10_ES7034.pdf

PDF 84 KB Posted

Attached to
Drogue Severance Assembly Federal contract opportunity
Solicitation number
FA821324R3019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is an attachment (ES7034) that outlines the requirements for rework and repair of nonconforming material under a federal contract.

The attachment defines rework as the reprocessing of nonconforming material to completely conform to drawings, specifications, or contract requirements. Repair is defined as the reprocessing of nonconforming material in accordance with approved procedures to reduce, but not eliminate, the nonconformance in order to make the item usable. The contractor must document rework and repair procedures and submit them to the government for review and approval prior to implementation. The submission must include the cause for the nonconformance and actions to prevent recurrence. Rework and repair requirements flow down to the contractor's suppliers, vendors, and subcontractors.

View the file

Other files for this federal contract opportunity

Other files attached to Drogue Severance Assembly, newest first.
File Type Posted
Solicitation FA821324R3019 Amendment 1.pdf PDF
4_ID_010838459ES.pdf PDF
8_REPSHIP.docx DOCX document
2_EDL-010838459ES.pdf PDF
Solicitation FA821324R3019.pdf PDF
7_JQR_1377-01-234-0706ES.pdf PDF
11_AIR_SPEC.pdf PDF
3_EDL-012340706ES.pdf PDF
1_CADPAD_Item_Marking.pdf PDF
12_JHCS_ZY56.pdf PDF
9_SPI.pdf PDF
6_JQR_1377-01-083-8459ES.pdf PDF
5_ID_012340706ES.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.