1-Plans-SC Youth BB Court (02.17.2026).pdf
PDF 2 MB Posted
- Attached to
- St. Clair - Firehouse Addition (0326-609049. 02)
- Solicitation number
- Not on record
- Issued by
- Schuylkill County, South Pottstown CDP, Pennsylvania
About this file
St. Clair Youth Basketball Court - Project Plans and Specifications
This is a set of engineering plans and design documents prepared by Alfred Benesch & Company for the Borough of St. Clair Youth Basketball Court project located at Third Street Recreation Complex in St. Clair, Schuylkill County, Pennsylvania. The project encompasses the construction of a full-depth asphalt basketball court with installation of basketball hoop systems, court markings, split-rail vinyl fencing, and safety surface materials on a 0.1-acre site within the larger 0.95-acre Third Street Recreation Complex property. The scope of work includes asphalt paving with a subbase of 6 inches of No. 2A material and wearing course of 1.5 inches of PG 64S-22 Superpave asphalt mixture, installation of basketball goal posts with concrete foundations (minimum 3000 PSI), court line painting, erosion and sedimentation controls, and landscape stabilization. Sealed bids were to be received online via the PennBid Program until Tuesday, March 3, 2026, at 1:00 PM, with bids publicly announced during the St. Clair Borough Council meeting scheduled for March 3, 2026, at 6:30 PM. The design documents were prepared as of February 17, 2026, with engineering oversight by registered professional engineer Brian W. Baldwin.
The project received funding assistance from the Commonwealth of Pennsylvania through the Pennsylvania Greenways, Trails, and Recreation Program Financing Authority, with contract number C000092964. Bidders were required to submit a bid bond, certified check, or cashier's check equal to not less than 10 percent of the total amount bid, payable to the Borough of St. Clair. The successful bidder must furnish performance and payment bonds each in the amount of 100 percent of the contract price with a corporate surety approved by the owner. Pennsylvania Prevailing Wage Rates apply to the project, and all bidders were required to submit a Public Works Employment Verification Form in compliance with the Public Works Employment Verification Act. The contractor must comply with the Pennsylvania Human Relations Act regarding non-discrimination in employment. All bidding documents were available at no cost through the PennBid portal at http://pennbid.bonfirehub.com/.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
31102.21 Y:\Pennsylvania\03XX-60S\0325-609049.21_StClair_YBballCourt\Eng_Docs\Base\01_Cover.dgn (Default)bbaldwin 02\17\2026 12:33:28
PREPARED BY:
PROJECT MANAGER DATE
LOCATION MAP
LOCATION
PROJECT
PROJECT
DRAWING NO.
OF
Drawing Index
Drawing No. Title
1 COVER SHEET
1 4
3 PROPOSED PLAN
20260480211
CALL BEFORE YOU DIG!
POCS SERIAL NUMBERPA
SYSTEM, INC.
DAYS IN DESIGN STAGE - STOP CALL
CONSTRUCTION PHASE AND 10 WORKING
3 WORKING DAYS NOTICE FOR
PENNSYLVANIA LAW REQUIRES
811 or 1-800-242-1776 for the
1"=1000'
SCALE
Schuylkill County, Pennsylvania
Borough of St. Clair
Borough of St. Clair design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
the property of Alfred Benesch & Company. Use, reuse, reproduction or modification of this plan or
Copyright 2026 of Alfred Benesch & Company. All rights reserved. This plan and design content is
COURT PROJECT
YOUTH BASKETBALL
0325-609049.21
CFA Contract No. C000092964
February 2026
- Solicitor
- Treasurer
- Manager/Secretary
- Mayor
- Council Member
- Council Member
- Council Member
- Council Member
- Council Member
- Council Vice-President
- Council President
Edward M. Brennan, Esq.
Carol A. Sutzko
Ronald Price Jr.
Richard Tomko
Micheal Petrozino
Anthony Klazas
Judith Stednitz Julian
Norm Diehl
Joann Brennan
Cheryl Dempsey
T. Dempsey
Recreation Program.
Financing Authority as part of their Greenways, Trails, and Commonwealth of Pennsylvania through the Commonwealth This Project has received funding assistance from the
Brian W. Baldwin, PE 02/17/2026
EXISTING PLAN
DETAIL SHEET4
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
PE060268
BRIAN W. BALDWIN
31102.21 Y:\Pennsylvania\03XX-60S\0325-609049.21_StClair_YBballCourt\Eng_Docs\Base\02_ExPlan.dgn (Default)bbaldwin 02\17\2026 12:35:04
Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: Sheet No.:02/17/2026
Pennsylvania
St. Clair, Schuylkill County
BWB reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026 of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, OF 4
Third Street Recreation Complex570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
0325-609049.02
20260480211
CALL BEFORE YOU DIG!
POCS SERIAL NUMBERPA
SYSTEM, INC.
DAYS IN DESIGN STAGE - STOP CALL
CONSTRUCTION PHASE AND 10 WORKING
3 WORKING DAYS NOTICE FOR
PENNSYLVANIA LAW REQUIRES
811 or 1-800-242-1776
YOUTH BASKETBALL COURT
CH BWB
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE060268
BRIAN W. BALDWIN
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
H O
N E
Y
L
O C
U S
T
Elec. Cover
Pole
Utility
M H
M H
M
IN
L E
T
M
IN
L E
T =2 X
T O P =7
.4
Inlet
M H
FOUND
I PIN
S 29°25'43" E - 226.17'
N
°3
'1 E
.0
S 29°25'43" E - 80.00'
N
°3
'1 E
.9
N 30°2 4'08"W
- 99.7 9'
FOUND
I PIN
FOUND
P/K
FOUND
I PIN
FOUND
I PIPE
FOUND
I PIN
N
°3
'1 E
.0
N
°5
'2
E
.2
S 36°4 2'17" E
- 30.23
N 32°48'39" W
- 496.92'
D B
P
G
T M
P
-0
-0
.0
D A
V
ID
A
J
A
E
. P
L A
C H
K O h w
D B
P
G
T M
P
-0
-0
.0
M
IC
H A
L
C
L L E
M
C H
N O
C h w
D B
P
G
T M
P
-0
-0
.0
M
IC
H A
L
L L E
C H
N O
C h w
D B
P
G
T M
P
-0
-0
.0
W
IL
L
IA
J
U D
IT
. G
U Y E
S K I
0.165 ACS
AREA= 7,200.00 SQ FT OR
DB 1416 PG 128
TMP 62-02-0219.000
TMP 62-02-0218.000 &
BOROUGH OF ST. CLAIR
S
°3
'17
" W
- 9
.0
S
°3
'17
" W
- 9
.0
N
°3
'1 E
.1
0.136 ACS
AREA= 5,929.25 SQ FT OR
DB 1416 PG 128
TMP 62-02-0213.001
BOROUGH OF ST. CLAIR
S
°3
'17
" W
- 5
.0
S 37°2 3'14" E
- 470 .64'
0.947 ACS
AREA= 41,243.05 SQ FT OR
DB 868 PG 14
TMP 62-02-0147.009
BOROUGH OF ST. CLAIR
DB 1602 PG 75
TMP 62-02-0214.000
KEVIN M. SBORZ & SHARON L. VERCHICK
DB 1208 PG 876
TMP 62-02-0213.000
JOSEPH J. MELOCHICK
MARY MELOCHICK &
STEVE A. MELOCHICK,
DB 1046 PG 217
TMP 62-02-0147.008
SEAN M. METTAN
(NO DEED FOUND)
TMP 62-02-0147.000
READING ANTHRACITE COMPANY
0.561 ACS
AREA= 24,439.28 SQ FT OR
DB 1628 PG 68
TMP 62-02-0224.000
BOROUGH OF ST. CLAIR
N 37°2 3'14" W
- 228 .37'
S
°3
'1
W
1.
N
°3
'1 E
1.
.9
1'
N
°3
'1 E
20.00'
S 29°25'43" E
A R
E A
.0
S
Q
T
R
.0
A C S
D B
P
G
T M
P
-0
-0
.0
B O
R O
U G
S T . C
L A
IR
PENNDOT RIGHT-OF-WAY
0.691 ACS
AREA= 30,095.60 SQ FT OR
(NO DEED FOUND)
TMP 62-02-0222.000
BOROUGH OF ST. CLAIR
S
°4
'5
W
.7
LEGEND
EXISTING SEWER
EXISTING WATER
EXISTING TEXT
PROPERTY BOUNDARY
EXISTING FENCE
EDGE OF ROAD
EXISTING CONTOUR LINE
LEGAL RIGHT-OF-WAY LINE
EXISTING TREE
NOTES
100 YEAR FLOODPLAIN
ZONING BOUNDARY
ADA CIRCULATION
A-1
R-2
THIRD STREET
UNNAMED ALLEY
ROUTE 61 (SR 0061)
BITUMINOUS PAVING
PARKING LOT
PLAYGROUND
5-12 YR OLD
BOONE PARK
GARAGE
PLAYGROUND
2-5 YR OLD
COURTS
BASKETBALL
PARKING
EXISTING ADA
GARAGE
STALL
PARKING
EXISTING ADA
STALL
PARKING
EXISTING ADA
Sign
SCALE IN FEET
AREA
PARKING
GRAVEL
BUILDING
BOROUGH
EXISTING PLAN
A
R R
O L L S
T R
E E
T
OWNER: BOROUGH OF ST. CLAIR
TOTAL PROPERTY - 0.95 AC
PROJECT LIMITS - 0.1 AC
ACREAGE OF SITE:
R-2 HIGH DENSITY RESIDENTIAL
A-1 CONSERVATION/LOW DENSITY RESIDENTIAL
ZONING DISTRICTS:
WETLANDS: THERE ARE NO WATER AREAS OR WETLANDS WITHIN THE PROJECT LIMITS.
FLOODPLAIN: NO PROPOSED WORK IS WITHIN THE 100-YEAR FLOODPLAIN.
SOILS: UU- URBAN LAND-UDULTS COMPLEX THROUGHOUT THE PROJECT SITE
31102.21 Y:\Pennsylvania\03XX-60S\0325-609049.21_StClair_YBballCourt\Eng_Docs\Base\03_PrPlan.dgn (2026 YBB)bbaldwin 02\17\2026 12:35:46
Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: Sheet No.:02/17/2026
Pennsylvania
St. Clair, Schuylkill County
BWB reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026 of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, OF 4
Third Street Recreation Complex570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
0325-609049.02
20260480211
CALL BEFORE YOU DIG!
POCS SERIAL NUMBERPA
SYSTEM, INC.
DAYS IN DESIGN STAGE - STOP CALL
CONSTRUCTION PHASE AND 10 WORKING
3 WORKING DAYS NOTICE FOR
PENNSYLVANIA LAW REQUIRES
811 or 1-800-242-1776
YOUTH BASKETBALL COURT
CH BWB
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE060268
BRIAN W. BALDWIN
M H
M H
IN
L E
T
IN
L E
T =2 X
T O P =7
.4
PROPOSED WORK\NOTES
LIMIT OF DISTURBANCE
LEGEND
EXISTING SEWER
EXISTING WATER
EXISTING TEXT
PROPERTY BOUNDARY
EXISTING FENCE
EDGE OF ROAD
EXISTING CONTOUR LINE
LEGAL RIGHT-OF-WAY LINE
EXISTING TREE
ROUTE 61 (SR 0061)
N
GARAGE
BITUMINOUS PAVING
GRAVEL
PLAYGROUND
2-5 YR OLD
STALL
PARKING
EXISTING ADA
SCALE IN FEET
PROPOSED PLAN
PROPOSED WORK DESCRIPTION
EXISTING ADA CIRCULATION
FUNDING ACKNOWLEDGEMENT SIGN
SAFETY SURFACE
SPLIT-RAIL VINYL FENCE (MATCH EXISTING)
BASKETBALL COURT LINE PAINTING
BASKETBALL SYSTEM (POST, BACKBOARD, RIM, NET)
ASPHALT PAVING
Sign
PROPOSED ASPHALT PAVING
PROPOSED SAFETY SURFACE
DETAIL SHEET
GENERAL NOTES EROSION CONTROL POLICIES
SCHEDULE OF CONSTRUCTION ACTIVITIES
REMOVAL PROCESS.
OF 70% STABILIZATION. STABILIZE ALL AREAS DISTURBED DURING
1.
2.
3.
4.
5.
6.
7.
8.
I. GENERAL
1.
2.
3.
4.
5.
PRIOR TO EXCAVATION, PLACE TEMPORARY EROSION CONTROL
FEATURES TO CONTROL SEDIMENT DURING EXCAVATING OPERATIONS.
STABILIZE ALL DISTURBED AREAS.
REMOVE ALL TEMPORARY EROSION CONTROLS AFTER A MINIMUM
CONSTRUCTION ENTRANCE AS NECESSARY.
CONSERVATION DISTRICT AND THE ENGINEER:
INSTRUCTIONS OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION, COUNTY
GUIDELINES AS THEY ARE APPLICABLE AND IN ACCORDANCE WITH THE
THAT THE CONTRACTOR FOR THIS PROJECT CONFORM WITH THE FOLLOWING
COMMONWEALTH OF PENNSYLVANIA TO CONTROL EROSION, IT WILL BE REQUIRED
IN ACCORDANCE WITH THE CURRENT POLICIES AND PRACTICES IN THE
TYP SILT FENCE DETAIL
FILTER FABRIC FENCE MUST BE INSTALLED AT LEVEL GRADE.
• THE ABOVE GROUND HEIGHT OF THE FENCE.
ANY FENCE SECTION WHICH HAS BEEN UNDERMINED OR TOPPED
8 FEET UP SLOPE AT 45° TO THE MAIN BARRIER ALIGNMENT.
BOTH ENDS OF THE BARRIER MUST BE EXTENDED AT LEAST
SEDIMENT MUST BE REMOVED WHEN ACCUMULATIONS REACH
FILTER OUTLET (SEE DETAIL THIS SHEET).
ONE SECTION MUST BE IMMEDIATELY REPLACED WITH A ROCK
NOTE:
NTS
STAKES
JOINING FENCE SECTIONS
STAPLES
BACKFILL
COMPACTED
GROUND
EXISTING
6" MIN
M
IN
SUPPORT STAKES
TOE ANCHOR
TRENCH
FABRIC FENCE
CLEAR & GRADE AREA AS NEEDED.
1.
3.
2.
4.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
COMPOST FILTER SOCK MAINTENANCE NOTES:
PERIMETER CONTROL
WATER FLOW
UNDISTURBED AREA
BE REPLACED ACCORDING TO MANUFACUTURER'S RECOMMENDATIONS.
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL
BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS;
ELSEWHERE IN THE PLAN.
GROUND HEIGHT OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED
SEDIMENT MUST BE REMOVED WHERE ACCUMULATIONS REACH • THE ABOVE
DEGREES TO THE MAIN SOCK ALIGNMENT.
ENDS OF THE SOCK MUST BE EXTENDED AT LEAST 8 FEET UPSLOPE AT 45
COMPOST FILTER SOCK MUST BE PLACED AT LEVEL EXISTING GRADE. BOTH
FILTERSOCK
COMPOST
PROTECTED
AREA TO BE
LINEAL SPACING
STAKE ON 10'
AREA
WORK
NTS
COMPOST FILTER SOCK
STAKE
2"x2" WOODEN
24"
18"
12"
COMPOST FILTER SOCK
EQUIVALENT
(12" - 24" TYP.)
FILTER SOCK
COMPOST
COMPOST
LOOSE
FLOW
SSF
30" HT
18" HT
SILT FENCE
DISTURBING OR PROHIBITING ANY NEW CONSTRUCTION.
EXCAVATE AS REQUIRED. MAINTAIN ACCESS WITHOUT
THAT ORIGINATING WITHIN.
SEPARATE ALL WATER ORIGINATING OUTSIDE OF THE PROJECT FROM
AS DIRECTED.
861. DISPOSE OF SILT FENCING AND SEDIMENT REMOVED FROM THE PROJECT,
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION 408, SECTION
SEDIMENTATION STRUCTURES DURING CONSTRUCTION AS SPECIFIED IN
PERMANENT SILT HOLDING BASINS WHERE FEASIBLE. CLEAN THE
TRAP SEDIMENT RESULTING FROM CONSTRUCTION IN TEMPORARY OR
MUST BE 2:1 OR FLATTER.
SLOPES. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES
INTERIM STABILIZATION MEASURES TO MINIMIZE EROSION OF THE STOCKPILE
FOR ANY EXCAVATION MATERIAL STOCKPILED MORE THAN 20 DAYS, TAKE
DEVICES AS SOON AS THE REQUIRED EARTHWORK HAS BEEN PERFORMED.
BE INSTALLED PRIOR TO DISTURBING THE EARTH, AND THE STABILIZATION
PLACING THE EROSION AND SEDIMENTATION CONTROL DEVICES THAT CAN
CONTROL THE ENTIRE GRADING AREA AT ALL TIMES DURING CONSTRUCTION BY
WITH PERMANENT SEEDING SPECIFICATIONS.
WILL NOT BE REDISTURBED WITHIN ONE YEAR MUST BE STABILIZED IN ACCORDANCE
SEEDING SPECIFICATIONS. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR
REDISTURBED WITHIN ONE YEAR MAY BE STABILIZED IN ACCORDANCE WITH TEMPORARY
RATES. DISTURBED AREAS WHICH ARE NOT AT FINSHED GRADE AND WHICH WILL BE
DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE RECOMMENDED
REMAIN EXPOSED FOR MORE THAN 20 DAYS MUST BE STABILIZED IMMEDIATELY.
ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL
DIRECT FLOWING WATER AWAY FROM PROJECT CONSTRUCTION AREAS.
DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED IMMEDIATELY.
AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION
THOSE CONTROLS.
AND FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN THE TRIBUTARY AREAS OF
EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED, STABILIZED,
TEMPORARY CONTROLS INCLUDE SILT FENCE, COMPOST FILTER SOCK, AND ROCK
REPRESENTATIVES.
AND NOT ON THE PROJECT OWNER OR alfred benesch & company, OR THEIR
MISUNDERSTANDING OF THE LOCATION OF THE UNDERGROUND UTILITIES IS ON THE CONTRACTOR, THE RISK OF FINANCIAL LOSS RESULTING FROM MISIDENTIFICATION, MISLOCATION OR
BE FIELD VERIFIED BY THE CONTRACTOR AT THE PROJECT SITE.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED BY THE CONTRACTOR AND SHALL
UNNECESSARY CONFLICTS THEREWITH.
UNDERGROUND UTILITIES PRIOR TO EXCAVATION OR DEMOLITION AND (3) TO AVOID ALL
CONTACT ALL UTILITY OWNERS INDEPENDENTLY, (2) TO DETERMINE THE EXACT LOCATION OF ALL
RESPONSIBLE AT ITS SOLE COST AND EXPENSE AND WITHOUT RELIANCE ON THESE PLANS: (1) TO
GUIDANCE ONLY, AND IS NOT GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR IS
LOCATION OR ANY OTHER FEATURE OF UNDERGROUND UTILITIES IS FOR GENERAL INFORMATION AND
NOTE: INFORMATION ON THESE PLANS CONCERNING THE CONDITIONS, DIMENSIONS, DEPTH, SIZE, AVAILABLE SURFACE INFORMATION IS INDICATED ON THE DRAWINGS.
OR STRUCTURES ARE SHOWN ON THE PLANS. NO FIELD EXCAVATION HAS BEEN PERFORMED.
INSTALLATION OR STRUCTURES SHOWN ON THE PLANS, OR THAT ALL UNDERGROUND INSTALLATION
ASSURE EITHER THE ACCURACY OF THE LOCATION OF THE PRESENT UNDERGROUND UTILITY
LISTED ABOVE. alfred benesch & company DOES NOT GUARANTEE, REPRESENT, WARRANT OR
INFORMATION THAT HAS BEEN PROVIDED TO alfred benesch & company FROM THE UTILITIES
WARNING! EXISTING UTILITIES, AS SHOWN ON THESE DRAWINGS, ARE IN ACCORDANCE WITH
dkuperavage@scmawater.com
ATTN: DAVID KUPERAVAGE
POTTSVILLE, PA 17901-0960
PO BOX 960
221 SOUTH CENTRE STREET
AUTHORITY
SCHUYLKILL COUNTY MUNICIPAL
scsa@ptd.net
ATTN: PAM MIHALSKY
ST CLAIR, PA 17970
16 S THIRD ST
SAINT CLAIR SEWER AUTHORITY
OFFICE PERSONNEL
ST CLAIR, PA 17970
16 SOUTH THIRD STREET
SAINT CLAIR BOROUGH
LIST OF UTILITIES:
PURPLE - NON-POTABLE WATER, IRRIGATION OR SLURRY LINES
WHITE - PROPOSED EXCAVATION
GREEN - SEWERS AND DRAIN LINES
BLUE - POTABLE WATER
ORANGE - COMMUNICATION, ALARM OR SIGNAL LINES, CABLES OR CONDUIT
YELLOW - GAS, OIL, STEAM, PETROLEUM OR GASEOUS MATERIALS
RED - ELECTRIC POWER LINES, CABLES, CONDUIT AND LIGHTING CODES
UNIFORM COLOR CODES. KNOW THEM!
ACT NO. 187 STANDARDIZES THE COLOR-MARKING OF UNDERGROUND UTILITIES IN ACCORDANCE WITH
SERIAL NO.: 20260480211
THIS PROJECT HAS A SERIAL NUMBER REGISTERED WITH THE ONE CALL SYSTEM. USE IT!
APPLY ANYWHERE IN THE COMMONWEALTH OF PENNSYLVANIA.
THAN 90 WORKING DAYS NOTICE WHEN ENGAGED IN THE DESIGN PHASE. THESE REQUIREMENTS
1974 AS AMENDED, REQUIRES DESIGNERS TO GIVE NO LESS THAN 10 WORKING DAYS NOR MORE
DRIVE-IN, GRADE, PLOW-IN, PULL-IN, RIP, SCRAPE, TRENCH, TUNNEL OR DEMOLISH. ACT NO. 287 OF
EARTH (WITH OR WITHOUT EXPLOSIVES), ANCHOR, AUGER, BACKFILL, BLAST, BORE, DIG, DITCH, DRILL, WORKING DAYS NOTICE FROM EXCAVATORS/DEMOLITION CONTRACTORS WHO ARE ABOUT TO MOVE
LINE PROTECTION LAW, REQUIRES NO LESS THAN 3 WORKING DAYS NOTICE NOR MORE THAN 10
PENNSYLVANIA ACT NO. 287 OF 1974 AS AMENDED BY ACT 121 OF 2008, THE UNDERGROUND UTILITY
1-800-242-1776
PENNSYLVANIA ONE CALL SYSTEM, INC.
STOP-CALL BEFORE YOU DIG!
VERTICAL DATUM IS BASED ON NAVD 1988.
HORIZONTAL DATUM IS BASED ON STATE PLANE COORDINATE SYSTEM SOUTH ZONE NAD 1983.
SEED AND STABILIZE ALL DISTURBED AREAS OUTSIDE OF PLAYGROUND MULCH AREAS (TYP).
IN ACCORDANCE WITH CONSUMER PRODUCT SAFETY COMMISSION STANDARDS.
ALL EQUIPMENT TO BE PLACED IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES AND SPACED
PRIOR TO INSTALLATION.
LAYOUT ALL IMPROVEMENTS PRIOR TO INSTALLATION. THIS MUST BE VERIFIED BY THE ENGINEER
ACCORDANCE WITH THE BEST AVAILABLE INFORMATION.
COORDINATE ALL WORK WITH UTILITY COMPANIES INVOLVED. EXISTING UTILITIES ARE SHOWN IN
TRANSPORTATION SPECIFICATIONS IN THEIR LATEST REVISION.
PENNDOT SPECIFICATIONS SHALL MEAN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF
BY THE OWNER OR ENGINEER.
PLAN LOCATIONS AND DIMENSIONS SHALL BE STRICTLY ADHERED TO UNLESS OTHERWISE DIRECTED
THESE CONTROLS ARE INCIDENTAL TO THE OTHER ITEMS OF WORK.
ON SITE SHALL BE PROVIDED, INSTALLED AND MAINTAINED DURING ALL PHASES OF CONSTRUCTION.
ANY NECESSARY SOIL EROSION AND SEDIMENTATION CONTROLS TO MAINTAIN EARTH DISTURBANCE
THE CONTRACTOR.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BY debra.d.delia@verizon.com
ATTN: DEBORAH BARUM
PITTSBURGH, PA 15221
1026 HAY STREET
VERIZON PENNSYLVANIA LLC
mikeburda@blythewater.com
ATTN: JUSTIN DEANGELO
NEW PHILADELPHIA, PA 17959
375 VALLEY STREET
THE TOWNSHIP OF BLYTHE
MUNICIPAL AUTHORITY OF
robert.trently@secv.com
ATTN: ROBERT F TRENTLY
HAZLE TWP, PA 18202
380 MAPLEWOOD DRIVE
SERVICE ELECTRIC CABLEVISION
BY 8" LONG
MARKS 2" WIDE
LANE SPACE
1'
BY 8" LONG
MARKS 12" WIDE
NEUTRAL ZONE
0.5%
0.5%0.5%
0.5%
.5
.5
.5
.5
10.0
50.0
0.109730
0.109095100
0.10859660
ANNUAL RYEGRASS
FORMULA E:
1000 SQ. YD. (LBS.)
SEEDING RATE PER
WEED SEED
MAX. %
GERMINATIONPURITY
MINIMUM %
WEIGHT
% BY
FORMULA AND SPECIES
FORMULA B:
PERENIAL RYEGRASS
FESCUE, CREEPING OR CHEWING
KENTUCKY BLUEGRASS MIXTURE
20 97 90 0.10
30 97 85 0.10
45 97 80 0.15
44.0
NOTES:
5 95 90 0.10ANNUAL RYEGRASS
FOR SLOPES 3:1 AND STEEPER, USE FORMULA D CONSERVATION MIX
FOR SLOPES LESS THAN 3:1, USE FORMULA B MIX
0.10
10 95 90 0.10
FORMULA D CONSERVATION MIX:
TALL FESCUE
FESCUE, RED OR CREEPING
ANNUAL RYEGRASS
SUBGRADE
PROOF ROLL
NTS
PAVING DETAIL
6" DEPTH
SUBBASE (NO. 2A),
25.0 MM MIX, 3" DEPTH, SRL-L
64S-22, < 0.3 MILLION ESALS,
DESIGN, BASE COURSE, PG
SUPERPAVE ASPHALT MIXTURE
1.5" DEPTH, SRL-L
< 0.3 MILLION ESALS, 9.5 MM MIX,
DESIGN, WEARING COURSE, PG 64S-22,
SUPERPAVE ASPHALT MIXTURE
34'
3'
4' 4'
3'
R =6
12'
0.5% 0.5%
PAVING
ASPHALT
LIMIT OF
2" WIDE
ALL LINES
COURT MARKINGS AND LAYOUT DETAIL
NTS
COURT SURFACE
BASKETBALL GOAL POST
FOUNDATION DETAIL
2' DIA.*
SPECIFICATIONS
MANUFACTURERS
OR MEET
M
IN
CONCRETE
MIN. 3000 PSI
NTS
31102.21 Y:\Pennsylvania\03XX-60S\0325-609049.21_StClair_YBballCourt\Eng_Docs\Base\04_Det01.dgn (Default)bbaldwin 02\17\2026 12:36:33
Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: Sheet No.:02/17/2026
Pennsylvania
St. Clair, Schuylkill County
BWB reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026 of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, OF 4
Third Street Recreation Complex570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
0325-609049.02
20260480211
CALL BEFORE YOU DIG!
POCS SERIAL NUMBERPA
SYSTEM, INC.
DAYS IN DESIGN STAGE - STOP CALL
CONSTRUCTION PHASE AND 10 WORKING
3 WORKING DAYS NOTICE FOR
PENNSYLVANIA LAW REQUIRES
811 or 1-800-242-1776
YOUTH BASKETBALL COURT
CH BWB
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE060268
BRIAN W. BALDWIN
| 2026-02-17_01_Cover |
| 2026-02-17_02_ExPlan |
| 2026-02-17_03_PrPlan |
| 2026-02-17_04_Det01 |
File details come from the government source that posted it. Updated .