1 - SOW_RECYCLE YARD SCALE UPFIT.docx

DOCX document 866 KB Posted

Attached to
Recycle Yard Scale Upfit
Solicitation number
FA820124R4995
Issued by

About this file

This document is a Statement of Work (SOW) for the Recycle Yard Scale Upfit at the Utah Test and Training Range (UTTR) in Utah. The SOW outlines the requirements for the contractor to deliver and install a Mettler Toledo Vehicle Scale Kit, including a 50-ton vehicle scale, cable, power cell, and lightning kit, as well as provide on-site installation by a certified technician and post-installation calibration of the vehicle truck scale. The delivery and installation must be completed within 180 days of contract award. The related federal contract opportunity, Solicitation Number FA820124R4995, is seeking a contractor to provide these services for the UTTR South Range Recycle Yard. The contract will be awarded by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files

File Type Posted
Combo Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECYCLE YARD SCALE UPFIT

STATEMENT OF WORK

09 APR 2024

1. SCOPE: Deliver and install the below items to the Utah Test and Training Range (UTTR) Recycle Yard at UTTR-South, Utah.

2. GENERAL INFORMATION: The Utah Test and Training Range (UTTR) utilizes a Mettler Toledo Vehicle Truck Scale in support of its recycle yard program.

2.1 DELIVERY: Delivery shall be made to: Utah Test and Training Range (UTTR) South Recycle Yard located approximately 11 miles south of I-80 Exit 49.

2.2. HOURS OF OPERATION: Contractor deliveries will be performed during the following hours: Normal duty hours, which are currently 7:00 A.M. to 4:00 P.M., Monday through Thursday, excluding holidays and weekends. All deliveries shall be scheduled with UTTR personnel outlined in this SOW. A minimum of 7 days notice is required prior to delivery.

2.3 EMPLOYEES: The Government reserves the right to restrict access of any contractor employee, or prospective contractor employee, who is identified as a potential threat to the health, general well-being, safety, security, or operational mission of the installation and its population. A security forces background check will be performed prior to access.

3. PERIOD OF PERFORMANCE: Delivery and installation within 180 days of contract award.

4. REQUIREMENTS: The contractor shall provide the following items;

1 EA, Mettler Toledo Vehicle Scale Kit VKR211 50T 1 EA, Mettler Toledo Cable HR PDX 70 meters 1 EA, Mettler Toledo Powercell PDX Channel IND780 1 EA, Mettler Toledo Lightning Kit 120V Dig LTE12LC 3G On-Site Installation of all products by a certified technician Calibration of Vehicle Truck Scale post-installation

9. REPORTS: The contract number and delivery date must be clearly visible on any and all invoices and delivery documents.

10. POC:HQ UTTR/RSL
Recycle Yard
Approx.. 11 miles South I-80W, Exit 49
Jasmine Nakayama, 801-568-1138

ATTACHMENT 1: DIRECTIONS TO RECYCLE YARD

1. Take 1-80 Clive exit 49.

The Recycle Yard is located approximately 75 miles west of Salt Lake City and 50 miles east of Wendover NV.

2. Head south from exit, follow main hard surface road crossing over the Rail Road tracks/stop sign.

3. Turn left towards Energy Solution recycle plant.

4. Drive past Energy Solutions facility (facility will be on your left) and follow the telephone poles south.

5. Continue south about 8 miles on semi-hard surface road to USAF North Gate.

6. USAF personnel will meet and escort driver to Recycle Yard facility Bldg. 1504 image1.png