This is a Pre-Bid Request for Information (RFI) Responses memorandum issued by CROFT on April 24, 2026, for Solicitation No. 10-2026-008-009 related to the Adairsville Primary School project (2026-1003). The document addresses clarifications from bidders regarding the Construction Manager at Risk (CMAR) delivery method. Key questions raised by bidders concern the availability of Exhibit B in editable electronic formats, building permit fee exemptions for public school projects, the applicable contract terms, and the release of geotechnical survey information. The memorandum confirms that Exhibit B files are attached and provides clarification on the permit fee waiver status and contractual framework.
In response to bidder inquiries, the project notes that building permit fees are typically waived for public school construction projects. The contract utilizes the AIA A132-2019 standard form as referenced in the Request for Proposal. The geotechnical survey has not yet been released but will be provided to the selected contractor upon availability. No pricing terms, funding sources, or other financial details are specified in this RFI response document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[Type here]
MEMORANDUM
TO: All Bidders, FROM: Chris Philhower, Project Manager; CROFT
SUBJECT: Pre Bid RFI Responses, Solicitation No: 10-2026-008-009
DATE: 2026, April, 24
PROJECT: 2026-1003 Adairsville Primary School
CMAR RFIs
• Do you have the Exhibit B in an excel or word document. In the RFP it appears to be scanned and a little blurry. If not we can redo. It appears it may have been created in
Excel.
o See attached files.
• Exhibit C page 12 notes Building permit fees by the CM. Would this project be exempt from Building permit fees?
o Because this is a public school, the permit fees are normally waived.
• Can a copy of the contract being utilized be shared?
o Refer to AIA A132-2019, as referenced in the RFP.
• Can a copy of the Geo Tech Report be shared as well?
o Geotech Survey has not been released. It will be shared with Contractor when available.