This is a Project Manual for a public works road construction contract issued by the Highridge Improvement District Authority (HIDA) in Schuylkill County, Pennsylvania. The project encompasses milling, asphalt patching, sign replacement, and related roadway improvements along Keystone Boulevard in Cass and Foster Township, spanning two locations: from State Route 901 to Highridge Park Road (SR 4007) and from Highridge Park Road to the Keystone Boulevard East cul-de-sac at the Tyson Foods Inc. entrance. The work scope includes milling of asphalt pavement surfaces to 2-inch depth, placement of Superpave asphalt wearing course at 2-inch depth, installation of post-mounted signs (Type B and Type F), reflective sign post strips, and maintenance and protection of traffic. Sealed bids are due online via the PennBid Program by July 27, 2026, at 11:00 A.M., with bid results announced at approximately 12:00 P.M. the same day. A mandatory pre-construction meeting must be scheduled at least five calendar days prior to project commencement. All work must be completed by October 15, 2026, with liquidated damages assessed at $975.00 per calendar day for delays.
Bidders must submit a bid bond, certified check, or bank draft equal to 10 percent of the total bid amount. The successful contractor will be required to provide Performance and Payment Bonds each equal to 100 percent of the contract price within 20 days of award. Pennsylvania prevailing wage rates apply to the contract, and the contractor must comply with the Public Works Employment Verification Act, requiring E-Verify employment eligibility verification for all employees and subcontractors. No fuel surcharge applies to the contract. The contractor is responsible for all material delivery documentation, including CS-4171 Certificates of Compliance and TR-465 Daily Asphalt Mixture Certifications, and must complete all work in accordance with PennDOT Publication 408 specifications. The contractor assumes responsibility for any defects occurring within one year following project completion. Bidders are not required to be PennDOT prequalified, and HIDA reserves the right to accept or reject any or all proposals based on budgetary constraints and to award the contract to a single bidder responsible for all work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Combined Plan Set 2026 0630.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright 2026, of Benesch. All rights reserved. This plan and design content is the property of Benesch . Use, reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
PROJECT MANUAL
2026 Keystone Boulevard Road Program Highridge Business Park Schuylkill County, Pennsylvania
Prepared for
Highridge Improvement District Authority (HIDA) Union Station One Progress Circle, Suite 200 Pottsville, PA 17901
July 2026 Project No. 0326-609065.00
Keystone Boulevard |2026 Road Program| Project Manual|i
ADVERTISEMENT
PENNDOT SHORT FORM DOCUMENTS
Proposal and Contract * Attachment 1 for Proposal and Contract Special Provisions to Contract (Attachment 1A) * Proposal and Contract Instructions Attachment 2 Performance Bond
Attachment 3 Payment Bond Attachment 4 Affidavit Accepting Provisions of the Workmen’s Comp. Act * Attachment 5 Anti-Collusion Affidavit * Attachment 6 Notice of Completion
Attachment 7 Insurance Requirements
OTHER EXHIBITS
Bid Bond * Agreement of Surety * Certificate of Compliance (CS-4171) Nondiscrimination/Sexual Harassment Clause * Contractor’s Statement of Compliance with CDL Testing Program * Compliance with the Prohibition of the Illegal Alien Labor Act * Compliance with the State Contractors Responsibility Program * Contract Provisions Right to Know Law * Certification of Non-Segregated Facilities * Contractor Integrity Provisions * Provisions Concerning the Americans with Disability Act * Public Works Employment Verification Form * Statement of Bidders Qualifications Form * Wage Rates PA1 Call Location Map Plans
Submit with Bid *
TABLE OF CONTENTS
Keystone Boulevard |2026 Road Program | Project Manual
ADVERTISEMENT
HIDA – 2026 Keystone Boulevard Road Program – Project No. 0326-609065.00
ADVERTISEMENT FOR BIDS Section 00100
AD-1
ADVERTISEMENT FOR BID
SEALED BIDS for 2026 KEYSTONE BOULEVARD ROAD PROGRAM will be received online via the PennBid Program by Highridge Improvement District Authority (HIDA) until July
27, 2026, at 11:00 A.M. (prevailing time) and will be announced at SEDCO’s Office on July 27
2026, at approximately 12:00 PM. Bid results will be available online at http://PennBid.bonfirehub.com following the meeting.
The project includes milling, asphalt patching, and signing along Keystone Boulevard in Cass and Foster Township. The items of work are identified more specifically in the Project
Specifications.
All documents and project details are available at no cost at http://PennBid.bonfirehub.com.
A certified check or bank draft, payable to the order of Highridge Improvement District
Authority (HIDA), negotiable US Government Bonds (at par value), or satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10% of the Total Bid of construction shall be submitted with each bid.
The SUCCESSFUL BIDDER will be required to furnish and pay for satisfactory Performance and Payment Bond, each in the amount of 100% of the Contract Price with a corporate surety approved by the Owner. Pennsylvania Wage Rates apply for the project.
PA Prevailing wages will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices, and related matters. The Contractor will be required to comply with the provisions of the
Pennsylvania Human Relations ACT in providing equal employment opportunities in connection with all work.
This bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations, and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1-
167.11. All submitted bids shall be accompanied with the Public Works Employment
Verification Form.
The Owner reserves the right to waive any informality or to reject any or all items or portions thereof or to waive any technicalities and informalities in the bid for the best interest of the
Owner.
No bidder shall withdraw a bid within sixty (60) days after the actual date of the Bid opening.
HIGHRIDGE IMPROVEMENT DISTRICT AUTHORITY (HIDA)
MR. FRANK ZUKAS, EXECUTIVE DIRECTOR
TO: SOUTH SCHUYLKILL NEWS, SCHUYLKILL HAVEN, PA
PLEASE PUBLISH ON:
1. THURSDAY, JULY 16, 2026
PLEASE SEND INVOICE TO:
UNION STATION
ONE PROGRESS CIRCLE- SUITE 200
POTTSVILLE, PA 17901-3070
ADVERTISEMENT FOR BIDS Section 00100
AD-2
ATTENTION: MR. FRANK ZUKAS, EXECUTIVE DIRECTOR
PLEASE SEND CONFIRMATION AND PROOF OF PUBLICATION TO:
CHERYL BOLICH
cbolich@benesch.com
PROPOSAL AND CONTRACT
MS-944 03-07
DISTRICT 5-0
PROPOSAL & CONTRACT (THIS PROPOSAL INCLUDES
(WHEN EXECUTED) INSTRUCTIONS TO BIDDERS)
-1-
A. DEPOSIT OF PROPOSALS.
All Bid proposals shall be clearly marked HIDA 570-622-1943 “2026 Keystone Boulevard Road Program Bid Municipality Name and Type Telephone No.
Proposal Due By: July 27, 2026.”
Date Frank Zukas Secretary
Sealed Proposals will be received on or before:
11:00 A.M., on Monday, July 27, 2026. One Progress Circle, Suite 200 Time and Date Address
Bids will be read at approximately: Pottsville, PA 17901
12:00 P.M., on Monday, July 27, 2026. Proposals must be uploaded to PennBID at Time and Date http://PennBid.bonfirehub.com
1. The contractor proposes to furnish and deliver all materials (including Form CS-4171, Certificate of Compliance and/or TR-465 Daily Asphalt Mixture Certification) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and specifications on file at http://PennBid.bonfirehub.com. This form (MS-944) will serve as the proposal and contract form for the awarded contractor.
2. Requirements for bidders include the supplements and special requirements contained herein and/or attached hereto and current PennDOT specifications (Publication 408). Bidders do not need to be prequalified by PennDOT.
3. If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed. Or as otherwise provided in the special requirements and will complete all work by October 15, 2026.
If all work is not completed on time, liquidated damages will be assessed at the rate of $975.00 per additional calendar day.
4. Accompanying this proposal is a certified check or bid Bond in the amount of 10% made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirement of the proposal.
B. PROPOSAL OF: _____________________________________________________________________________ Name of Contractor
Address
CONTRACTOR’S CERTIFICATION
It is hereby certified as follows:
1. The only person(s) interested in this proposal as principal(s) is (are): ________________________________
2. None of the above persons are employees of the municipality.
3. This proposal is made without collusion with any other person, firm, or corporation.
4. All plans and specifications referred to above and the site of the work have been examined by the contractor.
The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit prices listed on the Schedule of Prices (Attachment 1).
http://pennbid.bonfirehub.com/ http://pennbid.bonfirehub.com/
County: Schuylkill Municipality: HIDA Project No.: 0326-609065.00
-2-
5. The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
6. The contractor will provide the municipality with a performance bond, conditioned upon the faithful performance of the contractor in accordance with the plans, specifications and conditions thereof, and a payment bond conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Work’s Contractors’ Bond Law of 1967; and an affidavit accepting the provisions of the Workmen’s Compensation Act of 1915, as amended.
7. “The parties agree that the relationship between the Contractor and the Municipality is one of independent contractor and not the employer/employee and that the individual employees of the Contractor who will be performing the work pursuant to this contract are not employees of the Municipality. Contractor hereby certifies, represents and warrants to the Municipality that all persons performing any aspect of the work pursuant to this Contract who are required to have commercial driver’s license are subject to a program for drug and alcohol testing in accordance with the Omnibus Transportation Employee Testing Act of 1991 and the federal regulations adopted pursuant thereto.”
Contractor
WITNESSED OR ATTESTED BY:
BY:______________________________________
Title (Seal)
Title
SEAL
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
ACCEPTED ON:_______________________________________
Date
Municipality
ATTESTED BY:
________________________________________ BY:_______________________________________ Title Title
SEAL
ATTACHMENT 1 FOR PROPOSAL AND CONTRACT
County:
0326-609065.00
1 LS Mobilization
1 LS
3,000 SY
24 SF
2 SF
7 EA
3,000 SY
SUBTOTAL
Schuylkill Municipality:
T
H
IS
P O
R T
IO
N
T O
B E
C O
M P
L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Highridge Improvement District Authoity (HIDA)
Project Number:
Keystone Blvd from the intersection with SR 901 to the Highridge Park Rd (SR 4007) intersection.
ATTACHMENT 1
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
0413-0305
0608-0001
9491-0033
3A
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
SUBTOTAL FROM OTHER ATTACHMENTS
TOTAL AMOUNT OF BID
0931-0001 Post Mounted Signs, Type B
0935-0001 Post Mounted Signs, Type F
9000-0001 Sign Post Reflective Strips
Item
1 No.
Unit
*Description
0901-0001
LOCATION OF WORK:
DESCRIPTION OF WORK:
Maintenance and Protection of Traffic
Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 3 to < 10 Million ESALS, 9.5 mm Mix, 2"
Depth, SRL-M
Milling of Asphalt Pavement Surface, 2" Depth, Milled
Material Retained by Department (Delivered to
Stockpile)
Unit
5 Price
Total
ESCALATOR CLAUSE:( if adopted by Municipality.)
LOCATION 1: The project includes milling, asphalt patching, sign replacement and other roadway improvements along Keystone Boulevard in Cass and Foster Township. The items of work are identified more specifically in the Project Specifications.
County:
0326-609065.00
3 SF
1 EA
232 SY
232 SY
SUBTOTAL
0931-0001 Post Mounted Signs, Type B
9000-0001 Sign Post Reflective Strips
ATTACHMENT 1
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )
Schuylkill Municipality: Highridge Improvement District Authoity (HIDA)
Project Number:
LOCATION OF WORK:
T H
IS
P
O R
T
IO
N T
O B
E C
O M
P L
E T
E D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
Keystone Blvd from the intersection with Highridge Park Rd to the Keystone Blvd East cul-de-sac (Tyson
Foods Inc. entrance).
