1-Park Station Sign Update - Construction Drawings.pdf

PDF 3 MB Posted

Attached to
Contract No. 2026-534 Park Station Sign Update
Solicitation number
US.261328
Issued by
Butler County, Pennsylvania

About this file

This is a construction drawing and bid specification document for Contract No. 2026-534, the Park Station Sign Update project for Cranberry Township, Butler County, Pennsylvania. The project entails the complete fabrication and installation of a double-sided electronic monument sign measuring 8'-8½" high by 9'-6" wide at the intersection of Ernie Mashuda Road and Route 19. The sign will incorporate a Watchfire W10mm 120 x 240 electronic video display (no substitutions permitted) with display dimensions of 4'-5" x 8'-3" x 5", backlit graphics, Township identification panels, and all associated structural, electrical, and communications components. The scope of work includes demolition and removal of the existing monument sign and foundation, installation of a welded aluminum sign cabinet with concrete foundation and primary structural support, installation of a non-structural red brick base, electrical work including underground trenching and a new meter service near the utility pole, site restoration, tree trimming, shrub removal to improve sightlines, and preservation and reinstallation of existing fence components. Sealed bids are due electronically via PennBid by 10:00 AM on Thursday, December 3, 2026, with results to be made publicly available. Bidders are strongly encouraged to conduct pre-bid site visits to familiarize themselves with existing conditions, utility locations, and access limitations. All bids must be accompanied by a certified check or bid bond in the amount of $1,000 payable to Cranberry Township, and bids shall remain irrevocable for 60 days following the bid opening date.

The estimated project cost exceeds $25,000, making the Pennsylvania Prevailing Wage Act applicable to the contract. The contractor is responsible for all fabrication, installation, testing, commissioning, engineering, permits, and incidental work necessary for a complete and operational installation. Shop drawings and paint color samples must be submitted for review and approval prior to fabrication, with the Township allowing fourteen calendar days for review. The contractor must coordinate directly with Watchfire representatives, Penn Power utility company, Cranberry Township representatives, and qualified subcontractors to verify final equipment and electrical requirements. Penn Power will provide electrical service connection at the utility pole located approximately 25 to 30 feet from the monument sign, and the Township will submit the service request to Penn Power 30+ days prior to project commencement. The contractor shall perform all underground trenching, verify utility locations via PA One Call, and assume full responsibility for any damage to existing utilities caused by the work. No fabrication or installation shall proceed until all required submittals have been reviewed and approved by the Township and applicable permitting authorities. The Board of Supervisors reserves the right to reject any or all bids and to waive any defects or irregularities in the best interest of the Township.

View the file

Other files

File Type Posted
2-Front End - Park Station Sign Update.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 28, 2026

Park Station Sign Update BID DOCUMENTS

Park Station Sign Update Program

120’ R/W

LP

Right of Way

120'-0 3/16"

Existing fence and brick columns.

12'-6" +-

Project PlanCranberry Township - Park Station Sign Update

'-1

/8

9'-6" Estimated location of the existing sign; and the location of the new electronic message center.

1’-0” wide trench for conduit

ROW

'-1

1 /

8"

4'-0 3/16"

11'-6 1/4"

Pen Power Utility Pole/ Underground Electric

Free standing electric meter pedestal and fuse

MONUMENT SIGN

BID SPECIFICATIONS AND SCOPE OF WORK

1. GENERAL

The Contractor shall furnish all labor, materials, equipment, supervision, engineering, permits, coordination, transportation, installation, testing, and incidentals necessary to provide a complete and operational monument sign as specified herein and shown on the Contract Documents.

The work shall include, but shall not be limited to, fabrication and installation of the monument sign, electronic video displays, structural support, concrete foundation, non-structural masonry base, electrical work, associated communications compo-nents, finish materials, site restoration, tree trimming and all other work necessary to provide a complete and functioning installation.

The Contractor shall field-verify existing site conditions, Survey for Right of Way lines, dimensions, utility locations, access, grades, and other conditions a�ecting the work prior to submitting its bid. Any discrepancies or conflicts identified prior to bidding shall be brought to the Owner's attention.

The Contractor's bid shall include all costs necessary to complete the work described herein, whether specifically identified or reasonably inferred as necessary for a complete installation.

2. MONUMENT SIGN

2.1 Dimensions

The monument sign shall have the following overall dimensions: 8'-8 1/2" high x 9'-6" width

2.2 Design

The monument sign shall be a double-sided monument sign incorporating: backlit graphics; electronic video displays;Township identification and/or logo panels; and all associated structural, electrical, communication, and mounting components neces-sary for a complete installation.

2.3 Watchfire Electronic Video Display

The electronic video displays shall be:

Watchfire W10mm 120 x 240, NO SUBSTITUTIONS WILL BE PERMITTED.

Display dimensions: 4'-5" x 8'-3" x 5"

The Contractor shall coordinate directly with the Watchfire representative to verify final equipment requirements, electrical requirements, mounting requirements, communication requirements, clearances, ventilation, access, and all other require-ments necessary for proper installation and operation.

2.4 Construction

The monument sign cabinet and any structural components shall be constructed of welded aluminum unless otherwise indicated in the Contract Documents. The Contractor shall provide a complete, weather-resistant, durable assembly suitable for permanent exterior installation.

2.5 Contractor Responsibility

The Contractor shall furnish and install the complete monument sign, including, but not limited to: Sign cabinet and enclosure; attachment of the sign cabinet to the primary structural support; all sign components; electronic video display cabinets;

mounting hardware and accessories; associated electrical components; associated communication components; backlit graphics and illuminated elements;

non-structural masonry base; concrete foundation and associated structural support, as specified herein; electrical connections; required disconnects;

engineering and structural calculations; required shop drawings; permits and permit-related documentation required of the Contractor; testing and commis-sioning; and all other materials and incidental work necessary for a complete and operational monument sign.

3. SHOP DRAWINGS AND PERMITTING

The Contractor shall prepare and submit complete shop drawings for review and approval prior to fabrication and installation.

At the commencement of the shop drawing phase, the Contractor shall submit two (2) sets of paint color samples to the Township for review and approval.

Each sample shall consist of a 12" x 12" metal panel finished in the proposed paint color, with the corresponding color identification clearly labeled on the back of each panel. The Township shall be allowed fourteen (14) calendar days from receipt of the samples to review and approve the submitted colors.

The Contractor shall be responsible for obtaining any further engineering stamps if changes to the original design are required. In order to obtain the final sign permits by the township.

Shop drawings shall include, at a minimum: overall sign dimensions; sign construction and materials; structural support details; foundation and footing details; attachment details; masonry base details; electronic display mounting details; electrical requirements and connections; disconnect locations; electri-cal load calculations; finish and paint information; and other information reasonably required to demonstrate compliance with the Contract Documents.

No fabrication or installation shall proceed until required submittals have been reviewed and approved by the Owner and/or applicable permitting authorities.

Approval of Contractor submittals shall not relieve the Contractor of responsi-bility for the accuracy, completeness, code compliance, dimensions, structural adequacy, or performance of the work.

4. CONCRETE FOUNDATION AND PRIMARY STRUCTURAL SUPPORT

The Contractor shall furnish and install the concrete foundation and primary structural support posts required for the monument sign. The foundation and structural support shall be in accordance with applicable building codes, site conditions, manufacturer requirements, and Pennsylvania requirements. The Contractor may utilize an approved subcontractor to perform the foundation and structural support work; however, the Contractor shall remain fully respon-sible for the completed work.

The foundation is to accommodate the monument sign, electronic displays, wind loads, dead loads, soil conditions, and other applicable design criteria.

The Contractor shall verify all dimensions and conditions and shall provide any additional final engineered foundation details as required for permitting and construction.

All site work shall be reliant on PA One Call to ensure understanding that no lines are struck during excavating. The Contractor will be responsible for any damage to exsiting utilities struck during work. Any lines found to be under-neath the existing foundation may need to be Hydro Dug and foundation adjustment may be required. The contractor shall immediately inform the Township of any potential issues that may inhibit completing work.

5. BRICK BASE

The Contractor shall furnish and install the non-structural brick base, base pad, and associated concrete footer for the monument sign. Brick materials shall comply with the applicable project brick specification, including require-ments for product, size, color, finish, mortar, and installation.

The Contractor shall provide an experienced and qualified mason for installa-tion of the brick base.

The completed brick base shall be plumb; level; square; uniform in appearance;

properly aligned with the monument sign; and installed in a neat and workmanlike manner. The Contractor shall protect the brick base and surrounding work from damage during construction and shall clean all masonry upon completion. Any damaged, cracked, stained, improperly installed, or otherwise unacceptable masonry shall be repaired or replaced at the Contractor's expense.

6. ELECTRICAL WORK

The electrical work by the Sign Contractor shall include all labor, materials, equipment, conduit, wiring, fittings, fuses, disconnects, electric meter unit, meter enclosure, connections, grounding, testing, and incidental work necessary to provide a complete and operational electrical installation for the monument sign.

All electrical work shall comply with all applicable local codes and ordinances and utility company requirements. All applicable equipment and components shall be UL Listed.

The Township shall coordinate with Penn Power to initiate the final electrical service connection. The Contractor shall be responsible for obtaining and submitting all required electrical inspection reports, certifications, and approvals for the completed installation to the Township in order to obtain the final electrical service connection.

