10-PHASE 2 SOUTH.pdf
PDF 2 MB Posted
- Attached to
- Concrete Street Reconstruction
- Solicitation number
- 4490
- Issued by
- Clinton County, Kentucky
About this file
This is a project description document for the City of Owensboro, Kentucky's Concrete Street Reconstruction project. The project involves the reconstruction of Moreland Avenue from 12th Street to W Parrish Avenue, requiring the contractor to provide all labor, materials, supervision, equipment, construction staking, and incidentals necessary to complete the work. The scope of work includes removal and replacement of existing street, curb, ADA ramps, and sidewalk as directed by the City Engineer. The document appears to be Phase 2 South of a multi-phase project, indicating this is one segment of a larger street reconstruction initiative within the municipality.
The file provides the foundational project specifications and requirements for contractors bidding on this work. Specific details regarding pricing terms, bid submission deadlines, contract duration, bonding requirements, and project timeline are not explicitly detailed in the provided excerpt. Contractors should refer to the complete bid documents and specification sheets for comprehensive information on insurance requirements, performance standards, ADA compliance specifications, material standards, and any other contractual terms and conditions that would govern the execution of this street reconstruction project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M o re la n d A v e
M o re la n d A v e
W Parr ish
Ave
W Parr ish
Ave
W Parr ish
Ave
Esri Community Maps Contributors, Commonwealth of Kentucky, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, USFWS
MORELAND AVE CONCRETE STREET REBUILD PHASE 2 BID PAGE 2
Legend
PARCEL
ADDRESS
SEWER/STORM
UTILITIES
Structure Type ") Inlet
Storm Catch Basin
&- Sewer Structure
CONCRETE
REPLACEMENT LIMITS
PHASE 2
ANTICIPATED
QUANTITY LOCATIONS
PHASE 2
0 25 5012.5 Feet
33' ROLLCURB
SEE ATTACHED EXHIBIT
SEE ATTACHED EXHIBIT
File details come from the government source that posted it. Updated .