This is a Request for Proposals (RFP) issued by the City of Schertz, Texas for the 2026 Library Foundation Repair Project (RFP #2026-005). The project involves replacing foundation soil retainer panels and restoring surface and landscaping at the City Library located at 1400 Schertz Parkway, Schertz, Texas 78154. The scope of work includes mobilization, traffic control, storm water pollution control, site restoration, asphalt and concrete removal and replacement, irrigation installation, landscaping with trees and plants, sodding, and hand rail installation across 23 line items with estimated quantities ranging from 1 to 936 units depending on the item type. Sealed bids were due electronically through the City's e-procurement portal (https://schertz.bonfirehub.com/portal/?tab=openOpportunities) on Wednesday, July 1, 2026. A virtual pre-bid conference was held on June 18, 2026 at 10:00 AM via Microsoft Teams, and written questions were accepted through June 23, 2026. Bid security of 5 percent of the maximum bid price is required. The successful contractor shall substantially complete the work within 240 calendar days after the contract commences and achieve final completion within 30 additional calendar days. Liquidated damages are set at $600 per day for failure to achieve substantial completion within the contract time.
Pricing shall be submitted on a unit price basis for each of the 23 line items in the base bid, with all costs including labor, materials, equipment, overhead, and profit reflected in the unit prices. The City of Schertz is exempt from Texas sales and use taxes, and such taxes shall not be included in the bid. No set-asides or restrictions limiting bidder eligibility are specified in the RFP. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Performance and payment bonds equivalent to 100 percent of the contract price are required upon contract execution. Insurance requirements include general liability, errors and omissions, motor vehicle liability, and workers' compensation coverage. The Contractor must retain specified Subcontractors and Suppliers only with Owner's written approval, and Owner reserves the right to reject any proposed subcontractor with reasonable objection. Contract Documents include the Agreement, bonds, EJCDC C-700 Standard General Conditions (modified), Supplementary Conditions, Specifications, and 19 drawing sheets. The contract is contingent upon the City of Schertz's available funding and does not specify an explicit total project budget or award ceiling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-RFP 2026-005- Childcare Professional Development Training Services- Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE CITY OF SCHERTZ, TEXAS
REQUEST FOR PROPOSALS (RFP)
for
2026 LIBRARY FOUNDATION REPAIR PROJECT
#26-005
June 1, 2026
1400 SCHERTZ PARKWAY
SCHERTZ, TEXAS 78154
CITY OF SCHERTZ
2026 LIBRARY FOUNDATION
REPAIR PROJECT TC - 1
TABLE OF CONTENTS
BIDDING AND CONTRACT REQUIREMENTS: ......................................................... PAGE
Table of Contents ......................................................................................................................... TC
Invitation to Bid ............................................................................................................................ IV
Instructions to Bidders ................................................................................................................ ITB
Bid Form ....................................................................................................................................... BF
Qualifications Statement .............................................................................................................. QS
Bid Bond ...................................................................................................................................... BB
Prohibition on Contracts with Companies Boycotting Israel ......................................................... P
Performance Bond ........................................................................................................................ PB
Payment Bond ............................................................................................................................ PYB
Agreement ....................................................................................................................................... A
Supplementary Conditions ............................................................................................................ SC
Summary of Work
Standard General Conditions ..................................................................................... EJCDC C-700
2026 LIBRARY FOUNDATION REPAIR ROJECT
2026 LIBRARY FOUNDATION
REPAIR PROJECT IV-1
INVITATION TO BID
The City of Schertz is accepting Request for Bids for construction services of the 2026 LIBRARY
FOUNDATION REPAIR PROJECT, BID #2026-005.
Sealed Bids in response to this IFB will be received through the City’s e-procurement portal at https://schertz.bonfirehub.com/portal/?tab=openOpportunities on Wednesday, July 1, 2026. Submissions by other methods or after the aforementioned date and time will not be accepted.
All submitted and sealed responses will be opened at the above-mentioned time and date.
Responders who wish to be present for the opening may join the Zoom meeting at the below link immediately following the bid closing:
BID OPENING TEAMS MEETING LINK
Be advised that if your company is contemplating responding to this IFB you should register as a Schertz Vendor to be notified of any changes or additions to the IFB documents via addenda. Any questions regarding this IFB must be directed to the Q&A section of the Project on the City’s e-procurement portal at https://schertz.bonfirehub.com/portal/?tab=openOpportunities. General questions about the IFB process or using the e-procurement portal may be directed to the Purchasing Department at purchasing@schertz.com
Questions must be posted on the Q&A Section of the portal no later than Tuesday, June 23, 2026.
The City of Schertz reserves the right to refuse and reject any or all responses, waive any or all formalities or technicalities, accept the response or portions of the response determined to be the best and most advantageous to the City, and hold the responses for a period of 60 days without taking action. The City of Schertz reserves the right to accept responses from more than one firm determined to be the best option for the City. Respondents are required to hold their responses firm for the same period of time.
CITY OF SCHERTZ REQUEST FOR BIDS
BID #2026-005
https://schertz.bonfirehub.com/portal/?tab=openOpportunities https://teams.microsoft.com/meet/219247845442351?p=3TNoQ73F8pvrY2ePOr https://teams.microsoft.com/l/meetup-join/19%3ameeting_ODMwYzM4MWEtOTZjZC00NGM3LTllYTAtZjEzMmVmNGI0MWY4%40thread.v2/0?context=%7b%22Tid%22%3a%22c6a5f21e-8be3-4703-81d7-00f87aab018c%22%2c%22Oid%22%3a%225ffc77e2-0e99-4029-801d-87fa2ce068bb%22%7d https://schertz.bonfirehub.com/portal/?tab=openOpportunities mailto:purchasing@schertz.com
REPAIR PROJECT ITB - 1
INSTRUCTIONS TO BIDDERS
Page ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifications of Bidders
ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
ARTICLE 5 – Bidder’s Representations
ARTICLE 6 – Pre-Bid Conference
ARTICLE 7 – Interpretations and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Substitute and “Or-Equal” Items
ARTICLE 12 – Subcontractors, Suppliers, and Others
ARTICLE 13 – Preparation of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submittal of Bid
ARTICLE 16 – Modification and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evaluation of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
ARTICLE 22 – Sales and Use Taxes
REPAIR PROJECT ITB - 2
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. [Evidence of Bidder’s authority to do business in the state where the Project is located.]
B. [Bidder’s state or other contractor license number, if applicable.]
C. [Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”]
D. [Other required information regarding qualifications]
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
REPAIR PROJECT ITB - 3
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
REPAIR PROJECT ITB - 4
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, if available.
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
REPAIR PROJECT ITB - 5
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference will be held virtually using Teams on 18 June, 2026 at 10:00am at the following Link:
https://teams.microsoft.com/meet/220547873173487?p=xbK4wh54GyKZNfPo3I Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to City in writing, per the invitation or advertisement to bid. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents and published on www.publicpurchase.com.
Questions received after the deadline for questions may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of [_five_] percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
REPAIR PROJECT ITB - 6
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the work.
If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to
REPAIR PROJECT ITB - 7
submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary.
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The partnership’s address for receiving notices shall be shown.
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and
REPAIR PROJECT ITB - 8
qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Sectional Bids
A. Bidders may submit a Bid on any individual section or any combination of sections, as set forth in the Bid Form.
B. Submission of a Bid on any section signifies Bidder’s willingness to enter into a Contract for that section alone at the price offered.
C. If Bidder submits Bids on individual sections and a Bid based on a combination of those sections, such combined Bid need not be the sum of the Bids on the individual sections.
D. Bidders offering a Bid on one or more sections shall be capable of completing the Work covered by those sections within the time period stated in the Agreement.
14.02 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 15 – SUBMITTAL OF BID
15.01 The Bid Form is provided in the bid package. The Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form electronically as outlined in the invitation to bid.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in invitation to bid and shall be submitted electronically as outlined in the invitation to bid.
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
REPAIR PROJECT ITB - 9
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
18.02 Owner reserves the right to extend the time that a Bid remains subject to acceptance by mutual written agreement of Owner and one or more Bidders and their respective sureties.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For determination of the apparent low Bidder(s) when sectional bids are submitted, Bids will be compared on the basis of the aggregate of the Bids for separate sections and the Bids for combined sections that result in the lowest total amount for all of the Work.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the
REPAIR PROJECT ITB - 10
Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from Texas state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the General Conditions for additional information.
BF - i
BID FORM
RFP #2026 – 005
BF - ii
Page
ARTICLE 1 – Bid Recipient
ARTICLE 2 – Bidder’s Acknowledgements
ARTICLE 3 – Bidder’s Representations
ARTICLE 4 – Bidder’s Certification
ARTICLE 5 – Basis of Bid
ARTICLE 6 – Time of Completion
ARTICLE 7 – Attachments to this Bid
ARTICLE 8 – Defined Terms
ARTICLE 9 – Bid Submittal
2026 LIBRARY FOUNDATION BF - 1
REPAIR PROJECT
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
https://schertz.bonfirehub.com/portal/?tab=openOpportunities
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and
2026 LIBRARY FOUNDATION BF - 2
drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
2026 LIBRARY FOUNDATION BF - 3
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
BASE BID SCHEDULE–LIBRARY FOUNDATION REPAIR
Item No. Description Unit Estimated
Quantity Bid Unit
Price Bid Price
1 Mobilization LS 1 $ $ 2 Traffic Control and Regulation LS 1 $ $ 3 Storm Water Pollution Control LS 1 $ $ 4 Site Restoration LF 936 $ $ 5 Remove Asphalt Surface SY 73 $ $ 6 Remove Sidewalk and Driveway SF 306 $ $ 7 Removal Of Curb and Gutter LF 67 $ $ 8 Trench Excavation Safety Protection LF 936 $ $ 9 Hot Mix Asphalt Pavement, Type D (3") (PG 64-22) TON 4.62 $ $ 10 Hot Mix Asphalt Pavement, Type B (5") (PG 64-22) TON 7.7 $ $ 11 Tack Coat GAL 2.8 $ $ 12 Concrete Curb LF 67 $ $ 13 Concrete Sidewalk SY 34 $ $ 14 Stamped/Stained Concrete Sidewalk SY 177 $ $ 15 Irrigation, Tree Bubbler EA 8 $ $ 16 Irrigation, Shrub Bubbler - 6" EA 147 $ $ 17 Trees, 2" Caliper EA 4 $ $ 18 Plant Materials 5 Gal EA 151 $ $ 19 Bermuda Sodding SY 355 $ $ 20 Topsoil CY 40 $ $ 21 Precast Foundation Soil Retainer LF 936 $ $ 22 Concrete Paver Removal TON 31 $ $ 23 Hand Rail LF 16 $ $ Total of All Base Bid Items $
Sum Total $____________
Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
2026 LIBRARY FOUNDATION BF - 4
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be complete in accordance with Article 4 of the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. List of Project References;
C. Proposed Project Schedule;
D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;
E. Required Bidder Qualification Statement with supporting data;
F. Form 1295 – Certificate of Interested Parties (Bidder must complete the form online at www.ethics.state.tx.us/File); and
G. Prohibition on Contracts with Companies Boycotting Israel.
ARTICLE 8 – DEFINED TERMS
8.01 Unless otherwise specified herein, the terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
8.02 The terms “Bidders”, “Respondents”, “Proposers”, and “Offerors” and their associated word forms are used interchangeably to mean firms who participate in this RFCSP process.
http://www.ethics.state.tx.us/File)%3B http://www.ethics.state.tx.us/File)%3B
2026 LIBRARY FOUNDATION BF - 5
ARTICLE 9 – BID SUBMITTAL
BIDDER: [Indicate correct name of bidding entity]
By:
[Signature]
[Printed name] (If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest:
[Signature]
[Printed name]
Title:
Submittal Date:
Address for giving notices:
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Bidder’s License No.:
(where applicable)
REPAIR PROJECT QS - 1
THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO THE EXTENT
PERMITTED BY LAWS AND REGULATIONS
QUALIFICATIONS STATEMENT
1. SUBMITTED BY:
Official Name of Firm:
Address:
2. SUBMITTED TO:
3. SUBMITTED FOR:
Owner:
Project Name:
TYPE OF WORK:
4. CONTRACTOR'S CONTACT INFORMATION
Contact Person:
Title:
Phone:
Email:
REPAIR PROJECT QS - 2
5. AFFILIATED COMPANIES:
Name:
6. TYPE OF ORGANIZATION:
SOLE PROPRIETORSHIP
Name of Owner:
Doing Business As:
Date of Organization:
PARTNERSHIP
Type of Partnership:
Name of General Partner(s):
CORPORATION
State of Organization:
Executive Officers:
- President:
- Vice President(s):
- Treasurer:
- Secretary:
REPAIR PROJECT QS - 3
LIMITED LIABILITY COMPANY
State of Organization:
Members:
JOINT VENTURE
Sate of Organization:
Form of Organization:
Joint Venture Managing Partner
- Name:
- Address:
REPAIR PROJECT QS - 4
7. LICENSING
Jurisdiction:
Type of License:
License Number:
Jurisdiction:
Type of License:
License Number:
8. CERTIFICATIONS CERTIFIED BY:
Disadvantage Business Enterprise:
Minority Business Enterprise:
Woman Owned Enterprise:
Small Business Enterprise:
Other ( ):
9. BONDING INFORMATION
Bonding Company:
Bonding Agent:
Contact Name:
Aggregate Bonding Capacity:
Available Bonding Capacity as of date of this submittal:
REPAIR PROJECT QS - 5
10. FINANCIAL INFORMATION
Financial Institution:
Account Manager:
INCLUDE AS AN ATTACHMENT AN AUDITED BALANCE SHEET FOR EACH OF THE
LAST 3 YEARS
11. CONSTRUCTION EXPERIENCE:
Current Experience:
List on Schedule A all uncompleted projects currently under contract (If Joint Venture list each participant's projects separately).
Previous Experience:
List on Schedule B all projects completed within the last 5 Years (If Joint Venture list each participant's projects separately).
Has firm listed in Section 1 ever failed to complete a construction contract awarded to it?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
Has any Corporate Officer, Partner, Joint Venture participant or Proprietor ever failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?
Are there any judgments, claims, disputes or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?
REPAIR PROJECT QS - 6
12. SAFETY PROGRAM:
Name of Contractor's Safety Officer:
Include the following as attachments:
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) OSHA No. 500- Log & Summary of Occupational Injuries & Illnesses for the past 5 years.
amount of the Bid) list of all OSHA Citations & Notifications of Penalty (monetary or other) received within the last 5 years (indicate disposition as applicable) - IF NONE SO STATE.
amount of the Bid) list of all safety citations or violations under any state all received within the last 5 years (indicate disposition as applicable) - IF NONE SO STATE.
Provide the following for the firm listed in Section V (and for each proposed Subcontractor furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) the following (attach additional sheets as necessary):
Workers' compensation Experience Modification Rate (EMR) for the last 5 years:
YEAR EMR
YEAR EMR
Total Recordable Frequency Rate (TRFR) for the last 5 years:
YEAR TRFR
YEAR TRFR
REPAIR PROJECT QS - 7
Total number of man-hours worked for the last 5 Years:
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
Provide Contractor's (and Contractor's proposed Subcontractors and Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) Days Away From Work, Days of Restricted Work Activity or Job Transfer (DART) incidence rate for the particular industry or type of Work to be performed by Contractor and each of Contractor's proposed Subcontractors and Suppliers) for the last 5 years:
YEAR DART
YEAR DART
13. EQUIPMENT:
MAJOR EQUIPMENT:
List on Schedule C all pieces of major equipment available for use on Owner's Project.
REPAIR PROJECT QS - 8
I HEREBY CERTIFY THAT THE INFORMATION SUBMITTED HEREWITH, INCLUDING ANY ATTACHMENTS, IS
TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF.
NAME OF ORGANIZATION:
BY:
TITLE:
DATED:
NOTARY ATTEST:
SUBSCRIBED AND SWORN TO BEFORE ME
THIS DAY OF , 20
NOTARY PUBLIC - STATE OF
MY COMMISSION EXPIRES:
REQUIRED ATTACHMENTS
1. Schedule A (Current Experience).
2. Schedule B (Previous Experience).
3. Schedule C (Major Equipment).
4. Audited balance sheet for each of the last 3 years for firm named in Section 1.
5. Evidence of authority for individuals listed in Section 7 to bind organization to an agreement.
6. Resumes of officers and key individuals (including Safety Officer) of firm named in Section 1.
7. Required safety program submittals listed in Section 13.
8. Additional items as pertinent.
REPAIR PROJECT QS - 9
CURRENT EXPERIENCE
SCHEDULE A
Project Name Owner's Contact Person Design Engineer Contract Date Type of Work Status Cost of Work
Telephone:
Name:
Company:
Telephone:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
REPAIR PROJECT QS - 10
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years)
SCHEDULE B
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
REPAIR PROJECT QS - 11
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years)
SCHEDULE B
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
REPAIR PROJECT QS - 12
SCHEDULE C - LIST OF MAJOR EQUIPMENT AVAILABLE
ITEM PURCHASE DATE CONDITION ACQUIRED VALUE
EJCDC® C-430, Bid Bond (Penal Sum Form).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page BB-1 of 2
BID BOND (PENAL SUM FORM)
Bidder Surety
Name: Name:
Address (principal place of business): Address (principal place of business):
Owner Bid
Name: Project (name and location):
Address (principal place of business):
Bid Due Date:
Bond
Penal Sum:
Date of Bond:
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature) Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary.
EJCDC® C-430, Bid Bond (Penal Sum Form).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Page BB-2 of 2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.
Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1. Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2. All Bids are rejected by Owner, or
3.3. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action will be commenced under…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .