This statement of work describes a project to repair and paint siding and trim on cabins located in Yosemite National Park. The scope of work involves replacing deteriorated wood siding with a concrete board siding on two cabins, known as Cabins 20 and 21 and Cabins 22 and 23. All replaced and existing siding and trim will be painted. The contractor will provide all labor, equipment, and materials to remove and replace gable and lap siding, repair loose siding, seal cracks, remove and replace selected materials, and paint all surfaces to match existing colors and sheens. The contractor must follow all specifications for material brands and disposal requirements, and adhere to work hours and safety protocols regarding bears and animals in the park. The National Park Service will inspect the work and perform a final acceptance review.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8523Q0032.pdf | ||
| 3_-_Limitations_On_Subcontracting_Report_1.xlsx | XLSX spreadsheet | |
| 3_-_Limitations_On_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E X P E R I E N C E Y O U R A M E R I C A The National Park Service cares for special places saved by the American people so that all may experience our heritage.
Statement of Work
Objective
The scope of this project is to repair, replace, and paint siding and window and door trim at the Motor Inn Cabins located in El Portal, CA, and location of Yosemite National Park.
Background
The Motor Inn Cabins are currently utilized as seasonal housing from April to October. The siding is also original to the buildings and in need of repairs from the addition of exterior electrical equipment and contact with the ground. This project will focus on replacing the deteriorated wood siding with a concrete board siding that will be resistant to the effects of animals and weathering. The replaced and existing siding and trim will be painted to complete the project.
Scope
Deteriorated siding and trim will be replaced and painted to match existing on the following cabins:
EPQ 0773 - 10909 Highway 140, El Portal, CA - (Cabin 20&21) – 140 SF gables siding – V-Groove Siding
120 LF lap siding – 7” reveal 20 LF window and door trim – to match existing 840 SF siding (all) - 1 coat primer and 2 coats final paint
EPQ 0774 - 10909 Highway 140, El Portal, CA - (Cabin 22&23) – 140 SF gables – V-Groove Siding 120 LF lap siding – 7” reveal 20 LF window and door trim – to match existing 840 SF siding (all) – 1 coat primer and 2 coats final paint
Specifications
Gable siding will be a beveled tongue and groove, smooth surface, 7” reveal – James Hardie Aspyre Artisan V- Groove Siding or similar Lap siding will be smooth surface, 7” exposure – James Hardie HardiePlank Lap Siding or similar Trim will match existing in width and depth – James Hardie HardieTrim Boards or similar
Contractor will submit samples of materials and paint colors for approval by the COR.
Scope
• The contractor shall provide all labor, equipment, and materials to accomplish the work
• The contractor shall perform all work to meet the standards outlined within the specifications of the contract
• The contractor shall remove and replace all of the gable siding, above the drip line (vertical installation) with a smooth cementitious siding material that matches the existing profile and size
• The contractor shall remove and replace lap siding identified by the NPS for replacement
• The contractor shall fasten loose siding with nails prior to painting
• The contractor shall seal cracks and holes in the siding with caulk or applicable filler prior to painting
• The contractor shall remove and replace selected siding material
• The contractor shall paint all surfaces to match existing in color and sheen
Yosemite National Park
Carrie Toepper Facility Operations Specialist Buildings and Grounds Phone: 209-379-1089
National Park Service U.S. Department of the Interior
The National Park Service cares for special places saved by the American people so that all may experience our heritage.
• The contractor shall remove all associated debris and dispose of them in a responsible manner not within Yosemite National Park or its refuse collection containers
• The National Park Service will perform periodic inspections, provide a punch list as necessary, and perform a final acceptance inspection
Period of Performance
Please refer to the SF 1442 and contract for period of performance details.
Additional Information
HAULING RESTRICTIONS: Vehicles over 45 feet are prohibited and 1-way controlled traffic for all other vehicles 20 miles East of Mariposa (Mariposa County) 24 hours per day, seven days per week due to rockslide repairs.
ON-SITE WORK HOURS: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated. Holiday work will not be allowed.
BEAR/ ANIMAL SAFETY: Bears and other animals are active in Yosemite and surrounding areas. It is necessary for all visitors to practice bear and animal safety. Food items are not to be left in work trucks or anywhere else.
The NPS provides bear boxes in campgrounds for food storage. Bear incidents are a ticketable offense in Yosemite.
The National Park Service cares for special places saved by the American people so that all may experience our heritage.
Motor Inn Cabins 20 and 21, 22 and 23
The National Park Service cares for special places saved by the American people so that all may experience our heritage.
The National Park Service cares for special places saved by the American people so that all may experience our heritage.
File details come from the government source that posted it. Updated .