1-ScopeOfWork GrassCuttingContract 2026-006-000-50-4430021 20261019.pdf

PDF 9 MB Posted

Attached to
Fertilization and Weed Control Services
Solicitation number
Not on record
Issued by
Lehigh County, Allentown City, Pennsylvania

About this file

This is a Scope of Work document for grass cutting services issued by the Housing Authority of the City of Allentown, Pennsylvania, under Bid No. 2026-006-000-50-4430021. The Housing Authority is soliciting bids to provide comprehensive grass cutting and trimming services across 25 designated sites located throughout Allentown, organized into six bid packages (Bid A through Bid F). Services include mowing, trimming, bagging and removal of grass clippings (where required), and site cleanup at various residential properties and community centers managed by the Housing Authority. The pre-bid conference is scheduled for Tuesday, November 3, 2026, at 9:00 AM at Gross Towers, 1339 W. Allen Street, Allentown, PA 18102, with site visits to follow. Bidders must submit written questions through the PennBid website by Tuesday, November 17, 2026, at 12:00 PM Noon, with responses issued by Friday, November 20, 2026, at 3:00 PM. Electronic bid submissions are due no later than 10:00 AM on Tuesday, December 1, 2026, through the PennBid platform, with late submissions rejected. The contract will be awarded to the successful bidder(s), and the Housing Authority reserves the right to accept or reject any proposals.

The grass cutting height shall be maintained at three inches, with all work completed in a safe and workmanlike manner. Bidders must furnish all labor, equipment, materials, transport, and travel, with no additional fees or surcharges accepted beyond the proposed bid costs. The cutting schedule requires all sites to be completed within three business days (Monday through Wednesday) on a weekly basis, with the contractor capable of completing two normally scheduled days within one day if necessary. Services may not begin before 8:00 AM without prior Housing Authority approval. Bagging and removal requirements vary by site location, with some properties requiring full removal of grass clippings and others requiring no bagging but with clippings directed away from buildings. The contractor is responsible for all property damage caused during service performance and must respond to callback requests within 24 hours at no additional charge. The document specifies detailed trimming requirements, vegetation management protocols, and safety requirements including proper installation and positioning of all mower safety equipment. The Housing Authority will determine the final cutting schedule after bid awards and retains the authority to modify work assignments through a cost per cut rate established by bidders.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

and PROPOSAL

Scope of Work Specifications

THE HOUSING AUTHORITY

of the City of Allentown

1339 Allen Street Allentown, Pennsylvania 18102-2191

Section 4 Page 12

Grass Cutting Services

Bid No. 2026-006-000-50-4430021

GRASS CUTTING SITE LOCATIONS

All Sites are located within the City of Allentown, PA

Bid A: Site 1. AMP 200 and AMP 300 Towers East and Gross Towers 1337 and 1339 Allen Street

Site 2. AMP 800 Walnut Manor 1519 Walnut Street

Bid B: Site 3. AMP 700 700 Building 700 Union Street

Site 4. AMP 500 Little Lehigh (Phase 2) Lehigh Street & Martin Luther King Jr.

Drive

Site 5. AMP 700 401-409 Market Street

Bid C: Site 6. AMP 100 616,624-626, 636 N. Godfrey Street

Site 7. AMP 100 Central Park 683 Wahneta Street

Bid D: NSA Site 8. KC Building 124 N. Fourth Street

AMP 600

Site 9. 101 N. Third Street

AMP 600

Site 10. 726 Walnut Street

AMP 600

Site 11. 643 N. Front Street

AMP 600

Site 12. 1950 Chew Street

AMP 600

Site 13. 237 N. Seventh Street

Bid D: AMP 600 Site 14. 837 – 839 Gordon Street

403 N. Ninth Street

AMP 600

Site 15. 228 Ridge Avenue

AMP 600

Site 16. 910 N. Sixth Street

AMP 600

Site 17. 428 N. Sixth Street

Bid E: CGCC Site 18. Cumberland Gardens Community Center 501 E. Cumberland Street

CGCC

Site 19. Cumberland Gardens Gym 501 E. Susquehanna Street

CG1lihtc Site 20. Cumberland Gardens Phase 1 501 E. Cumberland Street

CG2lihtc Site 21. Cumberland Gardens Phase 2 501 E. Cumberland Street

CG3lihtc Site 22. Cumberland Gardens Phase 3 501 E. Cumberland Street

Site 23. AMP 100 102-124 E. Wyoming Street

Bid F: OPCC Site 24. Overlook Park Community Bldg 445 Hanover Avenue

OPCC

Site 25. East Hamilton St. Corridor (Between S. Albert St. and S. Carlisle St.)

Section 4 Page 13

SCOPE OF WORK

I. SPECIFICATIONS

A. All Grass Cutting Locations

1. Bidders shall furnish all labor, equipment, materials, transport, and travel for all grass cutting and trimming services specified herein at locations designated in Bid A through Bid G.

Additional fees and surcharges (e.g. equipment rental, disposal fees, fuel surcharges, etc.) not included in the proposed bid costs will not be accepted.

2. All bidders must complete the cost per cut sheet of the Form of Bid. This rate schedule will be used on a deduct basis only in the event of a work site deletion or unacceptable service by the successful contractor.

3. It is the responsibility of the bidders to visit the sites to familiarize themselves with boundary lines and terrain. The pre-bid conference on Tuesday, November 3, 2026, is the only time an AHA representative will accompany any prospective bidder.

Cutting Height. The grass cutting height shall be three (3) inches. Any deviation shall be established by the particulars of each location in accordance with standard landscape practices. Approval to change cutting heights must be obtained from the site Property Manager, site Maintenance Supervisor, or Director of Maintenance Operations at AHA.

B. Grass Clipping Requirements

1. Bagged and removed from the entire location for the following bids:

• Bid A – Towers East, Gross Towers, Walnut Manor

• Bid B – 700 Building, Market Street

• Bid C – Godfrey Street, Central Park

• Bid D – KC Building, 101 N. Third Street, 726 Walnut Street, 643 N. Front Street. 1950 Chew Street, 237 N. Seventh Street, 837-839 Gordon Street, 910 N. Sixth Street, 428 N.

Sixth Street

• Bid E – 102-124 Wyoming Street

• Bid F – Overlook Park Community Building, East Hamilton St. Corridor

2. No bagging requirements:

• Bid B – Little Lehigh

• Bid D – 228 Ridge Avenue

• Bid E – Cumberland Gardens Community Center, Cumberland Gardens Gym, Cumberland Gardens Phase 1, Phase 2, Phase 3

3. All properties will have grass clippings directed away from buildings as much as possible where bagging is not a requirement. Compliance with bagging requirements will be monitored on weekly inspections by AHA.

Section 4 Page 14

4. All residual grass clippings shall be removed on the day of the cut from sidewalks and all other paved areas, including public streets, by power blowing the debris off all surfaces or collecting the clippings for off-site disposal.

C. Trimming

1. Trimming will be done in a workmanlike manner with the intent to yield a finished project with a clean, crisp appearance of the property. Trimming for each site will be completed in full each time a site is cut. These areas shall include:

a. Grass to sidewalk, grass to curb, grass to driveway, grass to shrubs or trees, grass to poles or pipes.

b. Vegetation management: weeds and grass protruding above 1) the sidewalk joints and/or 2) the surface of the street/curb joints. The Contractor is responsible to control this growth to maintain a consistently clean appearance.

2. Vegetation management chemicals to control growth as described above may be considered for approval provided that the contractor:

a. Submits the product label and Safety Data Sheet (SDS) to the respective Property Manager for review.

b. Obtains prior written authorization from the respective Property Manager to use the proposed product.

3. Non-selective total kill herbicides shall only be considered for application along street/curb joints where healthy plants are not exposed directly or indirectly to these chemicals.

D. Safety Requirements: Protection of Residents and Property

1. All work must be completed in a safe and workmanlike manner to avoid personal injury to residents and damage to property. The Contractor shall be responsible for ensuring the safety of the residents, AHA employees, his employees, pedestrians, etc. while performing the assigned work.

2. All mowing equipment must have all manufacturers' safety equipment installed and functional. For example, all equipment will be equipped with chute deflectors that shall be positioned downward at all times that mowers are engaged.

3. The Contractor shall be held responsible for repairing or replacing property that is damaged by reason of the Contractor's operation on the property and all costs of such replacement or repairs shall be the sole responsibility of the Contractor.

Section 4 Page 15

4. If Contractor fails to correct any damages within a reasonable amount of time, AHA shall have the right to correct the damages, repairs or replacement, without any further notice to the Contractor and shall deduct the cost of such repairs or replacement from any monies due to the Contractor.

E. Communication.

1. The Contractor will assume full responsibility to communicate with each respective Property Manager(s) and to inform the Property Manager or designee of any scheduling conflicts and/or delays and make adjustments only upon prior approval by AHA. Contact information will be provided to the awarded Contractor.

2. Field supervisors/foreman shall be equipped with a cellular telephone or two-way radio so that scheduling issues, delays, and incidents occurring as services are performed in the field are reported immediately to the owner/Contractor who shall communicate these issues immediately to the AHA representative(s).

F. Callbacks. As deemed necessary by the Authority and at no additional charge to the Authority, the Contractor will be required to respond to a call for service within 24 hours pertaining to any areas not properly cut or omitted during the normal schedule. If the response is not completed, this interruption of service will be considered grounds for:

1. A pro-rated deduction in the site fee based on the amount of incomplete services. The Housing Authority shall be the sole judge of the deduction amount to be withheld.

2. Termination of the contract after three (3) documented and formal notifications to the Contractor.

G. Schedule. The successful bidder will follow a cutting schedule, including site cleanup, based on Housing Authority activities. The Housing Authority will determine the schedule to be used after bids have been awarded.

1. All sites shall be completed in no longer than three (3) business days, Monday through Wednesday, thereby permitting rescheduling for inclement weather.

2. Contractor shall be equipped with both personnel and equipment so as to be able to complete two normally scheduled days within one day if necessary.

3. No change in schedule will be permitted without authorization from the Housing Authority’s Director of Maintenance Operations.

4. Grass cutting will not begin before 8:00 AM without prior approval granted by the Allentown Housing Authority.

5. The following tentative grass cutting schedule of sites and day of cutting shall be used to determine the cutting cycle costs for Bids A through G:

Section 4 Page 16

CONTRACT 2026-006-000-50-4430021: GRASS CUTTING SCHEDULE

Monday Tuesday Wednesday

Bid Location Bid Location Bid Location

C 616-636 N. Godfrey St

A Towers East

Gross Towers E

Cumberland Community

C Central Park

A Walnut Manor

E Cumberland Gym

D KC Building

B 700 Building

E Cumberland Gardens - I

D 101 N. Third St.

B Little Lehigh

E Cumberland Gardens – II

D 726 Walnut St.

B 401-409 Market Street

E Cumberland Gardens - III

D 643 N. Front St.

E 102-124 E. Wyoming St.

D 1950 Chew St.

D 237 N. Seventh St.

D 837-839 Gordon St.

403 N. Ninth St.

D 228 Ridge Ave.

D 910 N. Sixth St.

D 428 N. Sixth St.

F Overlook Park

Community Building

*F E. Hamilton St. Corridor

Services may not begin prior to 8:00 AM without Housing Authority approval.

* PLEASE NOTE: E. HAMILTON ST. CORRIDOR SHALL BE CUT ONE TIME PER MONTH.

6. The Contractor must make every effort to stay on agreed upon schedule and shall complete all routine work during the scheduled calendar week unless unforeseen circumstances beyond the control of the Contractor cause delays.

INTENTIONALLY LEFT BLANK

Scope of Bid, General Conditions, and Specifications

Section 4 Page 18

Appendix A – Site Drawings

PLEASE NOTE:

Site plan maps are intended to be used only as an assist to understanding particulars of a location.

The maps ARE NOT to be considered accurate in scale or physical conditions.

Final determination of work site boundaries, terrain features, and actual square footage totals shall be obtained by visiting the sites or by attending the Pre-bid Conference.

Section 4 Page 19

Appendix A

Site Drawings

Site 1. Towers East and Gross Towers

Section 4 Page 20

Site 2. Walnut Manor

Section 4 Page 21

Site 3. 700 Building

Section 4 Page 22

Site 4. Little Lehigh

PHASE 3

PHASE 2

Section 4 Page 23

Site 3. 700 Building & Site 4. Little Lehigh

Section 4 Page 24

Site 5. 401-409 Market Street

Section 4 Page 25

Site 6. 616, 624-626, 636 N. Godfrey Street

Section 4 Page 26

Site 7. Central Park

Section 4 Page 27

Section 4 Page 28

Section 4 Page 29

Site 8. KC Building

Section 4 Page 30

Site 9. 101 N. Third Street

Section 4 Page 31

Site 10. 726 Walnut Street

Section 4 Page 32

Site 11. 643 N. Front Street

Section 4 Page 33

Site 12. 1950 Chew Street

Section 4 Page 34

Site 13. 237 N. Seventh Street

Section 4 Page 35

Site 15. 228 Ridge Avenue

Section 4 Page 36

Site 18, 19, 20, 21, 22 Cumberland Gardens Community Center, Gym, Phase 1, Phase 2, Phase 3

Section 4 Page 37

Site 23. 102-124 Wyoming Street

Section 4 Page 38

Site 24. Overlook Park Community Building

Section 4 Page 48

Site 24. Overlook Park Community Building Property

Section 4 Page 49

Section 4 Page 50

Section 4 Page 51

Section 4 Page 52

Section 4 Page 53

Section 4 Page 54

Section 4 Page 55

Section 4 Page 56

Site 25. Hamilton Street Corridor