6.1 Utility Service

Penn Power will provide the electrical service connection at the top of the utility pole located approximately 25 to 30 feet from the monument sign.

Cranberry Township will submit the request to Penn Power for new electrical service at the utility pole 30+ days prior to needing it. The Contractor shall furnish and install a dedicated, freestanding electrical pedestal service unit or meter-main combination unit near the utility pole from which service will be provided. The unit shall be installed on a concrete footer/pad and shall comply with applicable codes and Penn Power requirements.

The Contractor shall provide and install the electrical line and associated equipment required for Penn Power to extend the service up the utility pole and make the final connection to the pole. Penn Power requires 35’ plus of extra wiring coiled at the pole prior to any township inspection. Upon completion and approval of inspections, Penn Power will perform the final connection to the utility pole. The Contractor shall coordi-

Project Speci�cationsCranberry Township - Park Station Sign Update nate its work with Cranberry Township and Penn Power to ensure that the service unit, electrical line, and final utility connection are properly coordinated.

6.2 Contractor Electrical Work

The Contractor, through its properly licensed electrical contractor or qualified electrical subcon-tractor, shall furnish and install all electrical work from the meter location to the monument sign.

This work shall include, but shall not be limited to: underground conduit;

conductors and wiring; pull boxes and fittings, where required; grounding and bonding; discon-nects; final connections to the monument sign; connections to both electronic video displays;

connections for illuminated graphics and logos; electrical connections required by the Watchfire equipment; testing; and all other electrical components necessary for an operational installa-tion. The Contractor shall provide the final electrical connections and required disconnects at the monument sign.

6.3 Electrical Coordination

The Contractor shall coordinate all electrical requirements with Cranberry Township's designat-ed representative; the Watchfire representative; the Contractor's electrical contractor/subcon-tractor; and Penn Power, as applicable.

The Contractor shall verify the final electrical requirements for all equipment prior to installation.

The Contractor shall not rely solely upon preliminary electrical information shown on the Contract Documents. Final equipment requirements shall be confirmed with the equipment manufacturer prior to installation.

6.4 Electrical Loads

The electrical system shall be designed and installed to accommodate the requirements of both electronic video displays. For bidding purposes, the anticipated electrical requirement is approx-imately 20 amps per electronic video display The electrical system shall also accommodate the illumination requirements for the double sided static header graphics. The Contractor shall verify all final electrical loads and equipment requirements with Watchfire.

6.5 Underground Trenching

All trenching required to install electrical wire and conduit from the the light pole to the meter location to the monument sign shall be performed by the Contractor. Trenching shall comply with all applicable local, state, and federal codes, regulations, utility requirements, and applica-ble site restrictions. All underground electrical work shall remain within the applicable property lines and required setbacks.

The Contract Documents indicate a suggested trench routing and final meter location for reference. The routing shown shall not relieve the Contractor of responsibility for field verifica-tion or coordination. Following award, the Contractor shall provide the Owner with final trench-ing plans showing the proposed conduit routing, depths, utility crossings, electric meter location and other information necessary to demonstrate compliance with applicable requirements.

The Contractor shall verify the location of existing utilities prior to excavation and shall be responsible for protecting existing utilities and site improvements from damage. Any damage caused by the Contractor to existing utilities, paving, or structures shall be repaired at the Contractor's expense.

7. PAINT AND FINISH SAMPLES

Prior to fabrication and application of final finishes, the Contractor shall provide 6" x 6" metal panel samples demonstrating the proposed paint colors and finishes. Samples shall be submit-ted to both Cranberry Township and the project designers (DBX) for review and approval.

8. LANDSCAPING AND SITE RESTORATION

The Contractor shall be responsible for restoring all areas disturbed by its work to a condition suitable for final landscaping. The Contractor shall:

A. Restore disturbed grades to blend with the existing surrounding slope and site conditions.

B. Provide a minimum of 3 inches of topsoil over disturbed areas requiring restoration.

C. Match existing grades at the limits of disturbance and provide positive drainage.

D. Remove excess soil, rock, debris, and construction materials from the work area.

E. Seed all newly disturbed soil areas with contractor-grade grass seed.

F. Cover newly seeded areas with straw or another appropriate biodegradable covering material suitable for establishing the grass seed and controlling erosion.

G. Leave the site in a clean, stable, and workmanlike condition.

H. The Contractor shall repair any settlement, erosion, rutting, or other site disturbance resulting from its work prior to final acceptance.

MONUMENT SIGN

BID SPECIFICATIONS AND SCOPE OF WORK

1. GENERAL

The Contractor shall furnish all labor, materials, equipment, supervision, engineering, permits, coordination, transportation, installation, testing, and incidentals necessary to provide a complete and operational monument sign as specified herein and shown on the Contract Documents.

The work shall include, but shall not be limited to, fabrication and installation of the monument sign, electronic video displays, structural support, concrete foundation, non-structural masonry base, electrical work, associated communications compo-nents, finish materials, site restoration, tree trimming and all other work necessary to provide a complete and functioning installation.

The Contractor shall field-verify existing site conditions, Survey for Right of Way lines, dimensions, utility locations, access, grades, and other conditions a�ecting the work prior to submitting its bid. Any discrepancies or conflicts identified prior to bidding shall be brought to the Owner's attention.

The Contractor's bid shall include all costs necessary to complete the work described herein, whether specifically identified or reasonably inferred as necessary for a complete installation.

2. MONUMENT SIGN

2.1 Dimensions

The monument sign shall have the following overall dimensions: 8'-8 1/2" high x 9'-6" width

2.2 Design

The monument sign shall be a double-sided monument sign incorporating: backlit graphics; electronic video displays;Township identification and/or logo panels; and all associated structural, electrical, communication, and mounting components neces-sary for a complete installation.

2.3 Watchfire Electronic Video Display

The electronic video displays shall be:

Watchfire W10mm 120 x 240, NO SUBSTITUTIONS WILL BE PERMITTED.

Display dimensions: 4'-5" x 8'-3" x 5"

The Contractor shall coordinate directly with the Watchfire representative to verify final equipment requirements, electrical requirements, mounting requirements, communication requirements, clearances, ventilation, access, and all other require-ments necessary for proper installation and operation.

2.4 Construction

The monument sign cabinet and any structural components shall be constructed of welded aluminum unless otherwise indicated in the Contract Documents. The Contractor shall provide a complete, weather-resistant, durable assembly suitable for permanent exterior installation.

2.5 Contractor Responsibility

The Contractor shall furnish and install the complete monument sign, including, but not limited to: Sign cabinet and enclosure; attachment of the sign cabinet to the primary structural support; all sign components; electronic video display cabinets;

mounting hardware and accessories; associated electrical components; associated communication components; backlit graphics and illuminated elements;

non-structural masonry base; concrete foundation and associated structural support, as specified herein; electrical connections; required disconnects;

engineering and structural calculations; required shop drawings; permits and permit-related documentation required of the Contractor; testing and commis-sioning; and all other materials and incidental work necessary for a complete and operational monument sign.

3. SHOP DRAWINGS AND PERMITTING

The Contractor shall prepare and submit complete shop drawings for review and approval prior to fabrication and installation.

At the commencement of the shop drawing phase, the Contractor shall submit two (2) sets of paint color samples to the Township for review and approval.

Each sample shall consist of a 12" x 12" metal panel finished in the proposed paint color, with the corresponding color identification clearly labeled on the back of each panel. The Township shall be allowed fourteen (14) calendar days from receipt of the samples to review and approve the submitted colors.

The Contractor shall be responsible for obtaining any further engineering stamps if changes to the original design are required. In order to obtain the final sign permits by the township.

Shop drawings shall include, at a minimum: overall sign dimensions; sign construction and materials; structural support details; foundation and footing details; attachment details; masonry base details; electronic display mounting details; electrical requirements and connections; disconnect locations; electri-cal load calculations; finish and paint information; and other information reasonably required to demonstrate compliance with the Contract Documents.

No fabrication or installation shall proceed until required submittals have been reviewed and approved by the Owner and/or applicable permitting authorities.

Approval of Contractor submittals shall not relieve the Contractor of responsi-bility for the accuracy, completeness, code compliance, dimensions, structural adequacy, or performance of the work.

4. CONCRETE FOUNDATION AND PRIMARY STRUCTURAL SUPPORT

The Contractor shall furnish and install the concrete foundation and primary structural support posts required for the monument sign. The foundation and structural support shall be in accordance with applicable building codes, site conditions, manufacturer requirements, and Pennsylvania requirements. The Contractor may utilize an approved subcontractor to perform the foundation and structural support work; however, the Contractor shall remain fully respon-sible for the completed work.

The foundation is to accommodate the monument sign, electronic displays, wind loads, dead loads, soil conditions, and other applicable design criteria.

The Contractor shall verify all dimensions and conditions and shall provide any additional final engineered foundation details as required for permitting and construction.

All site work shall be reliant on PA One Call to ensure understanding that no lines are struck during excavating. The Contractor will be responsible for any damage to exsiting utilities struck during work. Any lines found to be under-neath the existing foundation may need to be Hydro Dug and foundation adjustment may be required. The contractor shall immediately inform the Township of any potential issues that may inhibit completing work.

5. BRICK BASE

The Contractor shall furnish and install the non-structural brick base, base pad, and associated concrete footer for the monument sign. Brick materials shall comply with the applicable project brick specification, including require-ments for product, size, color, finish, mortar, and installation.

The Contractor shall provide an experienced and qualified mason for installa-tion of the brick base.

The completed brick base shall be plumb; level; square; uniform in appearance;

properly aligned with the monument sign; and installed in a neat and workmanlike manner. The Contractor shall protect the brick base and surrounding work from damage during construction and shall clean all masonry upon completion. Any damaged, cracked, stained, improperly installed, or otherwise unacceptable masonry shall be repaired or replaced at the Contractor's expense.

6. ELECTRICAL WORK

The electrical work by the Sign Contractor shall include all labor, materials, equipment, conduit, wiring, fittings, fuses, disconnects, electric meter unit, meter enclosure, connections, grounding, testing, and incidental work necessary to provide a complete and operational electrical installation for the monument sign.

All electrical work shall comply with all applicable local codes and ordinances and utility company requirements. All applicable equipment and components shall be UL Listed.

The Township shall coordinate with Penn Power to initiate the final electrical service connection. The Contractor shall be responsible for obtaining and submitting all required electrical inspection reports, certifications, and approvals for the completed installation to the Township in order to obtain the final electrical service connection.

6.1 Utility Service

Penn Power will provide the electrical service connection at the top of the utility pole located approximately 25 to 30 feet from the monument sign.

Cranberry Township will submit the request to Penn Power for new electrical service at the utility pole 30+ days prior to needing it. The Contractor shall furnish and install a dedicated, freestanding electrical pedestal service unit or meter-main combination unit near the utility pole from which service will be provided. The unit shall be installed on a concrete footer/pad and shall comply with applicable codes and Penn Power requirements.

The Contractor shall provide and install the electrical line and associated equipment required for Penn Power to extend the service up the utility pole and make the final connection to the pole. Penn Power requires 35’ plus of extra wiring coiled at the pole prior to any township inspection. Upon completion and approval of inspections, Penn Power will perform the final connection to the utility pole. The Contractor shall coordi-nate its work with Cranberry Township and Penn Power to ensure that the service unit, electrical line, and final utility connection are properly coordinated.

6.2 Contractor Electrical Work

The Contractor, through its properly licensed electrical contractor or qualified electrical subcon-tractor, shall furnish and install all electrical work from the meter location to the monument sign.

This work shall include, but shall not be limited to: underground conduit;

conductors and wiring; pull boxes and fittings, where required; grounding and bonding; discon-nects; final connections to the monument sign; connections to both electronic video displays;

connections for illuminated graphics and logos; electrical connections required by the Watchfire equipment; testing; and all other electrical components necessary for an operational installa-tion. The Contractor shall provide the final electrical connections and required disconnects at the monument sign.

6.3 Electrical Coordination

The Contractor shall coordinate all electrical requirements with Cranberry Township's designat-ed representative; the Watchfire representative; the Contractor's electrical contractor/subcon-tractor; and Penn Power, as applicable.

The Contractor shall verify the final electrical requirements for all equipment prior to installation.

The Contractor shall not rely solely upon preliminary electrical information shown on the Contract Documents. Final equipment requirements shall be confirmed with the equipment manufacturer prior to installation.

6.4 Electrical Loads

The electrical system shall be designed and installed to accommodate the requirements of both electronic video displays. For bidding purposes, the anticipated electrical requirement is approx-imately 20 amps per electronic video display The electrical system shall also accommodate the illumination requirements for the double sided static header graphics. The Contractor shall verify all final electrical loads and equipment requirements with Watchfire.

6.5 Underground Trenching

All trenching required to install electrical wire and conduit from the the light pole to the meter location to the monument sign shall be performed by the Contractor. Trenching shall comply with all applicable local, state, and federal codes, regulations, utility requirements, and applica-ble site restrictions. All underground electrical work shall remain within the applicable property lines and required setbacks.

The Contract Documents indicate a suggested trench routing and final meter location for reference. The routing shown shall not relieve the Contractor of responsibility for field verifica-tion or coordination. Following award, the Contractor shall provide the Owner with final trench-ing plans showing the proposed conduit routing, depths, utility crossings, electric meter location and other information necessary to demonstrate compliance with applicable requirements.

The Contractor shall verify the location of existing utilities prior to excavation and shall be responsible for protecting existing utilities and site improvements from damage. Any damage caused by the Contractor to existing utilities, paving, or structures shall be repaired at the Contractor's expense.

7. PAINT AND FINISH SAMPLES

Prior to fabrication and application of final finishes, the Contractor shall provide 6" x 6" metal panel samples demonstrating the proposed paint colors and finishes. Samples shall be submit-ted to both Cranberry Township and the project designers (DBX) for review and approval.

Project Speci�cationsCranberry Township - Park Station Sign Update

New Freestanding Electrical Meter Site to be located near Shrubs on Erie Mashuta Drive

8. LANDSCAPING AND SITE RESTORATION

The Contractor shall be responsible for restoring all areas disturbed by its work to a condition suitable for final landscaping. The Contractor shall:

A. Restore disturbed grades to blend with the existing surrounding slope and site conditions.

B. Provide a minimum of 3 inches of topsoil over disturbed areas requiring restoration.

C. Match existing grades at the limits of disturbance and provide positive drainage.

D. Remove excess soil, rock, debris, and construction materials from the work area.

E. Seed all newly disturbed soil areas with contractor-grade grass seed.

F. Cover newly seeded areas with straw or another appropriate biodegradable covering material suitable for establishing the grass seed and controlling erosion.

G. Leave the site in a clean, stable, and workmanlike condition.

H. The Contractor shall repair any settlement, erosion, rutting, or other site disturbance resulting from its work prior to final acceptance.

120'-0 3/16"

9. DEMOLITIONS & REMOVALS

9.1 Pre-bid Site Visit

All bidders are strongly encouraged to visit the project site prior to submitting a bid to familiarize themselves with existing conditions, access limitations, the existing monu-ment sign and attached fence, utility locations, and other conditions that may a�ect demolition, removal, and installation of the new monument sign. The Contractor shall include in its bid all costs necessary to perform the specified demolition and removal work in accordance within these Contract Documents.

9.2 Existing Monument Sign

Existing Sign Dimensions: 8'-0 3/4" high x 9'-6" wide.

The Contractor shall be responsible for the complete demolition, removal, and disposal of the existing monument sign structure and foundation as necessary to accommodate installation of the new monument sign and foundation. All demolition and excavation activities shall be coordinated with PA One Call, and required utility mark-outs shall be obtained and verified prior to commencing work.

9.3 Existing Spotlight & Electrical Removal

Remove two (2) existing ground spotlights. The electrical line to these lights originates in the existing emergency signal cabinet. The contractors will be responsible for coordinat-ing the wire removal between the lighting units and the first electrical vault nearest the lights. Any remaining wiring leading back to the emergency signal in the vault shall be cut and capped.

9.4 Fence - Removal and Reinstall Fence

During demolition and removal of the existing sign, the Contractor shall carefully detach, preserve, and retain all existing fence components attached to the monument sign, including all associated hardware, fasteners, and other reusable pieces. The Contractor shall protect the salvaged materials from damage, organize and secure them, and coordinate with the Owner regarding their storage location.

Once the new sign has been installed, new fence shall be installed to the le� and right side of the sign and remain in-line with the current fencing. The new fencing will not connect to the sign due to the location of the video display, a gap will be maintained between the end posts and the sign. Final gap spans to be determined once the new sign is installed. The contractor will supply Two new posts and associated hardware inorder to reinstall the fence. The existing fence specifications are found in these design drawings on page 17. It is anticipated that the existing fence may be cut to new sizes in order to achieve the final gap determined.

9.5 Existing Township Fiber/Data line

A Township-owned fiber-optic line has been identified as potentially located near or beneath the existing sign. Prior to excavation, the Contractor shall verify and locate the line’s actual position. The Contractor shall be responsible for performing all demolition, excavation, and foundation/footer installation activities in a manner that protects the existing fiber-optic line from damage or disruption. All work shall be coordinated as necessary to avoid severing or otherwise damaging the line. (See page 16 for GIS plan)

EXISTING CONDITIONS EXISTING CONDITIONS

Project Speci�cationsCranberry Township - Park Station Sign Update

Remove fence to existing post and preserve for reuse.

New End post - Final gap to be determined

Remove fence to brick column and preserve for reinstalltion to new post

New End post - Final gap to be determined

9. DEMOLITIONS AND REMOVALS - continued

9.5 Tree Trimming Work and Shrub Removal Services

The Contractor shall provide tree trimming and shrub removal services as necessary to improve the visibility, sightlines, appearance, and clearance of the proposed sign for southbound tra�c on Route 19. For the purposes of this specification, low branches shall be defined as branches located below 8'-0" above grade within the sightline between the roadway and the proposed sign location.

Tree trimming shall be performed using appropriate industry-standard pruning practices, equipment, and methods to minimize damage to trees and surrounding property. The Contractor shall anticipate that certain tree trim-ming activities may require access beyond ground level. All branches, trim-mings, and debris generated by the work shall be removed from the work area and properly disposed of.

The scope of tree trimming shall be limited to the trees and branches identi-fied in the design drawings and/or marked in the field with orange tape by the Township. The Contractor shall coordinate with the Township to confirm the extent of the required work prior to commencement. Tree removal, cabling, bracing, or other tree care services shall be included only as necessary for the safe completion of the specified work and shall require Township approval where beyond the identified scope.

The Contractor or its landscaping subcontractor shall remove two (2) low hedges, as indicated in the accompanying image, to improve sightlines to the proposed sign. Upon completion of hedge removal, the Contractor shall restore the a�ected areas to match existing site conditions. All resulting holes shall be backfilled with clean fill and graded to match the surrounding land-scape. Mulch shall be replaced over the disturbed areas to match the adjacent landscaped areas.

All tree trimming and shrub removal work shall be subject to existing site conditions, weather, vegetation condition, accessibility, and other factors a�ecting the safe execution of the work. Any unforeseen conditions or work beyond the specified scope shall be brought to the Township's attention for review and approval prior to proceeding.

Tr ee

Tr ee

8’ -0

8’ -0

Shrub Brush Removal 2 total Care should be taken to ensure final visual aesthetic of shrubs remains natural.

Branch removal Tree limbs to be removed will be indicated with orange marker tie.

Branches shall be pruned so that no branch is within 2’-0” of the fence. Care should be taken to ensure final visual aesthetic of tree remains natural.

Shrub #1 Shrub #2

R E

A D

L.

.D

R E

A D

.D

9'-2"

2' -0

/4

8'-3"

8'-0" screen

4' -0

Sc re en

Elevation Scale 1’=1’-0”

Side View Scale 1’=1’-0”

Matthews Blackguard

MP33348

4Matthews Lucky Red

MP16043

3 Matthews Olive Whip

MP00805

5Matthews White Wood

MP42225

1 Matthews Omlibos Green

MP11083

Top Cap painted 1/8” thk. aluminum cabinet

Header Panel painted 1/8” thk. aluminum cabinet with individually routed flush acrylic face and translu-cent vinyl internally illuminated.

Road side Station Graphic panel routed flush acrylic face and translucent vinyl internally illuminated.

One side shall have a removable face for access to LEDS for maintenance. No light leakage will be acceptable from any joints.

Reveals 1, 2 and 3 3/4“ high, painted 1/8” thk. aluminum

End Cabinets

- painted 1/8” aluminum cabinet

Watchfire Display

- painted 1/8” aluminum cabinet 5in H x 8 3in L x 5in D Viewing Area: 4 H x 8 L

Trim #1 & #2

- painted 1/8” aluminum cabinet

Brick Paver Base

- Red brick base, 8 course height bellow landscaping. Built on 7 1/2” thk. concrete base. below grade

Brick Paver Base

- Red brick base, 10 course height. Built on 7 1/2” thk. concrete base. below grade.

Bricks to match: Triangle Brick Co.

Modular, Red Wirecut.2 1/4" x 3 9/16" x 7 5/8"

Push thru Illuminated graphic

- 1/4+- thk. White Translucent acrylic sheet with translucent vinyl first surface. Final color specifi-cations to be provided during fabrication.

Flush with aluminum surface.

Right side only (facing tra�c)

Concrete pad for Concrete pad for brick base below/at grade

Header Panel

Top Cap

Reveal#2

Reveal#1

Trim #1

End Cabinets

Brick Paver Base

Trim #2

Reveal#3

Watchfire Display Cabinet Size: 4

Elevation Drawings

Cranberry Township - Park Station Sign Update

8' -8

1 / 2"

4' -5

1 / 4"

1'-

1 / 8"

1'-11"

1'-7"

1'-5"

Push-thru Illuminated

Graphic

If necessary any external shut-o� switches and photocells shall be locate on the building side of the sign and

3 /

4"

North Bound Rt 19 View

Sign Renderings

Cranberry Township - Park Station Sign Update

A D

.D

R E

A D

.D

R E

A D

.D

R E

A D

.D

2'-0 7/8"

Elevation Scale 1’=1’-0”

Side View Scale 1’=1’-0”

Section A-A Scale 1’=1’-0”

CC

CC'

Sign DrawingsCranberry Township - Park Station Sign Update

B -B

B -B

9'-2"

4" 8'-11"

1'-

1 / 8"

2'-6 1/2" 2'-6 1/2"

/1 6"

1'-11"

1'-5 1/2"

2' -0

/4

1 /

2"

9'-9 1/8"

9'-6"

A

A

8' -8

1 / 2"

1 3 /8

1'-7"

1 3/4"

1'-7"

Detail 2

Detail 1

3 /

4"

7 /

8"

3 / 4"

3 1/2" O.D.

1'-7"

1'-7" 5" 5"

3 1/2"

1'-5 3/4"

3 1/2"

1'-5 3/4"

1'-9 5/16"

1'-9 5/16"

8'-3"

8'-0" screen

4' -0

Sc re en

1/4” airspace top to allow for display Insertion

1/8” space each side for display insertion

4' -5

1 / 4"

1'-4 7/8"

7/8"

1'-4 7/8" 7/8"

Section C-C Detail 1 CVFC Logo Scale 1 1/2”=1’-0” Scale 1 1/2”=1’-0” Scale 1 1/2”=1’-0”

Section A-A Scale 1’=1’-0”

Section B-B Scale 1’=1’-0”

Color Specifications Scale: NTS

Sign DrawingsCranberry Township - Park Station Sign Update

7 5/8"

9'-9 1/8"

2' -0

7 / 8"

1'-

/1

6"

1'-1 1/2"

7 /

8"

1'-7"o.c.

1'-

1/ 8" o.

c.1'-

1 /

2"

3/

4" o.

c.

1'-

1 / 2"

1'-

1 / 8"

1'-7"

1'-0 1/8"

1'-

1 / 8"

1/

2" o.

c.

9 /

Orange PMS #124

Red PMS #704

1'-9 5/16"3 1/2"

1'-11 1/16" o.c. 5'-11" 1'-11 1/16" o.c.

Structural Details

Cranberry Township - Park Station Sign Update

Structural Details

Cranberry Township - Park Station Sign Update

Cabinet Specifications Quote # 2617178.1 Sign ID 2223218

Model / Matrix W10 / 120 x 240 Faces 2

Sign Dimensions (Imperial) 4ft 5in x 8ft 3in x 5in Access Type Front Service

Overall Height 53.00 [134.6] Overall Width 99.00 [251.5]

Viewing Height 48.00 [121.9] Viewing Width 96.00 [243.8]

Weight 328 lbs.

Weight w/Hardware 364 lbs.

Electrical (per Face) Voltage 120

Total Amps 20.0 Killowatt Hr/Day 12.4 KWHrs

Bottom Left Amp Draw 20.0 Mounting Locations

Mounting Type / Qty Not Requested / 0 Dimension "A" 50.75 [128.9]

Wind Load Requirements Vertical Attachment Points / Uprights

(Min) 0 / 2

Spacing (Max) 115.20 [292.6] Cantilever (Max) 57.60 [146.3]

Spacing (Optimal) 49.50 [125.7] Cantilever (Optimal) 24.75 [62.9]

Notes

Generated 10/16/2026 1:28:02 PM

Customer Jobsite 684600 - Advance Sign Co LLC 2121 Robinson Blvd

Pittsburgh, PA 15221-1562

Cranberry Safer Video

Watch�re Speci�cation Sheet

Cranberry Township - Park Station Sign Update

T. Prather

2 2

U.S. IMPERIAL UNITS 1

COPYRIGHT © 2020

WATCHFIRE SIGNS, LLC.

Provide technical support related to sign assembly, mounting and wiring during installation. Technician will explain and offer advice on all aspects of installation.

Train customers on the use of sign

Verify winds are not in excess of 15mph at the time of install.

Lift sign off the truck utilizing lifting points.

Assemble the sign if shipped in multiple sections. Signs greater than 48'4" in length are shipped in multiple sections.

nsure the sections are never left to free-stand and are always secured by the crane or framing during the installation and stacking process.

ttach Watchfire provided camera to the camera boom. un the camera cable inside the entire length of the boom. Secure the camera boom bracket to the sign corner and then attach the camera boom. Connect the webcam cable to the POW48 inside the sign cabinet.

Mount the Sign.

Electrician Responsibilities Pre-install

Install electrical service and meter at jobsite.

Install main circuit panel.

Install conduit and wiring from the distribution panel to a junction box at the top of the structure.

Installation Day Attach Watchfire provided temperature sensor to the structure. Typically, the sensor will mount easily on the bottom of the catwalk or bottom edge of the sign cabinet. Route the cable through the hole in the bottom of the sign and to the first flare.

un power lines to the disconnects on the back of each sign section.

Verify all local electrical codes are adhered to.

Verify the correct voltage.

Turn on power.

If power is not applied on the day of install, you MUST contact Watchfire support before cycling power for the first time.

Failure to follow recommended installation procedures could result in voided warranty.

Watch�re Speci�cation Sheet

Cranberry Township - Park Station Sign Update

Watch�re Speci�cation Sheet

Cranberry Township - Park Station Sign Update

Current GIS plan showing Fiber cable location

Underground UtilitiesCranberry Township - Park Station Sign Update

Fence Specifications to be provide by Township

Existing Fence Speci�cationsCranberry Township - Park Station Sign Update

File details come from the government source that posted it. Updated .