About this file

This federal solicitation requests quotes to provide, install, and maintain a point-to-point dedicated 10Gb Ethernet connection over dedicated, non-routed commercial transport using wave transport technology with a 10Gb Ethernet hand-off between two buildings. Quotes are due by the required service date of February 1, 2023. Contractors must ensure the round-trip delay is less than or equal to 10 milliseconds for connections up to 600 miles, or less than or equal to 10 milliseconds per 350 miles for longer distances. Color powerpoint drawings must be provided showing physically diverse routes meeting a minimum 50 meter separation from another solicited connection. The Defense Information Systems Agency is the issuing agency.

View the file

Other files

File Type Posted
HC101322QA452.v1.pdf PDF
1 - Vendor Block Sample_Version3 (002) (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: All fiber routes are fictitious and used only as an example.

:'t\ •

N

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7

File details come from the government source that posted it. Updated .