10-PHASE 2 SOUTH.pdf

PDF 2 MB Posted

Attached to
Concrete Street Reconstruction
Solicitation number
4490
Issued by
Clinton County, Kentucky

About this file

This is a project description document for the City of Owensboro, Kentucky's Concrete Street Reconstruction project. The project involves the reconstruction of Moreland Avenue from 12th Street to W Parrish Avenue, requiring the contractor to provide all labor, materials, supervision, equipment, construction staking, and incidentals necessary to complete the work. The scope of work includes removal and replacement of existing street, curb, ADA ramps, and sidewalk as directed by the City Engineer. The document appears to be Phase 2 South of a multi-phase project, indicating this is one segment of a larger street reconstruction initiative within the municipality.

The file provides the foundational project specifications and requirements for contractors bidding on this work. Specific details regarding pricing terms, bid submission deadlines, contract duration, bonding requirements, and project timeline are not explicitly detailed in the provided excerpt. Contractors should refer to the complete bid documents and specification sheets for comprehensive information on insurance requirements, performance standards, ADA compliance specifications, material standards, and any other contractual terms and conditions that would govern the execution of this street reconstruction project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M o re la n d A v e

M o re la n d A v e

W Parr ish

Ave

W Parr ish

Ave

W Parr ish

Ave

Esri Community Maps Contributors, Commonwealth of Kentucky, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, USFWS

MORELAND AVE CONCRETE STREET REBUILD PHASE 2 BID PAGE 2

Legend

PARCEL

ADDRESS

SEWER/STORM

UTILITIES

Structure Type ") Inlet

Storm Catch Basin

&- Sewer Structure

CONCRETE

REPLACEMENT LIMITS

PHASE 2

ANTICIPATED

QUANTITY LOCATIONS

PHASE 2

0 25 5012.5 Feet

33' ROLLCURB

SEE ATTACHED EXHIBIT

SEE ATTACHED EXHIBIT

File details come from the government source that posted it. Updated .