1-PTSA Brush Run WPCP BFP Replacement Bid Specifications.pdf

PDF 18 MB Posted

Attached to
BRUSH RUN WATER POLLUTION CONTROL PLANT – BELT FILTER PRESS REPLACEMENT
Solicitation number
US.214107
Issued by
Washington County, Pennsylvania

About this file

This is a Project Manual and bid specification document for Peters Township Sanitary Authority (PTSA) in Washington County, Pennsylvania, for the Brush Run Water Pollution Control Plant Belt Filter Press Replacement project. The project encompasses three separate contracts: Contract 1 (General Construction), Contract 2 (HVAC Construction), and Contract 3 (Electrical Construction). The work includes replacement of the belt filter press, press feed pump, belt conveyor, polymer system, installation of HVAC equipment, and associated electrical work. The project site is located at 111 West Valley Brook Road, McMurray, PA 15317. Sealed bids are due by 2:00 PM on January 30, 2026, via the PennBid online platform. A pre-bid meeting is scheduled for January 6, 2026, at 2:00 PM at the Brush Run Water Pollution Control Plant. Contract times specify substantial completion within 300 calendar days and final completion within 330 calendar days after the notice to proceed, with a critical milestone requiring demolition and installation of the belt filter press system within 60 days. All bidding documents became available on December 15, 2025, through PennBid at no cost.

Each bid must be accompanied by a certified check or bid bond in an amount equal to at least 10 percent of the total bid price, payable to Peters Township Sanitary Authority. Bidders are required to submit statements of qualifications, non-collusion affidavits, compliance affidavits with Pennsylvania Steel Products Procurement Act, public works employment verification forms, and evidence of authority to conduct business in Pennsylvania. The contract specifies Pennsylvania prevailing wage requirements and compliance with the Pennsylvania Human Relations Commission's non-discrimination provisions. Liquidated damages are assessed at $500 per day for failure to achieve substantial completion, $1,000 per day for failure to complete remaining work after substantial completion, and $250 per day for failure to achieve specified milestones. Retainage provisions include 10 percent on the first 50 percent of work completed, reducing to 5 percent thereafter. The contract includes a $10,000 allowance for unforeseen site conditions (Contract 1 and 3). The Owner is procuring the belt filter press directly; contractors are responsible for all other materials, labor, equipment, and installation work. PennBid assesses a service fee of 0.33 percent of the bid total, capped at $6,000, only to awarded contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .