Project No. 26-G204 Fugett Middle School Classroom Unit-Ventilator Replacement
Solicitation number
US.225602
Issued by
Chester County, Pennsylvania

About this file

Project Manual and Bid Documents for Fugett Middle School Classroom Ventilator Replacement

This is a comprehensive project manual and bid document package issued by the West Chester Area School District for the replacement of classroom ventilator units at Fugett Middle School located at 500 Ellis Lane, West Chester, Pennsylvania 19380. The project (No. 26-G204) involves the removal of existing ceiling-mounted ventilator units and installation of new wall-mounted fan coil units in three classrooms (rooms 112, 212, and 312), along with associated HVAC piping insulation and Building Automation System (BAS) controls. The bid documents are structured as three separate base bids corresponding to each classroom, with optional alternates to exclude BAS controls for any individual room. A mandatory pre-bid meeting is scheduled for Monday, July 20, 2026, at 9:00 AM at Fugett Middle School, with all questions to be submitted through PennBid by Monday, July 27, 2026, at 1:00 PM. Sealed bids must be submitted online via the PennBid Program by 11:00 AM on Friday, July 31, 2026, with public opening and reading at the Facilities and Operations Center Building, 1181 McDermott Drive, West Chester, PA 19380. The date of commencement is established as June 15, 2026, with substantial completion required by August 14, 2026, representing a compressed project timeline of approximately 60 calendar days.

Bidders must submit a certified check or bid bond in the amount of 10 percent of their total bid price, made payable to the West Chester Area School District, along with a Non-Collusion Affidavit, Contractor's Qualification Statement, and an Agreement of Surety guaranteeing issuance of Performance and Payment Bonds equal to 100 percent of the contract price. Bids must remain valid for 60 days after the bid opening, and successful bidders must execute the contract within 10 days of acceptance notification or forfeit their bid security. The contract incorporates AIA Document A101-2017 with extensive supplementary conditions and modifications, including liquidated damages of $1,500 per calendar day for delays beyond the substantial completion date and an additional $500 per calendar day for delays beyond 30 days in completing punch-list items. Minimum bidder qualifications include three years of experience in similar public school construction, no school projects completed more than three months late in the previous three years, prior completion of projects at least 75 percent of the bid value, and provision of at least three project references of similar size and scope with the specified manufacturer's products. The project is subject to Pennsylvania prevailing wage requirements, and contractors must demonstrate that at least 10 percent of the construction work will be performed by their own workforce. The contract includes extensive indemnification and insurance requirements, with the District retaining the right to inspect all work, reject non-conforming materials, and pursue remedies through its own forces if the contractor fails to perform, with associated costs deducted from payments due.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .