Project Manual Summary: 2026 Sanitary Sewer Cleaning and Televising Project

This Project Manual contains complete contract documentation for the Womelsdorf Sewer Authority in Berks County, Pennsylvania, for a 2026 Sanitary Sewer Cleaning and Televising Project. The work includes light cleaning and closed-circuit television (CCTV) inspection of approximately 13,056 linear feet of 8-inch sanitary sewer main, televising of up to 20 laterals using a mainline-launched lateral camera capable of inspecting from the sewer main to the cleanout, and cured-in-place pipe (CIPP) lining of approximately 776 linear feet of 8-inch sanitary sewer main divided into two segments: approximately 386 linear feet between Manholes 7 and 9 (with 5 laterals) and approximately 390 linear feet between Manholes 9 and 10 (with 6 laterals) located along William Penn Boulevard. Sealed bids were to be submitted online through the PennBid Program by 10:00 AM on April 13, 2026, with bids reviewed at 7:00 PM on April 15, 2026, at the Womelsdorf Sewer Authority building located at 498 N. Water Street, Womelsdorf, PA. A non-mandatory pre-bid conference was scheduled for April 1, 2026, at 10:00 AM. The Contract Times specify 120 days for Substantial Completion and 150 days for Final Completion, with liquidated damages of $250 per day assessed for each day of delay beyond the specified completion dates.

Bidders must submit a Bid Security of ten percent of the extended bid amount and are required to demonstrate a minimum of five years of active engagement in pipe lining, pipe replacement, manhole rehabilitation, and televising work, supported by documentation of at least five similar projects completed within the past five years. The contract is based on unit prices and lump sum amounts as designated on the bid form, with quantities estimated but not guaranteed, and final payment determined by actual quantities measured by the Owner and Engineer. Contractor insurance requirements include workers' compensation at statutory rates, commercial general liability of $2,000,000 aggregate, automobile liability of $1,000,000 combined single limit, excess liability of $2,000,000, and pollution liability coverage. The project is funded through the Womelsdorf Sewer Authority and subject to Pennsylvania prevailing wage requirements and the Public Works Employment Verification Act (Act 127 of 2012). Contractor shall comply with all applicable federal, state, and local regulations including OSHA standards, environmental protection requirements, and Pennsylvania Department of Environmental Protection (PADEP) guidelines. All materials, equipment, and labor required for complete project execution are to be provided by the Contractor at no additional cost beyond the bid price, with no compensation for bypass pumping, traffic control, or restoration of disturbed surfaces.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .