1_ RFP P50067 Exhibit A Specs _ Scope.pdf
PDF 7 MB Posted
- Solicitation number
- PE-97100-NONST-2025-000000110
- Issued by
- Georgia
About this file
This is a specifications document from MARTA (Metropolitan Atlanta Rapid Transit Authority) for Project Number 32222 / Contract P50067 related to a Track Isolation Integrity Monitoring System (TIIMS). The project involves the design, installation, testing and commissioning of a monitoring system consisting of both hardware and software to measure and monitor voltage across track segments at Traction Power Substation locations. The work is to be completed within 1,825 days after the effective site notice to proceed and will be implemented in 11 phases across MARTA's 48-mile track route system covering 38 rail stations. The system must continuously monitor stray current for corrosion control and mitigation, actively monitor voltage across track to ground, and provide automated fault detection and reporting.
The project will be paid through a contract lump sum proposal with items for furnishing, installing, testing and commissioning voltage limiting devices as well as the associated monitoring software. The specifications require the contractor to provide a full-time scheduler with minimum qualifications including 5 years of Primavera P6 experience and large capital project scheduling experience. Progress payments will include 25% upon acceptance of the baseline schedule, with the balance prorated over the remaining contract duration in equal monthly amounts following acceptance of monthly schedule updates. The document details extensive requirements for project scheduling, reporting, and milestone tracking but does not specify total contract value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP P50067 Track Isolation Integrity Monitori.pdf | ||
| 2_ Exhibit B_C_D_E and Appendix A.pdf | ||
| 3_ RFP P50067 Notice to Proponents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
TRACK ISOLATION INTEGRITY
MONITORING SYSTEM
Project Number / Contract Number
32222 / P50067
CAPITAL PROGRAMS DELIVERY &
DESIGN, ENGINEERING, AND INFRASTRUCTURE
Docusign Envelope ID: 87DD59A1-E16A-450F-A748-0BA2F96D9F7E
This page is intentionally left blank for double-sided printing.
P50067 – TOC - 1
SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
011100 Summary of Work
- Attachment A: Track Isolation Integrity Monitoring System
- Attachment B: TIIMS Architecture
012116 Undefined Work Provision 012500 Substitution Procedures 012973 Schedule of Values 013119 Project Meetings
013216.13 Network Analysis Project Schedule
- Appendix A: Standard Schedule Milestones
- Appendix B: Track Allocation Codes
013233 Photographic Documentation 013300 Submittal Procedures 013523 Authority Safety Requirements
- Exhibit A: SAQ-PL-1004, MARTA Construction Safety Plan, Revision 4, dated August 2020
- Attachment A: Contractor Safety Experience Form
- Attachment B: EHS-FO-1008, Competent Person Designation Form
- Attachment C: EHS-FO-0101, Contractor’s Weekly EHS Report
- Attachment D: EHS-FO-0103, Project Monthly Safety Report
- Attachment E: EHS-FO-1007, Project-Specific Safety and Health Program Plan
- Attachment F: Critical Lift Plan
- Attachment G: EHS-FO-1012, Impairment Permit
- Attachment H: SAQ-FO-1025, Permit Form for Confined Space Entry
- Attachment I: Hot Work Permit
- Attachment J: EHS-FO-1010, Critical Task Analysis
- Attachment K: EHS-FO-1014, Preliminary Construction Incident Investigation
Form
013526 Governmental Safety Requirements 013543 Environmental Procedures
- Exhibit A: EMS-FO-5087, Compliance Evaluation Questionnaire for Offsite Waste Transporters and Management Facilities
- Exhibit B: EMS-FO-1034, Approval Form for Offsite Waste Management Facilities
- Exhibit C: EMS-FO-5085, Approved Waste Disposal Facilities
013556 Wayside Procedures
- Exhibit A: Vehicle Space Allowance
- Exhibit B: Standard MARTA Loading
- Appendix A: Wayside Access Procedure
- Appendix B: On-Track Equipment Operating Rules and Procedures
- Appendix C: General Order 16-03, Location Verification Procedure for OTE
Placement
- Appendix D: Daily Track Time Sheet
014316 Quality Assurance Testing
- Exhibit A: MARTA Testing Program Plan (MTPP) v14
- Exhibit B: Master Test List
014500 Quality Control 017113 Mobilization 017400 Cleaning and Waste Management 017823 Operation and Maintenance Data
- Appendix A: Inventory Flat File Requirements
017839 Project Record Documents
P50067 – TOC - 2
017845 Product Information and Performance Data, Software and Firmware Documentation 017850 Asset Management Data
- Table 1: Location Coding For Linear Assets/ Components
- Appendix A: Required Data for Asset Management
017900 Demonstration and Training
DIVISION 2 - EXISTING CONDITIONS
028000 Hazardous Materials Management
DIVISION 3 - CONCRETE
030190 Concrete Repairs 031100 Concrete Forming 031500 Concrete Accessories 031520 Post-Installed Concrete and Masonry Anchoring 032000 Concrete Reinforcing 033000 Cast-in-Place Concrete 033111 Portland Cement Concrete 033500 Concrete Finishes
DIVISION 4 THROUGH 24 (not used)
DIVISION 25 – INTEGRATED AUTOMATION
250810 Testing and Performance Verification for Utility Monitoring and Control Systems 251010 Monitoring and Control Systems Front End and Integration
DIVISION 26 - ELECTRICAL
260500 Electrical General 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Identification for Electrical Systems
DIVISION 27 – COMMUNICATIONS
272010 Data Communications System
DIVISIONS 28 THROUGH 33 (not used)
DIVISION 34 - TRANSPORTATION
342136 Voltage Limiting Device
- Appendix A: VLD INSTALLATION RECOMMENDATION
- Appendix B: VLD CONCRETE PAD DESIGN RECOMMENDATION
DIVISION 35 THROUGH 49 (not used)
END OF TABLE OF CONTENTS
P50067 – 011100 - 1
SECTION 011100 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 DESCRIPTION OF SYSTEM
A. MARTA System
The MARTA rapid transit rail system has 48 miles of track route and 38 rail stations located on four (4) service lines. The tracks for the system are a combination of elevated, ground-level, and underground track. Propulsion power for the rail cars is provided by Traction Power Substations (TPSS) located at the passenger stations and, in some cases, midway between two (2) passenger stations. MARTA tracks are powered by 49 main line and three (3) yard TPSS where the AC utility voltage (19.8 kV) is converted to nominal 750 volts DC for distribution to the rail vehicles.
