100_ Drawings 528A7-23-181 Abate 3rd Floor C-Wing_V2.pdf

PDF 2 MB Posted

Attached to
Z1DA--528A7-23-181 Air Monitoring-Asbestos
Solicitation number
36C24224Q0219
Issued by

About this file

This solicitation requests proposals for asbestos air monitoring services to support an asbestos abatement project at the Syracuse VA Medical Center. The air monitoring contractor will be required to review the abatement plan, perform air sampling according to New York regulations before, during and after abatement work, and submit daily logs and a final report. The abatement involves removal of asbestos floor tile, countertops, thermal piping insulation and other materials from several rooms over approximately 30 days according to plan #528A7-23-181. The air monitor must be certified and use an accredited laboratory for analysis. Pricing shall be provided for review of the abatement plan, air monitoring technician for 30 days, air sampling, and documentation. The selected firm must complete all documentation within seven days of abatement completion.

View the file

Other files

File Type Posted
36C24224Q0219_2.docx DOCX document
852.219-77 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224Q0219.docx DOCX document
(P07) Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWINGS INDEX

SHEET NO. DRAWING TITLE

GENERAL

1. GI-001 COVER SHEET

2. GC-101 INFECTION CONTROL (ICRA) PLAN

HAZARDOUS MATERIALS

3. HA-101 ASBESTOS ABATEMENT FLOOR PLAN

4. HA-102 ASBESTOS ABATEMENT FLOOR PLAN

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-23-181

VA MEDICAL CENTER

BUILDING NO. 1

800 IRVING AVENUE

SYRACUSE, NEW YORK 13210

SYRACUSE VAMC

ASBESTOS ABATEMENT

3RD FLOOR C-WING

AREA OF

WORK

3RD FLOOR

C-WING

KEY PLAN

SCALE: NONE2

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

800 IRVING AVE. SYRACUSE, NY 13210

03/01/2023

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

B

A

C

D

E

F

528A7-23-181ASBESTOS ABATEMENT

3RD FLOOR C-WING

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

P

RO

JE

CT

S\

8A

7-

-1

A ba te 3r d F loo r C W ing \D es ign

C on tra ct\

Dr aw ing s\C

AD

\01

_G en er al\

8A

7-

-1

A G_

CO

VE

R

SH

T.

dw g

GI-001

KAWDW

COVER SHEET

N

N

SHAFT 1 SHAFT 2

SHAFT 3

SHAFT 4

SCI

SHAFT 5

CHILLER BLDG

BLDG 2

BLDG 19 - GARAGE

D-WING

A-WING B-WING

C-WING

LOCATION PLAN

SCALE: NONE1

BLDG 16

AREA OF

WORK

1ST FLOOR

A-WING

C301C

STORAGE

C303

CLOSET

C303A

PIPE SHAFT 9

C301C

STORAGE

C301A

CLOSET

C301

LAB/PATHOLOGY

INFECTION CONTROL (ICRA) GENERAL NOTES:

1. CONTRACTOR MUST FOLLOW ALL INFECTION CONTROL PROCEDURES AND

TEMPORARY CONSTRUCTION DEFINED IN PROJECT SPECIFICATIONS.

2. CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL OCCUPANTS AT ALL TIMES

THROUGHOUT CONSTRUCTION. THIS SHALL INCLUDE EGRESS FROM STAIR 9S2.

3. CONTRACTOR IS TO COORDINATE ALL WORK AND SCHEDULES WITH VAMC COR. SEE

SHEET AD-101, ARCHITECTURAL DEMOLITION, FOR ADDITIONAL INFORMATION.

4. NEGATIVE PRESSURE MUST BE MAINTAINED 24/7 IN EACH ACTIVE WORK AREA. SEE

SHEET AD-101, ARCHITECTURAL DEMOLITION, FOR ADDITIONAL INFORMATION.

5. NO CONTRACTOR STORAGE IS ACCEPTABLE IN CORRIDORS. ALL MATERIALS MUST BE

CONTAINED IN THE ACTIVE WORK AREA, OR ASSIGNED AREAS ACCEPTABLE TO THE

VAMC COR.

6. REFER TO SPECIFICATION SECTION 01 74 19 FOR CONSTRUCTION WASTE

MANAGEMENT.

7. PROJECT AREA IS TO BE SEALED WITH A 2 HOUR FIRE-RATED TEMPORARY PARTITION

SUCH THAT NEGATIVE AIR PRESSURE IS MAINTAINED BETWEEN CORRIDOR(S) AND

ROOM BY EXHAUSTING AIR OUT OF WORK AREA.

8. TEMPORARY 2 HOUR FIRE-RATED BARRIERS ARE TO BE SEALED USING UL LISTED

MATERIALS TO INHIBIT TRANSFER OF DUST AND SMOKE. THEY SHALL ALSO BE

CONSTRUCTED TO MINIMIZE NOISE FROM CONSTRUCTION ACTIVITIES. ONCE IN PLACE,

THESE BARRIERS ARE TO BE INSPECTED AND ACCEPTED BY VAMC COR PRIOR TO

STARTING ANY CONSTRUCTION WORK.

9. PROVIDE DUST WALK-OFF MATS AT EACH ENTRANCE / EXIT TO PROJECT WORK AREA.

WALK-OFF MATS SHALL BE CHANGED WHEN THEY BECOME VISIBLY SOILED OR WHEN

REQUESTED BY THE VAMC COR.

10. PROVIDE TEMPORARY CONSTRUCTION SIGNAGE AT INTERIOR AND EXTERIOR OF

PROJECT WORK AREA. COORDINATE WITH VAMC COR ON REQUIREMENTS AND

LOCATIONS.

11. ANY WORK TO BE PERFORMED OUTSIDE OF THE CONSTRUCTION BARRIER SHALL BE

COORDINATED WITH THE VAMC COR.

12. ALL CONTRACTOR EQUIPMENT / CARTS, ETC. MUST BE WIPED DOWN PRIOR TO ENTRY

OR EXIT. ONCE IN, CARTS SHOULD BE WIPED DOWN PRIOR TO RELOCATION TO NEW

WORK AREA. THIS SHALL INCLUDE ALL EQUIPMENT / CART WHEELS.

13. PATCH ALL FINISHES DAMAGED BY TEMPORARY PARTITION INSTALLATION AND

REMOVAL TO MATCH EXISTING FINISHES.

14. THE CONTRACTOR SHALL NOT TRANSFER ANY CART THROUGH THE HOSPITAL THAT

DOES NOT HAVE A CLEANED COVER.

15. THE CONTRACTOR SHALL CLEAN THE SERVICE ELEVATORS IF CONSTRUCTION

MATERIAL IS TRACKED IN TO IT.

DRAWING LEGEND:

TEMPORARY ICRA 2 HOUR FIRE-RATED BARRIER WITH 36" 11

2 HOUR DOOR

CONSTRUCTION WORK BOUNDARY

WALK-OFF MAT

EXISTING 2-HR FIRE WALL

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

800 IRVING AVE. SYRACUSE, NY 13210

03/01/2023

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

B

A

C

D

E

F

528A7-23-181

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

P

RO

JE

CT

S\

8A

7-

-1

A ba te 3r d F loo r C W ing \D es ign

C on tra ct\

Dr aw ing s\C

AD

\01

_G en er al\

8A

7-

-1

G C_

IC

RA

.dw g

ASBESTOS ABATEMENT

3RD FLOOR C-WING

GC-101

KAWDW

INFECTION CONTROL (ICRA) PLAN

INFECTION CONTROL (ICRA) FLOOR PLAN

SCALE: 1/4" = 1'-0"1

N

C301

LAB/PATHOLOGY

543 SF

C301C

STORAGE

169 SF

C303

CLOSET

43 SF

LAB HOOD COUNTER AND WALLS

APPROX. SF ADDITIONAL.

80 SF COUNTERTOP &

BACKSPLASH

17 SF COUNTER TOP

41 SF COUNTERTOP

C303

CLOSET

C303A

PIPE SHAFT 9

6 PIPES

3 EX STEAM

PIPES

2 EX STEAM

PIPES SEE NOTE 1. F

FLOORS:

F1

REMOVE 650 SF OF ASBESTOS FLOOR TILE, MASTIC AND FLOOR LEVELING

COMPOUNDS (IF ANY). IF MULTIPLE LAYERS FLOOR TILE EXIST, ABATE ALL AS

ACM. REMOVE UNDER ALL CABINETS, REMOVE ANY ASBESTOS CONTAINING

WATER PROOFING MEMBRANE LOCATED UNDER FLOOR TILE SETTING BED.

ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:

1. COORDINATE HVAC, PLUMBING AND ELECTRICAL SHUT DOWNS WITH VAMC COR.

2. FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE. REQUIRED

SHUT DOWNS SHALL BE COORDINATED WITH VAMC COR AT LEAST 48 HOURS IN

ADVANCE.

3. ALL ELECTRICAL CONNECTIONS AND DISCONNECTIONS SHALL BE PERFORMED BY

LICENSED ELECTRICIANS.

4. REMOVE NON-FRIABLE FLOOR TILE AND MASTIC IN COMPLIANCE WITH SUBPART 56-11.7

AND/OR APPLICABLE VARIANCE AV-A-3.

5. EPOXY COATING COVERS ASBESTOS TILE AND MASTIC IN C301C AND C303.

6. CONTRACTOR SHALL PROVIDE DOCUMENTATION THAT CHEMICAL MASTIC REMOVAL

PRODUCT USED ARE COMPATIBLE WITH PROPOSED NEW MASTIC OR EPOXY

FLOORING.

7. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.

8. PROVIDE FIRE EVACUATION PLAN FOR WORK AREAS - POST AT DECON.

9. MAINTAIN EMERGENCY LIGHTING SYSTEM IN OPERABLE CONDITION.

10. PROVIDE FIRE EXTINGUISHER AT EACH WORK AREA PER SPECIFICATION 01 35 26.

11. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS (ACM) AND NON

ASBESTOS CONTAINING MATERIALS AS INDICATED ON THE DRAWINGS AND IN

CONFORMANCE WITH THE CONTRACT DOCUMENTS.

12. QUANTITIES AND LOCATIONS OF MATERIALS TO BE REMOVED INDICATED ON THESE

DRAWINGS ARE ESTIMATES ONLY. THIS INFORMATION IS PROVIDED FOR GUIDANCE

ONLY. THE CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS.

13. THESE DRAWINGS DO NOT SHOW ALL PIPING, EQUIPMENT, AND MOVEABLE OBJECTS

WITHIN THE BUILDING. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF

WORK AND COORDINATE RELOCATION OF ANY ITEMS WITH THE VAMC COR.

14. THE ASBESTOS CONTRACTOR MAY USE APPLICABLE VARIANCES FROM INDUSTRIAL

CODE RULE 56 TO PERFORM ASBESTOS REMOVAL WORK. TO UTILIZE A SITE SPECIFIC

VARIANCE, THE ASBESTOS CONTRACTOR SHALL SUBMIT TO THE ABATEMENT

DESIGNER FOR APPROVAL OF THE PROCEDURES TO BE UTILIZED FOR ASBESTOS

REMOVAL. THE VAMC COR MAY DISAPPROVE THE USE OF ANY SITE SPECIFIC

VARIANCE OR ELEMENTS THEREOF THAT MAY CONFLICT WITH THE TECHNICAL

SPECIFICATIONS OR DRAWINGS.

15. THE ASBESTOS CONTRACTOR SHALL CONSTRUCT THE PERSONAL AND WASTE

DECONTAMINATION ENCLOSURE UNITS IN CONFORMANCE WITH THE APPLICABLE

REGULATIONS. COORDINATE LOCATION OF THE WASTE LOAD OUT ROUTE AND WASTE

CONTAINER WITH THE VAMC COR.

16. WASTE ACCESS ROUTE AND LOCATION OF WASTE CONTAINERS TO BE DETERMINED BY

THE VAMC COR PER SPECIFICATION.

KEYED NOTES:

WORK SCHEDULE:

1. ACTUAL DATES MUST BE CONFIRMED AND COORDINATED WITH VAMC COR.

2. DESIGNATED TIME(S):

WORK AREA 1: REGULAR WORK HOURS

1. GENERAL CONTRACTOR

A. MOVE ALL REMAINING EQUIPMENT AND FURNISHINGS TO ABATE

B. REMOVE CASEWORK

C. REMOVE WALL AND FLOOR MOUNTED PLUMBING FIXTURES

D. REVIEW ALL SELECTED DEMO

E. REMOVE ASBESTOS COUNTERTOPS

F. REMOVE AND REINSTALL STAIR AS REQUIRED TO ABATE FLOOR

2. ABATEMENT CONTRACTOR

A. REMOVE ALL FLOOR TILE, MASTIC, AND ACM WATERPROOFING

MEMBRANE EXCEPT MATERIAL LOCATED UNDER PARTITIONS

SCHEDULED TO BE REMOVED. REFER TO DRAWING AD-101

SELECTIVE DEMOLITION

3. ABATEMENT CONTRACTOR

A. REMOVE WALLS TO ACCESS CONCEALED THERMAL PIPE INSULATION

B. REMOVE THERMAL PIPE AND PIPE FITTING INSULATION

C. REMOVE ASBESTOS CEMENT COUNTERTOPS

4. GENERAL CONTRACTOR

A. REMOVE ALL REMAINING SELECTIVE DEMOLITION EXCEPT METAL

WALL FLOOR TRACK (OR ANY OTHER MATERIAL) ATTACHED TO THE

CONCRETE FLOOR ON TOP OF FLOOR TILE AND MASTIC

5. ABATEMENT CONTRACTOR

A. REMOVE FLOOR TRACK AND OTHER MATERIALS AS REQUIRED TO

ACCESS FLOOR TILE & MASTIC LOCATED UNDER WALLS

GENERAL SELECTIVE DEMOLITION & ASBESTOS

ABATEMENT WORK SEQUENCE:

PIPING AND DUCTWORK:

P1

AT ALL REMOVED CHASES AND WALLS: REMOVE ALL INSULATION ON

PIPES WITH ACM. REMOVE ALL PIPES IN SCOPE OF WORK EXCEPT

FOR RISERS. TO BE FITTED WITH NEW INSULATION. CUT AND CAP

ALL PIPES DETERMINED TO BE DEAD OR ABANDONED.

WALL AND ALL FIRE DOORS SHALL REMAIN OPERABLE (AND CLOSED) WHILE

WORK IS BEING PERFORMED.

DRAWING LEGEND:

TEMPORARY ICRA 2 HOUR FIRE-RATED PARTITION WITH 36" 11

2 HOUR DOOR;SEE

DRAWING GC-101.

LIMIT OF WORK

TACK MATS

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

800 IRVING AVE. SYRACUSE, NY 13210

03/01/2023

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

B

A

C

D

E

F

528A7-23-181

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

P

RO

JE

CT

S\

8A

7-

-1

A ba te 3r d F loo r C W ing \D es ign

C on tra ct\

Dr aw ing s\C

AD

\02

_H az ma t\5

A7

-2 3-

1_

HA

_H

AZ

MA

T.

dw g

ASBESTOS ABATEMENT

3RD FLOOR C-WING

HA-101

KWDW

ASBESTOS ABATEMENT FLOOR PLAN

N

ASBESTOS DEMOLITION AND REMOVAL PLAN

SCALE: 1/4" = 1'-0"1

FURNITURE:

REMOVE ASBESTOS CEMENT COUNTERTOP IN LAB AS NOTED.

R1

R1

R1

R1

R1

ASBESTOS

TYPE QTY TOTAL AREA/ LENGTH

PIPES 11 122 LF

FLOOR 2 650 SF

COUNTERTOPS 4 175 SF

ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:

A143

EXAM

A144

EXAM

A146

CONFERENCE

A147

EXAM

A145

EXAM

2 EX STEAM

PIPES4 EX STEAM

PIPES

2 EX STEAM

PIPES

FLOORS:

F1

REMOVE 140 SF OF ASBESTOS FLOOR TILE, MASTIC AND FLOOR LEVELING

COMPOUNDS (IF ANY). IF MULTIPLE LAYERS FLOOR TILE EXIST, ABATE ALL AS

ACM. REMOVE UNDER ALL CABINETS, REMOVE ANY ASBESTOS CONTAINING

WATER PROOFING MEMBRANE LOCATED UNDER FLOOR TILE SETTING BED.

ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:

1. COORDINATE HVAC, PLUMBING AND ELECTRICAL SHUT DOWNS WITH VAMC COR.

2. FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE. REQUIRED

SHUT DOWNS SHALL BE COORDINATED WITH VAMC COR AT LEAST 48 HOURS IN

ADVANCE.

3. ALL ELECTRICAL CONNECTIONS AND DISCONNECTIONS SHALL BE PERFORMED BY

LICENSED ELECTRICIANS.

4. REMOVE NON-FRIABLE FLOOR TILE AND MASTIC IN COMPLIANCE WITH SUBPART 56-11.7

AND/OR APPLICABLE VARIANCE AV-A-3.

5. EPOXY COATING COVERS ASBESTOS TILE AND MASTIC IN C301C AND C303.

6. CONTRACTOR SHALL PROVIDE DOCUMENTATION THAT CHEMICAL MASTIC REMOVAL

PRODUCT USED ARE COMPATIBLE WITH PROPOSED NEW MASTIC OR EPOXY

FLOORING.

7. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.

8. PROVIDE FIRE EVACUATION PLAN FOR WORK AREAS - POST AT DECON.

9. MAINTAIN EMERGENCY LIGHTING SYSTEM IN OPERABLE CONDITION.

10. PROVIDE FIRE EXTINGUISHER AT EACH WORK AREA PER SPECIFICATION 01 35 26.

11. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS (ACM) AND NON

ASBESTOS CONTAINING MATERIALS AS INDICATED ON THE DRAWINGS AND IN

CONFORMANCE WITH THE CONTRACT DOCUMENTS.

12. QUANTITIES AND LOCATIONS OF MATERIALS TO BE REMOVED INDICATED ON THESE

DRAWINGS ARE ESTIMATES ONLY. THIS INFORMATION IS PROVIDED FOR GUIDANCE

ONLY. THE CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS.

13. THESE DRAWINGS DO NOT SHOW ALL PIPING, EQUIPMENT, AND MOVEABLE OBJECTS

WITHIN THE BUILDING. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF

WORK AND COORDINATE RELOCATION OF ANY ITEMS WITH THE VAMC COR.

14. THE ASBESTOS CONTRACTOR MAY USE APPLICABLE VARIANCES FROM INDUSTRIAL

CODE RULE 56 TO PERFORM ASBESTOS REMOVAL WORK. TO UTILIZE A SITE SPECIFIC

VARIANCE, THE ASBESTOS CONTRACTOR SHALL SUBMIT TO THE ABATEMENT

DESIGNER FOR APPROVAL OF THE PROCEDURES TO BE UTILIZED FOR ASBESTOS

REMOVAL. THE VAMC COR MAY DISAPPROVE THE USE OF ANY SITE SPECIFIC

VARIANCE OR ELEMENTS THEREOF THAT MAY CONFLICT WITH THE TECHNICAL

SPECIFICATIONS OR DRAWINGS.

15. THE ASBESTOS CONTRACTOR SHALL CONSTRUCT THE PERSONAL AND WASTE

DECONTAMINATION ENCLOSURE UNITS IN CONFORMANCE WITH THE APPLICABLE

REGULATIONS. COORDINATE LOCATION OF THE WASTE LOAD OUT ROUTE AND WASTE

CONTAINER WITH THE VAMC COR.

16. WASTE ACCESS ROUTE AND LOCATION OF WASTE CONTAINERS TO BE DETERMINED BY

THE VAMC COR PER SPECIFICATION.

KEYED NOTES:

WORK SCHEDULE:

1. ACTUAL DATES MUST BE CONFIRMED AND COORDINATED WITH VAMC COR.

2. DESIGNATED TIME(S):

WORK AREA 1: REGULAR WORK HOURS

GENERAL SELECTIVE DEMOLITION & ASBESTOS

ABATEMENT WORK SEQUENCE:

WALL AND ALL FIRE DOORS SHALL REMAIN OPERABLE (AND CLOSED) WHILE

WORK IS BEING PERFORMED.

DRAWING LEGEND:

TEMPORARY ICRA 2 HOUR FIRE-RATED PARTITION WITH 36" 11

2 HOUR DOOR;SEE

DRAWING GC-101.

LIMIT OF WORK

TACK MATS

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

DRAWING NUMBER

BUILDING NUMBER

PROJECT NUMBER

REVISION DATE

SYRACUSE

VA MEDICAL

CENTER

ENGINEERING

DEPARTMENT

800 IRVING AVE. SYRACUSE, NY 13210

03/01/2023

GENERAL PROJECT INFORMATION

100% SPRINKLERED

DWG.

U.S. Department of Veterans Affairs

B

A

C

D

E

F

528A7-23-181

S:

\S

YR

-M

S\

MS

-E ng ine er ing \P

RO

JE

CT

S\

AC

TI

VE

P

RO

JE

CT

S\

8A

7-

-1

A ba te 3r d F loo r C W ing \D es ign

C on tra ct\

Dr aw ing s\C

AD

\02

_H az ma t\5

A7

-2 3-

1_

HA

_H

AZ

MA

T.

dw g

ASBESTOS ABATEMENT

3RD FLOOR C-WING

HA-102

KWDW

ASBESTOS ABATEMENT FLOOR PLAN

N

ASBESTOS DEMOLITION AND REMOVAL PLAN

SCALE: 1/4" = 1'-0"1

ASBESTOS

TYPE QTY TOTAL AREA/ LENGTH

FLOOR 1 140 SF

PIPE 8 88 LF

ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:

PIPING AND DUCTWORK:

P1

AT ALL REMOVED CHASES AND WALLS: REMOVE ALL INSULATION ON

PIPES WITH ACM. REMOVE ALL PIPES IN SCOPE OF WORK EXCEPT

FOR RISERS. TO BE FITTED WITH NEW INSULATION. CUT AND CAP

ALL PIPES DETERMINED TO BE DEAD OR ABANDONED.

1. GENERAL CONTRACTOR

A. MOVE ALL REMAINING EQUIPMENT AND FURNISHINGS TO ABATE

B. REMOVE WALL AND FLOOR MOUNTED PLUMBING FIXTURES

C. REVIEW ALL SELECTED DEMO

2. ABATEMENT CONTRACTOR

A. REMOVE ALL FLOOR TILE, MASTIC, AND ACM WATERPROOFING

MEMBRANE EXCEPT MATERIAL LOCATED UNDER PARTITIONS

SCHEDULED TO BE REMOVED. REFER TO DRAWING AD-101

SELECTIVE DEMOLITION

3. ABATEMENT CONTRACTOR

A. REMOVE WALLS TO ACCESS CONCEALED THERMAL PIPE INSULATION

B. REMOVE THERMAL PIPE AND PIPE FITTING INSULATION

C. REMOVE ASBESTOS CEMENT COUNTERTOPS

4. GENERAL CONTRACTOR

A. REMOVE ALL REMAINING SELECTIVE DEMOLITION EXCEPT METAL

WALL FLOOR TRACK (OR ANY OTHER MATERIAL) ATTACHED TO THE

CONCRETE FLOOR ON TOP OF FLOOR TILE AND MASTIC

5. ABATEMENT CONTRACTOR

A. REMOVE FLOOR TRACK AND OTHER MATERIALS AS REQUIRED TO

ACCESS FLOOR TILE & MASTIC LOCATED UNDER WALLS

Sheets and Views
528A7-23-181 AG_COVER SHT-GI-001
528A7-23-181 GC_ICRA-GC-101
528A7-23-181_02HA_HAZMAT-HA-101
528A7-23-181_02HA_HAZMAT-HA-102

File details come from the government source that posted it. Updated .