Request for Proposals Summary
This is a Request for Proposals (RFP) issued by the City of West Allis, Wisconsin for architectural services related to the renovation of West Allis City Hall located at 7525 W. Greenfield Avenue. The City seeks qualified architectural firms to provide creative and efficient design, permitting, preparation of bid documents, bidding process management, and all necessary documents for the renovation project. The three-story existing building (approximately 13,000 square feet per level) requires comprehensive renovation to accommodate the relocation of the engineering and information technology departments and address aging building infrastructure. The project scope includes development of construction plans and specifications; coordination with internal staff; parking lot logistics review; incorporation of LEED or sustainability features; site and engineering plans; master site layout; stormwater management; utility confirmation; fire protection planning; topographic survey; lighting and landscape plans; and facility sign design. An on-site walk-through is scheduled for Monday, December 1, 2026, from 4:00 p.m. to 5:15 p.m. CST. The deadline for submitting questions is Monday, December 7, 2026, at 4:00 p.m. CST, with responses due by Friday, December 11, 2026. Proposals are due Friday, January 8, 2027, by 4:00 p.m. CST through the City's online Bonfire bidding portal. Consultant interviews are scheduled for Tuesday, January 26, 2027. The Notice of Award and Notice to Proceed are anticipated for mid to late February 2027, with construction anticipated to begin in early 2028. The initial contract covers design services, with the potential for a separate negotiated scope for construction management if the facility is authorized for renovation.
The RFP requires firms to submit proposals in a specified format including firm qualifications, understanding of City needs, staffing commitments, intended approach to deliverables, consultant relationships with City staff, project references, resumes of assigned professionals, and cost information. Labor costs, including position, hours, and hourly rates, must be provided in a separate online submittal. The City reserves the right to reject any and all proposals and to negotiate contract terms with the preferred proposer. Specific set-asides are not indicated in this RFP. The project schedule calls for a 75 percent construction budget by August 2027, completion of architectural design and detailed construction plans in October 2027, and tentative construction contract award on December 7, 2027. The City will utilize AIA standard architect contract forms subject to City Attorney modifications. Insurance requirements include General Liability with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, Professional Liability/Errors & Omissions coverage of minimum $1,000,000, and an Umbrella Liability policy of $5,000,000. The building was constructed between 1967 and 1970 and contains approximately 41,400 square feet on 2.11 acres, with the existing facility to remain operational throughout construction.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals West Allis City Hall Renovation
Architectural Services
RFP # EN-26024
Due Date: Friday, January 8, 2027, 5:00pm CST
City of West Allis
November 18, 2026
Request for Proposals No. RFP- for the West Allis City Hall Renovation
Architectural Services
I. Introduction The City is requesting proposals from qualified architectural firms for the creative and efficient design, permitting, preparation of bid documents, bidding process management, and all other necessary documents for the renovation of the existing City Hall facility at 7525 W. Greenfield Avenue. Due to the relocation of the engineering and information technology departments, and aging building infrastructure, there is a need for renovation of the existing City Hall to facilitate efficient interoperation of departments along with safe and secure interactions with the public during office hours and public meetings. The site consists of the existing 3-story building with a partially below grade lower level. Each level is approximately 13,000 square feet. The City has done an internal review of the space as well as a facility study for the site and operations. Each design firm proposing on this facility should be prepared to review and update these items with their own site and building layout. There will be a team consisting of City staff who will help portray collective ideas for the building. We further request that this firm have an out-of-the-box thinking approach to the needs of our municipality.
Background The City of West Allis has been implementing recommendations from a compete facility study performed in 2019. This includes constructing a new Department of Public Works (DPW) facility. Two departments currently located at the City Hall will be relocating to the new DPW facility, leaving open space for the realignment of remaining departments and opportunities for more efficient use of building space. In addition, as the building ages, maintenance needs have grown. The City has determined that the existing city hall is in a central location for the community, and the building has enough space for the remaining departments and understands the building requires infrastructure upgrades.
In 2026, internal city staff reviewed the existing building to determine if there would be enough space for the remaining department. The City then hired FEH to verify the staff results and perform a very high-level analysis of space. The analysis showed that there is enough space in the existing city hall building.
History The current West Allis City Hall is located at 7525 W. Greenfield Avenue.
Construction began in 1967 and completed by 1970. The current building is approximately 41,400 square feet on 2.11 acres. Many of the city departments which interact with the public daily are located in this building. Also, the Common Council meetings and other city committee meetings are held here.
Voting and central count occur in the building as well. There is a parking lot which connects some alleys and appears as alley throughways. The site also has a generator.
II. Scope of Work Architectural Requirements The architectural plans shall provide the following:
• Development of construction plans and specifications for the renovation of the existing city hall facility at 7525 W. Greenfield Ave. which is to include but is not limited to customer service areas, common council chambers, large and small meeting/conference rooms, office spaces for each department, elected official office/meeting rooms, storage spaces, space for the existing print shop that has several large printers, space for voting and central count, employee gathering spaces one of which should have kitchen amenities, exercise room, mail table/room, public and staff restrooms, public and staff vehicle parking, generator, garbage and recycle enclosure. As public-facing entities that serve the larger community, design should consider the nature of the patrons and the multifunctional use of the building.
• Coordinate with internal staff for building operations, including but not limited to, information technology, building maintenance, workflow, access, etc.
• The parking lot should be reviewed for logistics of staff parking, short visit parking, longer term parking for meeting attendance, voting, garbage/recycle collection, and generator location. The parking lot has a dedicated alley connected to it and must remain open to alley traffic.
• Incorporate as many LEED or sustainability features as practical. Give the City options to decide if such features are practical. Options include, but not limited to, alternate energy sources such as solar and/or geothermal.
• Design a sign for the facility.
• Develop construction plans and specifications for the new facility. Building construction plans will require approval by the State of Wisconsin Department Safety and Professional Services
• Coordinate building architecture with City staff to achieve integration with existing
City buildings and surrounding sites.
• Update budget requirements for all items of the project.
Engineering Requirements The site plans and engineering plans shall include the following:
• Master site layout to incorporate any new construction, roadways, parking areas, access points, etc.
• Traffic flows on site and entrances and exits onto S. 76th and S. 75th Streets and alley.
• Stormwater management plan, if needed, to meet MMSD, WDNR, and City requirements.
• Grading plan and erosion control plan. Regional permitting for erosion control (pre & post construction) is necessary through the WDNR and MMSD.
• Confirmation of adequacy of all site utilities including sanitary sewer, storm sewer, watermain, electric, telephone, fiber optic cable, and gas service. All new utilities will be underground. Inform utilities of the planned construction and provide them with preliminary and final plans.
• Fire protection plan with permitting required through the West Allis Fire
Department.
• Provide a topographic survey of the site and adjacent land in Wisconsin State Plane Coordinate System, South Zone (NAD 27) in US Survey Feet and the City of West Allis vertical datum. Perform Digger’s Hotline request to survey existing utilities adjacent to the site. Locate property pipes and establish right-of-way.
• Lighting plan for the site including photometric modeling.
• Landscape plan for the site where existing landscape areas are removed. Care should be given to existing landscape areas. Coordinate site landscaping/screening with staff to complement adjacent developments.
Coordinate species with City Forestry Department.
• Other items as needed and required for the renovation and operation of a City Hall.
• City standard specifications for streets, sewers, and watermain, if needed, will be provided to the selected firm.
Additional Requirements:
• Identify and apply for grant opportunities which include, but are not limited to, energy efficiencies, green infrastructure, etc.
• The existing facilities shall remain functional and house operations throughout construction.
• The facility shall meet the requirements of the zoning district.
• Building and site plan approval through the Planning Commission, and the
Committee of the Whole.
• Bidding, bid review and award recommendation are required.
III. Construction Delivery & Management:
The initial contract will be negotiated for the execution of design services. If the facility is authorized for renovation, the City will negotiate a scope of services for construction management of the project.
The City is evaluating whether to use a construction manager or a general contractor for project delivery. The City is requesting firms to address both options when preparing their proposals. The City intends to utilize the AIA standard architect contract forms subject to additions and deletions by the City Attorney. The initial contract will be awarded for the execution of design services. If the facility is approved for construction, the City will negotiate a separate scope of services for construction management of the project. Preference will be given to the design firm. The City would anticipate a higher level of on-site observation and quality control verification during construction from the architect if a general contractor is utilized.
IV. Meeting Attendance The design firm will be required to attend, at a minimum, 2 public meetings: Planning Commission and Committee of the Whole for approval of the final design. The design firm will be requested to attend interim internal meetings with various City personnel.
The frequency of those meetings will be determined after the successful firm is chosen.
V. Proposal Format and Requirements The proposal should provide sufficient detail to enable the City to thoroughly evaluate and compare it with other proposals. Although the City requires no specific proposal format the following information should be included along with any other information that may be pertinent to this project:
• Provide a description of your firm, including the qualifications to provide the architectural services requested in this RFP. Also include a description of your understanding of the City’s needs and your staffing commitments to ensure your ability to meet the City’s needs. Be sure to address why your firm is best suited to successfully complete the design and construction related services for the renovation of the existing building at 7525 W. Greenfield Ave. as the West Allis City Hall.
• Describe your firm’s intended relationship with City Staff, including the level of assistance anticipated for completion of the proposed work tasks.
• Provide a description that details the consultant’s approach to delivering the products requested as part of the Scope of Work in this RFP (planning, design, bidding, permitting, construction observation/oversight, quality assurance, commissioning, and project documentation) along with any modifications or expansions of the provided scope. Identify in detail the deliverable end products resulting from the scope of services. This must also include a description of all subcontracts and associations with other firms your firm proposes to utilize in the performance of this work. Explain fully the intended working relationships and responsibilities of each firm.
• Provide a list of at least three references for services similar in scope which you have conducted in other communities including the name, address, and phone number of a contact person for each reference. Indicate the type, scope, staff and duration of the work done for each client.
• Provide at least three (3) project profiles, fact sheets or plan designs for projects undertaken by your firm for another area community successfully completed in the last 5 years. Include staff that worked on these projects highlighting staff that cross over between the referenced projects, and this proposed project. Please identify any unique accommodations or special considerations that were provided for senior populations.
• Provide resumes of all professionals who will be actively working on this contract.
Resumes should list related project experience and general project duties. Be sure to identify the project manager and the point of contact for the City.
• Provide a cost for all services performed in a separate online submittal. The most qualified firms will be chosen prior to viewing costs. Once the most qualified firms are chosen, firms will be notified by Friday January 15, 2027. Interviews will be scheduled for Tuesday, January 26, 2027. A breakdown of positions and labor hours should be included in the proposal. The labor costs, including position, hours, and hourly rates of pay should be provided in a separate online submittal.
VI. Instructions For Submissions All proposals shall be downloaded and submitted through our online bidding platform, Bonfire. (https://westalliswi.bonfirehub.com/).
https://westalliswi.bonfirehub.com/
Proposals must be received by the West Allis Bonfire bid portal no later than 4:00 pm CST, Friday, January 8, 2027. Proposals received after the due date will not be considered by the City.
All questions concerning this RFP shall be submitted through the West Allis Bonfire portal by Monday, December 7, 2026, 4:00 pm CST. We will respond to all questions as soon as possible but no later than Friday, December 11, 2026, 4:00 pm CST.
The Notice of Award and Notice to Proceed are expected to be sent to the awarded vendor mid to late February 2027.
Examination of the Request for Proposal It is the responsibility of all prospective proposers to carefully read this entire Request for Proposals which contains provisions applicable to successful completion and submission of a proposal and consists of all documents listed in this document. If any ambiguity, inconsistency, error or omission is discovered in the RFP, the Senior Buyer, Purchasing Division, must be notified through the West Allis Bonfire bid portal. Only interpretations or corrections of the RFP made in writing are binding. Any interpretation or corrections given by any other method should not be relied upon.
The City is not liable for any costs incurred to prepare or submit a proposal for this project.
The City reserves the right to reject any and all proposals. The City reserves the right to negotiate the terms of the contract, including the award amount, with the selected proposer prior to entering into a contract. If contract negotiations cannot be concluded successfully with the preferred proposer, the City may negotiate a contract with the next preferred proposer.
The City of West Allis, at its sole discretion, may terminate contract services upon ten
(10) days’ notice when the Project is terminated or by written notification with or without cause upon 30-day notice.
Proposals will be reviewed by City staff.
VI. Time Frame The following is a proposed schedule for the selection process. The City reserves the right to modify the schedule.
Event Date RFP Released Wednesday, November 18, 2026 On-site Walk Through Monday, December 1, 2026, 4:00pm CST Deadline to Submit Questions Monday, December 7, 2026, 4:00pm CST Deadline for Question Response Friday, December 11, 2026, 4:00pm CST RFP Due Friday, January 8, 2027, 4:00pm CST Internal RFP Review Meeting Wednesday, January 13, 2027 Consultant Interview Notification Friday, January 15, 2027, 4:00pm CST
Consultant Interviews Tuesday, January 26, 2027 (Times TBD) Common Council Tuesday, February 2 or Tuesday, February
23, 2027, 7:00pm CST
On-Site Walk Through An on-site tour of the site and facility at 7525 W. Greenfield Ave. will take place on Tuesday, December 1, 2026, from 4:00pm to 5:15pm. While this meeting is not mandatory, it is highly recommended to attend. The tour will begin no later than 4:15pm. This is a guided tour with basic information about the existing building will be provided. It is not intended to be a question-and-answer session.
VII. Basis of Award The award resulting from this RFP will be made to the consultant that submits the response that, in the City’s opinion, best serves the overall interests of the City. Factors that will be considered in the evaluation may include but are not limited to:
• Proven ability of firm to provide similar products within established guidelines;
• A demonstrated clear understanding of the City’s needs;
• Progressive ideas and demonstrated ability to “think outside of the box” by providing innovative analysis or solutions;
• Evaluation of reference responses;
• Qualification of personnel assigned to the project and ability to accomplish the specified work;
• The costs of products and services.
VIII. Project Schedule The City’s tentative project schedule calls for a 75% construction budget by August 2027, completion of the architectural design and detailed construction plans in October 2027, with the tentative award of the construction contract on December 7, 2027 and construction beginning in early 2028. However, the actual bid and construction dates may be influenced by factors revealed during design, including final budget, and borrowing considerations.
IX. Deliverables While many of the deliverables will be based upon the details of the project and contract, the design firm may expect, at a minimum:
• Electronic copies (.pdf format) of plans at 30%, 60% and 90% plans with updated estimates at each milestone.
• Mounted, large format display copies of 90% plans.
• Electronic and hard copies of final plans for bidding.
• Electronic and hard copies of building specifications for bidding.
• Electronic .dwg files for the City’s records.
X. Attachments:
1. Site Locations Maps
2. Existing FEH Study
3. Existing Utility Maps
4. Insurance Requirements
XI. Other Non-Discrimination Statement The City of West Allis does not discriminate on the basis of race, color, religion, age, marital or veterans' status, sex, national origin, disability, or any other legally protected status in the admission or access to, or treatment or employment in, its services, programs or activities.
Americans With Disabilities Act Notice Upon reasonable notice, the City will furnish appropriate auxiliary aids and services when necessary to afford individuals with disabilities an equal opportunity to participate in and to enjoy the benefits of a service, program or activity provided by the City.
Limited English Proficiency Statement It is the policy of the City of West Allis to provide language access services to populations of persons with Limited English Proficiency (LEP) who are eligible to be served or likely to be directly affected by our programs. Such services will be focused on providing meaningful access to our programs, services and/or benefits.
ATTACHMENT 1
Site Locations Map
ATTACHMENT 2
FEH 2026 Study
(Remainder of page left blank intentionally)
\\FEHFS01\FEH Share\1-Projects\2026\2026409 - West Allis City Hall\0 Assessment-Predesign\3 Programming\260921- BOD\261007-WestAllisCityHall_Renovation-FEH_BOD.docx
MEMORANDUM
Project WEST ALLIS CITY HALL Date 10/7/26
Subject Building Renovation, Reorganization Basis of Design
Project No. 2026409
1. Project Scope
Comprehensive renovation and reorganization of West Allis City Hall to modernize building systems, improve public access and departmental operations, enhance the workplace, and provide flexibility for future growth.
2. Purpose
The purpose of the project is not simply to replace aging finishes or building systems, but to coordinate those investments with a broader reorganization of City Hall. The renovation should improve public access to municipal services, create a more collaborative and efficient workplace, address aging infrastructure, and provide flexibility for future staffing and operational change.
Preliminary analysis indicates that the existing City Hall contains sufficient overall area to accommodate current municipal staffing and anticipated growth. The principal planning challenge is therefore how available space is organized, connected, and utilized rather than a fundamental shortage of building area.
3. Existing Building and Project Context
The current West Allis City Hall Building was built in 1968 and remains an important civic presence along Greenfield Avenue. The building’s forthcoming historic recognition reinforces the value of maintaining its civic identity while adapting it to contemporary municipal operations.
Previous assessments have identified significant deferred maintenance and building-system needs, including HVAC, plumbing, electrical infrastructure, roofing, windows, skylights, finishes, and accessibility improvements. The renovation should coordinate architectural reorganization and building-system replacement as a single project strategy, reducing the potential for newly installed infrastructure to conflict with later departmental improvements.
4. Primary Design Objectives
• Improve public access and wayfinding through a clear entry, recognizable lobby, intuitive circulation, accessible restrooms, and identifiable public service points.
• Organize departments according to operational adjacency rather than simply reproducing existing office locations.
• Reduce workplace isolation by balancing appropriately sized private offices with open work areas, shared meeting rooms, and collaborative spaces.
• Preserve necessary visual and acoustic privacy for confidential functions, particularly Human Resources, City Attorney, Housing, and other sensitive resident or personnel interactions.
\\FEHFS01\FEH Share\1-Projects\2026\2026409 - West Allis City Hall\0 Assessment-Predesign\3 Programming\260921-
• Right-size individual offices and departmental areas so available space can support shared amenities, collaboration, improved circulation, and future growth.
• Coordinate HVAC, plumbing, electrical, technology, accessibility, and other infrastructure improvements with the architectural reconfiguration and renovation.
• Preserve and strengthen the building’s civic identity and significant public spaces.
• Provide long-term flexibility for departmental evolution and future staffing without major reconstruction.
5. Preliminary Staff Space Planning
Current departmental information identifies 72 City Hall staff distributed among twelve departments. For preliminary capacity analysis, a conservative planning allowance of 120 SF per staff member has been used to consider a mixture of private offices and open workstations rather than an individual allocation to every employee. Multipliers are then applied to the allowances to consider Meeting Room Spaces, Circulation, and Service spaces such as Restrooms, Utility Closets, and Storage spaces. The aggregate of the allowance and multipliers results in space planning and loading factors serving as a basis of design for the project. Based on 72 current staff, the preliminary staff-related space demand is approximately 11,664 gross square feet (GSF). The table below is a programming and capacity-planning tool; final requirements will vary with departmental operations, privacy requirements, workstation configurations, shared-space strategies, circulation, and detailed design.
Figure 1: West Allis City Hall Renovation – Estimated Space Needs Table - Current & Projected Capacity for Growth
6. Workplace Planning Criteria
It is recommended that proposed workplace renovations and reorganization efforts embrace open-office concepts where possible. In terms of modularity, private offices should generally be approximately 120 SF, with larger offices reserved for functions that warrant additional meeting or representational capacity.
The mayor’s office may appropriately exceed the standard departmental office module. Open workstations should generally be planned around an approximately 8'-0" × 8'-0" module, subject to departmental equipment and storage requirements. Shared conference, huddle, touchdown, and collaboration spaces should reduce the need to accommodate small meetings within oversized private offices.
7. Departmental Organization and Adjacencies
• Public / Civic Services – First Level: The first level should contain the principal public-facing functions. The main lobby should provide direct and intuitive access to the Customer Service
\\FEHFS01\FEH Share\1-Projects\2026\2026409 - West Allis City Hall\0 Assessment-Predesign\3 Programming\260921-
Center and Treasurer with connection to the Clerk as needed. Building Inspection & Neighborhood Services should also maintain convenient public access. Mayor/Administrator and Common Council functions should remain closely associated with the civic center of the building.
• Clerk / Election Functions: Clerk staff functions should remain readily accessible from the first level. Central Count and voter/election storage may remain on the lower level, provided Central Count has controlled public access, restroom access, secure circulation, and a functional connection to Clerk operations above.
• Development Services: Planning & Zoning, Housing, and Economic Development should function as a coordinated cluster supporting internal collaboration and resident/client interaction.
• City Attorney / Assessor: The Attorney and Assessor offices require adjacency for their collaborative functionality.
• Finance / Assessor: Finance and Assessor should be in proximity to one another while maintaining their individual operational requirements.
• City Attorney / Human Resources: Both departments require greater acoustic and visual privacy than the general workplace while still benefiting from shared circulation and meeting resources.
• Communications & Creative: Communications, marketing/engagement, print production, and associated storage should function as an integrated creative/production group.
8. Public Circulation and Service
A principal objective of the renovation is to make City Hall easier for residents to understand and navigate. The building should be reorganized around a clear hierarchy of public, staff, and service circulation. The primary lobby should remain a recognizable civic space rather than residual circulation.
Public visitors should be able to reach frequently used services without traveling deeply into staff work areas. Public waiting should be consolidated where practical. The Customer Service Center should provide an identifiable public interface and incorporate appropriate security measures, including protective glazing where required. Public restrooms should be conveniently accessible from the principal lobby and major public assembly areas without requiring entry into controlled staff zones.
9. Meeting and Collaboration Strategy
Departmental requests demonstrate a need for conference and meeting space; however, the renovation should avoid creating dedicated conference rooms for every department where utilization does not warrant them. A shared meeting strategy should provide a range of room sizes, including small focus/huddle rooms, medium-sized conference rooms, and larger flexible meeting spaces. Operable partitions may be considered where adjacent rooms can function independently or as a larger room.
Shared spaces should be located at natural intersections between departments and used intentionally to encourage cross-department interaction. Staff break and work-café areas should similarly function as shared workplace amenities rather than isolated departmental rooms.
10. Existing Capacity and Future Growth
The preliminary area study identifies approximately 32,848 gross square feet (GSF) of potentially staff-programmable floor area, exclusive of major identified non-staff functions such as the Council Chamber, primary lobby, lower-level mechanical areas, and designated break areas.
Compared with the preliminary current staff requirement of approximately 11,664 GSF, this produces an estimated 21,184 GSF of surplus staff-programmable area. This suggests that the existing building
\\FEHFS01\FEH Share\1-Projects\2026\2026409 - West Allis City Hall\0 Assessment-Predesign\3 Programming\260921-provides substantial flexibility to accommodate improved workplace conditions and future organizational growth without requiring expansion solely to meet current staffing needs.
Preliminary estimate; actual future growth area is subject to final programming, layout, circulation, and building requirements.
Available capacity should not be interpreted as a recommendation to maximize staff density. Capacity should also be used to improve public service areas, workplace quality, collaboration, accessibility, departmental relationships, and long-term adaptability.
11. Common Council Chamber and Civic Functions
If the chamber is relocated into the main building, the Common Council Chamber should remain a principal civic space within City Hall. Relocation and reorganization should improve public seating, accessibility, presentation capability, public-comment functions, acoustics, technology, and circulation. It should be noted that demolition of the current chamber/exhibition building component will be a substantial financial undertaking.
If the existing chamber and lower-level exhibition building component are to be renovated, the building exterior and interior should respect the architectural character of the existing chamber. These spaces are currently only periodically used. However, if properly renovated, they do have the advantage of continuing the full impact of the building’s presence within the community and carry the potential for increased public facing programming. It should be noted that this scenario would require substantial mechanical, acoustical, and building envelope upgrading in addition to developing a remedy for the adjacencies to exterior spaces frequented by the public in addition to incorporating a controlled staff connection behind the dais.
The relationship between the Council Chamber, Mayor/Administrator, public lobby, meeting spaces, and public restrooms should be treated as a coordinated civic suite rather than as independent rooms.
12. Building Systems and Infrastructure
The preliminary programming and space-capacity analysis supports continued evaluation of renovation of the existing West Allis City Hall. The next phase should translate these criteria into alternative departmental layouts and test them against public service and accessibility, departmental adjacencies, staff workflow and privacy, existing building constraints, infrastructure requirements, cost, phasing, and continuity of City operations.
Department-head interviews should validate functional requirements rather than simply reproduce existing room assignments. Attention should be given to identifying which positions genuinely require enclosed offices, which functions can transition to open work areas, and which meeting and support functions can effectively be shared.
Written by: Román Montoto AIA NCARB – FEH Design, October 8, 2026
Attachments: -
FEH DESIGN
Milwaukee, Wisconsin
West Allis City Hall Building Renovation Building Space Needs & Feasibility Study
10/08/26 - updated 10/15/26
West Allis City Hall Renovation – Estimated Building Space Needs - Current & Projected Capacity for Growth
Building Level
Total Staff
Area per Staff 120 S.F.*
15% Meeting Room Multiplier**
20% Service/Circulation
Multiplier**
Total Space Needs & Projections
Comments square feet
LOWER LEVEL 8 960 144 192 1,296 Does not include Mechanical, Breakroom.
FIRST LEVEL 24 2880 432 576 3,888 Does not include relocated Chamber, Lobby.
SECOND LEVEL 41 4920 738 984 6,642 Does not include Breakroom.
TOTAL ESTIMATED STAFF SPACE NEEDS - CURRENT = 11,826
ESTIMATED STAFF SPACE AVAILABLE - CURRENT =
32,848 Does not include Lower Level Mechanical, Chamber, Breakrooms, First Level Lobby.
ESTIMATED STAFF SPACE PROJECTED FOR GROWTH =
21,022
Prelimiary estimate; actual future growth area subject to final programming, layout, circulation, and building requirements.
* 120 SF/Staff is a conservative and preliminary planning allowance that considers both private offices and open workspaces.
** Meeting, support, and circulation factors are preliminary planning allowances and subject to detailed programming.
CITY HALL BUILDING AVAILABLE FLOOR AREA
PRELIMINARY SCHEME BUSINESS S.F. O.L.F. ASSEMBLY S.F. O.L.F. STOR/MECH S.F. O.L.F OCCUPANT LOAD*
LOWER LEVEL
FIRST LEVEL
SECOND LEVEL
9,653 150 934 15 2,087 300 134
9,164 150 2,157 15 0 300 205
14,031 150 722 15 0 300 142
TOTAL OCCUPANCY LOAD PER 2021 IBC = 480
* Occupant Loads are preliminary code-planning estimates and are not representative of anticipated daily staffing or occupancy.
FEH DESIGN
Milwaukee, Wisconsin
West Allis City Hall Building Renovation Building Space Needs & Feasibility Study
10/08/26 - updated 10/15/26
** COUNCIL CHAMBER - 12 Council Members / 60-100 Guest Seats / Presentation Area / Public Comment Area - Existing approx. 3,000 S.F. incl. Mech Rm
* ATTORNEYS - offices need to be sound proof
* LUNCH/BREAKROOM - Desired on second floor …Basement + Second Floor?
* PUBLIC RESTROOMS - Required @ Central Count in Lower Level and on Level One
* TREASURER - Counter space for 3 registers for public acccess with 6 feet each space.
*Protective glass windows installed at public counters
* LOBBY - Larger lobby area for public
* ASSESSOR - We will need conference room space during Open Book each year.
This is where staff will meet with property owners. Also, we have moved to primarily digital records retention, but we do have 4 filing cabinets of hard copy documents that need to be kept per records retention law.
* FINANCE - Requests impromptu meeting space as well as coffee/microwave area and may need training room for unscheduled session.
this group could be relocated to the first floor in closer proximity to the CSC. Housing, Planning, and Econ Development have frequent meetings where we bring the outside world into cityhall so it might be a consideration to move down a floor.
MISCELLANEOUS: STORAGE, A/V, MAILROOM (WITH BREAKROOM?), INTERIOR BIKE STORAGE,
City of West Allis Consolidated City Hall/Library/Social Services Facility 10/15/2026 13:43
Basement
LEVEL COMMENTS
Staffing by Department
CITY HALL DEPARTMENT REQUESTS PRIVATE OFFICES OPEN
WORKSTATIONS
STAFF BY
DEPARTMENT
CONFERENCE RM.
HOURS/MONTH
CONFERENCE RM.
SEATS
COMMUNICATIONS & CREATIVE 3 4 8 4 8
CLERK 2 1 3 0 0
MAYOR/ADMINISTRATOR 2 2 4 5
TREASURER 2 7 9 ? ?
BLDG INSPECTION & NEIGHBORHOOD 5 5 10 1 12
FINANCE 9 9 4 9
CITY ATTORNEY 5 4 9 6 10
ASSESSOR 2 3 5 2 10
HUMAN RESOURCES 5 5 2 10
PLANNING & ZONING 2 1 3 2 18
HOUSING 4 2 6 2 7
ECONOMIC DEVELOPMENT 3 1 4 2 18
REQUESTED TOTAL PRIVATE
OFFICES
TOTAL OPEN
WORKSTATIONS TOTAL STAFF CONFERENCE RM.
HOURS/MONTH
AVG. CONFERENCE
RM. SEATS
44 28 73 29 10
Basement, 1 Central Count + Voter/Election Storage (B) / Adjacency to Civic/Public Functions / Central Count would benefit from it's own Entrance, needs Public Access w/RR (2-4 times a year)
1 Alder Room not necessary.
ATTACHMENT 3
Existing Utility Maps
ATTACHMENT 4
Insurance Requirements
INSURANCE REQUIRED
Contractors shall purchase and maintain for the duration of the contract as required by the City or by Law, insurance indemnifying against claims, suits, personal injury, bodily injury to persons, or damage to property which arises from, or in connection with the performance of the work hereunder by the Contractor. Some contracts may require Completed Operations, Professional Liability or other insurance beyond the contract term.
Contractor acknowledges that the insurance coverage and policy limits set forth in this Insurance Requirement section constitute the minimum amount of coverage required.
Any insurance policy or other proceeds broader than or in excess of the specified limits and coverage required in this section, which are applicable to a given loss, shall be available to the City. The Insurance Requirements under this Contract shall be greater of (1) the minimum coverage and limits specified in the Contract or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named. It is agreed that these Insurance Requirements shall not in any way act to reduce coverage that is broader or that includes higher limits than the minimums required here. No representation is made that the minimum Insurance Requirements of this Contract are sufficient to cover the obligations of the Consultant under the Contract.
Any deductibles or self-insured retentions shall be identified to the City; those which exceed $10,000 must be declared to and approved by the City. City may require a review of the latest audited financial statements of the Contractor. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, employees, agents and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defenses expenses.
All required insurance under this Contract is to be placed with insurers with a Best’s rating of no less than A-VII. Said carriers to be admitted status with the State of Wisconsin, unless otherwise approved in advance by the City. City reserves the right to approve non-admitted carriers with a Best’s rating of no less than AX.
Work shall not be commenced under the Contract until all insurance required under this paragraph has been obtained and evidence thereof in the form of certificates, with original endorsements effecting coverage, are filed with and approved by the City. The City reserves the right to require complete, certified copies of all required insurance policies at any such time. Copies of policies shall be provided by Contractor within 10 days of such request.
The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be on forms approved by the City. For Worker’s Compensation-related risks, only forms approved by the Insurance Commissioner are to be used.
Contractor shall include all subcontractors as insured’s under its policies or shall furnish separate certificates and endorsements for each subcontractor. Contractor agrees to require in any subcontractor and other agreements to perform any operations under this Contract, or provide products or services in connection with this Contract (parties to such subcontracts and/or agreements collectively shall be referred to as “subcontractors”), that all Subcontractors comply with all of the provisions of this Contract, including the indemnity and insurance provisions to the extent they apply to the scope of the Subcontractor’s operations and/or performance under this Contract.
Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bond to City under this Contract.
No subcontractor shall be permitted to commence work until all required coverage has been obtained and certificates and endorsements thereof are filed with the City. A copy of the Indemnity and Insurance Requirements shall be furnished to the Subcontractors by Contractor upon request.
If any part of a loss is not covered because of the application of a deductible or retention, said loss shall be borne by the general Contractor and not the City. Failure to maintain the required insurance may result in termination of this Contract at the option of the City.
It is Contractor’s responsibility to ensure its compliance with the Insurance Requirements of the Contract. Any actual or alleged failure on the part of the City to obtain proof of insurance required under the Contract shall not in any way be construed to be a waiver of any right or remedy of the City, in this or any regard.
B. GENERAL ENDORSEMENTS.
The protection afforded by the required insurance policies under this Contract shall include, but shall not be limited to, the following:
1. Occurrence Based Policies. All required Liability insurance under this Contract shall be written on an "occurrence" form, except separately approved Professional Liability Policies.
2. Representation of Coverage Adequacy. By requiring insurance for this Contract, City does not represent or warrant that coverage and limits will be adequate to protect the Contractor, subcontractor, their agents or any project engineer.
3. Cross-Liability Coverage. If the Contractor's liability policies do not contain the standard ISO separation of insured’s provision, or a substantially similar clause, they shall be endorsed to provide cross-liability coverage.
4. Cancellation. The insurer shall endeavor to give the Director of Public Works/City Engineer at least ten (10) days prior written notice of any suspension or cancellation of the policy, or any reduction in coverage or in limits. In addition, the Contractor shall immediately notify the Director of Public Works/City Engineer whenever it receives notice from the insurer that the policy has been cancelled or suspended or there has been a reduction in coverage or limits. Cancellation or suspension of the policy or reduction in coverage or limits shall constitute a material breach and is grounds for immediate termination of the Contract. Upon notice to the Contractor by the City upon the City’s learning of said breach, the Contractor shall immediately cease all Work on the Project.
5. Additional Insured’s. The City, its officers (elected and appointed), employees, agents and volunteers must be named as additional insured’s as their interests may appear on the Contractor's General Liability insurance policy. Additional insured status shall be endorsed onto the insurance policy by the appropriate ISO Endorsement Form approved by the City and executed by duly authorized agents of said carrier.
6. Primary Insurance. Contractor's insurance shall provide primary insurance to the City, to the exclusion of any other insurance or self-insurance programs the City may carry. Any insurance or self-insurance maintained by the City shall be excess of the Contractor's insurance and shall not contribute to it.
7. Waiver of Subrogation. Contractor waives all rights against the City, its officers, employees, agents and volunteers for recovery of damages to the extent these damages are covered by the insurance the Contractor is required to carry pursuant to this Contract.
8. Reporting. Failure to comply with any insurance policy reporting provisions shall not affect coverage provided to the City.
9. Cross Liability. The required insurance coverages shall apply separately to each insured against whom claim is made or suit brought, except with respect to the limits of the insurer's liability.
10. Indemnification. The policies shall contain an acknowledgement by the underwriters that, to the fullest extent permitted by law, the Contractor shall indemnify and save harmless the City against any and all claims resulting from the wrongful or negligent acts or omissions of the Contractor or other parties acting on its behalf under the Contract; and that the hold harmless assumption on the part of the Contractor shall include all reasonable costs necessary to defend a lawsuit including actual reasonable attorney fees. The obligation to indemnify and defend the City as set forth herein shall survive the termination or completion of this Contract for the full period of time allowed by law. The parties agree that if any part of this indemnification provision is found to conflict with applicable laws, such part shall be unenforceable only insofar as it conflicts with said laws, and that this indemnification shall be judicially interpreted and rewritten to provide the broadest possible indemnification legally allowed and shall be legally binding upon Contractor.
C. MINIMUM LIMITS AND OTHER PROVISIONS.
1. WORKER'S COMPENSATION INSURANCE.
Wisconsin statutory limits for all employees of the bidder to whom the award is made.
All subcontractors and materialmen shall furnish to the Contractor and the
City certificates of similar insurance for all of their respective employees, unless such employees are covered by the protection afforded by the Contractor.
2. GENERAL LIABILITY INSURANCE.
a. Coverage. Coverages must include, but are not limited to the following:
"Occurrence" Coverage Form must be as broad as Insurance Service Form (ISO) (form CG 00 01) and include the following:
• Premises and Operations
• Products and Completed Operations, applicable for at least three years following acceptance of the work
• Personal Injury with Employment Exclusion deleted
• Unlicensed Mobile Equipment
• Explosion, Collapse and Underground Hazard Coverages
• Blanket Contractual (Independent Contractor's Protective)
• Contractual Liability coverage at least as broad as coverage provided by the ISO CG 00 01 policy form must be included and shall not limit by any modification or endorsement, coverage for liabilities assumed by Contractor under this Contract.
• Broad Form Property Damage
• Contingent Coverage for Subcontractors
• Care, Custody and Control Coverages for City Owned or Purchased Materials at the Work Site
b. Minimum Limits of Liability:
Per Occurrence Limit: $1,000,000 Policy Aggregate Limit: $2,000,000 Personal Injury Limit: $1,000,000 Fire Damage Limit: $50,000 Medical Expense Limit: $5,000
3. BUSINESS AUTOMOBILE LIABILITY INSURANCE.
a. Coverage. Coverage must be as broad as ISO CA 00 01 - Occurrence Form Code No. 1, "any auto" and include the following:
Comprehensive Coverage for all Owned, Non-Owned or Hired Motor Vehicles driven by the employees of the Contractor or Subcontractors, including vehicles and equipment owned by the City if used exclusively for the project.
Uninsured or Underinsured Motorists Liability Coverage at full policy limits.
Transportation by insured vehicles of pollutants, or toxic wastes (as determined by the EPA) shall require a minimum of the Pollution Liability Endorsement (CA9948) and/or the Motor Carrier Act Endorsement (MCA90) to address damages and clean-up costs.
b. Minimum Limits of Liability:
Per Occurrence/Accident for Bodily Injury and Property Damage: $1,000,000
4. PROFESSIONAL LIABILITY/ERRORS & OMMISSIONS COVERAGE.
a. Coverage. Standard form; coverage provided on a claim – made basis with at least three years extended reporting period; to include all liability assumed by Contractor for the project. The minimum three-year extension shall be for at least three years after all operations and/or performance under this Contract are complete, and additional claims-made coverage requirements apply as described below:
For any coverage that is provided on a claims-made form (which type of form is permitted only where specified above):
i. The retroactive date must be shown and must be before the date of the
Contract, and before the beginning of any operations and/or performance related to this Contract;
ii. Insurance must be maintained and Certificates of Insurance must be provided to the City for at three years after termination or completion of the Contract or completion of the contract work;
iii. If coverage is cancelled or not-renewed and not replaced with another claims-made policy form with a retroactive date prior to the effective date of the Contract, Contractor must purchase an extended reporting period for a minimum of three years after termination of this Contract or completion of contract work.
b. Minimum Limits of Liability: Minimum $1 Million (project specific).
5. UMBRELLA LIABILITY.
Five million dollars ($5,000,000) following form excess of the primary General Liability, Automobile Liability and Employers Liability Coverages. If excess or umbrella policies are used to meet the Insurance Requirements of this section, they shall provide coverage at least as broad as specified for the underlying coverages, and the full limits of the umbrella or excess coverage shall be available to the City. Such policy or policies shall include as insured’s those covered under the underlying policies, including additional insured’s, with a severability of interests’ provision applicable to the additional insured. Such policy or policies shall contain, or be endorsed to contain, a provision that such coverage shall also apply on a primary and non-contributory basis to the City before the City’s own primary liability policy or self-insurance shall be called upon to protect it as a named insured. Coverage shall apply on a “pay on behalf” basis.
IV. CONTRACT BONDS
After opening of bids, but before signing of contract, the bidder to whom award is made shall have executed, through a surety company authorized to do business in the state of Wisconsin and acceptable as surety to City, bonds in the form included in the contract documents for the faithful performance of the contract and payment for all work and labor performed and materials furnished to complete the work. The bonds shall be for the full amount of the contract and shall be adjusted to incorporate all extras, credits and change orders through final payment.
Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of his Power of Attorney indicating the monetary limit of such power.
Bidder shall pay the cost of the bonds.
V. INTERPRETATIONS AND ADDENDA
All questions about the meaning or intent of the contract documents are to be directed to the City Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by addenda mailed or delivered to all parties recorded by the Engineer as having received proposal forms. Questions received less than ten (10) days prior to the date for opening of bids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Addenda may also be issued to modify the contract documents, as deemed advisable by the Board of Public Works or the City Engineer.
| I. Introduction |
| II. Scope of Work |
| III. Construction Delivery & Management: |
| IV. Meeting Attendance |
| V. Proposal Format and Requirements |
| VI. Instructions For Submissions |
| VI. Time Frame |
| VII. Basis of Award |
| VIII. Project Schedule |
| IX. Deliverables |
| X. Attachments: |
| XI. Other |