B. Traction Power Electrification System
The MARTA traction power distribution system is an ungrounded design to minimize the amount of stray current produced. The running rails and the contact rail are electrically isolated from earth or the grounding circuit through the use of special supports, rail fasteners and pads, well drained ballast and inverts, and electrical isolation from switch machines, wayside equipment, and the train control system. In addition, rail-to-rail bonding and cross bonding between the tracks is installed to increase the conductivity of the negative return circuit and manage the magnitude of the track-to-ground voltage.
C. Stray Current Control of Direct Current Powered Rail Transit System Maintaining the effectiveness of stray current and corrosion mitigation is an integrated process that involves the following primary steps:
1. Detection – Monitoring to identify deficient conditions.
2. Identification – Troubleshooting to identify the cause/source of the deficient condition.
3. Threat Assessment – The probability of a failure of ‘x’ consequence resulting from the failure, utilized to prioritize the corrective actions necessary to remediate the deficient condition.
4. Corrective Action – Preparation and execution of a corrective action plan to remediate the deficient condition.
5. Documentation – Documenting the completion of the process steps and resolution of the deficient condition.
1.02 DESCRIPTION OF WORK
A. The Work generally consists of the design, installation, testing and commissioning of a monitoring system, that consists of both hardware and software, to measure and monitor voltage across track segments at TPSS locations identified by the Track Isolation Integrity (TII) Program.
The TII Program goal is to monitor stray current to control and mitigate corrosion, while producing reports and provide alerts and alarms to MARTA Electrical Power & Equipment (EP&E). For further detail, reference Attachment A and B for the TRACK ISOLATION INTEGRITY MONITORING SYSTEM (TIIMS) and Section 341236, VOLTAGE LIMITING
DEVICE.
B. Construct Work under a single contract.
1.03 CONTRACTOR'S DUTIES
A. Mobilize, survey, lay out, construct, and complete the Project in accordance with the Contract Documents.
P50067 – 011100 - 2
B. Supervise, superintend, direct, and manage the construction of the Project.
C. Establish means of, and techniques and procedures for, constructing and otherwise executing the Project.
1. Labor, superintendence, and products.
2. Software acquisition, deployment, integration, and certification.
3. Construction supplies, equipment, tools, and machinery.
4. Other facilities and services necessary to properly execute and complete the Work.
D. Pay costs of legally required sales, consumer, and use taxes, and Governmental fees.
E. Perform Work in accordance with codes, ordinances, rules, regulations, orders, and other legal requirements of governmental bodies and public agencies, including the Authority, bearing on performance of the Work. Perform work only with the written approval from the Authority.
F. Do not alter nor deviate from Drawings and Specifications. Necessary changes will be made by appropriate modifications to Drawings and Specifications.
G. Forward submittals and communications to the Authority via Authority’s authorized representative.
H. Maintain order, safe practices, and proper conduct at all times among Contractor's employees.
The Authority, and its authorized representative, may require that disciplinary action be taken against an employee for disorderly, improper, or unsafe conduct. Should an employee of the Contractor be dismissed from his duties for misconduct, incompetence, or unsafe practices, or combinations thereof, do not rehire that employee for the duration of the Project.
I. Execute the Work as specified and in a timely manner.
1. Plan, organize, and staff each shift to have sufficient, compatible complement of personnel, materials, equipment, and tools to maintain and sustain scheduled work program, and to complete the Project and portions thereof, as specified in GENERAL CONDITIONS 30A. Use multiple shifts, multiple crews, or extended hours, or combinations thereof.
2. Contractor shall coordinate the schedule of the Work with the Authority, in order to limit any disruptions to facility operation.
3. Time of Completion: Within 1825 days after the effective date of the Site Notice to Proceed.
1.04 ORDER OF WORK
A. Construct Work in stages as follows:
1. Phases 1 through 11 TIIMS Hardware: Table 1 shows Traction Power Sub Station (TPSS) locations proposed for the installation of the Voltage Limited Devices (VLDs) at the respective phase. VLDs will be located inside the TPSS and connected to the Supervisory, Control, and Data Acquisition (SCADA) Field Unit.
2. Phases 1 through 11 TIIMS Software: The monitoring software and workstation shall be located at EP&E (500 Plasters Ave NE, Atlanta, GA 30324). To receive SCADA alarms, a workstation shall be located inside the Control Room at the Integrated Operations Center (IOC).
3. Phases 1 through 11 shall demonstrate at a minimum, that the TIIMS is capable of:
a. Continuous monitoring, measuring, and recording of the rail-to-earth potential during operation.
b. Automatic location and alarming of insulation deficiencies.
P50067 – 011100 - 3
c. Representation, archiving and analysis of track potentials in a central evaluation unit.
d. Transmission of measured values via the existing communication network.
Table 1. TPSS Locations
4. An Implementation Plan shall be developed, submitted, and presented to MARTA to include, at minimum:
a. Scope
b. Expected Results
c. Resource Plan (including Resources, Schedule, Cost Estimate)
d. Quality Assurance (QA) / Test Plan
e. Communication Strategy
f. Change Control
g. Configuration Instructions
h. Network IP Address Settings
i. Emergency Recovery Plan
j. Final Report to include recommended Corrective Action Plan
5. Following the successful completion of Phase 1, the Implementation Plan shall be updated and submitted to MARTA for completion of the Systemwide Roll-out.
1.05 CONTRACTOR USE OF JOB SITE
A. Confine worksite operations to areas permitted by law, ordinances, permits, and the Contract Documents.
Phase
NFF FIVE POINTS N/S
NNE PEACH TREE CENTER
NNC CIVIC CENTER Phase
NNN NORTH AVENUE WFF FIVE POINTS E/W
NNT MIDTOWN WWT DOME/ PHILLIPS ARENA/ GWCC/ CNN
NNA ARTS CENTER WWV VINE CITY
NN1 INTERMEDIATE STATION WWA ASHBY
NNY ARMOR YARD/ NORTH YARD WW2 INTERMEDIATE STATION
SS1 INTERMEDIATE STATION WWW WEST LAKE
SSE EAST POINT WWH H.E. HOLMES
SS2 INTERMEDIATE STATION WPB BANKHEAD
SSC COLLEGE PARK NNP LINDBERG CENTER
SSA AIRPORT NN2 MIAMI CIRCLE
SSY SOUTH YARD NNL LENOX
SSG GARNETT NNB BROOKHAVEN
SSW WEST END NN3 REDDEN ROAD
SSO OAKLAND CITY NNS CHAMBLEE
SSL LAKEWOOD/ FT. MCPHERSON NN4 INTERMEDIATE STATION
EEU GEORGIA STATE UNIVERSITY NND DORAVILLE
EEG KING MEMORIAL NFB BUCKHEAD
EEM INMAN PARK NF1 STATEWOOD DR.
EEC EDGEWOOD/ CANDLER PARK NF2 NORTH LAND DR.
EEE EAST LAKE NFM MEDICAL CENTER
EED DECATUR STATION NFD DUNWOODY
EEA AVONDALE NFS SANDY SPRINGS
EEY EAST YARD NFN NORTH SPRINGS
EE2 INTERMEDIATE STATION
EEK KENSINGTON
EEI INDIAN CREEK
TPSS Location
TPSS Location
P50067 – 011100 - 4
B. Consider the safety of the Work, and that of people and property on and adjacent to Job Site, when determining amount, location, movement, and use of materials and equipment on Job site.
C. Protect products stored on Job Site.
D. Move stored products that interfere with foreseeable operations of the Authority, governmental bodies, public and private utilities, and other contractors at no additional expense to the Authority.
E. Secure additional storage and Work areas needed for operations at no additional expense to the Authority.
1.06 CONTRACTOR USE OF AUTHORITY FACILITIES
A. Return Authority facilities, other than those on the Job Site, occupied by Contractor during course of construction to the Authority in condition comparable to that in which those facilities existed when Contractor initially occupied facilities. Facilities will be inspected to ascertain acceptability for return to the Authority.
PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION (not used)
ATTACHMENTS A AND B INCULDED
P50067 – 011100 – Attachment A - 1
011100 ATTACHMENT A: TRACK ISOLATION INTEGITY MONITORING SYSTEM (TIIMS)
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This section specifies the functionality, technical requirements, and communications interface requirements for a Track Isolation Integrity Monitoring System (TIIMS) on the Authority rail transit system for the monitoring of track electrical isolation integrity.
1.02 MEASUREMENT
A. The Work of this Attachment to Section 011100 shall be measured for payment by the furnished and installed hardware and software and will also include all materials, labor, supervision, management, meetings, testing and training necessary for a complete and fully functional installation. Installation completion is based on receipt of all required submittals and final acceptance of the Commissioning Report.
1.03 PAYMENT
A. The Work of this Section shall be paid for as part of the Contract Lump Sum Proposal Items entitled FURNISH, INSTALL, TEST AND COMMISSION VOLTAGE LIMITING DEVICES and
FURNISH, INSTALL, TEST AND COMMISSION SOFTWARE TO MONITOR TRACK TO
GROUND AND CONTACT RAIL ISOLATION as applicable.
1.04 REFERENCES
A. European Standards (EN)
1. EN 50122-1 Railway applications – Fixed installations – Electrical safety, earthing and the return circuit – Part 1: Protective provisions against electric shock
2. EN 50122-2 Railway applications – Fixed installations – Electrical safety, earthing and the return circuit - Part 2: Protective provisions against the effects of stray currents caused by DC traction systems
3. EN 50162 Protection against corrosion by stray current from direct current systems
B. Related MARTA Specifications
1. 013300 SUBMITIAL PROCEDURES
2. 014500 QUALITY CONTROL
3. 014316 QUALITY ASSURANCE TESTING
4. 017845 PRODUCT INFORMATION AND PERFORMANCE DATA, SOFTWARE
AND FIRMWARE DOCUMENTATION
5. 017900 DEMONSTRATION AND TRAINING
6. 250810 TESTING AND PERFORMANCE VERFICATION FOR UTILITY
MONITORING AND CONTROL SYSTEMS
7. 251010 MONITORING AND CONTROL SYSTEMS FRONT END AND
INTERGRATION
8. 272010 DATA COMMUNICATIONS SYSTEM
9. 342136 VOLTAGE LIMITING DEVICE
1.05 DEFINITIONS
A. Voltage Limiting Device (VLD) – A protective device whose function is to prevent existence of an impermissible high touch voltage.
P50067 – 011100 – Attachment A - 2
B. Mixed Voltage – Voltage having significant AC and DC components.
C. Impermissible High Touch Voltage – A voltage exceeding the maximum permissible effective touch voltage as a function of time identified for dc transit systems in EN 50122-1.
D. Stray Current – Current flowing through paths other than the intended path.
E. Excessive Stray Current Emission – A level of stray current emission during normal operating conditions that causes an effect on Authority structures and/or neighboring utilities exceeding the guidelines provided in EN 50162.
F. Track Isolation Integrity – The effectiveness of track electrical isolation from ground to prevent excessive stray current emissions at normal operating conditions.
G. Track Isolation Deficiency – A degradation of track isolation effectiveness that results in excessive stray current emissions.
H. Track-to-Ground Potential – The electrical potential, measured in volts, between the track and the traction power ground system.
I. Track-to-Earth Resistance – The electrical resistance between a defined length and configuration of track and remote earth. Typically expressed in terms of ohms normalized to 1000 feet of track (two (2) rails).
1.06 SYSTEMS DESCRIPTION
A. General
1. Track Isolation Integrity Monitoring System (TIIMS) shall monitor stray current to control and mitigate corrosion.
2. TIIMS shall actively monitor voltage across track to ground.
3. TIIMS shall be capable of the following main functions,
4. Stray Current Monitoring
5. Touch Protection
6. Fault Detection
7. Lightening Protection
8. TIIMS output shall be accessible from a single workstation.
9. TIIMS shall be an automated system.
10. TIIMS shall detect nuisance tripping.
11. TIIMS shall function as a continuous monitoring system using multiple measurement locations and a centralized data acquisition system in accordance with the provisions of EN 50122-2, Annex B and this specification.
12. TIIMS system shall consist of, at a minimum, a dedicated computer with a 22-inch or larger monitor, interfaces and programming for data acquisition, analysis, alerting, reporting, graphing, exporting, and archiving.
13. An uninterruptible power supply shall be provided for the centralized data acquisition system that has a minimum back up run time of eight (8) minutes at one-half the maximum rated output and minimum surge suppression of 890 Joules, or as recommended by the manufacturer of TIIMS.
14. The computer shall have the latest generation processor and sufficient RAM to efficiently support the system and accommodate future software updates.
15. The computer shall be provided with a hard drive system that supports dual disk data archiving and data mirroring.
16. The system shall provide no less than ten (10) years of data and baselines archiving.
17. The centralized data acquisition system hardware configuration shall be submitted to the
Authority for approval.
P50067 – 011100 – Attachment A - 3
18. TIIMS shall obtain track-to-ground potential data from Voltage Limiting Devices (VLDs), or from Contractor provided and installed measurement devices at a minimum sampling rate of one (1) reading per second for each measurement location.
19. The VLDs shall contain a programmable logic controller (PLC) with a voltage measurement module and interface that is compatible with the data acquisition and communications requirements for TIIMS.
20. Measurement devices provided and installed by the Contractor shall be compatible with
TIIMS.
21. The data shall be transferred from the measurement location to the data acquisition system via the existing Authority network.
22. TIIMS shall be programmable for a minimum of five (5) separate line segments and 60 measurement locations.
23. The maximum spacing between measurement locations shall not exceed 1.86 miles (3 km) without demonstration of track isolation integrity deficiency location accuracy and written approval of the Authority.
B. Stray Current Monitoring
1. TIIMS shall have a stray current monitoring component.
2. TIIMS’ stray current monitoring (SCM) settings shall be configurable.
3. TIIMS SCM shall be programmable.
4. TIIMS SCM shall have an interface program / graphical user interface (GUI) to plot the real-time data captured and stored in the database.
5. TIIMS SCM GUI shall provide the user the ability to visualize the data in various ways, export the plotted data, perform various manual analysis of stored data and parameter the
SCM.
6. TIIMS SCM GUI shall communicate with the existing MARTA networks and SCADA systems through fieldbus protocol standards.
7. TIIMS SCM shall display the following diagrams:
a. Instantaneous values
b. Average values as a time characteristic
c. Average values related to locations.
8. TIIMS SCM shall have no interference with stray-current conditions.
9. TIIMS SCM shall provide the following functions:
a. Data acquisition
b. Archiving with multi-level data compression
c. Location of insulation deficiencies.
C. Touch Protection
1. TIIMS shall have a voltage limiting device/ negative ground device component, in accordance with Section 342136, VOLTAGE LIMITING DEVICE.
2. TIIMS shall incorporate a fast-acting Voltage Limiting Device (VLD) and/or as a Negative to Ground Short Circuiting Device (NGD).
3. TIIMS VLD shall be programmable.
4. TIIMS VLD shall receive and execute commands from user.
5. If TIIMS reports an occurrence at a single station, then that occurrence shall not trip multiple stations.
6. TIIMS power section shall be bi-directional.
7. TIIMS shall use thyristors (SCR) and a contactor in parallel.
8. TIIMS shall have two (2) modes of operation: Normal Mode and Bypass Mode.
9. TIIMS Bypass switch shall be used to connect the 1kV dc negative system to ground when the VLD is removed from service for maintenance.
10. TIIMS shall have the ability to record and visualize firing events.
11. TIIMS shall monitor the voltage between the rail return circuit and ground.
P50067 – 011100 – Attachment A - 4
12. TIIMS shall provide mutually independent adjustable voltage and time setting settings to close the SCR and/or contactor.
13. TIIMS shall have adjustable setting range and time delays.
14. TIIMS shall monitor current and provide an overcurrent level and time-based protection.
15. TIIMS shall monitor its voltage and provide an over voltage alarm.
16. TIIMS shall be fail-safe.
17. TIIMS shall have a local alarm interface panel to display alarm indications to the operator, status, set point adjustments, and access to the review of the alarm log.
18. TIIMS shall have a terminal interface to interface with SCADA equipment.
19. TIIMS shall interface with the SCADA Field Unit (SFU).
D. Fault Detection
1. TIIMS shall automatically monitor, evaluate, and detect negative-to-ground fault detection (on the running rail).
2. TIIMS shall continuously monitor track potentials and identify location of insulation deficiencies.
3. TIIMS shall provide automatic location of insulation deficiencies.
4. TIIMS shall continuously monitor, evaluate, and detect positive-to-ground fault detection
(on the contact rail).
5. TIIMS shall monitor the VLDs status, voltage, current, and alarms.
6. TIIMS shall provide voltage and current trending.
E. Lightning Protection
1. TIIMS equipment shall provide lightening protection to wayside equipment caused by lightning strikes/ overvoltage.
2. TIIMS shall detect surges potentially caused by lightning strikes/ overvoltage.
F. Data Monitoring
1. Data Recording
a. TIIMS shall record data in real-time.
b. TIIMS shall provide 24-hour data recording with a minimum sampling time of one (1) second.
