10.28.26_North Andover UST Replacement Bid Specifications.pdf

PDF 18 MB Posted

Attached to
Underground Storage Tank Fuel System Replacement Project
Solicitation number
BD-27-1647-NA001-TONA1-134925
Issued by
Essex County, Massachusetts

About this file

This bid specifications document pertains to the Underground Storage Tank Fuel System Replacement Project for the Town of North Andover, Massachusetts. The project scope encompasses the replacement of two 20,000-gallon underground storage tanks and associated fuel system components, the replacement of two underground waste-oil tanks with a single 2,500-gallon underground storage tank, and the complete replacement of the concrete drive pad, fuel island, and dispensers. The project also includes installation of a new monitoring system and addition of a canopy structure. Prospective bidders unable to attend the mandatory pre-bid conference may contact Dan McMahon at 978-685-0950 to arrange an alternative site visit to evaluate project conditions and specifications.

The specifications document establishes detailed technical and performance requirements for bidders to prepare comprehensive proposals for this infrastructure replacement initiative. Interested contractors should review all bid specifications thoroughly and submit proposals in accordance with the town's stated submission procedures and deadlines. The project represents a significant capital improvement to the municipality's fuel storage and dispensing infrastructure, ensuring compliance with current environmental and safety standards for underground storage tank systems.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .