100_ Drawings 528A7-23-181 Abate 3rd Floor C-Wing_V2.pdf
PDF 2 MB Posted
- Attached to
- Z1DA--528A7-23-181 Air Monitoring-Asbestos
- Solicitation number
- 36C24224Q0219
About this file
This solicitation requests proposals for asbestos air monitoring services to support an asbestos abatement project at the Syracuse VA Medical Center. The air monitoring contractor will be required to review the abatement plan, perform air sampling according to New York regulations before, during and after abatement work, and submit daily logs and a final report. The abatement involves removal of asbestos floor tile, countertops, thermal piping insulation and other materials from several rooms over approximately 30 days according to plan #528A7-23-181. The air monitor must be certified and use an accredited laboratory for analysis. Pricing shall be provided for review of the abatement plan, air monitoring technician for 30 days, air sampling, and documentation. The selected firm must complete all documentation within seven days of abatement completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24224Q0219_2.docx | DOCX document | |
| 852.219-77 VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| 36C24224Q0219.docx | DOCX document | |
| (P07) Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWINGS INDEX
SHEET NO. DRAWING TITLE
GENERAL
1. GI-001 COVER SHEET
2. GC-101 INFECTION CONTROL (ICRA) PLAN
HAZARDOUS MATERIALS
3. HA-101 ASBESTOS ABATEMENT FLOOR PLAN
4. HA-102 ASBESTOS ABATEMENT FLOOR PLAN
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-23-181
VA MEDICAL CENTER
BUILDING NO. 1
800 IRVING AVENUE
SYRACUSE, NEW YORK 13210
SYRACUSE VAMC
ASBESTOS ABATEMENT
3RD FLOOR C-WING
AREA OF
WORK
3RD FLOOR
C-WING
KEY PLAN
SCALE: NONE2
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/01/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-181ASBESTOS ABATEMENT
3RD FLOOR C-WING
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-1
A ba te 3r d F loo r C W ing \D es ign
C on tra ct\
Dr aw ing s\C
AD
\01
_G en er al\
8A
7-
-1
A G_
CO
VE
R
SH
T.
dw g
GI-001
KAWDW
COVER SHEET
N
N
SHAFT 1 SHAFT 2
SHAFT 3
SHAFT 4
SCI
SHAFT 5
CHILLER BLDG
BLDG 2
BLDG 19 - GARAGE
D-WING
A-WING B-WING
C-WING
LOCATION PLAN
SCALE: NONE1
BLDG 16
AREA OF
WORK
1ST FLOOR
A-WING
C301C
STORAGE
C303
CLOSET
C303A
PIPE SHAFT 9
C301C
STORAGE
C301A
CLOSET
C301
LAB/PATHOLOGY
INFECTION CONTROL (ICRA) GENERAL NOTES:
1. CONTRACTOR MUST FOLLOW ALL INFECTION CONTROL PROCEDURES AND
TEMPORARY CONSTRUCTION DEFINED IN PROJECT SPECIFICATIONS.
2. CONTRACTOR SHALL MAINTAIN EGRESS FOR ALL OCCUPANTS AT ALL TIMES
THROUGHOUT CONSTRUCTION. THIS SHALL INCLUDE EGRESS FROM STAIR 9S2.
3. CONTRACTOR IS TO COORDINATE ALL WORK AND SCHEDULES WITH VAMC COR. SEE
SHEET AD-101, ARCHITECTURAL DEMOLITION, FOR ADDITIONAL INFORMATION.
4. NEGATIVE PRESSURE MUST BE MAINTAINED 24/7 IN EACH ACTIVE WORK AREA. SEE
SHEET AD-101, ARCHITECTURAL DEMOLITION, FOR ADDITIONAL INFORMATION.
5. NO CONTRACTOR STORAGE IS ACCEPTABLE IN CORRIDORS. ALL MATERIALS MUST BE
CONTAINED IN THE ACTIVE WORK AREA, OR ASSIGNED AREAS ACCEPTABLE TO THE
VAMC COR.
6. REFER TO SPECIFICATION SECTION 01 74 19 FOR CONSTRUCTION WASTE
MANAGEMENT.
7. PROJECT AREA IS TO BE SEALED WITH A 2 HOUR FIRE-RATED TEMPORARY PARTITION
SUCH THAT NEGATIVE AIR PRESSURE IS MAINTAINED BETWEEN CORRIDOR(S) AND
ROOM BY EXHAUSTING AIR OUT OF WORK AREA.
8. TEMPORARY 2 HOUR FIRE-RATED BARRIERS ARE TO BE SEALED USING UL LISTED
MATERIALS TO INHIBIT TRANSFER OF DUST AND SMOKE. THEY SHALL ALSO BE
CONSTRUCTED TO MINIMIZE NOISE FROM CONSTRUCTION ACTIVITIES. ONCE IN PLACE,
THESE BARRIERS ARE TO BE INSPECTED AND ACCEPTED BY VAMC COR PRIOR TO
STARTING ANY CONSTRUCTION WORK.
9. PROVIDE DUST WALK-OFF MATS AT EACH ENTRANCE / EXIT TO PROJECT WORK AREA.
WALK-OFF MATS SHALL BE CHANGED WHEN THEY BECOME VISIBLY SOILED OR WHEN
REQUESTED BY THE VAMC COR.
10. PROVIDE TEMPORARY CONSTRUCTION SIGNAGE AT INTERIOR AND EXTERIOR OF
PROJECT WORK AREA. COORDINATE WITH VAMC COR ON REQUIREMENTS AND
LOCATIONS.
11. ANY WORK TO BE PERFORMED OUTSIDE OF THE CONSTRUCTION BARRIER SHALL BE
COORDINATED WITH THE VAMC COR.
12. ALL CONTRACTOR EQUIPMENT / CARTS, ETC. MUST BE WIPED DOWN PRIOR TO ENTRY
OR EXIT. ONCE IN, CARTS SHOULD BE WIPED DOWN PRIOR TO RELOCATION TO NEW
WORK AREA. THIS SHALL INCLUDE ALL EQUIPMENT / CART WHEELS.
13. PATCH ALL FINISHES DAMAGED BY TEMPORARY PARTITION INSTALLATION AND
REMOVAL TO MATCH EXISTING FINISHES.
14. THE CONTRACTOR SHALL NOT TRANSFER ANY CART THROUGH THE HOSPITAL THAT
DOES NOT HAVE A CLEANED COVER.
15. THE CONTRACTOR SHALL CLEAN THE SERVICE ELEVATORS IF CONSTRUCTION
MATERIAL IS TRACKED IN TO IT.
DRAWING LEGEND:
TEMPORARY ICRA 2 HOUR FIRE-RATED BARRIER WITH 36" 11
2 HOUR DOOR
CONSTRUCTION WORK BOUNDARY
WALK-OFF MAT
EXISTING 2-HR FIRE WALL
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/01/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-181
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-1
A ba te 3r d F loo r C W ing \D es ign
C on tra ct\
Dr aw ing s\C
AD
\01
_G en er al\
8A
7-
-1
G C_
IC
RA
.dw g
ASBESTOS ABATEMENT
3RD FLOOR C-WING
GC-101
KAWDW
INFECTION CONTROL (ICRA) PLAN
INFECTION CONTROL (ICRA) FLOOR PLAN
SCALE: 1/4" = 1'-0"1
N
C301
LAB/PATHOLOGY
543 SF
C301C
STORAGE
169 SF
C303
CLOSET
43 SF
LAB HOOD COUNTER AND WALLS
APPROX. SF ADDITIONAL.
80 SF COUNTERTOP &
BACKSPLASH
17 SF COUNTER TOP
41 SF COUNTERTOP
C303
CLOSET
C303A
PIPE SHAFT 9
6 PIPES
3 EX STEAM
PIPES
2 EX STEAM
PIPES SEE NOTE 1. F
FLOORS:
F1
REMOVE 650 SF OF ASBESTOS FLOOR TILE, MASTIC AND FLOOR LEVELING
COMPOUNDS (IF ANY). IF MULTIPLE LAYERS FLOOR TILE EXIST, ABATE ALL AS
ACM. REMOVE UNDER ALL CABINETS, REMOVE ANY ASBESTOS CONTAINING
WATER PROOFING MEMBRANE LOCATED UNDER FLOOR TILE SETTING BED.
ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:
1. COORDINATE HVAC, PLUMBING AND ELECTRICAL SHUT DOWNS WITH VAMC COR.
2. FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE. REQUIRED
SHUT DOWNS SHALL BE COORDINATED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE.
3. ALL ELECTRICAL CONNECTIONS AND DISCONNECTIONS SHALL BE PERFORMED BY
LICENSED ELECTRICIANS.
4. REMOVE NON-FRIABLE FLOOR TILE AND MASTIC IN COMPLIANCE WITH SUBPART 56-11.7
AND/OR APPLICABLE VARIANCE AV-A-3.
5. EPOXY COATING COVERS ASBESTOS TILE AND MASTIC IN C301C AND C303.
6. CONTRACTOR SHALL PROVIDE DOCUMENTATION THAT CHEMICAL MASTIC REMOVAL
PRODUCT USED ARE COMPATIBLE WITH PROPOSED NEW MASTIC OR EPOXY
FLOORING.
7. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.
8. PROVIDE FIRE EVACUATION PLAN FOR WORK AREAS - POST AT DECON.
9. MAINTAIN EMERGENCY LIGHTING SYSTEM IN OPERABLE CONDITION.
10. PROVIDE FIRE EXTINGUISHER AT EACH WORK AREA PER SPECIFICATION 01 35 26.
11. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS (ACM) AND NON
ASBESTOS CONTAINING MATERIALS AS INDICATED ON THE DRAWINGS AND IN
CONFORMANCE WITH THE CONTRACT DOCUMENTS.
12. QUANTITIES AND LOCATIONS OF MATERIALS TO BE REMOVED INDICATED ON THESE
DRAWINGS ARE ESTIMATES ONLY. THIS INFORMATION IS PROVIDED FOR GUIDANCE
ONLY. THE CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS.
13. THESE DRAWINGS DO NOT SHOW ALL PIPING, EQUIPMENT, AND MOVEABLE OBJECTS
WITHIN THE BUILDING. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF
WORK AND COORDINATE RELOCATION OF ANY ITEMS WITH THE VAMC COR.
14. THE ASBESTOS CONTRACTOR MAY USE APPLICABLE VARIANCES FROM INDUSTRIAL
CODE RULE 56 TO PERFORM ASBESTOS REMOVAL WORK. TO UTILIZE A SITE SPECIFIC
VARIANCE, THE ASBESTOS CONTRACTOR SHALL SUBMIT TO THE ABATEMENT
DESIGNER FOR APPROVAL OF THE PROCEDURES TO BE UTILIZED FOR ASBESTOS
REMOVAL. THE VAMC COR MAY DISAPPROVE THE USE OF ANY SITE SPECIFIC
VARIANCE OR ELEMENTS THEREOF THAT MAY CONFLICT WITH THE TECHNICAL
SPECIFICATIONS OR DRAWINGS.
15. THE ASBESTOS CONTRACTOR SHALL CONSTRUCT THE PERSONAL AND WASTE
DECONTAMINATION ENCLOSURE UNITS IN CONFORMANCE WITH THE APPLICABLE
REGULATIONS. COORDINATE LOCATION OF THE WASTE LOAD OUT ROUTE AND WASTE
CONTAINER WITH THE VAMC COR.
16. WASTE ACCESS ROUTE AND LOCATION OF WASTE CONTAINERS TO BE DETERMINED BY
THE VAMC COR PER SPECIFICATION.
KEYED NOTES:
WORK SCHEDULE:
1. ACTUAL DATES MUST BE CONFIRMED AND COORDINATED WITH VAMC COR.
2. DESIGNATED TIME(S):
WORK AREA 1: REGULAR WORK HOURS
1. GENERAL CONTRACTOR
A. MOVE ALL REMAINING EQUIPMENT AND FURNISHINGS TO ABATE
B. REMOVE CASEWORK
C. REMOVE WALL AND FLOOR MOUNTED PLUMBING FIXTURES
D. REVIEW ALL SELECTED DEMO
E. REMOVE ASBESTOS COUNTERTOPS
F. REMOVE AND REINSTALL STAIR AS REQUIRED TO ABATE FLOOR
2. ABATEMENT CONTRACTOR
A. REMOVE ALL FLOOR TILE, MASTIC, AND ACM WATERPROOFING
MEMBRANE EXCEPT MATERIAL LOCATED UNDER PARTITIONS
SCHEDULED TO BE REMOVED. REFER TO DRAWING AD-101
SELECTIVE DEMOLITION
3. ABATEMENT CONTRACTOR
A. REMOVE WALLS TO ACCESS CONCEALED THERMAL PIPE INSULATION
B. REMOVE THERMAL PIPE AND PIPE FITTING INSULATION
C. REMOVE ASBESTOS CEMENT COUNTERTOPS
4. GENERAL CONTRACTOR
A. REMOVE ALL REMAINING SELECTIVE DEMOLITION EXCEPT METAL
WALL FLOOR TRACK (OR ANY OTHER MATERIAL) ATTACHED TO THE
CONCRETE FLOOR ON TOP OF FLOOR TILE AND MASTIC
5. ABATEMENT CONTRACTOR
A. REMOVE FLOOR TRACK AND OTHER MATERIALS AS REQUIRED TO
ACCESS FLOOR TILE & MASTIC LOCATED UNDER WALLS
GENERAL SELECTIVE DEMOLITION & ASBESTOS
ABATEMENT WORK SEQUENCE:
PIPING AND DUCTWORK:
P1
AT ALL REMOVED CHASES AND WALLS: REMOVE ALL INSULATION ON
PIPES WITH ACM. REMOVE ALL PIPES IN SCOPE OF WORK EXCEPT
FOR RISERS. TO BE FITTED WITH NEW INSULATION. CUT AND CAP
ALL PIPES DETERMINED TO BE DEAD OR ABANDONED.
WALL AND ALL FIRE DOORS SHALL REMAIN OPERABLE (AND CLOSED) WHILE
WORK IS BEING PERFORMED.
DRAWING LEGEND:
TEMPORARY ICRA 2 HOUR FIRE-RATED PARTITION WITH 36" 11
2 HOUR DOOR;SEE
DRAWING GC-101.
LIMIT OF WORK
TACK MATS
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/01/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-181
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-1
A ba te 3r d F loo r C W ing \D es ign
C on tra ct\
Dr aw ing s\C
AD
\02
_H az ma t\5
A7
-2 3-
1_
HA
_H
AZ
MA
T.
dw g
ASBESTOS ABATEMENT
3RD FLOOR C-WING
HA-101
KWDW
ASBESTOS ABATEMENT FLOOR PLAN
N
ASBESTOS DEMOLITION AND REMOVAL PLAN
SCALE: 1/4" = 1'-0"1
FURNITURE:
REMOVE ASBESTOS CEMENT COUNTERTOP IN LAB AS NOTED.
R1
R1
R1
R1
R1
ASBESTOS
TYPE QTY TOTAL AREA/ LENGTH
PIPES 11 122 LF
FLOOR 2 650 SF
COUNTERTOPS 4 175 SF
ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:
A143
EXAM
A144
EXAM
A146
CONFERENCE
A147
EXAM
A145
EXAM
2 EX STEAM
PIPES4 EX STEAM
PIPES
2 EX STEAM
PIPES
FLOORS:
F1
REMOVE 140 SF OF ASBESTOS FLOOR TILE, MASTIC AND FLOOR LEVELING
COMPOUNDS (IF ANY). IF MULTIPLE LAYERS FLOOR TILE EXIST, ABATE ALL AS
ACM. REMOVE UNDER ALL CABINETS, REMOVE ANY ASBESTOS CONTAINING
WATER PROOFING MEMBRANE LOCATED UNDER FLOOR TILE SETTING BED.
ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:
1. COORDINATE HVAC, PLUMBING AND ELECTRICAL SHUT DOWNS WITH VAMC COR.
2. FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE. REQUIRED
SHUT DOWNS SHALL BE COORDINATED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE.
3. ALL ELECTRICAL CONNECTIONS AND DISCONNECTIONS SHALL BE PERFORMED BY
LICENSED ELECTRICIANS.
4. REMOVE NON-FRIABLE FLOOR TILE AND MASTIC IN COMPLIANCE WITH SUBPART 56-11.7
AND/OR APPLICABLE VARIANCE AV-A-3.
5. EPOXY COATING COVERS ASBESTOS TILE AND MASTIC IN C301C AND C303.
6. CONTRACTOR SHALL PROVIDE DOCUMENTATION THAT CHEMICAL MASTIC REMOVAL
PRODUCT USED ARE COMPATIBLE WITH PROPOSED NEW MASTIC OR EPOXY
FLOORING.
7. DO NOT COMPROMISE STRUCTURAL INTEGRITY OF THE BUILDING.
8. PROVIDE FIRE EVACUATION PLAN FOR WORK AREAS - POST AT DECON.
9. MAINTAIN EMERGENCY LIGHTING SYSTEM IN OPERABLE CONDITION.
10. PROVIDE FIRE EXTINGUISHER AT EACH WORK AREA PER SPECIFICATION 01 35 26.
11. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS (ACM) AND NON
ASBESTOS CONTAINING MATERIALS AS INDICATED ON THE DRAWINGS AND IN
CONFORMANCE WITH THE CONTRACT DOCUMENTS.
12. QUANTITIES AND LOCATIONS OF MATERIALS TO BE REMOVED INDICATED ON THESE
DRAWINGS ARE ESTIMATES ONLY. THIS INFORMATION IS PROVIDED FOR GUIDANCE
ONLY. THE CONTRACTOR SHALL FIELD VERIFY QUANTITIES AND LOCATIONS.
13. THESE DRAWINGS DO NOT SHOW ALL PIPING, EQUIPMENT, AND MOVEABLE OBJECTS
WITHIN THE BUILDING. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF
WORK AND COORDINATE RELOCATION OF ANY ITEMS WITH THE VAMC COR.
14. THE ASBESTOS CONTRACTOR MAY USE APPLICABLE VARIANCES FROM INDUSTRIAL
CODE RULE 56 TO PERFORM ASBESTOS REMOVAL WORK. TO UTILIZE A SITE SPECIFIC
VARIANCE, THE ASBESTOS CONTRACTOR SHALL SUBMIT TO THE ABATEMENT
DESIGNER FOR APPROVAL OF THE PROCEDURES TO BE UTILIZED FOR ASBESTOS
REMOVAL. THE VAMC COR MAY DISAPPROVE THE USE OF ANY SITE SPECIFIC
VARIANCE OR ELEMENTS THEREOF THAT MAY CONFLICT WITH THE TECHNICAL
SPECIFICATIONS OR DRAWINGS.
15. THE ASBESTOS CONTRACTOR SHALL CONSTRUCT THE PERSONAL AND WASTE
DECONTAMINATION ENCLOSURE UNITS IN CONFORMANCE WITH THE APPLICABLE
REGULATIONS. COORDINATE LOCATION OF THE WASTE LOAD OUT ROUTE AND WASTE
CONTAINER WITH THE VAMC COR.