ESCALATOR CLAUSE:( if adopted by Municipality.)
DESCRIPTION OF WORK:
LOCATION 2: The project includes milling, asphalt patching, sign replacement and other roadway improvements along Keystone Boulevard in Cass and Foster Township. The items of work are identified more specifically in the Project Specifications.
Item
1 No.
Unit
*Description
Unit
5 Price
Total
3B
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
SUBTOTAL FROM OTHER ATTACHMENTS
TOTAL AMOUNT OF BID
9491-0033
Milling of Asphalt Pavement Surface, 2" Depth, Milled
Material Retained by Department (Delivered to
Stockpile)
0413-0305
Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 3 to < 10 Million ESALS, 9.5 mm Mix, 2"
Depth, SRL-M
SPECIAL PROVISIONS TO CONTRACT
(ATTACHMENT 1A)
-4-
Attachment 1-A
SPECIFICATIONS AND SPECIAL PROVISIONS TO CONTRACT MS-944
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and Subcontractors must comply with all of the following provisions:
TRAFFIC CONTROL
- Traffic Control and Safety Devices to be provided by the Contractor. (Maintenance and Protection of Traffic to comply with current MUTCD, PennDOT Publication 212 and PennDOT Publication 213.)
- The Contractor may close roads were practical and must provide all road closed and detour signs as per Pub. 213. Road closures must be pre-approved by HIDA. Bus traffic must be accommodated if applicable.
GENERAL
- For further information regarding the project, please submit questions through PennBid by 12:00 P.M. on July 22, 2026.
- A pre-construction meeting will be mandatory and the Contractor’s and any Sub-Contractor’s onsite foreman must attend. The Contractor will schedule this meeting with HIDA at least 5 calendar day prior to the start of the project.
- Delivery tickets for all materials is required.
- CS-4171 Certificate of Compliance is required for all materials.
- No payments will be made until the bidder has supplied all required designs, delivery slips and certifications.
- The Contractor shall notify HIDA 5 calendar days prior to the start of the project.
- Work schedule must be coordinated with HIDA and must be completed by October 15, 2026.
- Work to be completed by October 15, 2026. After the established completion date, liquidated damages apply at the rate of $975.00 per calendar day.
- Roadway to be power broomed by the Contractor prior to start of project.
- Excess construction materials are to be removed by the Contractor.
- Municipality will inspect the project.
- Completion of NON-COLLUSION AFFIDAVIT required.
- Incidental preparation and clean up required. (Project Construction Materials)
- Contractor is responsible for defects that occur within one year of applications.
- Final Completion Certificate, “JMS-NCP Notice of Completion” is required at the completion of the project.
- Future award of Contracts will be based on quality of work as determined by HIDA.
- Bidders do not need to be PENNDOT prequalified.
- Contractor to supply proof of CDL Drug and Alcohol Compliance upon award of the bid.
- The successful bidder must provide a 100% Performance Bond and a 100% Payment Bond within 20 days of the award of the contract. Performance Bond must remain in effect for (1) year following completion of Construction. Contractor is responsible for defects that occur within one year of Notice of Completion or approval of final application for payment.
- HIDA intends to award the contract to one bidder; bidders need to bid on all items.
- HIDA reserves the right to accept or reject any and or all proposals or portions thereof, and to delete projects and/or portions of the project depending on budgetary constraints.
- A Fuel surcharge will not apply to this contract.
PENNSYLVANIA PREVAILING WAGES
PA Prevailing Wages apply to road work contracts in excess of one hundred thousand dollars ($100,000). If the contract bid price for this project is less than one hundred thousand dollars ($100,000), the attached minimum wage rates are void and will not be part of the contract.
-5-
Attachment 1-A
SPECIFICATIONS AND SPECIAL PROVISIONS TO CONTRACT MS-944
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
INSURANCE REQUIREMENTS
The awarded contractor shall purchase and maintain, at its expense, during the term of this contract and any renewals or extensions thereof, insurance issued by companies acceptable to the Municipality. See the INSURANCE REQUIREMENTS attachment.
PUBLIC WORK EMPLOYMENT VERIFICATION ACT
General. In accordance with Act 127 of 2012, known as the Public Works Employment Verification Act (“the Act”), effective January 1, 2013, 43 P.S. §§167.1-167.11, the Contractor shall use the Federal Government’s E-Verify system to ensure that all employees performing work on the project, including subcontractor’s employees, are authorized to work in the United States.
Verification Form. The Contractor shall verify the employment eligibility of each new employee hired after January 1, 2013 and submit the Commonwealth Public Works Employment Verification Form (“Form”) included in the bid package attachments to the Municipality.
Contractor. Mail the Form, signed by an authorized representative of the Contractor to the Municipality along with the Performance and Payment Bonds as specified by the contract documents. Failure or refusal to provide the Form will be considered a refusal to comply with bidding requirements, will result in rejection of the bid, and may subject the Contractor to the enforcement activities, sanctions and civil penalties specified in the Act.
Subcontractor. The Prime Contractor will obtain a Form signed by an authorized representative of any subcontractor performing work on the project, possessing sufficient knowledge to make the representations and certifications on the Form. The Prime Contractor shall submit the Form to the Municipality prior to requesting subcontractor approval and before the subcontractor performs any work. Failure or refusal to provide the Form will be considered a refusal to comply with subcontractor approval requirements, will result in rejection of the subcontractor request, and may subject the subcontractor to the enforcement activities, sanctions and civil penalties specified in the Act.
The Prime Contractor shall include information about the requirements of the Act in all subcontracts.
Department of General Services. The Department of General Services is the Commonwealth agency responsible for enforcement and administration of the Act. Please direct questions about the Act to:
Department of General Services Public Works Employment Verification Compliance Office Room 105 Tent Building 18th and Herr Streets Harrisburg, PA 17125 Fax: 717-214-3669
-6-
ASPHALT PAVING
The scope of the work is to sawcut, mill and place asphalt wearing course (2” depth) at proposed repair locations designated on the plans as indicated on Attachment 1.
