This is a Project Manual for a state and local contract opportunity issued by the Horsham Water & Sewer Authority in Montgomery County, Pennsylvania for Well 40A Hydrogeologic Study and Well Construction (Contract No. 26-7). The project involves drilling one 12-inch diameter test well and performing a 72-hour aquifer pumping test. The bid documents include 15 line items covering mobilization and demobilization, temporary water treatment systems, well drilling at various depths and diameters, well development, pump testing setup and operation, well disinfection, and sanitary sealing. Sealed bids are due by October 13, 2026 at 10:00 A.M. prevailing time via the PennBid online system. No pre-bid meeting will be held; contractors may request a site visit by contacting Gilmore & Associates, Inc., the consulting engineer. Questions must be submitted by October 6, 2026 at 5:00 P.M. The project is subject to Pennsylvania's Prevailing Wage Act (Act 422), and the contract is awarded to the lowest responsible and responsive bidder. The work must be substantially completed within 120 calendar days and fully completed within 150 calendar days from the contract commencement date, with substantial completion defined as the well drilled and the 72-hour pump test completed.
The contract is structured as a unit price agreement with estimated quantities provided for comparison purposes only; final payment will be based on actual quantities determined by the engineer. Bid security of 10 percent of the maximum bid price is required in the form of a certified check, bank money order, or bid bond. Performance and payment bonds equal to 100 percent of the contract amount and a maintenance bond for 10 percent of the contract price are required. Progress payments will be made at 90 percent of work completed (95 percent after 50 percent completion if progress is satisfactory), with retainage of the remaining balance. Liquidated damages are set at $500 per day for delays in achieving substantial completion and $500 per day for delays in final completion. The Owner is exempt from Pennsylvania sales and use taxes, and contractor-provided tax exemption certificates will be honored. The Bid Form includes 15 line items with unit prices to be submitted electronically through PennBid, and the three apparent low bidders must submit original hard copies of required documents (bid bond, bidder acknowledgment form, bidder qualification statement, non-collusion affidavit, surety agreement, and public works employment verification form) within three business days following bid opening.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HORSHAM WATER & SEWER AUTHORITY
MONTGOMERY COUNTY, PENNSYLVANIA
PROJECT MANUAL
FOR
CONTRACT NO. 26-7
WELL 40A HYDROGEOLOGIC STUDY
WELL CONSTRUCTION
Prepared For:
Horsham Water & Sewer Authority 617 Horsham Road
Horsham, PA 19044
SEPTEMBER 2026
FILE NO. 24-00204-01
Prepared By:
Gilmore & Associates, Inc.
Engineers Land Surveyors Planners GIS Consultants 65 E. Butler Avenue, Suite 100
New Britain, PA 18901 215-345-4330
TABLE OF CONTENTS
00 01 10-1
HORSHAM WATER & SEWER AUTHORITY
CONTRACT 26-7
WELL 40A HYDROGEOLOGIC STUDY
& WELL CONSTRUCTION
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
Division 00 – Procurement and Contracting Requirements
Procurement Requirements 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 21 13.1 Supplemental Instructions for Submitting Electronic Bids 00 41 00 Bid Form 00 43 13 Bid Bond 00 45 10 Bidder’s Acknowledgment Form 00 45 13 Bidder Qualification Statement 00 45 19 Non-Collusion Affidavit 00 45 53 Agreement of Surety Company
Contracting Requirements 00 52 00 Agreement 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 61 19 Maintenance Bond 00 62 16 Certificate of Insurance 00 65 19.13 Contractor’s Affidavit 00 65 19.16 Contractor’s Release of Liens 00 65 19.19 Consent of Surety to Final Payment 00 72 00 General Conditions 00 73 00 Supplementary Conditions Appendix A: Prevailing Minimum Wage Appendix B: Public Works Employment Verification Form Appendix C: Well Drill Logs – April 2023 (Raab Drilling) Appendix D: USGS Location Map Appendix E: Site Location Map
00 91 13 Addenda
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
Division 01 – General Requirements 01 11 13 Summary of Work 01 22 00 Measurement and Payment 01 29 00 Contract Considerations 01 31 00 Coordination and Meetings 01 32 36 Audio-videotaping 01 33 00 Submittals 01 40 00 Quality Control 01 42 13 Organization and Reference Acronyms 01 50 00 Construction Facilities & Temporary Controls
00 01 10-2
01 56 39 Landscape Protection 01 60 00 Materials and Equipment 01 70 00 Contract Closeout
FACILITY CONSTRUCTION SUBGROUP
Divisions 02 to 12 Not Used
Division 13 – Special Construction 13 34 19 Metal Building Systems
Divisions 14 to 19 Not Used
FACILITY SERVICES SUBGROUP
Divisions 20-26 Not Used
Division 27 – Communications Not Used
Divisions 28 to 29 Not Used
SITE AND INFRASTRUCTURE SUBGROUP
Division 30 Not Used
Division 31 – Earthwork Not Used
Division 32 – Exterior Improvements 32 92 00 Finish Grading, Seeding and Sodding
Division 33 – Utilities Not Used
Divisions 34 to 39 Not Used
PROCESS EQUIPMENT SUBGROUP – Not Used
ADVERTISEMENT FOR BIDS
00 11 13-1
DOCUMENT 00 11 13
ADVERTISEMENT FOR BIDS
Sealed bids will be received by the Horsham Water and Sewer Authority online at PennBid™ - www.PennBid.net until 10:00 A.M., prevailing time on Tuesday, October 13, 2026, at which time the bids shall be opened for:
WELL 40A HYDROGEOLOGIC STUDY AND WELL CONSTRUCTION
The work to be done under this contract consists of all labor, equipment and materials to Drill one 12-inch diameter test well and perform 72-hour pumping test as described elsewhere in the Project Manual.
Owner reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contracts, and to waive any informality in the bids. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids.
All Bid Documents and solicitation details are available online via PennBid™ Program – https://pennbid.bonfire.com. Click on the “Open Public Opportunities” tabs then “View Opportunity” button for the project. Only bids submitted online at PennBid™ -https://pennbid.bonfire.com by the date and time above will be considered and opened.
The Horsham Water and Sewer Authority reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, to waive any informality in the bids or to make an award to such Bidder who, in the judgement of the Authority makes the most advantageous bid. No Bidder may withdraw their bid within sixty (60) days after the date set for the opening of the bids.
The project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act, as amended, and prevailing minimum wage rates issued by the PA Department of Labor and Industry.
The following professional consultant is responsible to the Authority for the project: Gilmore & Associates, Inc., 65 East Butler Avenue, Suite 100, New Britain, PA 18901.
There will be no pre-bid meeting for this project. Contractors are to contact Gilmore & Associates if a site visit is requested.
All bids must be submitted in accordance with the Instructions to Bidders.
By Order of:
Authority Agent: Tina M. O’Rourke, Horsham Water and Sewer Authority
Business Manager Date: September 25, 2026
INSTRUCTIONS TO BIDDERS
00 21 13-1
DOCUMENT 00 21 13
Page
Article 1 - Defined Terms 3
Article 2 - Copies of Bidding Documents 3
Article 3 - Qualifications of Bidders 3
Article 4 - Examination of Bidding Documents, Other Related Data, and Site 3
Article 5 - Pre-Bid Meeting 5
Article 6 - Site and Other Areas 5
Article 7 - Interpretations and Addenda 5
Article 8 - Bid Security 6
Article 9 - Contract Time 6
Article 10 - Liquidated Damages 6
Article 11 - Substitute and "Or-Equal" Items 6
Article 12 - Subcontractors, Suppliers, and Others 6
Article 13 - Preparation of Bid 7
Article 14 - Basis of Bid; Evaluation of Bids 7
Article 15 - Submittal of Bid 7
Article 16 - Modification and Withdrawal of Bid 7
Article 17 - Opening of Bids 8
Article 18 - Bids to Remain Subject to Acceptance 8
Article 19 - Evaluation of Bids and Award of Contract 8
Article 20 - Contract Security and Insurance 9
Article 21 - Signing of Agreement 9
Article 22 - Sales and Use Taxes 9
Article 23 - Retainage 9
00 21 13-2
Page
Article 24 - Contracts to be Assigned 9
Article 25 - Blasting & Pre-Blasting Survey 9
Article 26 - Permits 9
Article 27 - Rock Removal 9
Article 28 - Government Requirements 9
Article 29 - Sequence of Construction 10
Article 30 - Information Concerning Owner and Engineer 10
00 21 13-3
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings below:
A. Bidder: The individual or entity who submits a Bid directly to Owner.
B. Issuing Office: The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
C. Successful Bidder: The lowest responsible Bidder submitting a responsive Bid to whom Owner
(on the basis of Owner’s evaluation as hereinafter provided) makes an award.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents are available online at no cost at PennBid
(www.PennBid.net).
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder's qualifications to perform the Work, Bidder must submit with his Bid a completed Bidder Qualification Statement. In lieu of the Bidder Qualification Statement, Bidder may submit with his Bid, a completed Construction Contractor's Qualification Statement for Engineered Construction developed by The Associated General Contractors of America (AGC Document No. 220).
3.02 If additional information is necessary to demonstrate qualifications to perform the Work, within five (5) days of Owner's request, Bidder shall submit written evidence such as financial data, previous experience, present commitments and such other data as may be reasonably requested.
3.03 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports known to Owner of explorations and tests of subsurface conditions at or contiguous to the Site.
2. Those drawings known to Owner of physical conditions relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities).
00 21 13-4
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing
Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify any reports and drawings known to Owner relating to a
Hazardous Environmental Condition identified at the Site.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated surface or physical conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 A. Reference is made to Paragraph 1.18 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of contract documents (other than portions thereof related to price) for such other work.
B. Paragraph 6.13.C of the General Conditions indicates that if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and the other related data identified in the
Bidding Documents;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in Paragraph 1.06 of the Supplementary Conditions as containing reliable “technical data”, and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been
00 21 13-5 identified in Paragraph 1.08 of the Supplementary Conditions as containing reliable “technical data”;
E. consider the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site;
the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies hat
Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
J. attend and participate in any mandatory pre-bid conference.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID MEETING
5.01 There will be no pre-bid meeting for this project. Contractors are to contact Gilmore & Associates if a site visit is requested.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
00 21 13-6
7.01 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer by clicking on the Questions tab within PennBid. Interpretations or clarifications considered necessary by Engineer in response to such questions will be by Addenda and posted within the PennBid Documents. Notifications of Addenda will be emailed to all parties recorded by Engineer as having downloaded the Bidding Documents. Questions received after the posted cut-off date of
Tuesday, October 6, 2026, at 5:00pm may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent
(10%) of Bidder’s maximum Bid price and in the form of a certified check, bank money order or a Bid Bond (on the form in Project Manual or equivalent) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Agreement, furnished the required contract security and insurance certificate(s) and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security and insurance certificate(s) within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement, after all bids are rejected by Owner or after the date the bid acceptance period has expired, whichever occurs first, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 - CONTRACT TIME
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall
00 21 13-7 within five days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
ARTICLE 13 - PREPARATION OF BID
13.01 A separate document entitled Supplemental Instructions for Submitting Electronic Bids contains a full description of what documents are to be submitted electronically along with instructions on how to submit sealed bids.
ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the electronic Bid schedule including any incidental Bid items.
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
14.02 Bid prices shall include all taxes of whatever nature applicable to the Work or Bidder's performance thereof.
ARTICLE 15 - SUBMITTAL OF BID
15.01 Bids are to be submitted electronically via the PennBid Program. The document entitled Supplemental Instructions for Submitting Electronic Bids is included as part of this solicitation and provides instructions on what information needs to be submitted along with how to submit.
15.02 A Bid shall be submitted via PennBid no later than the date and time prescribed in the advertisement or invitation to bid.
15.03 The Bidder is solely responsible for submitting his Bid by the time indicated in the advertisement or invitation to bid.
00 21 13-8
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn any time prior to the bid closing date and time by clicking on the “Withdraw
Bid” button within PennBid.
16.02 Bids may be withdrawn within two (2) business days after the opening of Bids only by the withdrawing Bidder's strict compliance with 73 P.S. §1602 and any subsequent amendments.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
Thirty (30) day extensions of the date for the award may be made by the mutual consent of Owner and the lowest responsible and responsive Bidder.
ARTICLE 19 - EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including, without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder due to noncompliance with Bid Specifications and/or prior work history of the Bidder. The successful Bidder shall be required to enter into a written Contract in form to be approved by the Owner.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work in accordance with the Contract Documents. Any Bidders who have defaulted on a public Contract within five years of the date of the issuance of this Bid document may be eliminated from consideration within the sole discretion of the Owner.
19.06 If the Contract is to be awarded, Owner will award the Contract to the lowest responsible and responsive Bidder whose Bid is in the best interests of the Project.
00 21 13-9
19.07 In the event that, after bids are opened, there are two or more bidders who submit bids (by unit price or total bid price, as such low bid is to be determined under the bid specifications) which are identical, such that the Owner cannot determine the low bidder solely by evaluation of the bid price, then, in that event, Owner reserves the right to determine the low bidder by either of the following methods, in the sole discretion of Owner: 1.) Owner may elect to evaluate the qualifications of the bidders who submitted identical bids, in order to determine the best qualified bidder, taking into account the number, scope, and cost of projects performed by each bidder (as disclosed in the bid submissions) over the past three (3) calendar years, including any jobs previously performed for the Owner; or 2.) Owner may elect to draw lots among the bidders who submitted identical bids, with the manner of determination (coin-flip, drawing of names, etc.) to be determined solely in the discretion of the Owner. In the event that Owner must resort to determining the low bidder under the terms of this paragraph, Owner shall notify the tie bidders of the nature of criteria to be used to determine the low bidder, and, in the event that Owner shall draw lots to determine the low bidder, the date, time and place where such drawing of lots shall occur.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth
Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by such Bonds and required insurance certificate(s).
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement to Owner with the required Bonds and insurance certificate(s). Owner shall deliver one fully signed counterpart to Successful Bidder within sixty (60) days of the date of the Notice of Award.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner is exempt from Pennsylvania state sales and use taxes on certain materials and equipment to be incorporated in the Work. Contractor will be provided with a copy of Owner's tax-exempt certificate. Said taxes shall not be included in the Bid. Refer to Paragraph 1.16 of the Supplementary Conditions for additional information.
ARTICLE 23 - RETAINAGE
23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24 - CONTRACTS TO BE ASSIGNED
24.01 Not used.
ARTICLE 25 - BLASTING AND PRE-BLASTING SURVEY
25.01 No blasting is permitted for the execution of this contract.
ARTICLE 26 - PERMITS
26.01 Paragraph 1.25 of the Supplementary Conditions presents the respective obligations of Owner and Contractor, with regard to the obtaining of permits and/or approvals from governmental
00 21 13-10 agencies relative to the proposed Work.
ARTICLE 27 - ROCK REMOVAL
27.01 The Total Bid Price is to include rock removal required to accomplish construction of the proposed Work.
ARTICLE 28 - GOVERNMENT REQUIREMENTS
28.01 Bids shall be submitted on the basis of full and total compliance with all Federal and State laws, regulations, statutes and requirements pertaining to the Work. Bidder shall refer to Paragraph
6.09 of the General Conditions.
ARTICLE 29 - SEQUENCE OF CONSTRUCTION
29.01 Section 01 11 13 Summary of Work notes the sequence of construction and timing relative to
“WELL 40A HYDROGEOLOGIC STUDY & WELL CONSTRUCTION - CONTRACT NO. 26-7.”
ARTICLE 30 - INFORMATION CONCERNING OWNER AND ENGINEER
31.01 Owner:
Horsham Water and Sewer Authority 617 Horsham Road Horsham, PA 19044 Telephone: (215) 672-8011 Fax: (215) 672-8065 Attention: Tina M. O’Rourke, Business Manager
31.02 Engineer:
Gilmore and Associates, Inc.
65 E. Butler Avenue, Suite 100 New Britain, PA 18901-5106 Telephone: (215) 345-4330 Fax: (215) 345-8606 Attention: Thomas J. Figaniak, P.E.
END OF DOCUMENT
SUPPLEMENTAL INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS
00 21 13.1-1
DOCUMENT 00 21 13.1
Using the PennBid™ electronic bid management system to respond to this solicitation:
Gilmore & Associates, Inc. is utilizing the PennBid™ electronic procurement program for its solicitations, bid requests, RFPs, and RFQs. Bid documents are available online, all Q&A’s are via email, and sealed bids can be submitted and updated online. Interested bidders need to register only once, a free process that takes only a few minutes. Once registered, bidders have access to all our publically available bids and solicitations. Bidders can obtain all project documents and submit and update their confidential bids online.
Sealed Bid Confidentiality – At no time before Bid Opening can anyone see your electronic bid.
Confidentiality of Identity – When questions are asked and answered, bidder identity is not disclosed to other bidders.
Documents – All documents may be downloaded directly to your computer. Documents can be electronically sent to your suppliers and sub contractors.
Being added to the “Bidders List” – By downloading any document, you are automatically added to the list of bidders for this solicitation.
Questions – By clicking on the “Questions” tab, you can see all questions that have been asked and answered related to this solicitation. You can also ask questions directly through this tab. Both questions and answers are emailed directly to all bidders.
Submitting and Updating Bids – You may submit and update your bid anytime up to the bid due date and time by clicking on the “Bid” tab. You need only to provide the per unit price. The PennBid Program will automatically calculate the extended price. You can update any line item without affecting the rest of your quote.
If the PennBid Program is idle for 50 minutes, a logout warning will appear. Bidders must acknowledge. If bidder does not acknowledge that they want to continue working, they will be logged out and bidder’s data will not be saved or submitted.
What to submit with this bid:
Click on the “Bid” tab
▪ Enter financial bid
▪ Answer questions
▪ Attach a single electronic file or zipped folder containing the documents listed below:
o 00 43 13 – Bid Bond or other Bid Security o 00 45 10 – Bidder’s Acknowledgement Form o 00 45 13 – Bidder Qualification Statement or Construction Contractor's Qualification Statement for Engineered Construction (AGC Document No. 220) with the exception of providing the recent Financial Statement.
00 21 13.1-2 o 00 45 19 – Non-Collusion Affidavit (This may not be required if covered as questions on Bid form) o 00 45 53 – Agreement of Surety o 00 73 00 Appendix B – Public Works Employment Verification Form (This is required for contracts with a total project cost estimated at over $25,000 for construction, reconstruction, demolition, alteration or repair work -other than maintenance - using state and/or local funds)
The three apparent low bidders shall submit the above documents in original hard copy form with signatures within three
(3) business days following bid opening. The recent Financial Statement shall be included with the Bidder Qualification Statement at this time.
How to submit your bid
The Bid tab contains the electronic bid form. All Per Unit Price fields must be filled out. To no-bid a line item, insert a zero (0). PennBid will automatically complete the line extensions and bid totals. At the bottom of the page, check the Verification Statement and click Submit Bid. Completed bid form can be printed or saved to Excel by clicking the icons in the middle of the bid form page.
Submitting documents with electronic bid
An electronic copy of the documents listed above is to be submitted with the electronic bid. To attach these documents:
1. Fill out required documents and scan to create a single electronic file or saved as a single zipped folder containing all documents
2. From the Bid tab, click on “browse” then click on the file or zipped folder name. The file will be attached to your bid submission when the Submit Bid button is clicked.
When uploading a proposal or other document, the maximum individual file or folder size is 20Mb.
Verifying that your bid was submitted
If submitted properly, you will receive an acknowledgement appearing in the middle of your screen saying “Your bid has been submitted”.
Withdrawing Your Bid
You may withdraw your bid anytime up to bid due date and time by simply clicking on Withdraw Bid, located at the bottom of the Bid tab.
Help Guides
There are several Help Guides available from the PennBid™ Home Page.
BID FORM
00 41 00-1
DOCUMENT 00 41 00
BID FORM
The Official Bid Form associated with the Contract may be found on the PennBid website at the “Bids” tab for the specific Contract; a copy of the Bid Form is also attached.
BID SCHEDULE
CLIENT: Horsham Water & Sewer Authoirty
PROJECT NAME: Well 40A Final Hydrogeologic Study & Well Construction
CONTRACT NUMBER: 26-7
PROJECT NUMBER: 24-00204-01
Number Description Unit Of
Measure
Estimated
Quantity Unit Price Total Price
1 Mobilization and Demobilization L.S. 1 $ $
Install Temporary Treatment system consisting of temporary settling tanks and granular activated carbon filtration, to be discharged to on site Wastewater Treatment Plant. Settling tanks should provide adequate storage of water during drilling and development.
$ / Each 1 $ $
Provide Alternate Temporary Treatment to remove sediment from drilling water sufficiently to discharge to existing granular activated carbon onsite water treatment system $ / Each 1 $ $
4 Install open hole to Nominal 20-inch diameter $ / Ft. 20 $ $
5 Install 0.375-inch thick, 16-inch I.D. casing $ / Ft. 20 $ $
6 Install hole to Nominal 16-inch diameter $ / Ft. 50 $ $
7 Install 0.33-inch thick, 12-inch I.D. casing $ / Ft. 52 $ $
8 Install 12-inch drive shoe at bottom of 12-inch casing $ / Each 1 $ $
9 Pressure Grouting $ / Bag 35 $ $
10 Install 12-inch open holefrom depth of 50 to 420 feet $ / Ft. 420 $ $
11 Develop well with drill rig $ / Hr. 8 $ $
Pump Test Setup and Breakdown: Install/remove test pump, generator, pressure gauge, ball valve, flowmeter, sample port, and two (2) 3/4-inch diameter pipes for water level monitoring L.S. 1 $ $
Operate pump during 4-hour Step-drawdown Test and 72-hour Pumping Test, pumping water through existing onsite water treatment system.
$ / Hr. 76 $ $
14 Well disinfection L.S. 1 $ $
15 12-inch sanitary seal well cap L.S. 1 $ $
Total Contract Price -$
PENAL SUM FORM
EJCDC C-430 Bid Bond (Penal Sum Form)
Prepared by the Engineers Joint Contract Documents Committee.
DOCUMENT 00 43 13
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
Horsham Water & Sewer Authority 617 Horsham Road Horsham, PA 19044
BID
Bid Due Date: October 16, 2026 @ 10:00 AM Description (Project Name and Include Location):
WELL 40A FINAL HYDROGEOLOGIC STUDY AND WELL CONSTRUCTION; HORSHAM TOWNSHIP
BOND
Bond Number:
Date (Not earlier than Bid due date):
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Note: Above addresses are to be used for giving any required notice. Provide execution by any additional parties, such as joint venturers, if necessary.
PENAL SUM FORM
EJCDC C-430 Bid Bond (Penal Sum Form)
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
BIDDER’S ACKNOWLEDGEMENT FORM
00 45 10-1
DOCUMENT 00 45 10
PROJECT IDENTIFICATION: WELL 40A FINAL HYDROGEOLOGIC STUDY & WELL CONSTRUCTION
CONTRACT IDENTIFICATION AND NUMBER: CONTRACT NO. 26-7
1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and
Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and
Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
00 45 10-2
G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance of the Work for which this Bid is submitted.
4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
5.01 Bidder is aware that the Total Bid Price is to include rock removal required to accomplish construction of the proposed Work.
6.01 Bidder will complete the Work in accordance with the Contract Documents for the submitted bid amount.
Unit Prices have been computed in accordance with paragraph 11.03.B of the General
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents.
7.01 Bidder agrees that the Work will be substantially complete within 120 calendar days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions within 150 calendar days after the date when the Contract Times commence to run. Substantial completion is to be defined as the 12-inch well drilled and 72-hour pump test completed. Site restoration/demobilization is not included in substantial completion but must be done before final payment.
7.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement.
8.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security;
B. Required Agreement of Surety;
C. Required Bidder's Qualification Form with supporting data;
D. Required Non-Collusion Affidavit.
9.01 Communications concerning this Bid shall be addressed to the following individual:
Thomas J. Figaniak, P.E., Gilmore & Associates, Inc.
00 45 10-3
If the address, telephone number, and fax number of the above individual is different than noted at the end of the Bid Form, note the address, telephone number, and fax number of the above individual:
Business Address:
Telephone No.: (____)
Fax No. (____)
Email:
10.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
SUBMITTED on , 20___.
Name of Bidder:
Corporation State of Incorporation:
Date of Qualification To do Business:
Partnership General Partner:
Individual Doing Business as:
Business Address:
Telephone No.: (____)
Fax No.: (____)
Name of Person authorized to sign (typed or printed):
Title of Person authorized to sign (typed or printed):
(Authorized Signature) SEAL Affix Corporate Seal
If Corporation
Attested by Corporate Secretary or An Assistant Secretary if Corporation
BIDDER QUALIFICATION STATEMENT
00 45 13-1
DOCUMENT 00 45 13
1. INTRODUCTION
1.1 This document must be included as part of the Bid submission. Failure to submit a fully completed and executed Bidder Qualification Statement may be considered justification for rejection of the bid.
1.2 This Bidder Qualification Statement is submitted with respect to the following project:
WELL 40A FINAL HYDROGEOLOGIC STUDY AND WELL CONSTRUCTION
2. GENERAL INFORMATION
2.1 Name of Bidder:
2.2 Address of Bidder:
2.3 Telephone No. of Bidder:
3. ORGANIZATIONAL BACKGROUND
3.1 Type of Organization:
Corporation Individual
Partnership Joint Venture
Other:
3.2 How long has your organization been in business?
a. As a Contractor? Years
b. As a Contractor engaged in construction work of the type proposed under this Contract: ______ Years
c. Under your current business name? ______ Years
3.3 If the bidder is a corporation, complete this section:
a. Date & State of Incorporation:
b. Names & Titles of Officers:
00 45 13-2
3.4 If the Bidder is other than a corporation, describe the structure of your organization including date of initiation as a business and list the principals involved:
3.5 What portions of the work (i.e. trades work items, etc.) included in the proposed contract will be performed by subcontractors?
4. WORK HISTORY
4.1 Attach or list the following information on similar projects which your organization has completed in the past five (5) years. Name and type of project, owner, engineer, contract amount, date of completion.
00 45 13-3
4.2 Attach or list the following information on similar project which your organization now has in progress: name and type of project, owner, engineer, contract amount, scheduled date of completion.
4.3 Has your organization ever defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:
4.4 Has any officer, partner or principal of your organization ever been an officer, partner or principal of another organization which defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:
4.5 Provide the construction experience (length, type) of the principal individuals…