16. WASTE ACCESS ROUTE AND LOCATION OF WASTE CONTAINERS TO BE DETERMINED BY
THE VAMC COR PER SPECIFICATION.
KEYED NOTES:
WORK SCHEDULE:
1. ACTUAL DATES MUST BE CONFIRMED AND COORDINATED WITH VAMC COR.
2. DESIGNATED TIME(S):
WORK AREA 1: REGULAR WORK HOURS
GENERAL SELECTIVE DEMOLITION & ASBESTOS
ABATEMENT WORK SEQUENCE:
WALL AND ALL FIRE DOORS SHALL REMAIN OPERABLE (AND CLOSED) WHILE
WORK IS BEING PERFORMED.
DRAWING LEGEND:
TEMPORARY ICRA 2 HOUR FIRE-RATED PARTITION WITH 36" 11
2 HOUR DOOR;SEE
DRAWING GC-101.
LIMIT OF WORK
TACK MATS
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/01/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-181
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-1
A ba te 3r d F loo r C W ing \D es ign
C on tra ct\
Dr aw ing s\C
AD
\02
_H az ma t\5
A7
-2 3-
1_
HA
_H
AZ
MA
T.
dw g
ASBESTOS ABATEMENT
3RD FLOOR C-WING
HA-102
KWDW
ASBESTOS ABATEMENT FLOOR PLAN
N
ASBESTOS DEMOLITION AND REMOVAL PLAN
SCALE: 1/4" = 1'-0"1
ASBESTOS
TYPE QTY TOTAL AREA/ LENGTH
FLOOR 1 140 SF
PIPE 8 88 LF
ASBESTOS DEMOLITION AND REMOVAL GENERAL NOTES:
PIPING AND DUCTWORK:
P1
AT ALL REMOVED CHASES AND WALLS: REMOVE ALL INSULATION ON
PIPES WITH ACM. REMOVE ALL PIPES IN SCOPE OF WORK EXCEPT
FOR RISERS. TO BE FITTED WITH NEW INSULATION. CUT AND CAP
ALL PIPES DETERMINED TO BE DEAD OR ABANDONED.
1. GENERAL CONTRACTOR
A. MOVE ALL REMAINING EQUIPMENT AND FURNISHINGS TO ABATE
B. REMOVE WALL AND FLOOR MOUNTED PLUMBING FIXTURES
C. REVIEW ALL SELECTED DEMO
2. ABATEMENT CONTRACTOR
A. REMOVE ALL FLOOR TILE, MASTIC, AND ACM WATERPROOFING
MEMBRANE EXCEPT MATERIAL LOCATED UNDER PARTITIONS
SCHEDULED TO BE REMOVED. REFER TO DRAWING AD-101
SELECTIVE DEMOLITION
3. ABATEMENT CONTRACTOR
A. REMOVE WALLS TO ACCESS CONCEALED THERMAL PIPE INSULATION
B. REMOVE THERMAL PIPE AND PIPE FITTING INSULATION
C. REMOVE ASBESTOS CEMENT COUNTERTOPS
4. GENERAL CONTRACTOR
A. REMOVE ALL REMAINING SELECTIVE DEMOLITION EXCEPT METAL
WALL FLOOR TRACK (OR ANY OTHER MATERIAL) ATTACHED TO THE
CONCRETE FLOOR ON TOP OF FLOOR TILE AND MASTIC
5. ABATEMENT CONTRACTOR
A. REMOVE FLOOR TRACK AND OTHER MATERIALS AS REQUIRED TO
ACCESS FLOOR TILE & MASTIC LOCATED UNDER WALLS
| Sheets and Views |
| 528A7-23-181 AG_COVER SHT-GI-001 |
| 528A7-23-181 GC_ICRA-GC-101 |
| 528A7-23-181_02HA_HAZMAT-HA-101 |
| 528A7-23-181_02HA_HAZMAT-HA-102 |
File details come from the government source that posted it. Updated .