These items are incidental to placement of paving unless otherwise noted.
- The Contractor is to remove excess material. Milled material is to be retained by HIDA.
- All open milled areas must be paved flush with the surface by the end of that working day.
- Complete all testing in accordance with PENNDOT Specifications Form 408 Section 413.
- The Contractor will tack coat the vertical edge of the paving joint as per PENNDOT Pub. 408, Section 460.
- The Contractor will provide a bill of lading and a signed CS-4171 for each type of material.
- Saw cut or Milled Paving Notch (RC-28M) is required and is incidental to paving.
- Tack Coat is required per Section 460 of PennDOT Specifications Form 408 and is incidental to paving.
- Milling of driveway notches is to be done as directed and in a fashion that maintains the shoulder slope and provides a smooth transition from the driveways to the shoulder.
- The Contractor will supply HIDA with Asphalt Mix Design which meets PennDOT Specifications Form 408 prior to receiving the Notice to Proceed.
- Asphalt Delivery tickets must contain the Job Mix Number (CAMMS No.) of the appropriate asphalt design.
- Asphalt Material Certifications must contain the Job Mix Number (CAMMS No.) from the appropriate asphalt design.
- The Contractor will place the specified type and depth of material (all depths are compacted in place) indicated in the Schedule of Prices. This material will conform to PENNDOT Pub. 408, Section 413 except Marshall Testing that is not required. The Contractor will provide delivery tickets and a daily asphalt material certification on a TR-465 or an approved CS-4171 form for each day's placement of asphalt material.
- Retain existing pavement cross slope unless otherwise noted.
ITEM NO. 0413-0305 SUPERPAVE ASPHALT MISTURE DESIGN, WEARING COURSE, PG 64S-22,
3 TO <10 MILLION ESALS, 9.5 MM MIX, 2” DEPTH, SRL-M
In accordance with Sections 0413 of PennDOT Publication 408 in its latest revision and as follows:
Description: The placement and compaction of asphalt wearing course.
Material:
• Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 3 to <10 Million ESALs, 9.5 mm Mix SRL-M Section 0413
Construction: All items of work necessary to install wearing course in accordance with Contract Details.
Unit of Measurement: SQUARE YARD (SY)
ITEM NO. 9491-0033 MILLING OF ASPHALT PAVEMENT SURFACE, 2” DEPTH, MILLED
MATERIAL RETAINED BY DEPARTMENT (DELIVERED TO STOCKPILE)
In accordance with Sections 0491 of PennDOT Publication 408 in its latest revision and as follows:
Description: Milling of existing pavement to a 2” average depth.
Construction: All items of work necessary to remove existing material.
Milling will be delivered to the salt shed driveway at the south end of the project.
Unit of Measurement: SQUARE YARD (SY)
-7-
ITEM NO. 0608-0001 MOBILIZATION
In accordance with Sections 0608 of PennDOT Publication 408 in its latest revision and as follows:
Description: This work includes obtaining the required permits, insurance bonds, and any other incidental items required for the start of work.
Construction: All items of work necessary to set up and begin work on the project.
Unit of Measurement: LUMP SUM (LS)
ITEM NO. 0901-1001 MAINTENANCE AND PROTECTION OF TRAFFIC
In accordance with Sections 0901 of PennDOT Publication 408 in its latest revision and as follows:
Description: Installation, furnishing, maintaining and relocation of traffic control devices.
Construction: All items of work necessary to install and maintain traffic control devices for the duration of the project.
Unit of Measurement: LUMP SUM (LS)
ITEM NO. 0931-0001 POST MOUNTED SIGNS, TYPE B
In accordance with Sections 0931 of PennDOT Publication 408 in its latest revision and as follows:
Description: The placement of post mounted signs.
Material:
• Post Mounted Signs, Type B Section 0931
Construction: All items of work necessary to install Post Mounted signs in accordance with the Contract Details. Item includes removal and disposal of old sign
Unit of Measurement: SQUARE FOOT (SF)
ITEM NO. 0935-0001 POST MOUNTED SIGNS, TYPE F
In accordance with Sections 0935 of PennDOT Publication 408 in its latest revision and as follows:
Description: The placement of post mounted signs.
Material:
• Post Mounted Signs, Type F Section 0935
Construction: All items of work necessary to install Post Mounted signs in accordance with the Contract Details.
Unit of Measurement: SQUARE FOOT (SF)
-8-
ITEM NO. 9000-0001 SIGN POST REFLECTIVE STRIPS
Description: The placement of sheeting reflective strips on existing sign posts or posts to be installed of the color of the sign above.
Material:
• Sign Post Reflective Strips
Construction: All items of work necessary to furnish and install reflective strips to existing or installed posts in accordance with the Contract Details.
Unit of Measurement: EACH (EA)
GENERAL DESCRIPTION OF WORK
LOCATION 1: Keystone Blvd from the intersection with Sunbury Rd (SR 901) to the Highridge Park Rd (SR 4007) intersection.
The contractor shall sawcut, mill and remove existing pavement material as indicated on plans and restore the roadway with Superpave Asphalt Mixture Wearing Course, PG 64S-22, 3 TO <10 Million ESALs, 9.5 mm Mix, 2” Depth. After patches have been restored, the contractor shall replace signs as indicated in the contract documents. Work shall include the following incidental items: sweeping of roadway; tack coating; milling of paving notches, drives, approaches, and curb reveals; placement of roll asphalt curb by hand or machine as directed; and sealing of joints and utilities. Contractor to properly dispose of milled/excavated material at the salt shed.
LOCATION 2: Keystone Blvd from the intersection with Highridge Park Rd (SR 4007) to the Keystone Blvd East cul-de-sac (Tyson Foods Inc. entrance).
