This solicitation is for mold remediation services at the Frenchburg Job Corps Center. The contractor will be responsible for supplying all labor, materials, equipment, utilities, and licenses to perform mold remediation, air quality clearance testing, and minor reconstruction after testing. An indoor environmental assessment identified mold issues. The work must be completed between 8am-4:30pm Monday through Friday. The Department of Agriculture Forest Service is the contracting agency. The solicitation includes pricing terms for lump sum base items and a project schedule with required submittal dates.

View the file

Other files

File Type Posted
9 RFI Log 1115315.xlsx XLSX spreadsheet
9 SF 30 0003 1115315.pdf PDF
14 Floor Plan Detail with Measurments 1115315.png PNG image
SF 30 0002 1115315.pdf PDF
14 Exterior Photo Culinary Arts Building 1115315.png PNG image
9 RFI Log 1115315.xlsx XLSX spreadsheet
SF 30 0001 1115315.pdf PDF
9 RFI Log 1115315.xlsx XLSX spreadsheet
9 Solicitation Final 1115315.pdf PDF
14 SCA Wage Determinations 1115315.pdf PDF
1 Air Quality Report 2 1115315.pdf PDF
1 Air Quality Report 1115315.pdf PDF
1 Photos Mold Remediation 1115315.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 1

FRENCHBURG JOB CORPS CCC GENERAL REQUIREMENTS

BUILDING 577 CULINARY ARTS - MOLD REMEDIATION

FRENCHBURG JOB CORPS CIVILIAN CONSERVATION CENTER

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:

1. Mold remediation, air-quality clearance testing, and minor reconstruction after passing clearance testing.

2. An indoor environmental air-quality assessment was performed by Air Source

Technology, Inc., on March 9, 2022. The assessment report, dated March 30, 2022, is included with this solicitation as Attachment 02.

1.2 LOCATION

A. This project is located at the Frenchburg Job Corps Civilian Conservation Center. The campus is located approximately 10 miles from Frenchburg, Kentucky in Menifee County. The address is 6969 Tarr Ridge Road, Frenchburg, KY 40322. Driving instructions can be obtained from the Center by calling 606-768-7000.

1.3 PROJECT SCHEDULING

A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.

1.4 POINT OF CONTACT

Center Point of Contact: Shal Thomas, 606-768-7016; shal.thomas@usda.gov .

Contracting Officer’s Representative (COR): Cary Pence, 970-556-4144, cary.j.pence@usda.gov .

1.5 USE OF PREMISES

A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.

cjpence Text Box Revised Specifications - 01/25/23 *See highlighted changes regarding vapor barrier *Deleted Section 071930

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 2

C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1.6 WORK RESTRICTIONS

A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.7 PERMITS (NOT USED)

1.8 SCHEDULE OF ITEMS

A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

B. Base Items (BI):

1. Base Item No. 0001 – Basement Mold Remediation – 1 Lump Sum

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to perform mold remediation according to the drawings, including tile, drywall, and insulation removal, main electrical panel removal and reinstallation, cleaning and treating of affected surfaces to remain, and clearance testing.

2. Base Item No. 0002 – Electrical and Mechanical Room Reconstruction – 1 Lump

Sum

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace insulation, vapor barrier and drywall in-kind. Drywall shall include a fire-tape level of finish.

3. Base Item No. 0003 – Men’s Restroom Reconstruction – 1 Lump Sum

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace insulation, BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 3 vapor barrier, and drywall in-kind. Drywall shall include a Level 4 drywall finish.

4. Base Item No. 0004 – Laundry Room Reconstruction – 1 Lump Sum

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to replace insulation, vapor barrier, and drywall in-kind. Drywall shall include a Level 4 drywall finish.

PART 2 – SUBMITTAL PROCEDURES

2.1 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government approval.

B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.

2.2 PROCEDURES

A. Contractor Responsibilities

1. Review each submittal and check for compliance with the Contract Documents.

2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

3. Include the following information on label or cover sheet for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Date of Contractor’s approval.

i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.

4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.

5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

6. Only final submittals with mark indicating action taken by Government are to be used for construction.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 4

7. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

B. Processing Time: Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Government will review initial submittal within 10 working days.

Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.

2.3 ACTION SUBMITTALS

A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.

1. Submit two copies of each submittal, unless otherwise indicated. CO will return one copy. Mark up and retain one returned copy as a Project Record Document.

Electronic submission of PDFs is an acceptable alternative to paper submission.

B. Collect information into a single submittal for each element of construction and type of product or equipment.

1. Mark each copy of each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Required Action Submittals

1. Mold Remediation Work Plan

2. Product Data: Manufacturer information for all remediation and reconstruction materials.

2.4 INFORMATIONAL SUBMITTALS

A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.

1. Submit one copy of each submittal, unless otherwise indicated. CO will not return copy. Electronic submission of PDFs is an acceptable alternative to paper submission.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 5

2. Provide a statement that includes signature of entity responsible for preparing certification.

B. Required Informational Submittals:

1. Proposed Construction Schedule

PART 3 – TEMPORARY FACILITIES AND CONTROLS

3.1 USE OF UTILITIES

A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service.

3.2 SANITARY FACILITIES

A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.

3.3 STAGING AREAS

A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).

3.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.

3.5 SAFETY AND ENVIRONMENTAL PROTECTION

A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Barricades, Warning Signs, and Lights: If required, comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel and public of possible hazard.

C. Fire Protection.

1. Store combustible materials in containers in fire-safe locations.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 6

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 4 – EXECUTION REQUIREMENTS

4.1 EXAMINATION

A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

4.2 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.

B. Make vertical work plumb and make horizontal work level.

C. Install per manufacturer's written instructions and recommendations.

4.3 PROGRESS CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

4.4 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 7

4.5 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 5 – CLOSEOUT PROCEDURES

5.1 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise the CO of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.

5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

6. Complete startup testing of systems.

7. Submit changeover information related to Government occupancy, use, operation, and maintenance.

8. Complete final cleaning requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 8

2. Results of completed inspection will form the basis of requirements for Final Completion.

5.2 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

5.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

5.4 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 9

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Remove waste materials from Project site and dispose of lawfully.

PART 6 – PROJECT SCHEDULE

6.1 PROJECT SCHEDULE

ITEM* REQUIRED DUE DATE (calendar days)

Bid Guarantee (if applicable)

Due at time of proposal

Performance Bonds (If applicable)

10 days after Award

Pre-Construction Conference

10 days after Award (virtually)

Informational Submittals

10 days after Award

Construction Start (Notice To Proceed)

1 day after Pre-Construction Conference. No items shall be ordered without approved action submittal.

Liability falls on Contractor if this occurs.

Action Submittals

10 days after NTP

Construction Start (NTP)

5 days after Submittal Approvals

Closeout Submittals

Prior to CO acceptance of project

Contract Release form and final pay request

10 days after CO acceptance of project

* All items above must be included in Contractor’s construction schedule

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 010150 – 10

END OF SECTION 010150

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 092900 – 1

FRENCHBURG JOB CORPS CCC GYPSUM BOARD ASSEMBLIES

SECTION 092900

GYPSUM BOARD ASSEMBLIES

PART 1 – GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Interior gypsum wallboard.

1.2 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: For gypsum board assemblies with fire-resistance ratings, provide materials and construction identical to those tested in assembly indicated according to ASTM E 119 by an independent testing and inspecting agency acceptable to authorities having jurisdiction.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the products specified.

2.2 PANEL PRODUCTS

A. Panel Size, General: Provide in maximum lengths and widths available that will minimize joints in each area and correspond with support system indicated.

B. Fiberglass Mat Faced Moisture Resistant Gypsum Boards.

1. Thickness: ½ inch

2. Edges: Tapered

3. Surfacing: Crated fiberglass mat on face, back and long edges.

4. Flexture Strength: ASTM C 473, ASTM C 1658, not less than 80 lbs.

5. Humidified Deflection: ASTM C 473, ASTM 1658, not more than ¼ inch.

6. Water Absorption: ASTM C 630, ASTM C 1396, ASTM C 1658, less than 5% of weight.

7. Mold Resistance: ASTM D 3273; 10

8. Basis of Design Product: The design for fiberglass mat faced moisture resistant gypsum board is based in Georgia – Pacific “Dense Armor Plus High Performance Interior Panel” for the purpose of establishing minimum requirements, other products can be substituted, provided that the final product is certified in writing to be equal or superior to that specified.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 092900 – 2

2.3 TILE BACKING PANELS

A. Cementitious Backer Units: ANSI A108.1.

1. Available Products: Subject to apmluance with requirements, products athat may be inciporated into the Work include, but are not limited to, the following:

2. Products: Subject to compliance with requirements, provide one of the following:

a. Custom Building Products; Wonderboard.

b. FinPan, Inc.; Util-A-Crete Concrete Backer Board.

c. USG Corporation; DUROCK Cement Board.

3. Thickness: ½ inch (12.7 mm).

2.4 TRIM ACCESSORIES

A. Interior Trim: ASTM C 1047.

1. Bullnose Bead: Use at outside corners.

2. LC-Bead: Use at exposed panel edges.

3. L-Bead: Use where indicated.

4. U-Bead: Use where indicated.

5. Expansion (Control) Joint:

6. Recommended Control Joints Locations:

a. Ceilings:

i. Space control joints not more than 50 feet (15.2 m) o.c.

ii. Install control joints where ceiling framing or furring

b. Partitions and Furring: - Install control joints in partitions and wall furring runs exceeding 30 feet (9.1 m) o.c.

i. Space control joints not more than 30 feet

(9.1) o.c.

ii. Install control joints in furred assemblies where control joints occur in base exterior wall.

2.5 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C 475.

B. Joint Tape:

1. Interior Gypsum Wallboard: Fiberglass mesh tape and setting compound.

C. Joint Compound for Interior Gypsum Wallboard: For each coat use formulation that is compatible with other compounds applied on previous or for successive coats.

1. Prefilling: At open joints, rounded or beveled panel edges, and damaged surface areas, use setting-type taping compound.

2. Embedding and First Coat: For embedding tape and first coat on joints, flanges of trim accessories, and fasteners, use setting-type taping compound.

a. Use setting-type compound for installing paper-faced metal trim accessories.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 092900 – 3

3. Fill Coat: For second coat, use setting-type, sandable topping compound.

4. Finish Coat: For third coat, use setting-type, sandable topping compound.

5. Skim Coat: For final coat of Level 5 finish, use setting-type, sandable topping compound.

D. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written recommendations.

1. Laminating Adhesive: Use adhesives that have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

E. Acoustical Sealant for Exposed and Concealed Joints: Non-sag, paintable, non-staining, latex sealant complying with ASTM C 834 that effectively reduces airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90.

1. Available Products:

a. Pecora Corp.; AC-20 FTR Acoustical and Insulation Sealant.

b. United States Gypsum Co.; SHEETROCK Acoustical Sealant.

F. Acoustical Sealant for Concealed Joints: Non-drying, non-hardening, non-skinning, non-staining, gunnable, synthetic-rubber sealant recommended for sealing interior concealed joints to reduce airborne sound transmission.

1. Available Products:

a. Ohio Sealants, Inc.; Pro-Series SC-170 Rubber Base Sound Sealant.

b. Pecora Corp.; BA-98.

c. Tremco, Inc.; Tremco Acoustical Sealant.

G. Steel Drill Screws: ASTM C 1002, unless otherwise indicated.

1. Use screws complying with ASTM C 954 for fastening panels to steel members from 0.033 to 0.112 inch (0.84 to 2.84 mm) thick.

2. For fastening cementitious backer units, use screws of type and size recommended by panel manufacturer.

PART 3 – EXECUTION

3.1 NON-LOAD-BEARING WOOD FRAMING INSTALLATION

A. General: Comply with ASTM C 840 requirements that apply to framing installation.

B. Partition and Soffit Framing:

1. Where studs are installed directly against exterior walls, install isolation strip between studs and wall.

2. Extend partition framing full height to structural supports or substrates above suspended ceilings, except where partitions are indicated to terminate at suspended ceilings. Continue framing over frames for doors and openings and frame around ducts penetrating partitions above ceiling to provide support for gypsum board.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 092900 – 4

3. Frame door openings to comply with GA-600 and with gypsum board manufacturer's applicable written recommendations, unless otherwise indicated.

Screw vertical studs at jambs to jamb anchor clips on door frames; install runner track section (for cripple studs) at head and secure to jamb studs.

a. Install two studs at each jamb, unless otherwise indicated.

b. Extend jamb studs through suspended ceilings and attach to underside of floor or roof structure above.

4. Frame openings other than door openings the same as required for door openings, unless otherwise indicated. Install framing below sills of openings to match framing required above door heads.

3.2 PANEL PRODUCT INSTALLATION

A. Gypsum Board: Comply with ASTM C 840 and GA-216.

1. Space screws a maximum of 12 inches (304.8 mm) o.c. for vertical applications.

2. Space fasteners in panels that are tile substrates a maximum of 8 inches (203.2

mm) o.c.

3. On ceilings, apply gypsum panels before wall/partition board application to the greatest extent possible and at right angles to framing, unless otherwise indicated.

4. On partitions/walls, apply gypsum panels horizontally (perpendicular to framing), unless otherwise indicated or required by fire-resistance-rated assembly, and minimize end joints.

a. Stagger abutting end joints not less than one framing member in alternate courses of board.

b. At stairwells and other high walls, install panels horizontally, unless otherwise indicated or required by fire-resistance-rated assembly.

5. Single-Layer Fastening Methods: Apply gypsum panels to supports with steel drill screws.

6. Layers with adhesive and supplementary fasteners.

7. Laminating to Substrate: Comply with gypsum board manufacturer's written recommendations and temporarily brace or fasten gypsum panels until fastening adhesive has set.

3.3 FINISHING

A. Installing Trim Accessories: For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. Otherwise, attach trim according to manufacturer's written instructions.

B. Finishing Gypsum Board Panels: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration.

1. Prefill open joints and damaged surface areas.

2. Apply joint tape over gypsum board joints, except those with trim having flanges not intended for tape.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 092900 – 5

3. Glass-Mat Gypsum Sheathing Board: Finish according to manufacturer's written instructions for use as exposed soffit board.

4. Glass-Mat, Water-Resistant Backing Panels: Finish according to manufacturer's written instructions.

C. Gypsum Board Finish Levels: Finish panels to levels indicated below, according to ASTM C 840, for locations indicated:

1. Level 2: Embed tape and apply separate first coat of joint compound to tape, fasteners, and trim flanges 2 inches above soffit ceiling on all wall and ceiling not exposed to view.

2. Level 5: Embed tape and apply separate first, fill, and finish coats of joint compound to tape, fasteners, and trim flanges at panel surfaces that will be exposed to view, unless otherwise indicated.

3.4 APPLYING TEXTURE FINISHES

A. Surface Preparation and Primer: Prepare and apply primer to gypsum panels and other surfaces receiving texture finishes. Apply primer to surfaces that are clean, dry, and smooth.

B. Texture Finish Application: Mix and apply finish using powered spray equipment, to produce a uniform texture matching approved mockup and free of starved spots or other evidence of thin application or of application patterns.

C. Prevent texture finishes from coming into contact with surfaces not indicated to receive texture finish by covering them with masking agents, polyethylene film, or other means. If, despite these precautions, texture finishes contact these surfaces, immediately remove droppings and overspray to prevent damage according to texture finish manufacturer's written recommendations.

D. Texture: Smooth

END OF SECTION 092900

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 1

FRENCHBURG JOB CORPS CCC MOLD REMEDIATION

SECTION 028500

MOLD REMEDIATION

PART 1 – GENERAL

1.1 SUMMARY

A. This section specifies the general procedures for removal of mold and/or otherwise microbial compromised material and disposal of removed materials if encountered during the course of the project. Specific work plans and procedures shall be completed by the owner’s representative prior to the commencement of any remedial activities.

B. Disturbance or dislocation of mold containing, or contaminated materials may cause mold spores to be released into building's atmosphere, thereby creating a health hazard to work persons and building occupants. Consistent with mold remediation work, Contractor shall appraise all of it’s workers, supervisory personnel, subcontractors and consultants who will be at job site of the seriousness of the hazard and of proper work procedures that must be followed.

1.2 REMEDIATION AREAS

A. Work shall be performed in the following sequence at each of the areas referenced in Paragraph 1.1.(4)(a) and all other areas fungal growth is discovered:

1. Walls, floors and ceilings other than those to be removed within the work area shall be covered with least 1 layer of six mil, flame retardant polyethylene sheeting and sealed with duct tape from the floor to ceiling deck. T-grid from drop ceiling will have to be removed and cleaned.

2. Critical barriers shall be installed over all openings to the work area consisting of at least 1 layer of six mil, flame retardant polyethylene sheeting and sealed with duct tape. An airlock shall be attached to work area.

3. HVAC diffusers to the work area shall be de-energized or disconnected and sealed with at least 1 layer of six mil, flame retardant polyethylene sheeting and duct tape.

4. Install HEPA filtered negative air pressure equipment in the work area, exhausting to the exterior of the building to create a negative pressure enclosure at all work areas.

5. Owner’s representative shall inspect work areas prior to start of removal and cleaning activities. Upon removal of the wall and all porous materials within the wall cavity and work area, the work area and adjacent wall should be inspected by a third party to determine if additional mold growth exists. If visible growth exists, the adjacent wall should also be removed. All components and surfaces within work area and sheeting shall be HEPA vacuumed and wet wiped.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 2

6. All adjacent surfaces to the microbial compromised areas shall be thoroughly cleaned, scraped, scrubbed and/or sanded to completely remove all mold contamination. Following the abatement of all mold-contaminated surfaces the entire work area shall be thoroughly cleaned and disinfected using a detergent solution and a wet/dry rag system.

7. The work area shall pass both a visual inspection and microbial clearance sampling following abatement and cleaning activities.

8. Following successful visual and microbial clearance sampling, surfaces adjacent to the remediation zone and any remediated surface to remain shall be disinfected by the proper use of an EPA Registered Disinfectant, Fungicide and Cleaner.

9. The work area shall be allowed to thoroughly dry, the abated surfaces will then be sprayed or wiped with a coating of fungicidal disinfectant/sealant such as Anabec X-90 or equivalent. Application shall be as described by the manufacturer.

10. Correction of conditions conducive to fungal growth is outside the scope of this specification.

1.3 LAWS, REGULATIONS AND STANDARDS

A. 29 CFR 1910.134 OSHA Respiratory Protection.

B. Mold Remediation in Schools and Commercial Buildings, US Environmental Protection Agency (US EPA) (2001).

C. 29 CFR 1926 OSHA Construction Standard.

D. IICRC Standard and Reference Guide for Professional Mold Remediation S520

E. Abbreviations And Names:

1. Where acronyms or abbreviations are used but not identified in specifications or other contract documents they are defined to mean the industry recognized name or trade association, standards generating organization, governing owner or other entity applicable to context of text provision. Refer to "Encyclopedia of Associations," published by Gale Research Co., available in large libraries. The following acronyms or abbreviations which may be referenced in Contract Documents are defined to mean the associated names.

1.4 SUBMITTALS

A. Work shall not proceed until submittals are approved. Prior to project commencement the contractor shall submit one (1) electronic copy of the following submittals to the consultant:

1. Work Plan: Submit alternative methods, if any, to the removal procedure as specified in this section. Any requested change to the procedures listed herein must provide for the control of dust, collection of wastewater, and use of

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 3

the negative pressurized work area. Refer to Section 1.04 for specific details of work plan.

2. Copies of the Contractor’s written respiratory program, qualitative fit test procedures and Safety Manual.

3. An affidavit indicating that each Contractor’s employee has passed a physical exam for use of a respirator and has been provided with qualitative/quantitative fit tests.

4. Copy of Certifying Physicians report for each employee indicating Physicians opinion that employee can safely work while wearing respiratory protection.

5. An affidavit indicating completion of training and if appropriate, certification of each Contractor’s employee employed on the project.

6. Waste Transporter Permit: One copy of transporter's current waste transporter permit.

7. Products: Submit manufacturer's product data and material safety data sheets (MSDS) for cleaning materials and chemicals used on this project.

8. Contractor’s Emergency Plan as detailed.

B. Contract Closeout Submittals:

1. Copy of contractor entry/exit logs.

1.5 QUALITY CONTROL

A. Work Plan: As part of project submittals the Contractor shall prepare and submit a detailed work plan. The work plan shall include, but not be limited to:

1. work procedures,

2. types of equipment,

3. products,

4. crew size,

5. number and location of negative air machines and exhaust discharge point,

6. emergency procedures for fire and medical emergencies and for failure of containment barriers.

PART 2 PRODUCTS AND PROCEDURES

2.1 EMERGENCY PLANNING

A. Description

1. The Contractor shall prepare an emergency preparedness plan detailing at least the information required in this section and in any applicable federal, state or local regulations.

B. Details of Plan

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 4

1. Emergency planning shall be developed prior to abatement initiation and submitted to the Owner for review under the requirements of section 1.03 of this specification to the Owner.

2. Emergency procedures shall be in written form and prominently posted in the clean change area of the worker decontamination area. Everyone, prior to entering the work area, must read and sign these procedures to acknowledge receipt review and understanding of work site layout, location of emergency exits, and emergency procedures.

3. Emergency planning shall include written notification of police, fire and emergency medical personnel of planned abatement activities, work schedule and layout of work area, particularly barriers that may affect response capabilities.

4. Emergency planning shall include considerations of fire, power failure, explosion, toxic atmospheres, electrical hazards, slips, trips, and falls, confined spaces, spills of releases of hazardous materials and heat related injury. Written procedures shall be developed and employee training in procedures shall be provided.

5. Employees shall be trained in evacuation procedures in the event of work place emergencies.

a. For Non-life-threatening Situations: Employees injured or otherwise incapacitated shall decontaminate following normal procedures with assistance from fellow workers, if necessary, before exiting the work place to obtain proper medical treatment.

b. For Life-threatening Injury or Illness: Worker decontamination shall take least priority. After measures to stabilize the injured worker, he/she shall be removed from the work place and secure proper medical treatment.

6. Telephone numbers of all emergency response personnel shall be prominently posted in the clean area and equipment room, along with the location of the nearest telephone.

2.2 TOOLS AND EQUIPMENT

A. All equipment shall at least conform to minimum industry standards:

1. Equipment:

a. Dessicant Dryers: Whenever air drying equipment is required, 115 volt portable dessicant dryers shall be utilized.

b. Negative Air Machines: Negative pressure machines: shall use centrifugal type fan: HEPA filters shall be closed on all edges with a ridge frame, filters shall be 99.97% effective down to .3 microns; two stage pre-filtration is required. Instrumentation shall include manometer, magnahelic gauge, and safety warning devices.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 5

c. Vacuum Cleaners: Vacuum cleaning equipment shall be fitted with HEPA filtration capable of filtering work area at 99.97% efficiency down to .3 microns before exhausting to the outside air.

2.3 MATERIALS

A. Remediation Materials:

1. Poly sheeting for all applications shall be 6-mil nominal thickness and flame retardant.

2. Tape shall be 2 or 3 inch duct tape or other waterproof tape suitable for joining poly seams and attaching poly sheeting to surfaces.

2.4 PERSONNEL PROTECTION

A. Full body disposable protective clothing, including head, body, and foot covering (unless using footwear as described below) consisting of material impenetrable by mold spores (Tyvek or equivalent) shall be provided to and used by all workers and authorized visitors in sizes adequate to accommodate movement without tearing. Provide a sufficient number for all required changes, for all workers and authorized visitors in the work area. Respiratory protection shall be provided and used.

B. Additional safety equipment (e.g., hard hats meeting the requirements of ANSI Standard Z89.1-1981, eye protection meeting the requirements of ANSI Standard Z87.1-1979, safety shoes meeting the requirements of ANSI Standard Z41.1- 1967, disposable PVC gloves or other work gloves), shall be provided to all workers and authorized visitors.

C. Nonskid footwear shall be provided to all abatement workers. Disposable clothing shall be adequately sealed to the footwear to prevent body contamination.

2.5 TRAINING

A. Supervisors and Workers shall have successfully completed training in mold remediation. Documentation/certification of completed training shall be provided.

This training shall be conducted by a Certified Industrial Hygienist or other professional knowledgeable in the potential hazards and safe removal of mold, and include, at a minimum, the following:

1. Potential risks, diseases, and health effects.

2. Engineering and administrative controls.

3. Work practices, including removal, cleaning, disinfecting and drying methods.

4. PPE usage, including respirator training and fit testing.

5. Waste packaging, handling, and disposal.

6. Specification requirements.

2.6 RESPIRATORY PROTECTION

A. All respiratory protection shall be provided to workers in accordance with the submitted written respiratory protection program, which includes all items in OSHA

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 6

29 CFR 1910.134 (B), (D), (E), and (F). This program shall be posted in the clean room of the worker decontamination enclosure system.

B. Workers shall be provided with personally issued, individually identified (marked with waterproof designations) respirators.

C. At minimum, half-face air purifying respirators utilizing P-100 filters shall be worn during all preparation and cleaning operations. During all removal operations, the minimum level of protection required shall be the half-face air-purifying respirator.

Powered air-purifying respirators (PAPR) and full-face air-purifying respirators are also allowable.

D. Fit Testing

1. Workers must perform positive and negative air pressure fit checks each time a respirator is put on, whenever the respirator design so permits. Powered air-purifying respirators shall be tested for adequate flow as specified by the manufacturer.

2. Workers shall be given a qualitative fit test in accordance with procedures detailed in the OSHA Regulation (29 CFR 1910.134) for all respirators to be used on this abatement project. The irritant fume protocol will be utilized.

An appropriately administered quantitative fit test may be substituted for the qualitative fit test.

E. No one wearing a beard or other facial hair which will reduce the performance of the respirator shall be permitted to don a respirator and enter the work area.

F. Respirator cartridges shall be replaced with new cartridges each time the worker exits the work area. Used cartridges shall be disposed of as mold contaminated waste. A sufficient supply of cartridges shall be maintained on site at all times.

2.7 MEDICAL SURVEILLANCE

A. Employees shall be evaluated by a physician to determine their capability to work safely while breathing through the added resistance of a respirator. The employer shall maintain these records and provide them as demanded by OSHA or other such compliance entity.

PART 3 EXECUTION

3.1 GENERAL

A. Secure entire work area to prevent entry of unprotected/unauthorized persons.

B. Cover, isolate, and seal work area doors, windows, skylights, lighting fixtures, duct openings, and all other openings into work area. Use polyethylene sheeting and seal edges with polyethylene adhesive tape, duct tape, restoration tape or other waterproof tape.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 7

C. Establish emergency and fire exits from the work area as part of the written emergency action plan.

D. Locate at the project site the log sheet sign-in for all persons entering work area from the beginning to the completion of the final clearance of the abatement project.

3.2 PREPARATION - WORK AREAS

A. The work areas shall be completely isolated from other parts of the building so as to prevent mold spore containing dust or debris from migrating beyond the isolated area.

Should the area beyond the work area become contaminated with mold-containing dust or debris as a consequence of the work, the Contractor shall immediately notify the Owner and shall be responsible for cleaning, on a daily basis, those areas in accordance with the procedures indicated in paragraphs below. All costs incurred in cleaning, or otherwise decontaminating, non-work areas and the contents there of shall be borne by the Contractor including, but not limited to air monitoring, project monitoring, Owner labor, consulting service costs and fees.

These areas shall be vacated and remain isolated until satisfactory clearance air monitoring results have been achieved.

B. Signs: Caution signs shall be posted at all locations and approaches to the work area.

Signs shall be posted that permit a person to read the sign and take the necessary protective measures to avoid exposure.

C. Utilities: The Contractor will be responsible to provide utilities to the work area.

Connection to existing building utilities and services will require written approval of the Owner. All internal building utility connections will be in compliance with NEC, state and local building codes.

1. Electric Power: The Contractor shall shut down and lock out electric power to all work areas. The Contractor shall provide temporary power and lighting, and ensure safe installation of temporary power sources and equipment used where high humidity and/or water shall be sprayed in accordance with all applicable codes. All power to work areas shall be brought in through a ground-fault interrupter at the source.

D. Movable Objects: Movable objects within the work area shall be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning and such objects shall be removed from the work area to an uncontaminated location. If disposed of as mold contaminated or microbial compromised material, cleaning is not required. The Owner shall determine which method is to be utilized.

E. Fixed Objects: Fixed objects and other items which are to remain within the work area shall be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning. Such objects and items shall be enclosed with two layers of six mil plastic sheeting (minimum) and sealed with tape.

F. Pre-cleaning: The work area shall be cleaned using HEPA filtered vacuum equipment and/or wet cleaning. Methods that raise dust, such as dry sweeping or vacuuming with equipment not equipped with HEPA filters, are prohibited. Mold contaminated material shall not be disturbed during pre-cleaning.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 8

G. Isolation Barriers - General: Isolation barriers that seal off all openings, including but not limited to windows, doorways, skylights, ducts, grilles, diffusers, and any other penetrations of the area shall be constructed using two layers of a minimum of six mil plastic sheeting sealed with tape. Also, all seams in the system components that pass through the work area shall be sealed. Doorways which shall not be used for passage during work shall also be sealed.

H. Exits: Emergency and fire exits from the work area shall be maintained or alternate exits shall be established according to all applicable codes.

I. Toilet Facilities: Adequate toilet facilities shall exist either in the clean area of the personal decontamination enclosure or shall be readily accessible to the personal decontamination enclosure.

J. A single chamber airlock shall be constructed at the entrance to the work area.

Airlock shall be constructed of rigid framing and covered in six mil flame retardant polyethylene sheeting. A triple sheet, weighted, curtained doorway shall be constructed at either end of the airlock. The airlock shall be sized as appropriate to accommodate cleaning, bagging, wrapping, decontamination and other abatement activities.

3.3 HYGIENE PRACTICES

A. Eating, drinking, smoking, chewing gum or tobacco, and applying of cosmetics are not allowed in the work area.

B. Personal protective equipment (PPE) shall be worn throughout removal and cleanup procedures to protect against potential microbiological exposure hazards, and skin and respiratory irritation from use of cleaners and disinfectants.

C. All persons entering the work area shall wear appropriate PPE, and shall follow the entry and exit procedures posted in the Personnel Decontamination Enclosure System.

1. Personal protection equipment shall include:

a. Respirators.

b. Full body disposable suits, headgear, and footwear.

c. Gloves.

d. Air Tight Goggles.

D. Non-disposable footwear and clothing shall remain in the work area and shall be disposed of as contaminated material or decontaminated when the job is completed.

E. Authorized visitors shall be provided with suitable PPE when PPE is required in the work area.

F. Negative Air Pressure System - Work Areas

1. Provide a negative pressure system for the abatement project areas. The details of planned negative pressure system shall be submitted per section 1.04.

G. Pressure Differential Meter: omitted

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 9

3.4 SYSTEM OPERATION

A. To calculate total air flow requirement:

B.

VOLUME OF WORK AREA (FT3)

TOTAL FT3 /MIN = ------------------------------

MINUTES

C. To calculate the number of units needed for the abatement:

D.

TOTAL FT3 /MIN

NUMBER OF UNITS NEEDED = ---------------------------------

CAPACITY OF UNIT IN FT3 /MIN

E. Provide sufficient number of spare HEPA filtration units to maintain a minimum of two air changes per hour in case of unit failure. At least one spare unit must be provided for every five units utilized during the work.

F. Filters shall be changed as dictated by the job conditions. Used filters shall be disposed of as mold contaminated waste. A sufficient supply of new and unused filters shall be maintained at all times.

G. Air shall flow in through the airlock at the entrance to the work area and exit through the negative air filtration unit by means of a flexible duct leading outside the building.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 10

H. Negative pressure units will be started before removal work begins and be in continuous operation until the area is ready for clearance testing.

I. Do not shut off units at the end of work shift.

3.5 PROHIBITED ACTIVITIES

A. Use of high-pressure water to wet mold-impacted materials.

B. Any activity that results in excessive or unnecessary moisture in or outside of the work area.

C. Dry removal or dry sweeping.

D. Use of compressed air for cleaning.

E. Use of high speed power tools not equipped with an HEPA-filtered local exhaust system.

F. Use of tools that can damage building surfaces, such as coarse wire brushes.

3.6 REMEDIATION PROCEDURES

A. Mold-impacted materials shall be misted (not soaked) with a disinfectant solution using a low-velocity mist spray prior to removal.

B. Remove mold-impacted bulk material in such a way as to prevent debris from becoming airborne.

C. Mold-impacted materials shall be double-bagged or containerized as it is removed.

Remove waste containers from work area by hand to the waste and equipment decontamination unit.

D. Sealed waste containers shall proceed through the decontamination sequence procedures of this specification.

E. Containerized Waste shall be deposited in a dumpster or trailer for disposal.

Dumpster/trailer shall be hard top style with lockable doors. Open top non-lockable style dumpster may be used if a barrier fence is installed to prevent unauthorized access.

BLDG. 577 CULINARY ARTS – MOLD REMEDIATION 028500 – 11

F. Appropriate OSHA protection shall be provided, as needed. The Contractor is responsible for compliance with all applicable OSHA regulations and…