2. Record
a. A record shall provide a date/time stamp.
b. TIIMS shall record reference values.
c. TIIMS shall have an adjustable daily recording period.
3. Data Storage
a. TIIMS shall store data for archive, retrieval and viewing.
b. TIIMS shall store data in compliance with the statute of limitations set by Federal
Transit Administration (FTA) regulations.
c. TIIMS shall store data in compliance with data retention requirements with MARTA
Security standards.
d. Capacity planning for the TIIMS database shall provide five (5) years of archived data storage.
e. The event and fault logs shall memorize the last 1,000 operations.
f. All stored data shall be accessible and exportable in CSV format.
4. Data Logging
a. TIIMS shall provide data logging functionality.
b. Data log records shall be preserved by the TIIMS data storage functionality.
P50067 – 011100 – Attachment A - 5
c. When logging data, TIIMS shall record the timestamp for the instant the recording is triggered.
d. TIIMS shall have a minimum log for:
1) Generated reports
2) Event and fault logs
3) Data entered by users
4) System security records
5) Diagnostic logs
6) Data Analysis
7) Data analysis shall be in real-time.
G. Alarms/ Alerts/ Notifications
1. TIIMS shall provide a visual indication of abnormal behavior.
2. Alarm notifications shall be customizable.
3. TIIMS shall indicate fault detections, suspected insulation fault.
4. Group indications shall communicate the time of detection and the indications of location.
5. Alarms shall be prioritized based upon risk analysis and updated accordingly per needs change.
6. Alarms shall automatically reset to Normal status upon corresponding change in the NGD status.
7. TIIMS shall provide a dry contact type over current alarm signal.
8. TIIMS shall provide a dry contact type over voltage alarm signal.
9. TIIMS subsystems shall provide, at a minimum, the following indications for the local display and send to the terminal interface and SCADA equipment:
a. On-Off Status,
b. High Running Rail Potential,
c. High/Sustained Current,
d. Trouble,
e. Disconnect Switch Position
10. TIIMS shall provide port for local notifications.
11. TIIMS shall provide automated detecting, locating and providing alerts for deficiencies in track isolation integrity that result in excessive stray current emissions.
12. TIIMS shall detect, provide alerts, and report VLD operations (opening and closing of contactor).
13. TIIMS shall account for the activation of VLDs in the analyses and identification of track isolation integrity deficiencies.
H. Reports
1. TIMS shall provide report creation functionality.
2. The produced reports shall be user configurable/ customizable.
3. Reports shall be created from data available in TIIMS.
4. The catalog of TIIMS reports shall provide at minimum:
a. Fault-to-ground reporting and alarms
b. Track-to-earth potential and trends.
5. TIIMS data reports shall export in CSV format.
6. TIIMS data shall export to text files.
7. TIIMS shall provide work order data for maintenance tasks for use with external reports.
I. User Requirements
1. TIIMS shall permit users to create reports.
2. TIIMS shall permit users to edit the data acquisition device(s) for testing purposes.
P50067 – 011100 – Attachment A - 6
3. TIIMS shall permit users to edit status information.
4. TIIMS shall be configurable per specific station requirements.
J. Interfaces
1. User Interface
a. TIIMS shall permit user input to configure the system.
2. External Interface
a. TIIMS subsystems shall interface with MARTA’s Train Control and SCADA System
(TCSS).
b. TIIMS shall not alter MARTA’s TCSS.
c. TIIMS shall interface with a railway maintenance tool (i.e., OPTRAM).
d. TIIMS shall have a geometrical output to the railway maintenance tool.
e. TIIMS shall have a tabular output to the railway maintenance tool.
3. User Access
a. Local user access to TIIMS shall be password protected.
K. Communications
1. TIIMS server shall connect to the MARTA Train Control System Network (TCSN).
2. TIIMS equipment shall connect to the MARTA TCSN
3. TIIMS measurement devices shall be compatible with each other and with the following communications protocols: Ethernet, TCP/IP, MPI, Profibus DP/FMS/S7, and MODBUS
TCP.
1.07 SUBMITTALS
A. Submittals shall be in accordance with Section 013300, SUBMITTAL PROCEDURES.
B. All documentation shall be provided in English.
C. Printed and electronic copies of the following documents for TIIMS shall be provided to MARTA for review and approval prior to delivery and installation of the system:
1. Design drawings, including line configuration and measurement location drawings, communications schematic drawings, cable and wiring routing and connection details, equipment serial numbers, and proposed installation and interface drawings;
2. TIIMS Installation Work Plan:
a. A listing and description of all personnel and equipment interfacing requirements
b. The sequence of tasks required to complete the installation
c. The start-up and commissioning plan
d. Proposed testing procedures
e. A schedule for the installation.
3. TIIMS Commissioning Plan:
a. Data acquisition and communications interface protocols that demonstrate compatibility with the Authority network and the voltage measurement devices;
b. Centralized data acquisition system hardware configuration;
c. Operation and Maintenance Manual with detailed operating, analysis, graphing, reporting and data archiving procedures, complete device specifications and
P50067 – 011100 – Attachment A - 7 schematic drawings, maintenance procedures, testing procedures, troubleshooting procedures and spare parts list;
d. Manufacturer’s certification of conformance to specified standards and performance parameters;
e. As-built installation drawings;
f. Commissioning Report, including all start up and commissioning test results
g. Training materials;
h. Documentation of all programmable settings.
1.08 QUALITY ASSURANCE
A. The Contractor shall be in accordance with Section 014500, QUALITY CONTROL.
B. TIIMS shall comply with the MARTA Configuration Management Plan.
C. All TIIMS subassemblies and components shall be 100% tested and certified by the manufacturer to meet their published performance parameters and the requirements of this specification.
1.09 WARRANTY
A. All TIIMS hardware and supporting components shall be warranted to be free from defects in materials and workmanship, under normal use and in accordance with the instructions provided by the manufacturer for a period of five (5) years from the date of final installation acceptance.
1.10 SOFTWARE AND FIRMWARE DOCUMENTATION
A. The Contractor shall provide documented release notes for all software deployments.
B. The Contractor shall provide documented release notes for all firmware deployments.
C. Documentation provided by the Contractor shall be in accordance with Section 017845, PRODUCT INFORMATION AND PERFORMANCE DATA, SOFTWARE AND FIRMWARE
DOCUMENTATION.
1.11 DELIVERY, STORAGE AND HANDLING
A. The Contractor shall be accountable for the delivery, storage, and handling of all equipment until TIIMS is installed, tested, and accepted by the Authority.
B. TIIMS equipment shall be labeled with a MARTA ASSET TAG.
1.12 JOB SITE CONDITIONS
A. TIIMS shall be physically located at a workstation within Electrical Power and Equipment (EP&E).
B. TIIMS shall be installed within the existing EP&E facility.
1. The Manager of EP&E shall identify the location within the facility for the installation.
2. The Contractor shall verify that the environmental conditions within the EP&E facility is compatible with the operating requirements of the centralized data acquisition system equipment, communications equipment, and enclosures.
C. The Contractor shall perform a site visit to the EP&E facility to identify the location for installation of TIIMS and all associated equipment in order to prepare design drawing submittals for Authority review and approval.
P50067 – 011100 – Attachment A - 8
1. The Contractor shall identify and address all restrictions or obstacles to the successful installation and operation of TIIMS during the site visit.
2. All site visits shall be coordinated with the Authority EP&E, Information Technology Department and Engineering Department.
D. The Contractor shall perform site visits to locations where voltage measurement device installation is required.
1. The Contractor shall identify the location for installation of each measurement device and all associated equipment in order to prepare design drawing submittals for Authority review and approval.
2. The Contractor shall identify and address all restrictions or obstacles to the successful installation and operation of the measurement devices during the site visit.
3. All site visits shall be coordinated with the Authority EP&E, Information Technology Department and Engineering Department.
1.13 SYSTEMS STARTUP
A. The Contractor shall confirm and document all programmable settings for each line of TIIMS.
B. The Contractor shall confirm and document operations of TIIMS for each line, by the following,
1. Demonstration of the ability of TIIMS to identify and locate deficiencies in the track isolation integrity that result in excessive stray current emissions.
2. Demonstration of the ability to detect and report VLD operations (where applicable).
C. The Contractor shall confirm correct data acquisition and communication between each measurement device or VLD and TIIMS.
D. All testing and evaluations shall be performed without affecting those portions of the system already online and not disrupt operation of the Authority’s system.
1.14 COMMISSIONING PLAN
A. The Contractor shall verify that complete TIIMS functions in accordance with the design intent and operational requirements. See the article for Commissioning and Testing in this specification for minimum commissioning and testing requirements.
B. The Contractor shall prepare and submit a TIIMS Commissioning Plan.
1. The plan shall document the following:
a. All planned installed equipment,
b. Equipment programming and system start up,
c. Established analysis parameters and reference conditions for monitoring of track isolation integrity effectiveness,
d. A complete set of reports available from TIIMS,
e. statements regarding the status of track isolation integrity effectiveness at the time of the report, and
f. Recommendations for continued operation and maintenance of the system.
C. The Contractor shall provide a minimum of eight (8) hours of on-site training to Authority personnel for operation of TIIMS.
1. The training shall consist of, at a minimum, the following:
a. A review of the system operating principals,
b. Review of the Operating Instructions Manual for the system, P50067 – 011100 – Attachment A - 9
c. Data evaluation and reporting procedures,
d. Track isolation integrity deficiency locating procedures,
e. Procedures for setting and adjusting reference values, and
f. Any other information pertinent to the efficient operation of TIIMS
2. A copy of all training materials shall be submitted to the Authority.
1.15 MAINTENANCE
A. The manufacturer shall provide all available software and hardware updates for the operation and maintenance of TIIMS and measurement devices to Authority for a minimum period of five (5) years from the date of installation acceptance.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. Manufacturers must have a minimum of five (5) years producing and implementing a TIIMS (or similar configuration) for DC. rail transit systems.
2.02 EXISTING PRODUCTS
A. Existing VLDs shall be compatible and capable of data acquisition and communication with TIIMS.
B. Existing Authority network is accessible at all traction power substation measurement locations.
2.03 MINIMUM OPERATIONAL PERFORMANCE REQUIREMENTS
A. Measurement devices shall be provided with components to measure and communicate bi-polar real-time track-to-earth voltage to TIIMS.
B. The devices shall comply with the following specifications at a minimum:
1. Power supply: 95-240VAC, 60 Hz, minimum isolation of 2300Vrms for one (1) minute to all inputs and outputs. All measurement devices connected to power through an uninterruptible power supply, with the power supply rated for a minimum back up run time of eight (8) minutes at one-half rated output and have a minimum surge suppression of 890 Joules, or as specified by the measuring device manufacturer;
2. Low Frequency Noise Rejection: >100 dB, DC to 120 Hz in Common Mode, >60dB at 60 Hz without filtering in Normal Mode;
3. Environmental Operating Range: 0-50C, 0-85% RH (non-condensing), maximum elevation not less than 2000 ft. above sea level;
4. Electromagnetic emissions and immunity in compliance with EN 61326;
5. Terminal block connections capable of accepting wire gauges from 30 – 14 AWG copper wire;
6. Enclosure suitable for exposure conditions and identified mounting location and method;
7. 16 bit resolution A/D converter with a minimum conversion rate of 20 readings/sec;
8. Minimum DC input range +/- 500V with a full-scale accuracy of 0.15% of the reading or better (0 to 50V) and a minimum input impedance of 1 Megohm;
9. Data transmission and communication protocol compatible with TIIMS requirements;
10. Proposed alternate specifications must be accompanied by a written statement of compliance from the TIIMS manufacturer.
C. TIIMS shall identify, locate, and report deficiencies in track isolation integrity that result in excessive stray current emissions.
P50067 – 011100 – Attachment A - 10
D. The minimum performance requirements for TIIMS shall consist of:
1. TIIMS shall record and store a minimum of ten (10) sets of reference value conditions to accommodate a variety of normal operating conditions based on varying headways and system loads.
2. The accuracy of deficiency locating shall be 100m or less where the spacing between measurement points is 3km or less.
3. Track electrical isolation deficiencies shall be automatically detected and the location of the deficiency identified in the recorded data and graphically represented.
a. The time of the deficiency detection shall be recorded and reported.
b. The time window for automatic analysis and deficiency location shall be parameterizable.
c. TIIMS shall consider activation of VLDs, where applicable, for part of the analysis to identify track electrical isolation deficiencies.
4. Detection of track electrical isolation deficiencies shall initiate an alarm condition that is displayed on the screen of the centralized analysis system and communicated via email and/or text messaging.
a. The alarm condition shall be acknowledged to clear the condition.
5. TIIMS shall identify, report, and record the time of activation of VLDs, where applicable.
6. TIIMS shall have a minimum circulating archive of 240 hours (ten (10) days) of instantaneous sampling data for a sampling rate of 1 sample/second.
7. TIIMS shall have a minimum circulating archive of 500 days of short-term average values with an averaging window of one (1) minute to 60 minutes of instantaneous values.
8. TIIMS shall have a minimum permanent archive of ten (10) years of long-term average values with an averaging window of one (1) day to seven (7) days.
9. TIIMS shall provide graphical representation of the measured track-to-ground potentials versus time and versus measurement location simultaneously or individually for all measurement points.
10. At a minimum, the following graphical representations shall be available:
a. Instantaneous values;
b. Arithmetic average values for parameterizable averaging windows for short-term and long-term average values;
c. Arithmetic average of the absolute values for parameterizable averaging windows for short-term and long-term average values;
d. Reference ranges for each line;
e. The location of identified deficiencies in the track electrical isolation.
PART 3 - EXECUTION
3.01 INSTALLERS
A. Minimum experience. The personnel supervising and installing TIIMS equipment shall have a minimum five (5) years of experience installing similar equipment for transit systems.
3.02 EXAMINATION
A. Authority Inspectors and Engineering personnel, or their designee, shall have access to the installation site at all times during the installation and commissioning of the TIIMS equipment.
P50067 – 011100 – Attachment A - 11
3.03 PREPARATION
A. Project Kick-Off Meeting. The Contractor shall schedule a project kick-off meeting a minimum of three (3) weeks prior to the planned commencement of the installation work.
1. The Contractor shall review the Work Plan and Commissioning Plan for the project during the meeting.
2. The Contractor shall coordinate the delivery, installation, and commissioning of TIIMS with Authority departments and personnel as necessary to ensure an efficient completion of the work.
B. Delivery of measurement, TIIMS, and other equipment. TIIMS and associated measurement and installation materials shall not be delivered to each installation site more than 1 week prior to the scheduled installation date.
1. Temporary storage shall be coordinated with Authority.
2. The Contractor shall be solely accountable for all risks associated with temporary storage.
3.04 INSTALLATION
A. The TIIMS equipment installation shall comply with required MARTA Installation Specifications.
B. TIIMS shall be installed at the location shown on the design drawings and in accordance with the manufacturer’s recommended procedures, with TIIMS ARCHITECTURE.
1. In addition, all applicable Authority safety procedures shall be strictly followed during the installation.
2. Cable sizing, routing and connection methods shall be in accordance with the submitted design drawings and details.
C. All connecting cables shall be routed through rigid galvanized conduit and permanently labeled at each termination.
1. The cables connected directly to the Negative Bus shall be routed through non-metallic conduit (FRE).
2. All metallic conduits shall be terminated with insulated end bushings.
D. Installation of communications equipment and cabling shall be in accordance with the design drawings and coordinated with the Authority IT department.
E. TIIMS shall be provided power through an uninterruptible power supply with surge suppression.
1. The power supply shall be fully charged prior to connection of TIIMS.
F. The Contractor shall install measurement devices in a manner and at the locations shown on the submitted and approved design drawings. Measurement device installation includes connecting power and communications to the device.
3.05 FIELD QUALITY CONTROL
A. All field quality control shall follow the requirements of Section 014500, QUALITY CONTROL, and be coordinated with the Authority Department of Safety and Quality Assurance.
B. Authority Inspectors and Engineering personnel, or their designee, shall have access to the installation site at all times during the installation and commissioning of the measurement devices and SCMS.
P50067 – 011100 – Attachment A - 12
3.06 CLEANING
A. The Contractor shall provide receptacles to collect and store rubbish.
B. The Contractor shall remove all rubbish from the site, at a minimum, on a daily basis.
3.07 PROTECTION
A. The Contractor shall provide temporary barriers or other appropriate devices as necessary to protect the work from incidental damage until the installation is completed.
3.08 COMMISSIONING AND TESTING
A. Test scheduling, test procedures, test conduct, test data recording, and test data submittal shall be in accordance with Section 014316, QUALITY ASSURANCE TESTING; Section 250810, TESTING AND PERFORMANCE VERFICATION FOR UTILITY MONITORING AND CONTROL
SYSTEMS; and Section 251010, MONITORING AND CONTROL SYSTEMS FRONT END AND
INTERGRATION.
B. When performing a test, TIIMS shall use real-time or archived data.
C. TIIMS test system shall operate independently from the production system.
D. The Contractor shall perform commissioning tests in accordance with the submitted Commissioning Plan and all recommended manufacturer procedures.
E. At a minimum, commissioning and testing shall consist of:
1. Setting up TIIMS and installing all required software;
2. Confirm communication with the measurement devices;
3. Parameterizing the stray current monitoring software specific to the Authority transit system;
4. Confirm correct operation of the parameterized software;
5. Demonstration of the accuracy of track isolation deficiency locating and reporting;
6. Preparation and submittal of a Commissioning Report.
F. The completed, executed Commissioning Plan shall be submitted as the final Commissioning Report.
3.09 TRAINING
A. The Contractor shall provide on-site training.
B. The Contractor shall submit training materials prior to contract closeout.
C. Training and training materials shall be in accordance with Section 017900, DEMONSTRATION
AND TRAINING.
TIIMS ARCHITECTURE ATTACHED
Traction Power Substation
(TPSS)
Integrated Operations Center (IOC)
EP&E
VLD
SFU
Net
Traction Power Substation
(TPSS)
VLD
SFU
Net
Running Rail, L-
Ground/ Earth
TRACKS
TRACK ISOLATION INTEGRITY PROGRAM
TII MONITORING SYSTEM (TIIMS)
ARCHITECTURE DIAGRAM
Workstation
TIIMS
Software
Data Center
Net
Database Server
Control Room
Workstation
SCADA
Legend
VLD – Voltage Limiting Device
SFU – SCADA Field Unit
EthernetEthernet
Contact ClosureContact Closure
Legend
VLD – Voltage Limiting Device
SFU – SCADA Field Unit
Ethernet
Contact Closure
011100-B_TIIMS ARCHITECTURE
Train Control System Network
(TCSN)
P50067 – 012116 - 1
SECTION 012116 - UNDEFINED WORK PROVISION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Providing technical and other support not otherwise indicated or specified in the Contract Documents but required to complete the Project.
1.02 MEASUREMENT: The Work of this Section will either:
A. Be measured for payment by the number of man-hours of personnel furnished and the cost of material and/or equipment for technical and other support required, determined from Time and Material Sheets submitted by the Contractor, and executed by the Authority; or
B. Be performed at a mutually agreed upon price.
1.03 PAYMENT
A. The Work of this Section will be paid for out of the Provision Proposal Item entitled UNDEFINED WORK PROVISION. Any residual remaining at the completion of the Work will not be paid.
PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION
3.01 GENERAL
A. The Contractor shall provide Technical Representatives and other support personnel, material, and/or equipment on an as-required basis for technical and other support functions necessary to complete the Project.
B. The Authority reserves the right to direct the Contractor to do work not indicated or specified in the Contract Documents, but which is within the general scope of the Contract.
3.02 AUTHORIZATION
A. The Work of this Section will be authorized in writing by the Authority as a directive.
B. The Authority’s written directive will either require, at the Authority’s sole discretion, the Contractor to:
1. Document labor hours and material and equipment costs in accordance with Article 21, FORCE ACCOUNT WORK, of the GENERAL CONDITIONS; or
2. Perform the Work at a mutually agreed upon price.
END OF SECTION
P50067 – 012500 - 1
SECTION 012500 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Preparing, submitting, amending, and updating lists of products which Contractor proposes to furnish and install in lieu of those specified. The Work of this Section shall not serve to limit the operation of Articles 13 and 20 of the GENERAL CONDITIONS.
1.02 MEASUREMENT: The Work of this Section will not be measured for payment.
1.03 PAYMENT: The Work of this Section will be paid for as part of the Contract lump sum Proposal Item for GENERAL REQUIREMENTS.
1.04 LIST OF SUBSTITUTE PRODUCTS AND METHODS
A. Formal requests for substitution of products and methods in place of those specified will be considered but only if those requests shall have been submitted within 30 days after effective date of Administrative Notice to Proceed. Acceptance of substitute products and methods will be only for characteristics and use named in acceptance and shall not be interpreted as a modification of Specification and Project Drawing requirements or to establish acceptance of products and methods for other portions of the Authority's System. The Authority will be the sole judge of quality and suitability of a substitute product and method, and its decision shall be final. If use of a substitute product and method involves redesign of other parts of the Work, the cost and time required to effect that redesign will be charged to Contractor or redesign shall be accomplished by Contractor, as determined by Authority. Authority approval shall be in writing.
B. List, if submitted: Submit five (5) copies. Amend and update list when changes concerning information on list become known to Contractor. Include the following information:
1. Complete data substantiating compliance of proposed substitution with requirements of Specifications and Project Drawings, including pertinent technical and manufacturer's data for both, the specified item or method, and that of the proposed substitution.
2. For products
a. Product identification, including manufacturer's name and address, and Original Equipment Manufacturer’s part number.
b. Installation characteristics, installation drawings, and manufacturer's literature, including product description, performance and test data, and reference standards if pertinent.
c. Name and address of projects where product was successfully used under similar circumstances, and date of installation.
3. For construction methods
a. Detailed description of proposed method.
b. Drawings illustrating methods.
4. Itemized comparison of proposed substitution with product specified. Include differences in estimated life, estimated maintenance, availability of spare parts and repair services, energy consumption, performance capacity, salvage ability, manufacturer's warranties, and other material differences.
5. Data relating to changes in Construction Schedule.
P50067 – 012500 - 2
6. Accurate cost data for proposed substitution in comparison with product and method specified except that cost data will not be required for substitutes proposed as equal, equivalent, or superior to specified brand names, and for which Contractor does not request a price adjustment to Contract.
7. Equitable adjustment and credit Contractor proposes to offer Authority if substitutes proposed are not equal, equivalent, or superior to specified brand names.
C. In making request for substitution, Contractor shall certify:
1. That he has personally investigated the proposed product and method; that he believes, to the best of his knowledge, information, and belief, that product and method is either equivalent or superior to that product and method specified; and that he will update information as new or different data become known to him.
2. That he will furnish same guarantee for substitution as he would for product and method specified.
3. That he will coordinate installation of accepted substitution into the Work and will make those changes required for the Work to be complete in all respects, all at no additional expense to the Authority.
4. That he waives all claims for additional costs, related to substitution, which consequently become apparent.
5. That cost data is complete, include all related costs, and exclude costs of Authority's redesign.
CI. Substitutions indicated or implied on shop drawings or product data submittal will not be considered if no formal request for substitution has been submitted in accordance with Article
1.04 of this Section. Except as stipulated in Article 20 of the GENERAL CONDITIONS,…
This is the start of the file's text. The full file is on GovTribe.