The contractor shall sawcut, mill and remove existing pavement material as indicated on plans and restore the roadway with Superpave Asphalt Mixture Wearing Course, PG 64S-22, 3 TO <10 Million ESALs, 9.5 mm Mix, 2” Depth. After patches have been restored, the contractor shall and replace signs as indicated in the contract documents. Work shall include the following incidental items: sweeping of roadway; tack coating; milling of paving notches, drives, approaches, and curb reveals; placement of roll asphalt curb by hand or machine as directed; and sealing of joints and utilities.
Contractor to properly dispose of milled/excavated material at the salt shed.
* NOTE: The length of the work and quantity of material needed on these roadways may be reduced or increased depending on cost and budgetary constraints.
My signature signifies that I have read and understand the above conditions and special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
Contractor’s Representative Date HIDA’s Representative Date
Company Municipality
PROPOSAL AND CONTRACT INSTRUCTIONS
-9-
MS-944
PROPOSAL AND CONTRACT INSTRUCTIONS – FORM 944
1. The proposal must be typewritten or printed.
2. If more than one proposal on any project is submitted by any individual, firm or partnership, corporation or association under the same names, only one lowest proposal will be considered.
3. Description of work------
A. If additional space is needed, insert appropriately numbered attachment and note “Continued on Attachment No. __________________________.”
B. Where Wearing Surfaces are a part of this Contract, Average Daily Traffic (ADT) Count or SRL determination must be included in the description.
4. Part A of Page 1 to be completed by municipality. Part B of Page 1 to be completed by contractor. Schedule of
Prices – Column #1 (Item), #2 (Approximate Quantities), #3 (Unit, i.e., ton, square yard, linear feet, etc.) and #4 (Description, i.e., asphalt materials – 9.5 mm S & L, 12.5 mm Wearing, 25.0 mm Base Course, etc.) must be filled in by the municipality to insure equitable bidding. Column #5 (Unit Price), #6 (Total), and total amount of bid must be filled in by the contractor. If more space is needed, add note at bottom of the page: Continued on Attachment No. 1-A,” and add additional sheet designated as Attachment No. 1-A, 1-B, etc. Repeat for each additional sheet required.
5. If liquidated damages are to be assessed, add the following sentence to Part A #2. “If all work is not completed on time, liquidated damages will be assessed at the rate of $975.00 per additional working day.” (OR”…as set forth in the attached schedule.”)
6. Payment and Performance bonds are provided only by the successful bidder. Contracts under $5,000 – bonds must be in 50% of the contract amount. Contracts in excess of $5,000 – bonds must be in 100% of the contract amount. Bond Form MS-944 Attachments 2 and 3 and Workmen’s Compensation Affidavit Attachment 4 must be submitted by the successful bidder within 20 days of the contract award. Failure to submit the bonds shall constitute grounds to cancel the contract.
7. *Construction projects, where the estimated cost of the total project exceeds $25,000, are subject to the provisions of the Pennsylvania Prevailing Wage Act 442. It is the responsibility of the municipality to obtain the Prevailing Wage Scale for the area and include it in the proposal. IF the Prevailing Wage Act applies, this fact shall be noted in the advertisement.
On projects utilizing Federal revenue Sharing Funds, if the project cost exceeds $2,000 and is financed with 25% or more Federal Revenue Sharing Funds, the Davis Bacon Act applies. Again, it is the responsibility of the municipality to obtain the Davis Bacon Wage Rates, include them in the proposal and note the fact in the advertisement. If both Acts are applicable, the Davis Bacon Act has preference over the Pennsylvania Prevailing Wage Act.
8. An ESCALATOR CLAUSE is optional; however, if used, it must be included in the proposal prepared by the municipality. An escalator clause may not be inserted by the contractor.
*(1961, Aug. 15, P.L. 987; 43 P.S. 165)
PERFORMANCE BOND
-10-
MS-944 (02-01) PERFORMANCE BOND Attachment 2 (REPRODUCE LOCALLY) (With Corporate Surety)
KNOW ALL MEN BY THESE PRESENTS, that we, _______________________________________________
(NAME AND ADDRESS OF CONTRACTOR)
as Principal and ____________________________________________________________________________________
(SURETY COMPANY)
a corporation incorporated under the laws of the State of _____________________________________________as Surety
(NAME OF STATE)
are held and firmly bound unto ____________________________________________________ . In the full and just sum of _________________________________________________________ ($ _____________________________) dollars lawful money of the United States of America, to be paid to the above Municipality or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, the above bouden Principal has entered into a contract with the above Municipality, bearing even date herewith, for the undertaking of certain obligations as therein set forth.
NOW, THEREFORE, the condition of this obligations such that if the bounden Principal, as Contractor, shall in all respects comply with and faithfully perform the terms and conditions of said Contract, including the Specifications and conditions referred to and made a part thereof, and such alterations as may be made in said Specifications as therein provided, and corrections of all defects that occur within (1) year following the completion of construction, and shall well and truly, and in a manner satisfactory to the Municipality fulfill all obligations as therein set forth, then this Obligation shall be void, (1) year after completion of construction, but otherwise the same shall be and remain in full force, virtue and effect.
It is further provided that any alteration which may be made in the terms of the contract or its specifications with the express approval of the Municipality or the Principal to the other, shall not in any way release the Principal and Surety or either or any of them, their heirs, executors, administrators, successors or assigns from their liability hereunder, notice to the Surety of any such alteration or forbearance being hereby waived.
IN WITNESS WHEREOF, the said Principal and Surety have duly executed this Bond under Seal, pursuant to due and legal action authorizing the same to be done on ____________________________________________________
(DATE OF BOND)
SEAL Attest / Witness CONTRACTOR
_____________________________________ BY:___________________________________________________
TITLE TITLE
SEAL Attest / Witness ___________________________________________________
SURETY COMPANY
____________________________________ BY:____________________________________________________
TITLE TITLE
PAYMENT BOND
-11-
MS-944 PAYMENT BOND Attachment 3
KNOW ALL MEN BY THESE PRESENTS, that we, _______________________________________________ of _____________________________________, as PRINCIPAL and ________________________________________ corporation incorporated under the laws of the State of _______________________________________as SURETY, are held and firmly bond unto the ___________________________________________________, in the full and just sum of
____________________________________________ ($ _____________________) dollars, lawful money of the United
States of America, to be paid to the said __________________ or its assigns, to which payment well and true to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the above bounden Principal has entered into a contract with the above municipality, hereinafter called Obligee, bearing even date herewith, for the improvement of a certain section of highway or bridge in said Municipality consisting of: ___________________________________________________________________________ for approximately the sum of ____________________________________________ ($ _________________) dollars.
NOW, THEREFORE, the condition of this obligation is such that if the above bounden PRINCIPAL shall and will promptly pay or cause to be paid in full all sums of money which may be due to contract or otherwise, to any individual, firm, partnership, association or corporation, for all material furnished or labor supplied or performed in the prosecution of the work, whether or not the said material or labor entered into and became component parts of the work and for rental of the equipment used and services rendered by public utilities in, or in connection with the prosecution of such work, then this obligation to be void, otherwise to remain in full force and effect.
The PRINCIPAL and SURETY, hereby, jointly and severally, agree with the Obligee herein that any individual firm, partnership, association or corporation, which has performed labor or furnished material in the prosecution of the work as provided, and any public utility which has not been paid in full therefore, may sue in assumpsit’s on this Payment bond in his, them or it, and have execution thereon. Provided, however, that the Obligee shall not be liable for the payment of any costs of expenses of such suit.
RECOVERY by any individual, firm, partnership, association or corporation hereunder shall be subject to the provisions of the “Public Works Contractors’ Bond Law of 1967”, Act No. 385, approved December 20, 1967, P.L. 869, which Act shall be incorporated herein and made a part hereof, as fully and completely as though its provisions were fully and at length herein recited.
It is further provided that any alterations which may be made in the terms of the contract or in the work to be done or materials to be furnished or labor to be supplied or performed under it or the giving by the Obligee of any extension or forbearance being hereby waived.
IN WITNESS WHEREOF, the said PRINCIPAL and SURETY have duly executed this Bond under seal this _______________________________________Day of _________________________________, 20 ___________.
WITNESS:
CONTRACTOR
_____________________________________________________ BY:_______________________________________________
TITLE TITLE
WITNESS:
SURETY COMPANY
______________________________________ BY: ______________________________________________
TITLE TITLE
AFFIDAVIT ACCEPTING PROVISIONS OF THE
WORKMEN’S COMP. ACT
-12-
MS-944 Attachment 4
AFFIDAVIT RE
ACCEPTING PROVISIONS OF THE WORKMEN’S COMPENSATION ACT
State of )
)SS:
County of ) he has Being duly sworn according to law deposes and says that they have it accepted the provisions of the Workmen’s Compensation Act of 1915 of the Commonwealth of Pennsylvania, with its supplements and amendments, and have insured their liability hereunder in it accordance with the terms of said
Act with _________________________________________________________________________________________
(SURETY COMPANY)
(TYPE OR PRINT) CONTRACTOR
BY: ______________________________________
SIGNATURE
Sworn to and subscribed before me this ________________________________________________________ day of
_______________________________________A.D. 20 ____________
My Commission Expires ___________________________
(DATE)
ANTI-COLLUSION AFFIDAVIT
-13-
MS-NCP
D-7126 ( 6-99 )
ANTI-COLLUSION AFFIDAVIT
County Schuylkill
Municipality HIDA
Project Number 0326-609065.00
State of Pennsylvania Fed. Project No.
( If Applicable ) County of Schuylkill
The undersigned deponent deposes and says that he is the of the Company; that he is authorized to make this affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, Publication 408, as amended and that the said company has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
(Contractor)
BY
Sworn to and subscribed before me the undersigned notary public this day of , .
Notary Public
My Commission expires
NOTICE OF COMPLETION
-14-
MUNICIPALITY Highridge Improvement District Authority (HIDA)
NOTICE OF COMPLETION
IN REFERENCE TO PROJECT NO.: 0326-609065.00
Name of Contractor:
Performance of work as specified on the above numbered contract is completed and final pavement inspection has been made by the contractor and HIDA in accordance with the terms of the contract awarded.
DATE OF AWARD:
Signature of HIDA
Signature of Contractor
Both copies of this form to be filled by the Contractor-Municipality on completion of final pavement restoration.
THIS PORTION TO BE COMPLETED BY MUNICIPALITY
FINAL COMPLETION CERTIFICATE
By the affixing of my signature I hereby certify that final inspection has been made and all work has been performed in accordance with the above contract # and is hereby accepted by the municipality as completed.
Authorized Agent for HIDA
*DATE: _______________
* The Bidder is responsible for maintenance of permanent pavement repairs for a period of one year from this date.
INSURANCE REQUIREMENTS
400 One Norwegian Plaza Pottsville, PA 17901 www.benesch.com
P 570-622-4055
Highridge Improvement District Authority (HIDA) 2026 Keystone Boulevard Road Program Schuylkill County, Pennsylvania
Project No. 0326-609065.00
INSURANCE REQUIREMENTS
The awarded Contractor shall purchase and maintain, at its expense, during the term of this contract and any renewals or extensions thereof, the following types of insurance issued by companies acceptable to the HIDA.
1. Workmen’s compensation insurance sufficient to cover all of the employees of the contractor working to perform this contract as required by the laws of the Commonwealth.
2. Comprehensive general liability insurance, property damage insurance, and where appropriate automobile liability insurance. The minimum amount of coverage shall be $250,000.00 per person and $1,000,000.00 per occurrence for bodily injury, including death and $250,000.00 per person and $1,000,000.00 per occurrence for property damage.
These coverages shall be occurrence-based. The policy shall name the HIDA and Alfred Benesch & Company as an additional insured and shall contain a provision that the coverages afforded thereunder shall not be cancelled or changed unless at least thirty (30) days prior written notice has been given to the HIDA.
Prior to the commencement of work, the Contractor shall provide the HIDA with a current certificate(s) of insurance showing the required coverages and provisions.
3. Your attention is directed to the hold harmless and indemnification provision:
“The Contractor shall hold the HIDA harmless and indemnify the HIDA against any and all claims, demands, and actions based upon or arising out of any activities performed by the Contractor and its employees and agents under this Contract and shall, at the request of the HIDA, defend any and all actions brought against the HIDA based upon any such claims or demands.”
OTHER EXHIBITS
BID BOND
EJCDC C-435 Bid Bond (Damages Form) Prepared by the Engineers Joint Contract Documents Committee.
Any singular reference to Bidder, Surety, Owner, or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name and Include Location):
BOND
Bond Number:
Date (Not earlier than Bid due date):
Penal sum $ (Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Attest: Attest:
Signature Signature
Note: Above addresses are to be used for giving any required notice. Provide execution by any additional parties, such as joint venturers, if necessary.
EJCDC C-435 Bid Bond (Damages Form) Prepared by the Engineers Joint Contract Documents Committee.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder any difference between the total amount of Bidder’s Bid and the total amount of the Bid of the next lowest, responsible Bidder who submitted a responsive Bid as determined by Owner for the work required by the Contract Documents, provided that:
1.1 If there is no such next Bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and
1.2 In no event shall Bidder’s and Surety’s obligation hereunder exceed the penal sum set forth on the face of this Bond.
1.3 Recovery under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length.
If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
AGREEMENT OF SURETY
AS-1
(Note: This Agreement must be properly executed and must accompany the certified check or bid bond, whichever is furnished as proposal security).
KNOW ALL MEN BY THESE PRESENTS, that we , as Surety, a corporation existing under the laws of the State of _________________________________________________ and authorized to transact business in the Commonwealth of Pennsylvania, hereby agree to execute within the time limit specified in the Contract, the Bonds, in the forms and in the amounts required for to faithful performance and proper fulfillment of the Contract for the ________________________________________________________ on behalf of hereinafter called the Bidder, provided that the above Contract be awarded to the Bidder within sixty
(60) days after the date of receipt of Bids; and the Surety further agrees that should the Surety, after notification of such award, omit or refuse to execute the required bonds, then the Surety shall pay to ______________________________________________________, any difference between the total amount specified in said Bidder's proposal for the required work and the amount for which said Owner may procure the same work, if the latter amount be in excess of the former, and after deduction therefrom of payment made by reason of the forfeiture of the Proposal Security.
DATE CORPORATE SURETY
CORPORATE SEAL
BY
TITLE
BUSINESS ADDRESS
CERTIFICATE OF COMPLIANCE (CS-4171)
,.�!�%$(0�������!(����".�"�%���"��� !(��(�����"!�$�(����0�'�!�����!(���!(1.!��1"�%�!(����!�%�01$��"!$�*'���"��� !(��(����2��!������ ��3���
4�!(1.!��1"�������45!�"$�!���������4��!���������46"��!%���������46"��1��� �7�
8� !(��� ���!"����$%����!��9����"�$.$�%�� !��� ���!��"$!��%*��(��$(��/�����%�� ��"�:1$"���(�%��.
;<=>?@AB?CDEFGH'�����$�(�%*
IIJKLMNEIJLON�5���"!���"��� �"���%$0(!�$�(
P� � ���!��"$!���$%��������#�$%���$(0�% $�������������!(���!��*
/� E
Q� 4RKSRTEKSUSEVWEXMYUE;UMZYRLERM[LIV[JEVUM[EMUEJLSS\]�,���"�$.��� ���!��"$!��$��(�$.$���!��9����(.�"�%��������$�(%��̂Q�̂� !(���̂Q��̂�!*��.�61��$�!�$�(�P̂_�
RKSRTEM[SEMWELKSEL̀ MEaMbSJc
46"��1���$%��̂ d̂����%����� 46"��1�����(�!$(%��$($�!��.�"�$0(�%�����$(�!���"�!(���#$� �)���8�!(��71��)��"$�!� IBBA@eEWCfgERJhFijiJEk?BeEfl@l?mBnECfE?DoC?@ln]
RKSRTELKSEaMbELKILEI;;\VSJELMEXMYUE;UMZYRLcE
4p,��(�$.$!���������q����������"��1��%�� !����(�!$(���"�!(�(���!"3$(0%�� !��$��(�$.��� !��� ���!��"$!��#!%��������!(���!(1.!��1"���$(�� � �($������!��%��MD>rEWCfgERJhFijiE?nEfls<?flt]
4������6"��1��%�!(��6"��1��%���(�!$($(0�������#$� �,(�6�!(��,(%����$�(����� ��u��!"���(���"�!�u��!"���(�� ��"�%�(�!�$9���
WCfEiGGvEYJEnBll>EmfCt<@BnEkelflE?Dhm>ADBE?Dnml@B?CDEeAnEolf?w?ltEBeABEBelEnBll>EkAnEgl>BltEADtEgAD<wA@B<fltE?DEBel
YD?BltEJBABlnNECD>rEWCfgERJhFijiE?nEfls<?flt]EWCfEmfCt<@BnEkelflE?Dhm>ADBE?Dnml@B?CDEeAnEolf?w?ltEg?D?gA>EwCfl?xDEnBll>E?D
A@@CftAD@lEk?BeEI@BEyEADtEa<rEIglf?@ANEABBA@eE=?>>nECwE>At?DxECfEne?mm?DxEtC@<glDBnEwCfEwCfl?xDEnBll>NEADtEABBA@eEWCfg
RJhFijiJEk?BeEn<mmCfB?DxEtC@<glDBAB?CD]
4p�($��(�$.$��������q�z��������"��1��%�� !�����(��������� ����.$($�$�(��.�pp,��(�$.$!���������q�!(�����(���"���$9��$(���!(��$(%����$�(�!% ��.$(���!��9���WCfEiGGvEYJEnBll>EmfCt<@BnNEABBA@eEn<mmCfB?DxEtC@<glDBAB?CDE?D@><t?DxE?DoC?@lnNE=?>>nECwE>At?DxEADtEg?>>EBlnB flmCfBnEBeABEmCn?B?ol>rE?tlDB?wrEBeABEBelEnBll>EkAnEgl>BltEADtEgAD<wA@B<fltE?DEBelEYD?BltEJBABln]EWCfEmfCt<@BnE@CDBA?D?Dx g?D?gA>EwCfl?xDEnBll>E?DEA@@CftAD@lEk?BeEI@BEyEADtEa<rEIglf?@ANEABBA@eE=?>>nECwE>At?DxECfEne?mm?DxEtC@<glDBnEwCfEwCfl?xD nBll>NEADtEABBA@eEWCfgERJhFijiJEk?BeEn<mmCfB?DxEtC@<glDBAB?CD]
{� |S[ZMUER\IJJVWVRILVM[E}RKSRTEM[SEa\MRTEM[\X~Eh
4�i OAD<wA@B<flfNEEWA=f?@ABCfNEERCABlfNEE;fl@AnBlf 4�� Z?nBf?=<BCfNEEJ<mm>?lfEECfEE�;f?oABlE\A=l>ERCgmADr�
\?nBltE?DEa<>>lB?DE�i�NECfE;fCt<@lfE\?nBltE?D [CBE\?nBltE?DEa<>>lB?DE�i�]Ea<>>lB?DE�i�ECfEIxlDBE>?nBltE?DE a<>>lB?DE�iFNEFiECfEF� a<>>lB?DE�iF]EI>nCNE@Cgm>lBlE>?DlEiGE
�_� 7��%$0($(0�� $%����1��(�'���1�!"����"�$.�$(0�� !��� $%��"��1�������%�� ��71$���)��"$�!'�71��)��"$�!�)���"�:1$"���(�%�!(����(.�"�%���
����$�(��̂Q�����.�61��$�!�$�(�P̂_�
� [IOSE}mf?DB~EcE¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡EELVL\Sc¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡
RMO;I[XE[IOSEcE¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡EJKV;OS[L¢RSULVWVRILVM[EZILSc¡¡¡¡¡¡¡¡¡¡¡¡¡¡
JV£[ILYUSEcE¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡EEZILSc¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡
�̂� �$%������!(��� !��%������1�� ���!��"$!��%*����1��(����!��9�
����������$.���1�� ��3���7���3���+��(��$(����{'��� �"#$%����!9����!(3�*
������������!����.��!(1.!��1"�"'�5!�"$�!��"'���!��"'�6"��!%��"��"�6"��1��"* ��1���$�"�����*��1%���!�� ��2!�����!%�$(���)����
¤¥¦§̈ ©̈ ª«¬¦¬®
RSULVWVRILSEMWERMO;\VI[RS
¯̄ °̄±²°³́µ¶±·̧ ¹̧́º
7��
\MLE[M] KSILE[M] »YI[LVLX Y[VLEMWE
OSIJYUS I;;UM|SZEOILSUVI\EIJE\VJLSZEV[E;S[[ZMLEaY\\SLV[
¼ ¼ ¼ ¼
¼
¼ ¼ ¼ ¼
¼
¼ ¼ ¼ ¼
¼
¼ ¼ ¼ ¼
¼
¼ ¼ ¼ ¼
¼
¼ ¼ ¼ ¼
¼
�! �����,&�-�.��&��/�.�/0&�/�(�1
23456789:;89<34=8>:96?@43AB:64?9C;8389:;89AB:836BD96E9F86?G9E;6<<87H9I@96?@43AB:64?96E9J?K?4C?L98?:839MNOH
%! �P(/�� �(P�� P����/�&� P)���P���&���P�/�&�#�/�P��/�����#��Q��/�
RS;8>K9B<<34<36B:89F4TU9AB?J@B>:J387L9@BF36>B:87L9>4B:87L9<38>BE:879439<347J>879BE9B<<34<36B:8H9I@9B9E6?GD89>4A<B?V
<83@43AE9A4389:;B?94?894<83B:64?9W8HGHL9B9>4A<B?V9AB?J@B>:J38E9B?79>4B:E9GJ6783B6DXL9A4389:;B?94?89F4T9ABV9F89>;8>K87H
RODE4L9<3456789:;89?BA89B?79:;89EJ<<D6839>47894@9:;89AB?J@B>:J383L9@BF36>B:43L9>4B:839439<38>BE:8394@9:;89AB:836BD9D6E:8796?
YJDD8:6?9Z[\9439:;89?BA89B?79:;89EJ<<D6839>47894@9:;892347J>8394@9AB:836BD9D6E:8796?9YJDD8:6?9Z9[]L9][9439]̂H
+! (//����#/�� ��P������/_���/(/���
6̀E:9:;89E<8>6@6>B:64?9J?7839C;6>;9:;89<347J>:96E9B<<34587H
�! �a�##/Q���
6̀E:9:;89?BA894@9:;89>4A<B?V9:49C;6>;9:;89AB:836BD96E9F86?G9E;6<<87H
b! -�����()/�&�a/P����()/�&�_�P����,&������� �(/P���/&�Q/����#������ �(P�/��P-
6̀E:9:;89J?6cJ89̀4:9MJAF839B?79d8B:9MJAF839@439:;89<347J>:L9:;89cJB?:6:V9WC6:;9J?6:94@9A8BEJ38X9F86?G9E;6<<879:49:;8
:9439?8T:978E:6?B:64?L9B?79B978E>36…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .