About this file

This is a Highway Occupancy Permit Plan and construction plan document prepared by The Gateway Engineers, Inc. for the Municipality of Bethel Park in Allegheny County, Pennsylvania, involving improvements to State Route 0088 (Library Road) and Kings School Road. The project encompasses local road improvements including the widening of Kings School Road for an auxiliary right turn lane, with work activities spanning from station 493+50.00 to station 499+00.00 on SR 0088 and Kings School Road. Construction activities include removal of existing pavement, curbing, and pavement markings; full-depth widening; unclassified bulk excavation and fine grading; adjustment of existing utilities including utility pole relocation; placement of new bituminous pavement and bituminous mill and overlay; traffic signal modifications; driveway adjustments; installation of new ADA ramps, sidewalk, and curb; sign removal and replacement; line stripping; and storm sewer installation. A mandatory pre-bid meeting is scheduled for Tuesday, April 21, 2026, at 11:00 a.m. at the corner of Kings School Road and SR 0088, with attendance required for bid consideration. Sealed proposals will be received via PennBid until 11:00 a.m. prevailing time on Thursday, May 14, 2026.

Contractors must comply with Pennsylvania Department of Transportation requirements and prevailing wage standards. Performance and Labor and Material Payment Bonds, Public Liability and Property Damage Certificates of Insurance in specified amounts, and Certificates of Workman's Compensation must be filed with the executed agreement. The project requires coordination with multiple utility providers including Pennsylvania Electric Company, Peoples Natural Gas Company LLC, Verizon Pennsylvania LLC, Pennsylvania American Water, and the Municipality of Bethel Park. Contractors must notify the Regional Traffic Management Center at 412-429-6030 at least 15 minutes prior to and immediately after any road restrictions, notify the district permit office at least three days prior to work start, and provide the Roadway Network Assessment (RNA) form 21 days before commencing work. Property owners and businesses must be notified 10 days in advance of driveway restrictions. All construction documents, drawings, specifications, and bidding information are available at no cost on the PennBid website (www.PennBid.net).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Serial No.

Know what's below.

before you dig.Call

R

REGISTERED

O

MMONWEALTH

PROFESSIONAL

P

E N N S Y L V A N

I A

C

O F

ENGINEER

PE074259

MICHAEL J. HABERMAN

AutoCAD SHX Text 4/9/2026

AutoCAD SHX Text 493+50.00

AutoCAD SHX Text 499+00.00

AutoCAD SHX Text 480.89

AutoCAD SHX Text 0.091

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ALLEGHENY

AutoCAD SHX Text

BETHEL PARK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11-0

AutoCAD SHX Text 20252874705 20260950291

AutoCAD SHX Text P.E.-074259

AutoCAD SHX Text SR 0088 (LIBRARY ROAD)0088 (LIBRARY ROAD) (LIBRARY ROAD)(LIBRARY ROAD)LIBRARY ROAD))

AutoCAD SHX Text BETHEL PARK, ALLEGHENY COUNTY, PENNSYLVANIA, ALLEGHENY COUNTY, PENNSYLVANIA ALLEGHENY COUNTY, PENNSYLVANIAALLEGHENY COUNTY, PENNSYLVANIA COUNTY, PENNSYLVANIA, PENNSYLVANIA

AutoCAD SHX Text

EPS APPLICATION #389660

AutoCAD SHX Text

MUNICIPALITY OF BETHEL PARK 5100 W LIBRARY AVE BETHEL PARK, PA 15102

AutoCAD SHX Text

LOCATION MAP SCALE: 1" = 1000'1" = 1000'

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

LIMITED ACCESS HIGHWAY

AutoCAD SHX Text

STATE ROUTE AND NUMBER

AutoCAD SHX Text

STATE MAINTAINED BRIDGE ON TOWNSHIP ROAD

AutoCAD SHX Text

TOWNSHIP ROAD, NAME AND SEGMENT LENGTH IN MILES

AutoCAD SHX Text

IMPASSABLE TOWNSHIP ROAD

AutoCAD SHX Text

TURNBACK TOWNSHIP ROAD

AutoCAD SHX Text

OTHER ROAD

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

RAILROAD (IN SERVICE)

AutoCAD SHX Text

RAILROAD ABANDONED (TRACK RETAINED)

AutoCAD SHX Text

STATE BOUNDARY

AutoCAD SHX Text

COUNTY BOUNDARY

AutoCAD SHX Text

TOWNSHIP BOUNDARY

AutoCAD SHX Text

CITY OR BOROUGH BOUNDARY

AutoCAD SHX Text

RIVERS/STREAMS

AutoCAD SHX Text

MUNICIPAL BUILDING

AutoCAD SHX Text

SPLIT MILEAGE BETWEEN MUNICIPALITIES

AutoCAD SHX Text

LIST OF PUBLIC UTILITIES

AutoCAD SHX Text PENNSYLVANIA ELECTRIC CO. 21 SOUTH MAIN STREET AKRON, OH 44308 CONTACT: MELLYSSA ADAMS PHONE: 330-604-4073

AutoCAD SHX Text PEOPLES NATURAL GAS COMPANY LLC 375 NORTH SHORT DRIVE PITTSBURGH, PA 15212 CONTACT: TODD COEN PHONE: 412-258-4415

AutoCAD SHX Text VERIZON PENNSYLVANIA LLC 1050 VIRGINIA AVENUE FORT WASHINGTON, PA 19034 CONTACT: VICTOR WOOD PHONE: 212-395-1000

AutoCAD SHX Text BETHEL PARK MUNICIPALITY 5100 WEST LIBERTY AVENUE BETHEL PARK, PA CONTACT: SUSAN DOLINAR PHONE: 412-831-6800 X301

AutoCAD SHX Text PENNSYLVANIA AMERICAN WATER 500 NOBLESTOWN ROAD CARNEGIE, PA 15106 CONTACT: LUCIAN CAPPETTA PHONE: 412-401-1871

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text C/T

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text Path & Filename=G:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwgG:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwg

AutoCAD SHX Text Save Date=4/9/2026 1:41 PM4/9/2026 1:41 PM

AutoCAD SHX Text

REGISTERED PROFESSIONAL

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

P.E. NUMBER

AutoCAD SHX Text

DATE

AutoCAD SHX Text PREPARED BY: THE GATEWAY ENGINEERS, INC 100 McMORRIS ROAD PITTSBURGH, PA 15205

AutoCAD SHX Text

DISTRICT

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

TOWNSHIP

AutoCAD SHX Text

CITY

AutoCAD SHX Text

ROUTE

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

TOTAL SHEETS

AutoCAD SHX Text THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION.

AutoCAD SHX Text

HIGHWAY OCCUPANCY PERMIT PLAN

AutoCAD SHX Text

FOR

AutoCAD SHX Text

%%UPREPARED FOR%%U:

AutoCAD SHX Text

FROM STA.

AutoCAD SHX Text

TO STA.

AutoCAD SHX Text

LENGTH

AutoCAD SHX Text

FT.

AutoCAD SHX Text

MI.

AutoCAD SHX Text

FROM SEG.

AutoCAD SHX Text

OFFSET

AutoCAD SHX Text

TO SEG.

AutoCAD SHX Text

OFFSET

AutoCAD SHX Text

LOCAL ROAD IMPROVEMENTS

AutoCAD SHX Text %%uALSO INCLUDES:

AutoCAD SHX Text

TRAFFIC SIGNAL CONSTRUCTION PLAN - 3 SHEETS

REGISTERED

O

MMONWEALTH

PROFESSIONAL

P

E N N S Y L V A N

I A

C

O F

ENGINEER

PE074259

MICHAEL J. HABERMAN

A F U L L - S E R V I C E C I V I L E N G I N E E R I N G F I R M

WWW.GATEWAYENGINEERS.COM | PITTSBURGH & BUTLER, PA | 1-855-634-9284Serial No.

Know what's below.

before you dig.Call

R

1-800-242-1776 20252874705 20260950291

AutoCAD SHX Text Path & Filename=G:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwgG:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwg

AutoCAD SHX Text Plot Date=4/9/2026 1:42 PM Shawn M. Pritchard 4/9/2026 1:42 PM Shawn M. Pritchard Shawn M. Pritchard Shawn M. Pritchard

AutoCAD SHX Text Save Date=4/9/2026 1:41 PM4/9/2026 1:41 PM

AutoCAD SHX Text

AutoCAD SHX Text

DISTRICT

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

ROUTE

AutoCAD SHX Text

OF

AutoCAD SHX Text THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION.

AutoCAD SHX Text

AutoCAD SHX Text

MUNICIPALITY OF BETHEL PARK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ALLEGHENY

AutoCAD SHX Text 11-0

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

SR 0088 (LIBRARY ROAD) & KINGS SCHOOL ROAD

AutoCAD SHX Text 4'

AutoCAD SHX Text

CONC. SIDEWALK

AutoCAD SHX Text

LEGAL R/W

AutoCAD SHX Text

LEGAL R/W

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 10 ft.

AutoCAD SHX Text

LEGAL R/W

AutoCAD SHX Text

KINGS SCHOOL ROAD POSTED 25 MPH25 MPH MPH

AutoCAD SHX Text

EXISTING SIDEWALK TO BE REMOVED

AutoCAD SHX Text

EXISTING CONC. CURB TO BE REMOVED

AutoCAD SHX Text

EXISTING CONC. CURB TO BE REMOVED

AutoCAD SHX Text

EXISTING PAVEMENT MARKINGS TO BE ERADICATED

AutoCAD SHX Text

EXISTING ADA RAMP TO BE REMOVED

AutoCAD SHX Text SR 0088 (LIBRARY ROAD) 0088 (LIBRARY ROAD) (LIBRARY ROAD) LIBRARY ROAD) ) POSTED 35 MPH35 MPH MPH

AutoCAD SHX Text

SAWCUT LIMITS OF REMOVAL

AutoCAD SHX Text

SAWCUT LIMITS OF REMOVAL

AutoCAD SHX Text

SAWCUT LIMITS OF REMOVAL

AutoCAD SHX Text EXISTING MAILBOX TO BE ADJUSTED, AS REQUIRED FOR CONSTRUCTION. THE MAILBOX SHALL REMAIN ACCESSIBLE FOR MAIL DELIVERY DURING CONSTRUCTION.

AutoCAD SHX Text EXISTING WALL SHALL BE REMOVED DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH OWNER AND ENGINEER FOR REPLACEMENT.

AutoCAD SHX Text

CONTRACTOR SHALL COORDINATE FENCE RELOCATION AND TYPE WITH OWNER AND ENGINEER.

AutoCAD SHX Text

SAWCUT LIMITS OF REMOVAL

AutoCAD SHX Text

SAWCUT AT NEAREST JOINT

AutoCAD SHX Text

CONTRACTOR SHALL SAWCUT AT NEAREST JOINT

AutoCAD SHX Text

SAWCUT LIMITS OF REMOVAL

AutoCAD SHX Text

CONTRACTOR SHALL COORDINATE FENCE RELOCATION AND TYPE WITH OWNER AND ENGINEER.

AutoCAD SHX Text

EXISTING SIGN TO BE REMOVED

AutoCAD SHX Text

EXISTING UTILITY POLE TO BE RELOCATED

AutoCAD SHX Text

EXISTING UTILITY POLE TO BE RELOCATED

AutoCAD SHX Text

EXISTING INLET TO BE REMOVED

AutoCAD SHX Text

EXISTING INLET TO BE REMOVED

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

INLET

AutoCAD SHX Text

INLET

AutoCAD SHX Text

INLET

AutoCAD SHX Text

MH

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

ASPHALT DRIVEWAY

AutoCAD SHX Text

ASPHALT WEDGE CURB

AutoCAD SHX Text

WV

AutoCAD SHX Text

INLET

AutoCAD SHX Text

INLET

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

- EXISTING MAST ARM

AutoCAD SHX Text

- EXISTING SIGN

AutoCAD SHX Text

- EXISTING UTILITY POLE

AutoCAD SHX Text

- EXISTING CATCH BASIN

AutoCAD SHX Text

- EXISTING MANHOLE

AutoCAD SHX Text

- SAWCUT

AutoCAD SHX Text

- DEMOLITION AREA

AutoCAD SHX Text

SAWCUT

SAWCUT

MMONWEALTH

PROFESSIONAL

P

E N N S Y L V A N

I A

C

O F

ENGINEER

PE074259

MICHAEL J. HABERMAN

.3

.6

.8

.5

A F U L L - S E R V I C E C I V I L E N G I N E E R I N G F I R M

WWW.GATEWAYENGINEERS.COM | PITTSBURGH & BUTLER, PA | 1-855-634-9284Serial No.

Know what's below.

before you dig.Call

R

1-800-242-1776 20252874705 20260950291

AutoCAD SHX Text

SAWCUT BEGIN WORK

AutoCAD SHX Text

LEGAL R/W

AutoCAD SHX Text 1040.18

AutoCAD SHX Text +07.60

AutoCAD SHX Text 1040.2

AutoCAD SHX Text

KINGS SCHOOL ROAD

AutoCAD SHX Text

SAWCUT BEGIN WORK

AutoCAD SHX Text 1040.50

AutoCAD SHX Text +10.63

AutoCAD SHX Text 1040.5

AutoCAD SHX Text

LEGAL R/W

AutoCAD SHX Text

KINGS SCHOOL ROAD

AutoCAD SHX Text -2.6%

AutoCAD SHX Text 2.6%

AutoCAD SHX Text -11.1%

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 25 ft.

AutoCAD SHX Text Path & Filename=G:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwgG:\Projects\90000 Bethel Park\90056 SR 88 & Kings School Grants and ROW\-0002 CACI\Dwg\02-Sheet\90056-0002_Construction Plans.dwg

AutoCAD SHX Text Plot Date=4/9/2026 1:42 PM Shawn M. Pritchard 4/9/2026 1:42 PM Shawn M. Pritchard Shawn M. Pritchard Shawn M. Pritchard

AutoCAD SHX Text Save Date=4/9/2026 1:41 PM4/9/2026 1:41 PM

AutoCAD SHX Text

AutoCAD SHX Text

DISTRICT

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

ROUTE

AutoCAD SHX Text

OF

AutoCAD SHX Text THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION.

AutoCAD SHX Text

AutoCAD SHX Text

MUNICIPALITY OF BETHEL PARK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ALLEGHENY

AutoCAD SHX Text 11-0

AutoCAD SHX Text

LAYOUT PLAN

AutoCAD SHX Text

SR 0088 (LIBRARY ROAD) & KINGS SCHOOL ROAD

AutoCAD SHX Text

KINGS SCHOOL ROAD POSTED 25 MPH25 MPH MPH

AutoCAD SHX Text 19'

AutoCAD SHX Text 20'

AutoCAD SHX Text 41.5'

AutoCAD SHX Text 18'

AutoCAD SHX Text 20'

AutoCAD SHX Text 16.5'

AutoCAD SHX Text W/6"

AutoCAD SHX Text 12'

AutoCAD SHX Text

N/F DAVID C. BROCKWAY TAX ID: 0665-N-001

AutoCAD SHX Text

N/F KENNETH W WARYWODA & SAMANTHA KITE TAX ID: 0665-N-00114

AutoCAD SHX Text

N/F ZOHEIR A & KATHRYN M ELNAHAL TAX ID: 0665-N-00118

AutoCAD SHX Text

N/F A&M ROCHE ENTERPRISES LLC TAX ID: 0666-S-00040

AutoCAD SHX Text

N/F LEE C GAYDOS TAX ID: 0666-S-00300

AutoCAD SHX Text

N/F FIRST BETHEL METHODIST CHURCH TAX ID: 0665-N-00175

AutoCAD SHX Text

N/F EDITH A VANDALE TAX ID: 0665-N-00190

AutoCAD SHX Text

SAWCUT AND SEAL W/ PG 64S-22

AutoCAD SHX Text 13'

AutoCAD SHX Text 12'

AutoCAD SHX Text

PENNDOT LEGAL R/W

AutoCAD SHX Text

PENNDOT LEGAL R/W

AutoCAD SHX Text

PENNDOT LEGAL R/W

AutoCAD SHX Text

PENNDOTLEGAL R/W

AutoCAD SHX Text

MUNICIPAL LEGAL R/W

AutoCAD SHX Text

MUNICIPAL LEGAL R/W

AutoCAD SHX Text

EXISTING UTILITY POLE (TO BE RELOCATED)

AutoCAD SHX Text

BEGIN CONCRETE CURB (TIE TO EXISTING) +96.39, 18.11' LT

AutoCAD SHX Text

P.T. CONCRETE CURB +49.52, 19.77' LT

AutoCAD SHX Text R=30'

AutoCAD SHX Text

EXISTING UTILITY POLE (TO BE RELOCATED)

AutoCAD SHX Text SR 0088 (LIBRARY ROAD) 0088 (LIBRARY ROAD) (LIBRARY ROAD) LIBRARY ROAD) ) POSTED 35 MPH35 MPH MPH

AutoCAD SHX Text

EXISTING DRIVEWAY #2 PROFILE 101+87.64 VERT SCALE: 1"=5' HORIZ SCALE: 1"=25'

AutoCAD SHX Text

EXISTING DRIVEWAY #2 (TO BE ADJUSTED) (SEE DETAIL) 101+87.64

AutoCAD SHX Text

P.T. CONCRETE CURB +64.53, 19.99' LT

AutoCAD SHX Text

END CONCRETE CURB (TIE TO EXISTING) +63.37, 9.02' LT

AutoCAD SHX Text

WV

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

MH

AutoCAD SHX Text

INLET

AutoCAD SHX Text

GV

AutoCAD SHX Text

INLET

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

MH

AutoCAD SHX Text

SIGNAL POLE

AutoCAD SHX Text

UP

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

FH

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGNAL POLE

AutoCAD SHX Text

GV

AutoCAD SHX Text

SIGNAL POLE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

INLET

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

MH

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

WV

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

LP

AutoCAD SHX Text

INLET

AutoCAD SHX Text INLET 1 STA 100+91.01, 11.15' RT TOP 1037.98 FL IN 1031.32 (15" CPP) INLET 2 STA 100+92.97, 11.04' LT TOP 1037.86 FL OUT 1034.66 (15" CPP)

AutoCAD SHX Text

INLET

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

- SIGN

AutoCAD SHX Text

- UTILITY POLE

AutoCAD SHX Text

- PROPOSED CATCH DRAIN

AutoCAD SHX Text

- PROPOSED STORM MANHOLE

AutoCAD SHX Text

- FLOW ARROW

AutoCAD SHX Text

- PROPOSED PIPE

AutoCAD SHX Text

- SAWCUT

AutoCAD SHX Text

- TRAFFIC CIRCULATION ARROW

AutoCAD SHX Text A

AutoCAD SHX Text

- EXISTING SIGN

AutoCAD SHX Text

- EXISTING UTILITY POLE

AutoCAD SHX Text

- EXISTING CATCH BASIN

AutoCAD SHX Text

- EXISTING MANHOLE

AutoCAD SHX Text A

AutoCAD SHX Text

EXISTING DRIVEWAY #2 DETAIL SCALE: 1"=10'

AutoCAD SHX Text

BEGIN WORK +07.60

AutoCAD SHX Text

END DEPRESSED CONCRETE CURB +18.77, 7.88' RT

AutoCAD SHX Text

BEGIN DEPRESSED CONCRETE CURB +18.77, 6.07' LT

AutoCAD SHX Text

BEGIN CONCRETE PAVEMENT END CONC. SIDEWALK -DRIVEWAY CROSSING +24.13, 5.59' LT

AutoCAD SHX Text

END CONCRETE PAVEMENT BEGIN CONC. SIDEWALK -DRIVEWAY CROSSING +22.75, 5.83' RT

AutoCAD SHX Text

P.C. CONCRETE CURB CONCRETE CURB +98.08, 18.11' LT

AutoCAD SHX Text

BEGIN CONCRETE CURB (TIE TO EXISTING) +60.60, 32.77' LT

AutoCAD SHX Text

END CONCRETE CURB (TIE TO EXISTING) +39.50, 11.19' RT

AutoCAD SHX Text

END CONCRETE CURB (TIE TO EXISTING) +96.38, 11.66' RT

AutoCAD SHX Text

BEGIN CONCRETE CURB (TIE TO EXISTING) +19.05, 11.41' RT

AutoCAD SHX Text

EXISTING DRIVEWAY #3 (TO BE ADJUSTED) 102+04.86

AutoCAD SHX Text

INLET 1

AutoCAD SHX Text

INLET 2

AutoCAD SHX Text

EXISTING DRIVEWAY #3 PROFILE 102+04.86 VERT SCALE: 1"=5' HORIZ SCALE: 1"=25'

AutoCAD SHX Text END DEPRESSED CONCRETE CURB BEGIN CONC. SIDEWALK -DRIVEWAY CROSSING +19.44, 5.98' LT

AutoCAD SHX Text END CONC. SIDEWALK -DRIVEWAY CROSSING BEGIN DEPRESSED CONCRETE CURB +19.44, 7.70' RT

AutoCAD SHX Text

WV

AutoCAD SHX Text

(TO BE RELOCATED)

AutoCAD SHX Text

KINGS SCHOOL ROAD POSTED 25 MPH25 MPH MPH

AutoCAD SHX Text LIMIT OF WORK STA 499+00.00 499+00.00 SEG 0030 OFF 2951 0030 OFF 2951 OFF 2951 2951 SR 0088 0088 MUNICIPALITY OF BETHEL PARK ALLEGHENY COUNTY

AutoCAD SHX Text LIMIT OF WORK STA 493+50.00 493+50.00 SEG 0040 OFF 0499 0040 OFF 0499 OFF 0499 0499 SR 0088 0088 MUNICIPALITY OF BETHEL PARK ALLEGHENY COUNTY

AutoCAD SHX Text

0088/0040/0000 STA 498+49.20 =STA 100+00.00

AutoCAD SHX Text

0088/0040/0007 STA 498+42.46 =STA 200+00.00

AutoCAD SHX Text

END CONCRETE PAVEMENT (TIE TO EXISTING) +34.61, 5.53' RT

AutoCAD SHX Text

END CONCRETE PAVEMENT (TIE TO EXISTING) +34.61, 5.45' LT

AutoCAD SHX Text

END DRIVEWAY ADJUSTMENT (TIE TO EXISTING) +34.61

AutoCAD SHX Text

END PAVEMENT +34.61

AutoCAD SHX Text

END PAVEMENT +14.24

AutoCAD SHX Text

END DRIVEWAY ADJUSTMENT (TIE TO EXISTING) +14.24

AutoCAD SHX Text NOTES: 1. ALL CONSTRUCTION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ALL CONSTRUCTION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SHALL MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION MEET OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION OR EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION EXCEED THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION THE REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION REQUIREMENTS OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION OF TRANSPORTATION OF TRANSPORTATION TRANSPORTATION TRANSPORTATION PUBLICATIONS 13, 72, AND 408, MOST RECENT VERSIONS. 2. THE CONTRACTOR SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT THE CONTRACTOR SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT CONTRACTOR SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT CONTRACTOR SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT SHOULDER MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT MATERIAL AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT AS NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT NECESSARY TO ENSURE THE PAVEMENT REPLACEMENT TO ENSURE THE PAVEMENT REPLACEMENT TO ENSURE THE PAVEMENT REPLACEMENT ENSURE THE PAVEMENT REPLACEMENT ENSURE THE PAVEMENT REPLACEMENT THE PAVEMENT REPLACEMENT THE PAVEMENT REPLACEMENT PAVEMENT REPLACEMENT PAVEMENT REPLACEMENT REPLACEMENT REPLACEMENT IS ADJACENT TO THE FULL-DEPTH PAVEMENT OF THE TRAVEL LANE. 3. FOR TRAFFIC CONTROL, SEE PENNDOT PUBLICATION 213 PATA FIGURE 101, 102, & 107. FOR TRAFFIC CONTROL, SEE PENNDOT PUBLICATION 213 PATA FIGURE 101, 102, & 107. 4. THE LEGAL RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION THE LEGAL RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION LEGAL RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION LEGAL RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION RIGHT-OF-WAY OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION OF S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION S.R. 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 0088 (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION (FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION FORMERLY L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION L.R. 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 00247) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION ) IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION IS 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION 41.5' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION ' IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION IN WIDTH BASED ON DRAWINGS FOR CONSTRUCTION WIDTH BASED ON DRAWINGS FOR CONSTRUCTION WIDTH BASED ON DRAWINGS FOR CONSTRUCTION BASED ON DRAWINGS FOR CONSTRUCTION BASED ON DRAWINGS FOR CONSTRUCTION ON DRAWINGS FOR CONSTRUCTION ON DRAWINGS FOR CONSTRUCTION DRAWINGS FOR CONSTRUCTION DRAWINGS FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION DATED MARCH 16, 2018. . 5. CONTRACTOR TO UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND CONTRACTOR TO UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND TO UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND TO UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND UTILIZE SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND SEEDING FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND FORMUMA D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND D, IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND IN ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND ACCORDANCE WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND WITH PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND PENNDOT PUBLICATION 408, SECTION 804-SEEDING AND PUBLICATION 408, SECTION 804-SEEDING AND PUBLICATION 408, SECTION 804-SEEDING AND 408, SECTION 804-SEEDING AND 408, SECTION 804-SEEDING AND SECTION 804-SEEDING AND SECTION 804-SEEDING AND 804-SEEDING AND 804-SEEDING AND AND AND SOIL SUPPLEMENTS FOR ALL AREAS WITHIN THE SR 0088 RIGHT-OF-WAY. 0088 RIGHT-OF-WAY. RIGHT-OF-WAY. 6. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING UNDERGROUND UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING UNDERGROUND UTILITIES PRIOR TO EXCAVATION. 7. IT IS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS IT IS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS IS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS IS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS THE PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS PERMITTEE'S RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS RESPONSIBILITY TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS TO MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS MAINTAIN MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS MINIMUM SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS SIGHT DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS DISTANCES. KEEP VEGETATION TRIMMED AND NO OBJECTS KEEP VEGETATION TRIMMED AND NO OBJECTS KEEP VEGETATION TRIMMED AND NO OBJECTS KEEP VEGETATION TRIMMED AND NO OBJECTS VEGETATION TRIMMED AND NO OBJECTS VEGETATION TRIMMED AND NO OBJECTS TRIMMED AND NO OBJECTS TRIMMED AND NO OBJECTS AND NO OBJECTS AND NO OBJECTS NO OBJECTS NO OBJECTS OBJECTS OBJECTS MAY BE PLACED WITHIN THE LINE OF SIGHT. 8. ALL PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, ALL PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, FACILITIES REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, REFLECTED ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, ON THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, THESE PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, PLANS, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, OF PENNDOT LEGAL RIGHT-OF-WAY, OF PENNDOT LEGAL RIGHT-OF-WAY, PENNDOT LEGAL RIGHT-OF-WAY, PENNDOT LEGAL RIGHT-OF-WAY, LEGAL RIGHT-OF-WAY, LEGAL RIGHT-OF-WAY, RIGHT-OF-WAY, RIGHT-OF-WAY, SHALL BE CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY BE CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY BE CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY TO COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY COMPLY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY WITH THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY THE REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY ACCESS BOARD, PUBLIC RIGHT-OF-WAY ACCESS BOARD, PUBLIC RIGHT-OF-WAY BOARD, PUBLIC RIGHT-OF-WAY BOARD, PUBLIC RIGHT-OF-WAY PUBLIC RIGHT-OF-WAY PUBLIC RIGHT-OF-WAY RIGHT-OF-WAY RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT GUIDELINES (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT GUIDELINES (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT BUILDINGS AND FACILITIES (ADAAG). PENNDOT BUILDINGS AND FACILITIES (ADAAG). PENNDOT AND FACILITIES (ADAAG). PENNDOT AND FACILITIES (ADAAG). PENNDOT FACILITIES (ADAAG). PENNDOT FACILITIES (ADAAG). PENNDOT (ADAAG). PENNDOT (ADAAG). PENNDOT PENNDOT PENNDOT PENNDOT DESIGN MANUAL PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) MANUAL PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) MANUAL PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) STANDARDS FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) FOR ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) ROADWAY CONSTRUCTION (PUBLICATION 72M, RC-67M) CONSTRUCTION (PUBLICATION 72M, RC-67M) CONSTRUCTION (PUBLICATION 72M, RC-67M) (PUBLICATION 72M, RC-67M) (PUBLICATION 72M, RC-67M) 72M, RC-67M) 72M, RC-67M) RC-67M) RC-67M) PROVIDE GUIDANCE ON ADA ACCESSIBLE DESIGN FOR PEDESTRIAN FACILITIES AND CAN BE UTILIZED FOR REFERENCE. 9. NOTIFICATION - EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT NOTIFICATION - EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT - EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT - EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT EVERY TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT TIME WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT WORK RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT RESTRICTS A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT A ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT ROAD, CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT CONTACT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT THE REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) AT TRAFFIC MANAGEMENT CENTER (RTMC) AT TRAFFIC MANAGEMENT CENTER (RTMC) AT MANAGEMENT CENTER (RTMC) AT MANAGEMENT CENTER (RTMC) AT CENTER (RTMC) AT CENTER (RTMC) AT (RTMC) AT (RTMC) AT AT AT 412-429-6030 AT LEAST 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS AT LEAST 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS AT LEAST 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS LEAST 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS LEAST 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS 15 MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS MINUTES PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS PRIOR TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS TO THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS THE ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS ROAD RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS RESTRICTION AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS AND IMMEDIATELY AFTER THE ROAD RESTRICTION IS IMMEDIATELY AFTER THE ROAD RESTRICTION IS IMMEDIATELY AFTER THE ROAD RESTRICTION IS AFTER THE ROAD RESTRICTION IS AFTER THE ROAD RESTRICTION IS THE ROAD RESTRICTION IS THE ROAD RESTRICTION IS ROAD RESTRICTION IS ROAD RESTRICTION IS RESTRICTION IS RESTRICTION IS IS IS REMOVED. REPORT THE WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA REPORT THE WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA REPORT THE WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA THE WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA THE WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA WORK LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA LOCATION, BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA BEGINNING TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA TIME AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA AND TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA TYPE OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA OF ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA ROAD RESTRICTIONS, AND WHAT PA PUB 213 PATA RESTRICTIONS, AND WHAT PA PUB 213 PATA RESTRICTIONS, AND WHAT PA PUB 213 PATA AND WHAT PA PUB 213 PATA AND WHAT PA PUB 213 PATA WHAT PA PUB 213 PATA WHAT PA PUB 213 PATA PA PUB 213 PATA PA PUB 213 PATA PUB 213 PATA PUB 213 PATA 213 PATA 213 PATA PATA PATA FIGURE IS BEING USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IS BEING USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IS BEING USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL BEING USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL BEING USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL USED. THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL THIS INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL INFORMATION IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IS A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL A VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL VITAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL COMPONENT IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL IN THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL THE DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL DEPARTMENTS ABILITY TO MAINTAIN SITUATIONAL ABILITY TO MAINTAIN SITUATIONAL ABILITY TO MAINTAIN SITUATIONAL TO MAINTAIN SITUATIONAL TO MAINTAIN SITUATIONAL MAINTAIN SITUATIONAL MAINTAIN SITUATIONAL SITUATIONAL SITUATIONAL AWARENESS OF ROAD CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 OF ROAD CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 OF ROAD CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 ROAD CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 ROAD CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 CONDITIONS AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 AND WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 WILL ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 ALLOW FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 FOR MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 MORE EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 EFFICIENT OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 OPERATIONS. THE RTMC IS CONTINUALLY STAFFED 24 THE RTMC IS CONTINUALLY STAFFED 24 THE RTMC IS CONTINUALLY STAFFED 24 RTMC IS CONTINUALLY STAFFED 24 RTMC IS CONTINUALLY STAFFED 24 IS CONTINUALLY STAFFED 24 IS CONTINUALLY STAFFED 24 CONTINUALLY STAFFED 24 CONTINUALLY STAFFED 24 STAFFED 24 STAFFED 24 24 24 HOURS PER DAY, 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PER DAY, 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PER DAY, 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DAY, 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DAY, 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN 365 DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DAYS PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PER YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN YEAR. NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN NOTIFY DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DISTRICT PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN PERMIT OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN OFFICE THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN THROUGH DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DROPDOWN MENU (NOTIFY PENNDOT) WITHIN DROPDOWN MENU (NOTIFY PENNDOT) WITHIN MENU (NOTIFY PENNDOT) WITHIN MENU (NOTIFY PENNDOT) WITHIN (NOTIFY PENNDOT) WITHIN (NOTIFY PENNDOT) WITHIN PENNDOT) WITHIN PENNDOT) WITHIN WITHIN WITHIN APPLICATION AND CALL, PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AND CALL, PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AND CALL, PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE CALL, PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE CALL, PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE PERMIT SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE SUPERVISOR AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AT 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE 412-429-4805 AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE AT LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE LEAST 3 DAYS PRIOR TO THE START OF WORK. PROVIDE 3 DAYS PRIOR TO THE START OF WORK. PROVIDE 3 DAYS PRIOR TO THE START OF WORK. PROVIDE DAYS PRIOR TO THE START OF WORK. PROVIDE DAYS PRIOR TO THE START OF WORK. PROVIDE PRIOR TO THE START OF WORK. PROVIDE PRIOR TO THE START OF WORK. PROVIDE TO THE START OF WORK. PROVIDE TO THE START OF WORK. PROVIDE THE START OF WORK. PROVIDE THE START OF WORK. PROVIDE START OF WORK. PROVIDE START OF WORK. PROVIDE OF WORK. PROVIDE OF WORK. PROVIDE WORK. PROVIDE WORK. PROVIDE PROVIDE PROVIDE DEPARTMENT WITH RESPONSIBLE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE WITH RESPONSIBLE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE WITH RESPONSIBLE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE RESPONSIBLE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE RESPONSIBLE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE PERSON ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE ON PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE PROJECT CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE CONTACT INFORMATION AS WELL AS CONTACT INFORMATION FOR THE INFORMATION AS WELL AS CONTACT INFORMATION FOR THE INFORMATION AS WELL AS CONTACT INFORMATION FOR THE AS WELL AS CONTACT INFORMATION FOR THE AS WELL AS CONTACT INFORMATION FOR THE WELL AS CONTACT INFORMATION FOR THE WELL AS CONTACT INFORMATION FOR THE AS CONTACT INFORMATION FOR THE AS CONTACT INFORMATION FOR THE CONTACT INFORMATION FOR THE CONTACT INFORMATION FOR THE INFORMATION FOR THE INFORMATION FOR THE FOR THE FOR THE THE THE CONTRACTOR AND ANY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY AND ANY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY AND ANY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY ANY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY ANY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY SUBS. NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY NOTIFY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY PROPERTY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY OWNERS AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY AND/OR BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY BUSINESSES 10 DAYS IN ADVANCE OF DRIVEWAY 10 DAYS IN ADVANCE OF DRIVEWAY 10 DAYS IN ADVANCE OF DRIVEWAY DAYS IN ADVANCE OF DRIVEWAY DAYS IN ADVANCE OF DRIVEWAY IN ADVANCE OF DRIVEWAY IN ADVANCE OF DRIVEWAY ADVANCE OF DRIVEWAY ADVANCE OF DRIVEWAY OF DRIVEWAY OF DRIVEWAY DRIVEWAY DRIVEWAY RESTRICTIONS AFFECTING THEIR PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND AFFECTING THEIR PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND AFFECTING THEIR PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND THEIR PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND THEIR PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND PROPERTIES. MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND MAINTAIN ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND ONGOING COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND COMMUNICATION WITH INSPECTOR REGARDING OPERATIONS AND WITH INSPECTOR REGARDING OPERATIONS AND WITH INSPECTOR REGARDING OPERATIONS AND INSPECTOR REGARDING OPERATIONS AND INSPECTOR REGARDING OPERATIONS AND REGARDING OPERATIONS AND REGARDING OPERATIONS AND OPERATIONS AND OPERATIONS AND AND AND WORK SCHEDULE. 10.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .