100% CD DrawingsPart-2.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ 171 260000000384 1
- Issued by
- Michigan
About this file
This document consists of construction drawings for the State of Michigan Department of Corrections, specifically for the Smoke Purge System Repair project at the Gus Harrison Correctional Facility. The drawings are labeled as 100% Complete Design Drawings Part 2 and represent the final design phase for the smoke purge system repair initiative. These technical drawings provide detailed specifications and layout plans necessary for contractors to understand the scope of mechanical and ventilation system work required at the facility. The project involves the installation or repair of smoke purge systems to enhance safety and operational capabilities within the correctional facility's infrastructure.
The drawings serve as the basis for construction procurement and bidding activities associated with contract opportunity 472/24055. Contractors responding to this bid will need to reference these comprehensive design documents to develop accurate cost estimates and project timelines. The technical specifications depicted in these drawings establish the minimum requirements and standards that successful bidders must meet during implementation, ensuring that all work aligns with the state's facility specifications and operational needs for the correctional institution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LEIN Request 24055.pdf | ||
| 100% CD Specifications.pdf | ||
| DTMB0415 Advertisment.pdf | ||
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf | ||
| 100% CD DrawingsPart-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .