1-Tower Hill IFB CPM.pdf

PDF 37 MB Posted

Attached to
Tower Hill Road (T-653) Bridge Replacement
Solicitation number
US.243481
Issued by
Somerset County, Pennsylvania

About this file

This is a Conformed Project Manual and bidding document for a bridge replacement project issued by Ararat Township in Susquehanna County, Pennsylvania, prepared by Bassett Engineering, Inc. The project involves replacing the Tower Hill Road (T-653) bridge over the West Branch Lackawanna River with an aluminum box culvert measuring 20'-6" wide by 6'-1" rise by 22'-9" long, furnished with headwalls, wingwalls, full invert plates, and fish baffles. Ararat Township is pre-purchasing the aluminum box culvert through COSTARS; the contractor must purchase all other necessary materials. Work includes erosion and sedimentation control installation, stream flow diversion, existing utility protection, demolition and removal of the existing bridge, excavation for foundations and bridge components including bedrock removal where applicable, setting foundations and bridge inverts below the stream bottom with flowable fill backfill, stone backfill placement and compaction behind bridge structures, riprap stabilization of bridge corners and wingwalls, roadway restoration, guiderail and traffic control signage installation, traffic control, and site restoration. Sealed bids are due by 4:00 P.M. on Tuesday, August 4, 2026, with public bid opening at 7:00 P.M. the same day at Ararat Township Building, 1765 Ararat Road, Thompson, Pennsylvania 18465-9509. A pre-bid meeting is scheduled for 10:00 A.M. on Wednesday, July 15, 2026, at the same location, with attendance recommended but not mandatory. The site is available for inspection at any time. The contract period is seventy (70) calendar days from Notice to Proceed, with in-stream work limited to dates specified on contract drawings in accordance with Pennsylvania Fish and Boat Commission Regulations.

Bidders must be PennDOT Prequalified and submit a bid bond, certified check, or cashier's check equal to ten percent (10%) of the bid amount, along with a completed Non-Collusion Affidavit and Public Works Employment Verification Form. Pennsylvania prevailing wage rates apply to all workers on site, with rates detailed in the document for various trades including carpenters, laborers, operators, and other classifications, effective through specified dates in 2026 and 2027. Progress payments will be made monthly at 90% of completed work, with retainage reduced to 5% after 50% completion based on good performance. Final payment is due within thirty days of final completion, with the Owner retaining funds for three months to address any defects. Liquidated damages apply for delays: $800 per day for the first fifteen days past contract time, $1,600 per day for days sixteen through thirty, and $3,000 per day for delays exceeding thirty days. The contractor must perform a minimum of 70% of work with its own forces, excluding materials purchases only. Upon contract award, the successful bidder must provide Performance and Payment Bonds each equal to 100% of the contract price and Certificates of Insurance within seven days. The contract is subject to the Pennsylvania Public Works Contractor's Bond Law of 1967 and federal prevailing wage requirements.

View the file

Other files

File Type Posted
2-Tower Hill IFB CPM DWGs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .