This Addendum #1 document, issued by Levy Dykema PLLC on behalf of the City of Ingleside, Texas, modifies the bid documents for electrical infrastructure upgrades at Live Oak Park and N.O. Simmons Park (RFP2026-06). The project scope includes modifications to electrical distribution systems, new and replacement panels, underground conduit and wiring, exterior receptacles and controls, and conduit infrastructure for CCTV systems, along with selective demolition, trenching, boring, connections to existing systems, testing, and restoration of disturbed landscaping. The addendum reschedules the non-mandatory pre-bid conference from November 10th to November 9th, 2026 at 10:00 AM at N.O. Simmons Park with a site visit to follow. Sealed bids are due November 24th, 2026 at 2:00 PM and will be publicly opened at that time. The bid documents consist of a project manual and drawings available as of October 26th, 2026. Prospective bidders must submit prequalification documentation on AIA Document A305 and comply with all requirements outlined in the Request for Qualifications prior to being eligible to submit construction bids.
Bidders must provide a 5% bid bond or certified check payable to the City of Ingleside, with all bonds issued by surities holding current certificates of authority from the U.S. Department of Treasury and licensed in Texas. The prequalification criteria require prospective bidders to demonstrate proper licensing, financial capacity, successful completion of a minimum of five similar projects with at least two completed within the last three years, acceptable past performance records, and compliance with Minority-owned business enterprise/woman-owned business enterprise (MBE/WBE) requirements. Key project personnel, including the project manager and field superintendent, must have successfully completed a minimum of three similar projects. The contract will be awarded as a Stipulated Sum contract. Sealed proposals must be submitted in PDF format via thumb drive and three hard copies to the City Secretary at 2671 San Angelo Avenue, Ingleside, Texas 78362, or through the City's preferred PlanetBids portal. The City reserves the right to reject any or all submittals and waive any defects or informalities in the RFP procedure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STUDIOS 620 Congress Ave., STE 100 807 N. Upper Broadway, STE 101 www.LevyDykema.com Austin, Texas 78701 Corpus Christi, Texas 78401
512.342.9177 361.882.8171
ADDENDUM # 1
Architect: LEVY DYKEMA, PLLC 807 N Upper Broadway Suite 101, Corpus Christi, TX 78401
Contact: Rob J Garcia
(361) 882 - 8171
Project: City of Ingleside – Live Oak Park and N.O. Simmons Park
Date: 10/28/2026
The following items shall be included as part of the Construction Documents/Bid Documents issued for Permit & Pricing dated October 08, 2026.
ADDENDUM # 1
Project Manual
1. Table of Contents – Sections modified are highlighted in gray, sections added are shown in red.
2. 00 11 16 – Invitation to Bid – Modifications are shown in red. Non-mandatory pre-bid meeting has changed from November 10th at 10:00 a.m. to November 9th at 10:00 a.m.
3. 00 11 53 – Request for Qualifications – Modifications are shown in red.
4. Request for Proposals – Added as an attachment to the Request for Qualifications.
Electrical Upgrades
10/28/2026 http://www.levydykema.com/
TABLE OF CONTENTS
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 01 10 - 1
SECTION 00 01 10 - TABLE OF CONTENTS
Division Section Title
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 COVER SHEET
00 01 01 PROJECT TITLE PAGE
00 01 10 TABLE OF CONTENTS
ELECTRICAL TABLE OF CONTENTS
00 01 16 INVITATION TO BID
00 11 53 REQUEST FOR QUALIFICATIONS
REQUEST FOR PROPOSAL
00 21 13 INSTRUCTIONS TO BIDDERS
00 31 13 PRELIMINARY SCHEDULES
00 31 43 PERMIT APPLICATION
00 41 13 BID FORM – STIPULATED SUM
00 43 73 PROPOSED SCHEDULE OF VALUES FORM
00 72 00 GENERAL CONDITIONS
00 73 43 WAGE RATES REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 03 90 COORDINATION AND MEETINGS
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 30 00 SUBMITTALS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 60 00 MATERIAL AND EQUIPMENT
01 73 00 EXECUTION
01 70 00 CONTRACT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
10/28/2026
TABLE OF CONTENTS
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 01 10 - 2
01 78 39 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
DIVISION 26 – ELECTRICAL
REFER TO ELECTRICAL’S TABLE OF CONTENT
END OF TABLE OF CONTENTS
INVITATION TO BID
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 01 16 - 1
SECTION 00 01 16 - INVITATION TO BID
Owner: City of Ingleside
2671 San Angelo, Ingleside, Texas 78362
Gary Paredes
Architect: LEVY DYKEMA
807 N. Upper Broadway Suite 101
Corpus Christi, Tx 78401
p. (361)882.8171
Robert J. Garcia, AIA
MEP Engineer: NRG Engineering
5656 S. Staples Ste. 312
Corpus Christi, TX 78411
p. (361) 852-2727
John Rodriguez, P.E.
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 01 16 - 2
Date: October 23rd , 2026
1. General Contractors are invited to submit an offer under seal to the Architect for the project entitled City of Ingleside – Live Oak Park & N.O. Simmons Electrical Upgrades. The project consists of electrical infrastructure upgrades at Live Oak Park and N.O. Simmons Park in Ingleside, Texas.
Work includes modifications to electrical distribution systems, new and replacement panels, underground conduit and wiring, exterior receptacles and controls, and conduit infrastructure for
CCTV systems. Associated work includes selective demolition, trenching and boring, connections to existing systems, testing, and restoration of disturbed landscaping and site areas, as indicated in the drawings and specifications.
2. The offers shall be submitted in sealed envelopes or through the City’s preferred portal. See
Request for Proposal (RFP) for Live Oak Park and N.O. Simmons Park Electrical Upgrades.
3. A non-mandatory pre-bid conference will be held, November 9th, 2026 at 10:00 AM at N.O.
Simmons Park, Live Oak Park site visit to follow.
4. Bids opened November 24th, 2026 at 2:00 p.m.
The Contract will be for a Stipulated Sum contract between the Owner and General Contractor.
The bid documents consist of a Project Manual and Drawings. The bid documents will be available
October 26TH, 2026 by email from Levy Dykema. Hard Copy Project Manuals, Drawings, and Ad-denda will be paid for by the General Contractor and distributed to the Contractor. No partial sets of Project Manuals or Drawings will be released.
Refer to other Bidding requirements described in Document 00 10 00 - Instructions to Bidders.
5. Submit the offer on the Bid Form provided within the project manual. Bidders may use their own letterhead but content of bid form must duplicate the form(s) included in the Project Manual under Section 00 41 00 - Bid Form. Bidders are required to complete the Bid Form and may sup-plement this form as appropriate.
All proposals shall be accompanied by a cashier’s or certified check upon a national or state bank in the amount of 5% of the largest possible total of the bid submitted, payable to Owner, or a bid bond in the same amount issued by a surety company licensed by the State Department of Insurance to do busi-ness in Texas and to issue said bonds. The bid bond must be signed by an authorized representative of the surety, and be licensed by the State Board of insurance. Bids without a check or bid bond will not be considered.
All bid securities will be returned to the respective bidders within ten (10) days after bids are opened, except those which the Owner elects to hold until the successful bidder has executed the contract and furnished performance and payment bonds. Thereafter, all remaining securities, including security of the successful bidder, will be returned within ten (10) days.
All bonds for the Project, including Bid Bond, performance Bond, and Payment Bond, shall be issued by a surety that:
6. Is named on the current list of “Companies Holding Certificates of Authority as Acceptable
Sureties on Federal Bonds and Acceptable Reinsuring Companies: as published in Circular 570
(amended) by the Financial Management Service, Surety Bond Branch, US Department of the
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 01 16 - 3
Treasury.
7. Is licensed to conduct business in the State of Texas.
8. Is licensed by the Texas Department of Insurance to issue the bonds.
All Bonds signed by an agent must be accompanied by a certified copy of such agent’s authority to act.
Questions and/or clarifications requested by Bidders must be in writing not less than 5 days before date set for receipt of Bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known re-cipients and plan room. Addenda cannot be issued any later than 2 days prior to the Bid Date.
The offer is required to be submitted under a condition of irrevocability for a period of 60 days after submission.
The Owner reserves the right to accept or reject any or all offers.
END OF DOCUMENT 00 01 16
Copyright 2019 AIA Procurement and Contracting Documents 03/19
REQUEST FOR QUALIFICATIONS
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 1
DOCUMENT 00 11 53 - REQUEST FOR QUALIFICATIONS
1.1 PURPOSE, LAWS, AND REGULATIONS
A. The purpose of the Prequalification Procedure described in this Document is to provide
Owner with a mechanism to evaluate and determine whether Prospective Bidders are qualified to participate in the construction of Project. Evaluation will be limited to that office of the Prospective Bidder that is proposed to perform the Work.
B. Prospective Bidders are required to comply with these Requirements for Prequalification.
Only those Prospective Bidders who have complied with the Requirements for
Prequalification and have been determined to be qualified will be eligible to submit construction bids on Project.
1.2 PREQUALIFICATION DOCUMENTS
A. Prequalification Documents: Consist of the Advertisement for Prequalification of Bidders; this
Request for Qualifications document; AIA Document A305, "Contractor's Qualification
Statement"; and additional documents issued by Owner.
B. Obtaining Prequalification Documents: Prospective Bidders may obtain complete sets of the
Prequalification Documents from the issuing office designated in the Advertisement for
Prequalification of Bidders. Prospective Bidders shall use complete sets of Prequalification
Documents in preparing their submittal. Owner assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Prequalification Documents.
C. Interpretation or Correction of Prequalification Documents: If the Prospective Bidder is in doubt as to the interpretation of any part of the Prequalification Documents, or finds discrepancies in or omissions from any part of the Prequalification Documents, it must submit a written Request for Interpretation thereof no later than seven (7) days prior to acceptance of Submittals of Qualifications. Address all communications to Owner.
1.3 PREQUALIFICATION PROCEDURES
A. Form of Prequalification Submittal:
1. Submittals of Prequalification must be submitted in duplicate on AIA Document A305, "Contractor's Qualification Statement," properly executed and with all items filled out in ink or typed, and all additional data, attachments, and forms provided. Do not change or add words to the Qualification Statement or forms. All signatures must be original (and sealed if a corporation) and must be notarized and sealed by a Notary
Public.
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 2
B. Modification to Requirements for Prequalification:
1. Clarifications, alterations, or changes made by Owner to the Requirements for
Prequalification shall be in writing only. Verbal information is not valid or binding.
2. Modifications will be mailed or delivered to those Prospective Bidders having obtained
Prequalification Documents from the issuing office.
C. Submission of Prequalification Documents:
1. Refer to attached Request for Proposal (RFP) for Live Oak Park and N.O. Simmons
Park Electrical Upgrades.
D. Attachments:
1. Prospective Bidders shall complete all required forms and attachments described in the Prequalification Documents, entering "Not Applicable" where information does not apply. Absence of any of the forms included in the Prequalification Documents will be reason for possible disqualification.
E. Status of Prospective Bidders:
1. Proprietors submitting bids shall indicate their status as proprietors.
2. Prospective Bidders submitting qualifications for partnerships shall indicate their status as partners and shall submit a certified copy of the power of attorney authorizing the executor of the submittal to bind the partnership.
3. Prospective Bidders submitting qualifications for corporations shall indicate their status as corporations and shall submit a certified copy of the board of directors' authorization for the Prospective Bidder to bind the corporation and shall affix the corporate seal on the submittal.
4. Prospective Bidders shall provide the following:
a. Names and addresses of proprietors, of all members of a partnership, or of the corporation's officers.
b. Name of jurisdiction where the partnership is registered or where the corporation is incorporated. Corporations must be licensed to do business in
Project state at the time of executing the Contract.
1.4 WITHDRAWAL
A. A Qualification Statement may be withdrawn on personal request received from the
Prospective Bidder.
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 3
1.5 PREQUALIFICATION CRITERIA
A. Prospective Bidders must demonstrate the following to the satisfaction of Owner:
1. Proper license under the laws and regulations governing their respective trade(s).
2. Capacity to provide Bid Bond, Performance Bond, and Payment Bond, and Insurance in a form acceptable to Owner in amounts adequate to bond the Work based on the scope indicated in the Advertisement for Prequalifications.
3. Applicable experience of firm as described in the Contractor's Qualification Statement, including the following:
a. Experience of Firm: The firm in its current organization shall have successfully completed minimum of five (5) projects of similar type, quality, and scope, including a minimum of two (2) within the last three (3) years. The firm shall have a record of project completion, credit record, record of judgment claims, arbitration proceedings, and suits pending or outstanding acceptable to Owner.
b. Experience of Firm Officers: The firm officers shall have personal record of project completion acceptable to Owner.
c. Experience of Project and Field Management Staff to Be Committed by the
Prospective Bidder to Carry Out the Work: The assigned project manager and field superintendent must have successfully completed minimum of three (3) projects of similar type, quality, and scope.
d. For purposes of this submittal, reference to "key individuals" as described in the
Contractor's Qualification Statement shall be understood to mean the principal in charge, the project manager(s), and the project field superintendent(s) committed by the Prospective Bidder to carry out the Work of this Project.
Prospective Bidder by submitting qualifications of key individuals agrees that
Owner reserves the right to approve or reject subsequent reassignment of key individuals.
e. For purposes of this submittal, "successful completion" shall be understood to mean completion of project within project schedule and budget. Provide additional information indicating reasons why any referenced project did not meet project schedule or project budget.
f. For purposes of this Qualification, "similar project" shall be understood to include the following project elements:
1) Reinforced masonry load-bearing construction.
2) Long-span, steel-framed roof structure.
3) Automated building systems (controls, fire detection and alarm, technology wiring infrastructure, intercommunications).
4) Renovation/addition work on occupied sites.
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 4
4. Adequate financial resources, including ability to secure materials and labor necessary for completion of the Work and other work in hand, within the anticipated contract times, and reflecting the anticipated retainage from progress payments.
5. Work-in-hand capacity, such that the Prospective Bidder demonstrates adequate work under contract to continue its business operations at least at their current level, at the same time indicating the capability to carry out Owner's proposed work.
6. Adequate organization to complete work of the scope anticipated, including firm management, project management, field superintendence, and field engineering and quality control.
7. Acceptable past performance as indicated by firm's references, including ability to meet contract time and to monitor, manage, and communicate interim scheduling requirements, to carry out required quality-control activities, to properly prepare interim and final payment requests, and to successfully complete project closeout requirements.
8. Acceptable documentation of firm's ability to comply with Owner's Minority-owned business enterprise/woman-owned business enterprise (MBE/WBE) requirements.
Prospective Bidders shall contact Owner to obtain copies of requirements.
9. Acceptable documentation of firm's employee screening practices as indicating by affidavit describing background check procedures for firm's employees and requirements for same incorporated in firm's subcontracts.
B. Consideration of qualifications may be withheld if the Qualification Statement shows any unexplained erasures, omissions, alterations of form, additions not called for, added restrictions or qualifying conditions, or other irregularities of any kind.
C. Owner may make such investigations as it deems necessary to determine the ability of the
Prospective Bidder to perform the Work, and the Prospective Bidder shall furnish to Owner all such information for this purpose as Owner may request. Owner reserves the right to withhold qualification if the evidence submitted by or investigation of such Prospective
Bidder fails to satisfy Owner that such Prospective Bidder is properly qualified to carry out the obligations of the proposed Project. The determination of which bidders are prequalified is not protestable, except as allowed by law.
D. Prequalification Submittal and data contained therein is considered privileged and confidential and will not be disclosed to any outside party except as required by law.
1.6 ACCEPTANCE OF QUALIFICATIONS
A. Prospective bidders will be notified of Owner's determination, within ten (10) days from the date of submission.
B. Evaluations will be confidential. Notifications will be publicly available information.
C. Owner may deny prequalification if it finds one or more of the following:
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 5
1. The Prospective Bidder does not have sufficient financial capacity to perform the
Work.
2. The Prospective Bidder does not have the appropriate experience to perform the
Work, including, but not limited to, having met the experience criteria set forth herein.
3. The Prospective Bidder or any officer, director, or owner thereof has had judgments entered against him within the past five years for the breach of contracts for governmental or nongovernmental construction work including, but not limited to, design-build or construction management contracts.
4. The Prospective Bidder has been in substantial noncompliance with the terms and conditions of prior construction with Owner, or in documented substantial noncompliance with the terms and conditions of prior construction with another public body without good cause.
5. The Prospective Bidder or any officer, director, owner, or chief financial official thereof has been convicted within the past 10 years of a crime related to governmental or nongovernmental construction or contracting.
6. The Prospective Bidder or any officer, director, or owner thereof is currently debarred pursuant to an established debarment procedure from bidding or contracting by any public body, agency of another state, or agency of the Federal Government.
7. The Prospective Bidder failed to provide to the public body in a timely manner any information required by the public body relevant to the six preceding subparagraphs.
8. The Prospective Bidder provides false, nonresponsive, misleading, or incomplete information for items required herein.
D. The acceptance of a Prospective Bidder's qualifications will be a Notice of Prequalification, signed by a duly authorized representative of Owner; no other act by Owner or its agents shall constitute the acceptance of qualifications. The acceptance of a Prospective Bidder's qualifications by Owner does not constitute a contract or promise to award a contract to the
Prospective Bidder.
1.7 PROSPECTIVE BIDDER'S CHECKLIST
A. In an effort to assist the Prospective Bidder in properly completing all documentation required, the following checklist is provided for the Prospective Bidder's convenience. The
Prospective Bidder is solely responsible for verifying compliance with prequalification requirements.
B. Attach this completed checklist to the outside of the Submittal envelope.
1. Reviewed the Prequalification Documents, including the Advertisement for
Prequalification and Requirements for Prequalification, prior to preparing this submittal.
2. Prepared AIA Document A305, "Contractor's Qualification Statement," as required by the document instructions and by the Requirements for Prequalification, including all
10-26004 City of Ingleside – Live Oak Park & N.O. Simmons Park Electrical Upgrades 00 11 53 - 6 attachments and data required as part of the Qualification Statement, properly notarized.
3. Provide Attachment: General Information
4. Provide Attachment: Financial and Performance Information
5. Provide Attachment: Project-Specific Information
6. Provide Attachment: Past Experience
7. Provide Attachment: Copy of applicable Contractor's license(s).
8. Provide Attachment: Affidavit of Employee Screening.
9. Provide Attachment: Attached: Resumes of key individuals.
10. Provide Attachment: Other attachments as necessary to provide information required.
11. Envelope shows name and address of the Prospective Bidder.
12. Envelope shows the Prospective Bidder's Contractor's License No.
END OF DOCUMENT 00 11 53
1 | P a g e
City of Ingleside Request for Proposal (RFP) for Live Oak Park and N.O. Simmons Park Electrical Upgrades.
Dear General Contractors:
The City of Ingleside Request for Proposal for RFP2026-06 Live Oak Park and N.O. Simmons Park Electrical Upgrades, to consist of electrical infrastructure upgrades at Live Oak Park and N.O. Simmons Park in Ingleside, Texas. Work includes modifications to electrical distribution systems, new and replacement panels, underground conduit and wiring, exterior receptacles and controls, and conduit infrastructure for CCTV systems. Associated work includes selective demolition, trenching and boring, connections to existing systems, testing, and restoration of disturbed landscaping and site areas, as indicated in the drawings and specifications.
Please submit your sealed proposal through the Ingleside PlanetBids Portal or in person to the City Secretary at City Hall located at 2671 San Angelo Ave, Ingleside, Texas, 78362, marked with the name of the Request for Proposal and the company name submitting the proposal to:
City of Ingleside Attn: City Secretary RFP – Electrical Upgrades for Parks 2671 San Angelo Avenue Ingleside, Texas 78362
RFP packets are available at Ingleside City Hall at the above address or online at:
https://vendors.planetbids.com/portal/80600/bo/bo-detail/147722
A non-mandatory pre-bid conference will be held, November 9, 2026, at 10:00am at Ingleside City Hall, 2671 San Angelo Ave. Ingleside, Texas 78362 with N.O. Simmons Park, Live Oak Park, site visit to follow.
The deadline for submission of sealed proposal is November 24, 2026, 2:00pm local time to be considered at which time they will be publicly opened and read. Submittals shall be in .pdf format via thumb drive and (3) three hard copies for hand delivered submittals. No proposal will be accepted or considered after 2:00 p.m. local time. Late proposals will be retained in the City Secretary’s office. No electronic mail submissions will be accepted except through the PlanetBids portal.
The City reserves the right to: waive any defect, irregularity or informality in the RFP procedure or in any response to the RFP; to reject any or all submittals; to cancel any portion or the entire RFP at any time; to re-issue the RFP; to negotiate with any, all, or none of the Proposers; to request additional information or clarification at any time; to extend the submission deadline; to take any other action reasonable necessary to: (a) administer the RFP in a fair and impartial manner; (b) to effectuate City policy; (c) to comply with any law, rule or regulation; (d) to ensure the City a full and open opportunity to review and consider the information submitted. The City of Ingleside is an Affirmative Action/Equal Opportunity Employer.
https://vendors.planetbids.com/portal/80600/bo/bo-detail/147722
| LD_Addendum |
| ADDENDUM # 1 |
| ADDENDUM # 1 |
| 00 01 10 Table of Contents |
| 00 11 16 SF - Invitation to Bid |
| SECTION 00 01 16 - INVITATION TO BID |
| 00 11 53 SF - Request for Qualifications |
| 1.1 PURPOSE, LAWS, AND REGULATIONS |
| A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate and determine whether Prospective Bidders are qualified to participate in the construction of Project. Evaluation will be limi... |
| B. Prospective Bidders are required to comply with these Requirements for Prequalification. Only those Prospective Bidders who have complied with the Requirements for Prequalification and have been determined to be qualified will be eligible to submit... |
| 1.2 PREQUALIFICATION DOCUMENTS |
| A. Prequalification Documents: Consist of the Advertisement for Prequalification of Bidders; this Request for Qualifications document; AIA Document A305, "Contractor's Qualification Statement"; and additional documents issued by Owner. |
| B. Obtaining Prequalification Documents: Prospective Bidders may obtain complete sets of the Prequalification Documents from the issuing office designated in the Advertisement for Prequalification of Bidders. Prospective Bidders shall use complete set... |
| C. Interpretation or Correction of Prequalification Documents: If the Prospective Bidder is in doubt as to the interpretation of any part of the Prequalification Documents, or finds discrepancies in or omissions from any part of the Prequalification D... |
| 1.3 PREQUALIFICATION PROCEDURES |
| A. Form of Prequalification Submittal: |
| 1. Submittals of Prequalification must be submitted in duplicate on AIA Document A305, "Contractor's Qualification Statement," properly executed and with all items filled out in ink or typed, and all additional data, attachments, and forms provided. D... |
| B. Modification to Requirements for Prequalification: |
| 1. Clarifications, alterations, or changes made by Owner to the Requirements for Prequalification shall be in writing only. Verbal information is not valid or binding. |
| 2. Modifications will be mailed or delivered to those Prospective Bidders having obtained Prequalification Documents from the issuing office. |
| C. Submission of Prequalification Documents: |
| 1. Refer to attached Request for Proposal (RFP) for Live Oak Park and N.O. Simmons Park Electrical Upgrades. |
| D. Attachments: |
| 1. Prospective Bidders shall complete all required forms and attachments described in the Prequalification Documents, entering "Not Applicable" where information does not apply. Absence of any of the forms included in the Prequalification Documents wi... |
| E. Status of Prospective Bidders: |
| 1. Proprietors submitting bids shall indicate their status as proprietors. |
| 2. Prospective Bidders submitting qualifications for partnerships shall indicate their status as partners and shall submit a certified copy of the power of attorney authorizing the executor of the submittal to bind the partnership. |
| 3. Prospective Bidders submitting qualifications for corporations shall indicate their status as corporations and shall submit a certified copy of the board of directors' authorization for the Prospective Bidder to bind the corporation and shall affix... |
| 4. Prospective Bidders shall provide the following: |
| a. Names and addresses of proprietors, of all members of a partnership, or of the corporation's officers. |
| b. Name of jurisdiction where the partnership is registered or where the corporation is incorporated. Corporations must be licensed to do business in Project state at the time of executing the Contract. |
| 1.4 WITHDRAWAL |
| A. A Qualification Statement may be withdrawn on personal request received from the Prospective Bidder. |
| 1.5 PREQUALIFICATION CRITERIA |
| A. Prospective Bidders must demonstrate the following to the satisfaction of Owner: |
| 1. Proper license under the laws and regulations governing their respective trade(s). |
| 2. Capacity to provide Bid Bond, Performance Bond, and Payment Bond, and Insurance in a form acceptable to Owner in amounts adequate to bond the Work based on the scope indicated in the Advertisement for Prequalifications. |
| 3. Applicable experience of firm as described in the Contractor's Qualification Statement, including the following: |
| a. Experience of Firm: The firm in its current organization shall have successfully completed minimum of five (5) projects of similar type, quality, and scope, including a minimum of two (2) within the last three (3) years. The firm shall have a recor... |
| b. Experience of Firm Officers: The firm officers shall have personal record of project completion acceptable to Owner. |
| c. Experience of Project and Field Management Staff to Be Committed by the Prospective Bidder to Carry Out the Work: The assigned project manager and field superintendent must have successfully completed minimum of three (3) projects of similar type, ... |
| d. For purposes of this submittal, reference to "key individuals" as described in the Contractor's Qualification Statement shall be understood to mean the principal in charge, the project manager(s), and the project field superintendent(s) committed b... |
| e. For purposes of this submittal, "successful completion" shall be understood to mean completion of project within project schedule and budget. Provide additional information indicating reasons why any referenced project did not meet project schedule... |
| f. For purposes of this Qualification, "similar project" shall be understood to include the following project elements: |
| 1) Reinforced masonry load-bearing construction. |
| 2) Long-span, steel-framed roof structure. |
| 3) Automated building systems (controls, fire detection and alarm, technology wiring infrastructure, intercommunications). |
| 4) Renovation/addition work on occupied sites. |
| 4. Adequate financial resources, including ability to secure materials and labor necessary for completion of the Work and other work in hand, within the anticipated contract times, and reflecting the anticipated retainage from progress payments. |
| 5. Work-in-hand capacity, such that the Prospective Bidder demonstrates adequate work under contract to continue its business operations at least at their current level, at the same time indicating the capability to carry out Owner's proposed work. |
| 6. Adequate organization to complete work of the scope anticipated, including firm management, project management, field superintendence, and field engineering and quality control. |
| 7. Acceptable past performance as indicated by firm's references, including ability to meet contract time and to monitor, manage, and communicate interim scheduling requirements, to carry out required quality-control activities, to properly prepare in... |
| 8. Acceptable documentation of firm's ability to comply with Owner's Minority-owned business enterprise/woman-owned business enterprise (MBE/WBE) requirements. Prospective Bidders shall contact Owner to obtain copies of requirements. |
| 9. Acceptable documentation of firm's employee screening practices as indicating by affidavit describing background check procedures for firm's employees and requirements for same incorporated in firm's subcontracts. |
| B. Consideration of qualifications may be withheld if the Qualification Statement shows any unexplained erasures, omissions, alterations of form, additions not called for, added restrictions or qualifying conditions, or other irregularities of any kind. |
| C. Owner may make such investigations as it deems necessary to determine the ability of the Prospective Bidder to perform the Work, and the Prospective Bidder shall furnish to Owner all such information for this purpose as Owner may request. Owner res... |
| D. Prequalification Submittal and data contained therein is considered privileged and confidential and will not be disclosed to any outside party except as required by law. |
| 1.6 ACCEPTANCE OF QUALIFICATIONS |
| A. Prospective bidders will be notified of Owner's determination, within ten (10) days from the date of submission. |
| B. Evaluations will be confidential. Notifications will be publicly available information. |
| C. Owner may deny prequalification if it finds one or more of the following: |
| 1. The Prospective Bidder does not have sufficient financial capacity to perform the Work. |
| 2. The Prospective Bidder does not have the appropriate experience to perform the Work, including, but not limited to, having met the experience criteria set forth herein. |
| 3. The Prospective Bidder or any officer, director, or owner thereof has had judgments entered against him within the past five years for the breach of contracts for governmental or nongovernmental construction work including, but not limited to, desi... |
| 4. The Prospective Bidder has been in substantial noncompliance with the terms and conditions of prior construction with Owner, or in documented substantial noncompliance with the terms and conditions of prior construction with another public body wit... |
| 5. The Prospective Bidder or any officer, director, owner, or chief financial official thereof has been convicted within the past 10 years of a crime related to governmental or nongovernmental construction or contracting. |
| 6. The Prospective Bidder or any officer, director, or owner thereof is currently debarred pursuant to an established debarment procedure from bidding or contracting by any public body, agency of another state, or agency of the Federal Government. |
| 7. The Prospective Bidder failed to provide to the public body in a timely manner any information required by the public body relevant to the six preceding subparagraphs. |
| 8. The Prospective Bidder provides false, nonresponsive, misleading, or incomplete information for items required herein. |
D. The acceptance of a Prospective Bidder's qualifications will be a Notice of Prequalification, signed by a duly authorized representative of Owner; no other act by Owner or its agents shall constitute the acceptance of qualifications. The acceptance...
| 1.7 PROSPECTIVE BIDDER'S CHECKLIST |
| A. In an effort to assist the Prospective Bidder in properly completing all documentation required, the following checklist is provided for the Prospective Bidder's convenience. The Prospective Bidder is solely responsible for verifying compliance wit... |
| B. Attach this completed checklist to the outside of the Submittal envelope. |
| 1. Reviewed the Prequalification Documents, including the Advertisement for Prequalification and Requirements for Prequalification, prior to preparing this submittal. |
| 2. Prepared AIA Document A305, "Contractor's Qualification Statement," as required by the document instructions and by the Requirements for Prequalification, including all attachments and data required as part of the Qualification Statement, properly ... |
| 3. Provide Attachment: General Information |
| 4. Provide Attachment: Financial and Performance Information |
| 5. Provide Attachment: Project-Specific Information |
| 6. Provide Attachment: Past Experience |
| 7. Provide Attachment: Copy of applicable Contractor's license(s). |
| 8. Provide Attachment: Affidavit of Employee Screening. |
| 9. Provide Attachment: Attached: Resumes of key individuals. |
| 10. Provide Attachment: Other attachments as necessary to provide information required. |
| 11. Envelope shows name and address of the Prospective Bidder. |
| 12. Envelope shows the Prospective Bidder's Contractor's License No. |
| 2026, 10-26 RFP |
| The deadline for submission of sealed proposal is November 24, 2026, 2:00pm local time to be considered at which time they will be publicly opened and read. Submittals shall be in .pdf format via thumb drive and (3) three hard copies for hand delivere... |