1-Several Disasters Letcher County Livestaking Provision and Installation Services RFB due 11.25.26.pdf
PDF 265 KB Posted
- Solicitation number
- livestaking - 2
- Issued by
- Knott County, Kentucky
About this file
Summary
This Request for Bids document is issued by Letcher County Fiscal Court in Kentucky for the provision and installation of native live stake cuttings at multiple shoulder and embankment locations throughout Letcher County. The project involves sourcing willow (Salix spp.) cuttings from licensed nurseries or growers, storing and handling the stakes, and installing them 3 feet apart in joint or rock openings per Kentucky Best Management Practices for Construction Activities specifications. The stakes serve as erosion control and embankment reinforcement measures resulting from federally declared disasters. Bids are due by Wednesday, November 25, 2026, at 2:00 PM ET through the DFS Procurement Portal at dfs.bonfirehub.com, with public bid opening at 3:00 PM the same day. Award is scheduled for the Letcher County Fiscal Court meeting on December 21, 2026. The project encompasses approximately 4,663 disaster locations with an estimated 50,000 live stakes to be furnished and installed by December 31, 2026. All material specifications, installation requirements, and pre-bid documentation must be submitted through the designated portal, and contractors must meet insurance, licensing, and compliance requirements prior to contract execution.
Pricing shall be all-inclusive per unit, covering labor, equipment, materials, transport, storage, and handling, with prices guaranteed through May 31, 2027. Quantities are estimated only and not guaranteed by the county. Successful bidders must provide evidence of $1,000,000 minimum liability coverage and Workers Compensation insurance. All live stakes must be sourced directly from licensed nurseries or growers with current state licenses; resellers, brokers, and distributors are ineligible sources. Contractors must submit before and after photographic documentation with GPS coordinates and timestamps, along with supporting documentation for quantities per site and debris disposal locations. This work is funded through FEMA grants for disaster recovery. Payment is contingent upon work completion, submission of all required invoices and documentation, reconciliation by the Grants Management Team, and Fiscal Court approval.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
LETCHER COUNTY FISCAL COURT
PROJECT NAME: LIVE STAKES PROVISION AND INSTALLATION SERVICES
Purpose:
Letcher County Fiscal Court is requesting bids to furnish and install native live stake cuttings (willow, Salix spp.) at several shoulder/embankment locations around Letcher County. The contractor will source the live stakes from a licensed nursery or grower, store and handle them, and install them by staking cuttings
3 ft apart in joint or rock openings of shoulder/embankment channel lining per construction specifications and drawings in the Kentucky Best Management Practices for Construction Activities.
These mitigation measures will reduce the risk of future damage by preventing scour and erosion on associated embankments. Live stakes add strength and structure to the soil, and by reinforcing the channel lining, thereby helping to protect the integrity of the road during future flooding events.
This Request For Bids is for both provision (furnishing) and installation of live stakes. Live stakes are
NOT provided by the county.
The bidder does not need to be a nursery. All live stakes must be sourced from a licensed nursery or grower that grows or harvests the stakes. Stakes sourced from resellers, brokers or distributors are not acceptable.
Any contractor with overdue work for the county is ineligible for additional work from the county until overdue projects are completed.
Responses are due no later than Wednesday, November 25, 2026; 2:00 PM ET through the DFS Procurement Portal at dfs.bonfirehub.com
Bids will be opened publicly at 3:00 PM the same day in the Judge Executive's Office. The award is scheduled to occur at the Letcher County Fiscal Court meeting, December 21, 2026 , 156 Main Street, Suite 107 Whitesburg, KY 41858.
Required Documents for Submission in DFS Procurement Portal:
1. Copy of Insurance Policies, and the Insurance Carrier, Limit ($), and Expiration Date for General Liability, Commercial Auto, and Worker's Compensation
2. Copy of Drug Free Workplace Policy
3. Printout from SAM.gov (https://www.SAM.gov) showing active registration
4. Three (3) references, each with Reference Agency, Project Name/Type/Location/Year, Reference
Person Name, and email/phone
5. Contractor Capacity and Experience Statement (a statement of qualifications, brochure, or other documentation may be used)
6. Name and physical address of the source nursery/grower and where and how the stakes are grown or harvested (stock beds or harvest sites the nursery owns, leases or controls)
7. Copy of the source nursery's current state nursery license, nursery dealer/grower certificate, or plant inspection certificate from the state where the stakes are grown or harvested
Letcher County Fiscal Court Livestake Installation Services Page 1 http://dfs.bonfirehub.com http://sam.gov https://www.sam.gov
Requirements for Bidding
● Stake sourcing: The bidder may be an installer, landscaper, contractor or nursery. All stakes must come from a licensed nursery or grower that grows or harvests them, not a reseller, broker or distributor. The bidder must identify the source nursery (name and physical location), provide its current state nursery license or certificate, and state its stock source. Bids without this proof will be considered non-responsive. A change of source nursery after award requires prior written
County approval.
● All requested information must be filled out to be considered a valid bid.
● Bidders must use the bid form and must submit by Wednesday, November 25, 2026 at 2:00 PM
EST through the DFS Procurement Portal: dfs.bonfirehub.com
● Proposals received after the due date and time will not be considered.
● Only authorized members of an establishment are to submit a bid. Any individual bidder certifies that he/she has the authority to bind the company in fulfillment of all terms of the project.
● Successful bidders must provide a Certificate of Insurance showing proof of liability coverage for a minimum of $1,000,000 and Workers Compensation.
● Successful bidders, assigns, subcontractors must be compliant with all applicable Federal, State and Local laws, and be in good standing with the state.
● The following forms are provided in this RFB for reference. Bidders must review each form and enter their response as directed in the Portal's Required Information section. Bioengineering must be installed according to specifications which can be found at Kentucky Best Management Practices for Construction Activities. All specifications and drawings can be found online at the following link:
https://eec.ky.gov/Environmental-Protection/Water/PermitCert/WQ401Cert/Documents/Kentucky BestMgmtPracticesForConstructionActivities-2005.pdf
● Invoice validation will also include contractor certification that all work was completed to specifications published by KYTC Specifications.
● Invoices must include at least 4 Photos of “Before” and 4 Photos “After” work completion. Photos must be taken with an app (such as Solocator or GPS Camera) that displays the GPS (and preferably road name) and date.
● This work is for specific sites/repairs with quantities listed on a FEMA grant; as such documentation supporting the quantities must be provided (e.g. quarry tickets, or load counts/truck capacities). Invoices must list the haul off location of any debris, spoils, or waste (example: permitted landfill, recycling location, or road dept for reuse).
● Work can not start until the contract agreement is fully executed and the contractor has made contact with Letcher County Matt Amburgey at (606) 595-8710 to schedule work and work supervision/inspection.
● Letcher County reserves the right to accept or reject any and all bids. Letcher County reserves the right to seek clarification from bidders.
Letcher County Fiscal Court Livestake Installation Services Page 2 http://dfs.bonfirehub.com https://eec.ky.gov/Environmental-Protection/Water/PermitCert/WQ401Cert/Documents/KentuckyBestMgmtPracticesForConstructionActivities-2005.pdf https://eec.ky.gov/Environmental-Protection/Water/PermitCert/WQ401Cert/Documents/KentuckyBestMgmtPracticesForConstructionActivities-2005.pdf
● Letcher County Fiscal Court is an Equal Opportunity Employer and encourages all qualified businesses to respond to this request, including minority, women, veteran owned businesses, as well as hub-zone businesses.
General Terms & Information
● Materials. Live stakes must be native willow (Salix spp.) cuttings meeting the Kentucky Best
Management Practices for Construction Activities and KYTC Specifications: KY BMP manual.
Species: silky willow (Salix sericea) or other Kentucky-native willow approved by the county
Stream Specialist. Length: 2–3 ft (bidders may also quote 1–2 ft and 3–4 ft lengths as alternates).
● Cut rules. Stakes must have a flat-cut top and angle-cut bottom, side branches trimmed, and at least two buds above ground once installed.
● Sourcing. Stakes must be harvested during dormancy from the identified licensed nursery/grower. The County may verify the nursery license and inspect the stock source before award or before installation.
● Storage and handling. The contractor is responsible for transport, storage and handling. Stakes must be kept moist and shaded and installed fresh; the county does not provide cold storage.
Stakes that are dried out, split or damaged will be rejected and will not be paid.
● Installation. Bioengineering must be installed according to the Kentucky Best Management
Practices for Construction Activities and KYTC Specifications.
● All materials and work will be inspected and monitored by a county-provided Stream Specialist
Engineer or designee.
● Invoice validation includes contractor certification that all work was completed to KYTC
Specifications, plus nursery invoices/delivery tickets showing date, quantity, species, length and source nursery.
● Invoices must include at least 4 "Before" and 4 "After" photos per site taken with an app (such as
Solocator or GPS Camera) showing GPS (and preferably road name) and date.
● This work is for specific sites with quantities listed on a FEMA grant; documentation supporting quantities per site must be provided. Invoices must list the haul off location of any debris, spoils, or waste.
● This Request for Bids is for needs resulting from several federally declared disasters. All 4663 disaster locations must have livestaking installed by December 31, 2026
● Prices are to be guaranteed by contractors until May 31, 2027
● There are no guarantees of "quantities" (overall or per site). Estimated quantity: 50,000 live stakes furnished and installed. This is an estimate only and is not a guaranteed quantity.
Letcher County Fiscal Court Livestake Installation Services Page 3 https://eec.ky.gov/Environmental-Protection/Water/PermitCert/WQ401Cert/Documents/KentuckyBestMgmtPracticesForConstructionActivities-2005.pdf
● Work will not be considered complete until all invoice documents are provided and invoice validation is complete.The successful bidder must submit invoices to erassist.com/submit/livestaking. This submission form will not be available until the contract is fully executed. Invoices and work complete photos will no longer be accepted through email.
● Payment will follow only after work is completed, all documentation is received from the
Contractor and reconciled by the Grants Management Team, and after approval by the Fiscal
Court.
Letcher County Fiscal Court Livestake Installation Services Page 4
The following forms are provided in this RFB for reference. Bidders must review each form and enter their response as directed in the Portal’s Required Information section. The confirmation or declaration statement for each form for which a response is required is provided in a gray box at the bottom of each form in this document. All responses must be true and accurate and shall be considered the equivalent of a legally-binding electronic signature.
1. Attachment 1: Bid Certification and Cost Proposal Form
2. Attachment 2: NON-COLLUSION DECLARATION
3. Attachment 3: CERTIFICATION REGARDING LOBBYING
4. Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
5. Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and VOLUNTARY EXCLUSION
6. Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
7. Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
8. Attachment 8: INSURANCE COVERAGE DECLARATION
Letcher County Fiscal Court Livestake Installation Services Page 5
Attachment 1: Certification and Cost Proposal Form
Bidding Certification: I have carefully examined the Request for Bids and any other documents accompanying or made a part of this Request for Bids.
I hereby propose to furnish the goods or services specified in the Request for Bids at the rates quoted in my Bid. I agree that my Bid will remain in effect for a period of up to one hundred eighty (180) days.
I agree to abide by all conditions of this Bid l and understand that a background investigation may be conducted prior to award.
I certify that all information contained in this Bid is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this Bid on behalf of the Bidder as its act and deed and that the Bidder is ready, willing and able to perform if awarded the Contract.
I certify this Bid is made without prior understanding, agreement, connection, discussion, or collusion with any other person, firm or corporation submitting a Bid for the same product or service. I further certify that no officer, employee or agent of
County or of any other Bidder has a financial interest in this Bid. I further certify that the undersigned executed this Bidder's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so.
DFS Portal Confirmation / Declaration:
By completing and submitting the Cost Proposal Form, you are certifying all of the above as well as the prices and data entered in the Cost Proposal Form in the DFS Portal. The following
Cost Proposal Form is provided for reference only.
Letcher County Fiscal Court Livestake Installation Services Page 6
Attachment 1: Certification and Cost Proposal Form
Cost Proposal Form
By completing and submitting the Cost Proposal Form, you are certifying all of the above as well as the prices and data entered in the Cost Proposal Form in the DFS Portal. The following Cost Proposal Form is provided for reference only.
Unit pricing shall be all-inclusive and include all labor, equipment, materials (including live stakes), transport, storage and handling, and shall not be increased or changed for any reason other than changes requested or approved by the County.
Bid item
Description Unit of Measure
Provision and Installation of Native willow live stake cutting, 2–3 ft length, to shoulder/embankments EA
1A Provision and Installation of Native willow live stake cutting, 1–2 ft length, to shoulder/embankments (Potential Alternative Length)
EA
1B Provision and Installation of Native willow live stake cutting, 3–4 ft length, to shoulder/embankments (Potential Alternative Length)
EA
2 Mobilization/Demobilization and Traffic Control Lump Sum (per road)
Letcher County Fiscal Court Livestake Installation Services Page 7
Attachment 2: NON-COLLUSION DECLARATION
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder.
All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price of any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the applicable laws that the foregoing is true and correct.
Do you confirm that you have read the Non-Collusion declaration and therefore declare under penalty of perjury under the applicable laws that the Non-Collusion Declaration is true and correct? (Y/N)
Letcher County Fiscal Court Livestake Installation Services Page 8
Attachment 3: CERTIFICATION REGARDING LOBBYING
The undersigned certifies that, to the best of their knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure
Form to Report Lobbying,” in accordance with its instruction.
3. The undersigned shall require that the language of this certification be included in the award document for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31
U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Do you, the Contractor, confirm that you have read the Certification Regarding Lobbying form and certify or affirm the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31
U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any. (True/False)
Letcher County Fiscal Court Livestake Installation Services Page 9
Attachment 4: FORM 200.321 AFFIRMATIVE STEPS
CONTRACTING WITH SMALL AND MINORITY BUSINESSES, WOMEN’S BUSINESS
ENTERPRISES, AND LABOR SURPLUS AREA FIRMS §200.321
The County is required to take all necessary affirmative steps to assure that minority business, women's business enterprises, and labor surplus area firms are used when possible. If contractor uses subcontractors, they are also required to take the following affirmative steps:
1. Placing qualified enterprises on solicitation lists.
2. Assuring that enterprises are solicited whenever they are potential sources.
3. Dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by enterprises.
4. Establishing delivery schedules, where the requirement permits, which encourage participation by enterprises.
5. Using the services and assistance, as appropriate, of such organizations as the Small
Business Administration and the Minority Business Development Agency of the
Department of Commerce.
Do you confirm that you have read the 200.321 Affirmative Steps Confirmation and agree to take the listed affirmative steps when using subcontractors. (Y/N)
Letcher County Fiscal Court Livestake Installation Services Page 10
Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and
VOLUNTARY EXCLUSION
Neither the entity or its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency.
Do you confirm that neither the entity nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency? (Y/N)
Letcher County Fiscal Court Livestake Installation Services Page 11
Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT
To the best of our knowledge the bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project. [ SELECT YES IF TRUE ]
OR
The bidder, by attachment, submits information which may be a potential conflict of interest due to other clients, contracts, or property interest for this project. [ SELECT NO
IF TRUE & UPLOAD DOCUMENTATION ]
Failure to answer appropriately may result in disqualification of your bid.
Do you confirm that to the best of your knowledge the undersigned bidder has no potential conflict of interest due to any other clients, contracts, or property interest for this project?
(Y/N)
If answered no, documentation must be uploaded containing information regarding what may be a potential conflict of interest due to other clients, contracts, or property interest for this project.
Letcher County Fiscal Court Livestake Installation Services Page 12
Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT
The undersigned certifies that the responding firm has taken steps to :
1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are proposed, a copy of the drug- free workplace statement.
4. In the statement specified in drug-free workplace statement, notify the employees that as a condition of working on the commodities or contractual services that are under bid the employee will abide by the terms of the statement and will notify the employer of any conviction of or plea of guilty or nolo contendere to any violation of any controlled substance law of the United States or any state for a violation occurring in the workplace no later than five (5) days after such conviction.
5. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community by any employee who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
I certify that this firm complies fully with the above requirements.
Do you confirm that you have read the Drug-Free Workplace Affidavit and certify that the responding company complies fully with the listed requirements? (Y/N)
- Upload the contractor's Drug Free Workplace Policy
Letcher County Fiscal Court Livestake Installation Services Page 13
| Attachment 1: Certification and Cost Proposal Form |
| Attachment 1: Certification and Cost Proposal Form |
| Attachment 2: NON-COLLUSION DECLARATION |
| Attachment 3: CERTIFICATION REGARDING LOBBYING |
| Attachment 4: FORM 200.321 AFFIRMATIVE STEPS |
| Attachment 5: CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY and VOLUNTARY EXCLUSION |
| Attachment 6: CONFLICT/NON-CONFLICT OF INTEREST STATEMENT |
| Attachment 7: DRUG-FREE WORKPLACE AFFIDAVIT |
File details come from the government source that posted it. Updated .