
MM
DR.
ST.
CMU
EQ.
STL
NR.
A.F.F.
EJ
CJ
Q.R.S.
F
FIBER OPTIC
SINGLE MODE
MULTIMODE
DRIVE
STREET
CONCRETE MASONRY UNIT
EQUAL
STAINLESS
NOT RATED
ABOVE FINISHED FLOOR
EXPANSION JOINT
CONTROL JOINT
QUICK RELEASE SPRINKLER
FAHRENHEIT
PAPER
CADDY
ICRA, ILSM, FIRE WATCH
AND MISC. FORMS
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR THE HAMPTON CORRECT HVAC SPS
PROJECT
• CONSTRUCTION AREA
• PLEASE EXIT AS MARKED
MOUNT THIS SIGN NEXT TO PAPER CADDY
17"
SWIVEL
CASTERS
WITH TWO
LOCKING
BRAKES
MOBILE CART
HEPA NEGATIVE AIR UNIT
EXISTING WALL
EXISTING CEILING
A D
J U
S T
A B
L E
H E
IG
H
T
NOTE: ALL ABOVE CEILING WORK IN HALLWAYS TO USE MOBILE CARTS
NOTE: THIS DOOR AND FRAME SCHEDULE IS FOR RATED TEMPORARY ICRA ENCLOSURES ONLY
NO. QTY. WIDTH HEIGHT THICK. TYPE MAT'L TYPE MAT'L DEPTH RATING HRDWR. REMARKS
MISCELLANEOUS
SET 190 MIN5 3/4"HMTYPE IHMA1 3/4"7'-0"3'-6"(1)D000
DOOR INFORMATION FRAME INFORMATION
HINGES
DUST PROOF STRIKE
LATCH SET
DOOR CLOSER
KICK PLATES
GASKETING
TA2714
VA SPEC F01
DC6210XA11
K1050F
S888 X HEAD & JAMBS
32D
26D
32D
MK
RO
CO
RO
PE
HARDWARE SET 1:
MANUFACTURERS:
CORBIN RUSSWIN CO
MCKINNEY MK
PEMKO PE
ROCKWOOD RO
NOTES:
HARDWARE MANUFACTURER'S LISTED AS BASIS
OF DESIGN. ALTERNATE MANUFACTURERS
ACCEPTABLE, SUBJECT TO REVIEW BY
ARCHITECT AND C.O.R. FOR EQUAL QUALITY
COMPLIANCE.
LATCH SET TO SUPPORT THAT ARE USED AT THIS
FACILITY, COORDINATE WITH COR.
TYPE A TYPE I
DOOR AND FRAME SCHEDULE
2"SEE SCHED.2"
F.F.
MAINTAIN MINUMUM 6'-0"
WIDTH AT EXISTING
CORRIDOR
NEW 2 HOUR PARTITIONS
SEE UL U404 THIS SHEET
CONSTRUCT RATED LID BELOW EXISTING
CEILING. EXISTING CEILING HEIGHT IS
APPROX 8'-0". BOTTOM OF PARTITION LID
TO BE 4" ABOVE THE TOP OF DOOR FRAME.
USE SAME PARTITION TYPE
SEAL WHERE NEW TEMP.
PARTITIONS CONTACT
EXISTING WALLS. REMOVE
GUARDS AND RE-INSTALL
NEW TEMPORARY DOOR-
SEE SCHEDULE THIS
SHEET
D000
EXISTING WALL
12' - 0"
V
IF
/4
PROVIDE STICKY MAT
(CHANGE END OF SHIFT OR
MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
LOCATION OF DEMOLITION
AND NEW WORK
CORRIDOR
CCG-34
STORAGE
ROOM
CG114
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
A
M
G-004
ICRA
4 4WVS GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
Scale: 3" = 1'-0"
ILSM SIGNAGE
Scale: No Scale
MOBILE CART DETAIL
Scale: 1/2" = 1'-0"
PARTIAL PLAN - ICRA MEASURES
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE REFERENCE PHOTO
VANTAGE POINT
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT HEIGHTMATL
1'-0"
-1
DEDUCTIVE ALTERNATE
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH
ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT
GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT
CONSTRUCTION UNLESS INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE
PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE
DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND
DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF
SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT
INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE
CONTRACTING OFFICER.
6X6- W1.4X W1.4 WWF
TYPICAL EQUIPMENT
ANCHORAGE - SEE
EQUIPMENT CUT
SHEETS
PROVIDE #3 DOWEL
BARS 24" O.C. EACH WAY.
EPOXY DOWELS INTO
EXISTING SLAB
NOTE: L & W DIMENSIONS SHALL BE 6" GREATER THAN THE EQUIPMENT MOUNTING
LOCATIONS. SEE MECHANICAL DRAWINGS FOR EQUIPMENT INFORMATION.
EXISTING CONCRETE
SLAB
" 5
NEW CONCRETE
EQUIPMENT PAD 3000
PSI, PAINT EXPOSED
PAD WITH YELLOW
EPOXY PAINT
EXISTING EXHAUST
FAN TO BE REMOVED.
SEE MECHANICAL
DRAWINGS.
REMOVE (2) EQUIPMENT
SUPPORTS AND
ASSOCIATED ROOFING.
PATCH TPO ROOFING
MEMBRANE WITH NEW
TPO MEMBRANE AS PER
MANUFACTURER'S
RECOMMENDATIONS.
AFTER DEMOLITION THIS
ROOF AREA TO BE FLUSH
WITH EXISTIING
4 EXISTING EXHAUST FAN
TO BE REMOVED.
DEMOLISH (2) EXISTING
ROOF CURBS AND
PATCH. SEE PHOTO THIS
SHEET.
NEW EXHAUST FANS. INSTALL
(2) NEW EQUIPMENT CURBS
FOR EACH FAN, SEE DETAIL 2
THIS SHEET. FOLLOW ALL
MANUFACTURER'S
RECOMMENDATIONS.
EXISTING FAN SET TO
REMAIN
EXISTING AHU
NOTE: GC TO VERIFY ALL
ROOF WORK CONDUCTED
DOES NOT AFFECT OR IS
IN COMPLIANCE WITH
ROOF WARRANTY.
## PHOTO VANTAGE POINT
REFER TO DETAIL 4 THIS SHEET
GASKET
SHEET METAL COVER
FASTEN 8" O.C.
EQUIPMENT SUPPORT
SECURED TO DECK
PLATES & FASTENERS
SPACING AS PER
MANUFACTURER'S
RECOMMENDATIONS
EXISTING ROOF
DECK / SUBSTRATE
EQUIPMENT SUPPORT
BRACKET
SET BOLT IN SEALANT
REINFORCED TPO
MEMBRANE
EXISTING ROOF
INSULATION
M
IN
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:3
A
M
A-100
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS, NOTES AND DETAILS
1 2WVS GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGENDGENERAL NOTESDEMOLITION NOTES
Scale: 1" = 1'-0"
CONCRETE EQUIPMENT BASE
Scale: No Scale
REFERENCE PHOTO - EXISTING EXHAUST FAN
Scale: 1/8" = 1'-0"
EXISTING ROOF PARTIAL PLAN
DEDUCT ALTERNATE NOTES##
Scale: 6" = 1'-0"
ROOF EQUIPMENT CURB DETAIL
0 4 8 16
NORTH
PLAN
PHOTO KEY NOTES##
1. SEE SPECIFICATION SECTION 01 00 00, 1.3, B.
PHASING PLAN NOTES
1. REFER TO SPEC SECTION 01 00 00, 1.6, G. GENERAL
REQUIREMENTS FOR PHASING PLAN.
DN
DN
MECH
ROOM
CG113
CORRIDOR
CCG-34CORRIDOR
CCG-3
STORAGE
ROOM
CG114
5'-0" 1'-0"
D100
EXISTING SPS AHU TO REMAIN
MECH
ROOM
CG113
12 3
1 2
CORRIDOR
CCG-34
CORRIDOR
CCG-3
VIF
7'-0"
VIF
3'-6"
STORAGE
ROOM
CG114
NO. QTY. WIDTH HEIGHT THICK. TYPE MAT'L TYPE MAT'L DEPTH RATING HRDWR. REMARKS
MISCELLANEOUS
SET 190 MIN5 3/4"HMTYPE ISCWA1 3/4"7'-0"3'-6"(2)D100
DOOR INFORMATION FRAME INFORMATION
HINGES
FLUSH BOLTS
DUST PROOF STRIKE
STOREROOM LOCK
COORDINATOR
ASTRAGAL
DOOR CLOSER
KICK PLATES
GASKETING
TA2714
CL3100 SERIES
2600 SERIES
BY DOOR MANUF.
DC6210XA11
K1050F
S888 X HEAD & JAMBS
32D
32D
26D
32D
32D
MK
RO
RO
CO
RO
CO
RO
PE
HARDWARE SET 1: MANUFACTURERS:
CORBIN RUSSWIN CO
MCKINNEY MK
PEMKO PE
ROCKWOOD RO
NOTES:
HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN. ALTERNATE
MANUFACTURERS ACCEPTABLE, SUBJECT TO REVIEW BY ARCHITECT AND
C.O.R. FOR EQUAL QUALITY COMPLIANCE.
FLUSH DOORS TO MATCH EXISTING ADJACENT WOOD VENEER DOORS -
SEE SPECIFICATIONS
LOCKSET TO ACCOMMODATE MEDECO SFIC CORE, COORDINATE WITH
C.O.R.
TYPE A TYPE I
DOOR AND FRAME SCHEDULE
2" SEE SCHEDULE 2"
F.F.
## PHOTO VANTAGE POINT
REFER TO DETAILS 3 AND 4 THIS SHEET
TYPES
SEE PARTITION
DOOR AND FRAME -
SEE DOOR SCHEDULE
SEALANT BOTH SIDES
OF DOOR - CONTINUOUS
METAL STUD HEADER BY
METAL STUD PROVIDER
DOOR AND
FRAME - SEE
DOOR
SCHEDULE
SEALANT BOTH
SIDES OF DOOR -
CONTINUOUS
5/8" GYPSUM
BOARD
T Y
P E
S
S E
E P
A R
T
IT
IO
N
METAL STUDS
EXISTING BRICK
WALL
CORRIDOR
COURTYARD
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:3
:0
A
M
A-101
PARTIAL PLANS - GROUND FLOOR
DEMOLITION AND NEW WORK
2 2WVS GTS
CORRECT HVAC
DEFICIENCIES BLDG. 110 -
(SPS, 110/110A)
HAMPTON VA MEDICAL CENTER
100 EMANCIPATION DRIVE
HAMPTON, VA 23667 FEBRUARY 23, 2021
100% CONSTRUCTION DOCUMENTS
590-19-11019-025
110,110A
Scale: 1/4" = 1'-0"
GROUND FLOOR PLAN - NEW WORK 0 2 4 8
NORTH
PLAN
Scale: 1/4" = 1'-0"
GROUND FLOOR PLAN - DEMOLITION 0 2 4 8
NORTH
PLAN
HM= HOLLOW METAL
PF= PREFINISHED
PNT= PAINT
SCW= SOLID CORE WOOD
GROUND FLOOR
1. INSTALL NEW DOOR AND FRAME - SEE SCHEDULE
THIS SHEET
2. INSTALL NEW METAL STUD AND GYPSUM FROM TOP
OF NEW DOOR TO UNDERSIDE OF EXISTING LINTEL
3. NEW WALLS ABOVE DOOR TO ALIGN WITH EXISTING
4. NEW EQUIPMENT BASE SLAB - SEE MECHANICAL
DRAWINGS FOR LOCATION AND SIZE. SEE DETAIL
1/A-001.
5. EXISTING FIRE EXTINGUISHER, PROVIDE WALL
MOUNT BRACKET AT 4'-0" MAX TO HIGHEST
OPERABLE POINT - IF FIRE EXTINGUISHER OVER 40
LBS 3'-6" MAX HT.
1. REMOVE EXISTING DOOR AND FRAME
2. REMOVE EXISTING METAL STUD AND GYPSUM
BOARD TO 8'-6" A.F.F. ( TO UNDERSIDE OF EXISTING
LINTEL.)
3. EXISTING SWITCH TO BE RELOCATED - SEE
ELECTRICAL DRAWINGS.
4. EXISTING 8'-0"H WOOD STUD PARTITION WALLS
WITH 1/2" OSB SHEATHING TO ONE SIDE TO BE
DEMOLISHED.
A. SEE SHEET G-003 FOR ICRA PARTITIONS. ICRA
PARTITIONS MUST BE CONSTRUCTED AND
SEALED PRIOR TO DEMOLITION WORK AND
STAY IN PLACE UNTIL THE COMPLETION OF
WORK.
B. THE VA WILL MOVE ALL STORED ITEMS FROM
ROOM CG114, PRIOR TO CONSTRUCTION.
C. VA OPERATING HOURS FOR DAY AND NIGHT
WORK IS 7:00AM TO 9:00PM.
D. ALL TIE IN WORK NEEDS TO OCCUR DURING
WEEKENDS.
E. ALL WORK MUST HAVE ZERO IMPACT ON
HOSPITAL OPERATIONS.EXISTING EQUIPMENT
IS TO REMAIN OPERATIONAL DURING THE
ENTIRETY OF WORK BEING PERFORMED.
F. GC TO STAFF PROJECT ACCORDINGLY TO
ACCOMPLISH NECESSARY WORK IN A SINGLE
WEEKEND IN ORDER TO KEEP HOSPITAL
OPERATIONAL.
G. FOR ANY ADDITIONAL ACCESS PANELS THAT
NEED TO BE CUT IN FOR DUCT CLEANING –
CUT HOLE IN EXISTING DRYWALL CEILING
24X24 WITH NEAT EDGES. INSTALL NEW FLUSH
24”X24” FLUSH ACCESS DOOR WITH 1” FLANGE
AS PER MANUFACTURER’S STANDARD
DETAILS. COLD ROLLED STEEL, PRE-FINISHED-
WHITE, WITH NEOPRENE GASKETING. BASIS
OF DESIGN: BEST ACCESS DOORS, MODEL BA-
AHD, 24”X24”. ACCESS DOORS MUST BE
AIRTIGHT POST-INSTALLATION. SEE
MECHANICAL DRAWINGS FOR LOCATIONS AND
QUANTITIES.
PHOTO KEY NOTES##
Scale: No Scale
REFERENCE PHOTO 2
Scale: No Scale
REFERENCE PHOTO 1
Scale: 3" = 1'-0"
HEAD DETAIL @ METAL STUD
Scale: 3" = 1'-0"
JAMB DETAIL @ METAL STUD
DOOR REMARKS:
1. VERIFY WITH C.O.R. WHICH EXACT DOOR TO MATCH FOR VENEER
TYPE AND STYLE.
2. HOLLOW METAL FRAME TO BE PAINTED TO MATCH COLOR OF
EXISTING DOOR FRAME IN CLOSE PROXIMITY
N
KEY PLAN
SCALE: NO SCALE
DEDUCT ALTERNATE
NOTES
1. SEE SPECIFICATION SECTION 01 00 00.
F
SD
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRR GLYCOL RECOVERY RETURN
GRS GLYCOL RECOVERY SUPPLY
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH