1-Montgomery Boat Ramp Front Ends.pdf

PDF 16 MB Posted

Attached to
BOAT RAMP CONSTRUCTION
Solicitation number
Not on record
Issued by
Lycoming County, Pennsylvania

About this file

This is a Project Manual and Bidding & Contract Documents package prepared by Larson Design Group for Montgomery Borough, Pennsylvania, detailing the construction of a boat ramp facility in Montgomery, PA. The project encompasses general construction work including demolition of the existing boat ramp, installation of a new concrete boat ramp, temporary cofferdam installation and removal, erosion and sediment control measures, construction of a concrete block building, installation of chemical storage tanks, and installation of chemical dosing pumps and related equipment. Sealed bids for Contract No. 1 - General Construction will be received electronically via PennBid until 2:00 PM local time on March 6, 2026. A pre-bid conference is scheduled for 10:00 AM on February 18, 2026, at the Montgomery Borough Office, 35 S. Main Street, Montgomery, PA 17752, with attendance encouraged but not mandatory. The contract specifies a substantial completion date of 180 calendar days after the contract times commence to run, with final completion within 210 calendar days. Liquidated damages are assessed at $1,500 per day for failure to achieve substantial completion and $1,000 per day for failure to complete remaining work following substantial completion.

Each bid must be accompanied by a certified check or bid bond in the amount of ten percent of the total bid. The project is funded through a grant from the Pennsylvania Fish and Boat Commission and the Owner. Contractors must comply with Pennsylvania Prevailing Wage Act requirements, with prevailing wage rates provided for various classifications. The contract requires performance and payment bonds, comprehensive insurance coverage including workers' compensation, commercial general liability with minimum limits of $2,000,000 general aggregate and $1,000,000 per occurrence, and automobile liability coverage. All work must comply with Pennsylvania Department of Environmental Protection Management of Fill Policy, and contractors are responsible for coordinating with public agencies for inspections. The Owner reserves the right to waive irregularities and reject any or all bids, awarding the contract to the lowest responsible bidder. Montgomery Borough is an Equal Opportunity Employer, and all contractors must comply with nondiscrimination and sexual harassment requirements under federal and Pennsylvania law.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

BIDDING & CONTRACT DOCUMENTS

Boat Ramp Construction

Contract No. 1 – General Construction

Prepared for:

Montgomery Borough 35 South Main Street Montgomery, Pennsylvania 17752

Prepared by:

LARSON DESIGN GROUP

1000 Commerce Park Drive, Suite 201 Williamsport, PA 17701

LDG Project No. 5870-034

February 2026

THIS PAGE INTENTIONALLY LEFT BLANK

LDG 5870-034

TABLE OF CONTENTS 000110 - 1

TABLE OF CONTENTS

SERIES 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Cover

000110 Table of Contents

000101 Project Title Page

001100 (C-111) Advertisement for Bids

002113 (C-200) Instructions to Bidders

002513 Pre-Bid Meeting

003100 Available Project Information

Pennsylvania Fish and Boat Commission Grant

PA Prevailing Wage

Pennsylvania Fish and Boat Sign Requirements

004113.1 (C-410) Bid Form

004303 (C-430) Bid Bond (Penal Sum)

004393 Bid Submittal Checklist

004513.1 (C-451) Qualifications Statement

004519 Non-Collusion Affidavit

005100.1 (C-510) Notice of Award

005213 (C-520) Agreement Form

005500.1 (C-550) Notice to Proceed

006113.13 (C-610) Performance Bond

006113.16 (C-615) Payment Bond

006363 (C-941) Change Order Form

006516.1 (C-625) Certificate of Substantial Completion

006519.16 Affidavit of Release of Liens Form

006519.19 Consent of Surety to Final payment Form

007213 (C-700) General Conditions

007314 (C-800) Supplementary Conditions

009113.xx Addendum

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary

012100 Allowances

012500 Substitution Procedures

012600 Contract Modification Procedures

012900 Payment Procedures

012900.1 Contractor’s Application for Payment

013100 Project Management and Coordination

013100.1 RFI Form

013200 Construction Progress Documentation

013233 Photographic Documentation

013300 Submittal Procedures

013300.1 Contractor’s Certification

014000 Quality Requirements

014200 References

TABLE OF CONTENTS 000110 - 2

015000 Temporary Facilities and Controls

016000 Product Requirements

017300 Execution

017700 Closeout Procedures

017839 Project Record Documents

END OF SECTION 000110

PROJECT TITLE PAGE 000101 - 1

DOCUMENT 000101 - PROJECT TITLE PAGE

1.1 PROJECT MANUAL– BIDDING & CONTRACT DOCUMENTS

A. Project: Boat Ramp Construction

B. Owner: Montgomery Borough

35 South Main Street

Montgomery, PA 17752

C. Owner Phone: 570-547-1671

D. Engineer’s Project No: 5870-034

E. Engineer: Larson Design Group

1000 Commerce Park Drive, Suite 201

Williamsport, PA 17701

F. Engineer Phone: (570) 244-3454

G. Engineer Fax: (570) 323-9902

H. Engineer Web Site: www.larsondesigngroup.com

I. Issued: February 6th, 2026

END OF DOCUMENT 000101

http://www.larsondesigngroup.com/

EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

MONTGOMERY BOROUGH

MONTGOMERY BOROUGH, LYCOMING COUNTY, PENNSYLVANIA

BOAT RAMP CONSTRUCTION

CONTRACT No. 1 – GENERAL CONSTRUCTION

ADVERTISEMENT FOR BIDS

Sealed Bids for the construction of the Boat Ramp Construction will be received electronically via PennBid (https://pennbid.bonfirehub.com) by Montgomery Borough until 2 P.M. local time on March 6, 2026.

Bids will be received for Contract No. 1 – General Construction.

Bidding and Contract Documents may be viewed and downloaded online at no cost on PennBid (https://pennbid.bonfirehub.com). Following registration, complete sets of Bidding & Contract Documents may be downloaded from the website as portable document format (PDF) files. The cost of printing Bidding and Contract Documents will be the sole responsibility of the interested party. For questions pertaining to access and use of the website, contact PennBid at 610-693-4769, or by email at info@pennbid.net.

A Pre-Bid Conference will be held at 10:00 AM local time on February 18, 2026 at the Montgomery Borough Office, 35 S. Main Street, Montgomery, PA 17752. Attendance at the Pre-Bid Conference is highly encouraged but is not mandatory.

Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him.

The Contractor shall ensure that employees and applicants for employment are not discriminated against because of race, age, color, religion, sex, national origin or handicap status; and comply with the Nondiscrimination/Sexual Harassment Clause included in the Supplementary Conditions, the Americans with Disabilities Act, the Pennsylvania Human Relations Act, federal and Pennsylvania laws and regulations, relating to non-discrimination and sexual harassment, drug-free workplaces and disadvantage business enterprises.

Montgomery Borough reserves the right to waive any irregularities and to reject any and all bids and to award either contract to the lowest responsible bidder for the total of all bid items.

No bidder may withdraw his or her bid within ninety (90) days after the actual opening thereof.

Montgomery Borough is an Equal Opportunity Employer.

Advertise Date:

Proof of Publication requested.

END OF ADVERTISEMENT FOR BIDS

https://pennbid.bonfirehub.com/

EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page

Article 1 – Defined Terms

Article 2 – Copies of Bidding Documents

Article 3 – Qualifications of Bidders

Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site ............................................................................................................................... 2-3

Article 5 – Bidder’s Representations .......................................................................................................... 3-4

Article 6 – Pre-Bid Conference ................................................................................................................... 4-5

Article 7 – Interpretations and Addenda

Article 8 – Bid Security

Article 9 – Contract Times

Article 10 – Liquidated Damages

Article 11 – Substitute and “Or-Equal” Items ............................................................................................ 5-6

Article 12 – Subcontractors, Suppliers, and Others

Article 13 – Preparation of Bid

Article 14 – Basis of Bid .............................................................................................................................. 7-8

Article 15 – Submittal of Bid

Article 16 – Modification and Withdrawal of Bid

Article 17 – Opening of Bids

Article 18 – Bids to Remain Subject to Acceptance

Article 19 – Evaluation of Bids and Award of Contract .............................................................................. 8-9

Article 20 – Bonds and Insurance

Article 21 – Signing of Agreement

Article 22 – Sales and Use Taxes

Article 23 – Contracts to be Assigned

Article 24 - Wage Rate Requirements

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued and where the Bidding procedures are to be administered:

Larson Design Group 1000 Commerce Park Drive, Suite 201 Williamsport, PA 17701

B. Bidder – The individual or entity who submits a Bid.

C. Bidding Documents – Project Manual Bidding & Contract Documents.

D. Successful Bidder – The lowest responsible Bidder submitting a responsive Bid to whom Owner makes an award.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be obtained from the following website: PennBid (bonfirehub.com). Bidders are required to register on the website for the ability to view and/or acquire the Bidding Documents.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit the following information with the Bid.

A. Qualifications Statement.

B. Non-Collusion Affidavit.

3.02 A Bidder’s failure to submit required qualification information may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

https://pennbid.bonfirehub.com/portal/?tab=login https://pennbid.bonfirehub.com/portal/?tab=login

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor. In addition, the Contractor is responsible for contacting Montgomery Borough (570-547-1671) regarding any bonding requirements for the use of the Montgomery Borough roads that provide access to the Site.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. Those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others. Call Before You Dig! Pennsylvania State law requires a three (3) business day notice (does not include state holidays or weekends), but not more than ten (10) business days prior to the start of excavation and 10 business day notice, but not more than 90 business days in Design Stage.

Call 8-1-1 or 1-800-242-1776, PA One Call Serial No. 20260333207. The Designer has obtained this Serial Number(s) as required by PA Act 287, as amended.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A Pre-Bid Conference will be held at the time and location stated in the Advertisement for Bids.

Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of Record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Messages/Vendor Discussions” feature in PennBid no later than seven (7) days prior to the date for receipt of bids.

7.02 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.03 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award or Notice of Award, and the Bid security of that Bidder will be forfeited to the Owner as liquidated damages for such failure and not as a penalty.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 90 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute materials and

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date of receipt of Bids in the case of a proposed substitute and 5 days prior in the case of a proposed “or-equal.” Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraph 7.04 and 7.05 of the General Conditions after the effective date of the Contract.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

11.03 If an award is made, Contractor shall be allowed to submit proposed substitutes and “or-equals” in accordance with the General Conditions.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

12.02 If required by the bid documents, the apparent Successful Bidder, and any other Bidder so requested, shall submit with the bid, a list of the Subcontractors or Suppliers proposed for all portions of the Work.

If requested by Owner after bid submission, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

12.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

12.04 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has a reasonable objection.

12.05 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC7.06.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7

ARTICLE 13 – PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab)

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign.

The partnership’s address for receiving notices shall be shown.

13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.

13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.

13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.

13.07 All names shall be printed in ink below the signatures.

13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 14 – BASIS OF BID

14.01 Base Bid

A. Bidders shall submit a Bid on a lump sum basis for the base Bid.

14.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8

14.03 Allowances

A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.

ARTICLE 15 – SUBMITTAL OF BID

15.01 Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein.

Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.

16.03 If within two (2) business days after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 – OPENING OF BIDS

ARTICLE 18 – A SUMMARY OF BIDS RECEIVED WILL BE ISSUED VIA A PUBLIC NOTICE ON PENNBID SHORTLY AFTER BID OPENING, THE TIME OF WHICH IS LISTED IN THE INVITATION TO BID. IT SHOULD BE NOTED THAT BID RESULTS ARE SUBJECT TO FURTHER REVIEW AND SHOULD NOT BE CONSTRUED

AS ISSUANCE OF AN AWARD.BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9

19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Intent to Award.

19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 22 – SALES AND USE TAXES

22.01 Owner is exempt from Pennsylvania state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the Supplementary Conditions for additional information.

ARTICLE 23 – CONTRACTS TO BE ASSIGNED

Not Used

ARTICLE 24 – WAGE RATE REQUIREMENTS

24.01 Wage Rates: The Supplementary Conditions set forth requirements for the payment by the Contractor and its’ Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the Pennsylvania Prevailing Wage Act.

PRE-BID CONFERENCE 002513 - 1

DOCUMENT 002513 – PRE-BID CONFERENCE

1.1 PRE-BID CONFERENCE

A. Engineer will conduct a pre-bid conference as indicated below:

1. Conference Date: February 18, 2026

2. Conference Time: 10:00 AM

3. Location: Montgomery Borough Office, 35 South Main Street, Montgomery, PA 17752.

B. Attendance:

1. Prime Bidders: Attendance at pre-bid conference is recommended.

2. Subcontractors: Attendance at pre-bid conference is recommended.

C. Bidder Questions: Submit bidder questions through the PennBID website.

D. Agenda: pre-bid conference agenda will include review of topics that may affect proper preparation and submittal of bids, including the following:

1. Procurement and Contracting Requirements:

a. Advertisement for Bids.

b. Instructions to Bidders.

c. Bidder Qualifications.

d. Bonding.

e. Insurance.

f. Bid Security.

g. Bid Form and Attachments.

h. Bid Submittal Requirements.

i. Bid Submittal Checklist.

j. Notice of Award.

2. Communication during Bidding Period:

a. Obtaining documents.

b. Access to PennBid website.

c. Bidder's Requests for Information.

d. Bidder's Substitution Request/Prior Approval Request.

e. Addenda.

3. Contracting Requirements:

a. Agreement.

b. The General Conditions.

c. The Supplementary Conditions.

d. Other Owner requirements.

LDG 5870-023

PRE-BID CONFERENCE 002513 - 2

4. Construction Documents:

a. Scopes of Work.

b. Temporary Facilities.

c. Use of Site.

d. Work Restrictions.

e. Alternates, Allowances, and Unit Prices.

f. Substitutions following award.

5. Separate Contracts:

a. Work by Owner.

b. Work of Other Contracts.

6. Schedule:

a. Project Schedule.

b. Contract Time.

c. Liquidated Damages.

d. Other Bidder Questions.

7. Site/facility visit or walkthrough.

8. Post-Conference Addendum.

E. Minutes: Entity responsible for conducting the conference will record and distribute minutes to attendees. Minutes will be issued as modifications to the Bidding and Contract Documents in a written Addendum.

1. Sign-in Sheet: Minutes will include list of attendees.

END OF DOCUMENT 002513

AVAILABLE PROJECT INFORMATION 003100 - 1

DOCUMENT 003100 - AVAILABLE PROJECT INFORMATION

1.1 SUMMARY

A. Available Project Information Includes:

1. PA Prevailing Wage Decision

2. Pennsylvania Fish and Boat Commission Grant (contractor shall comply with all grant stipulations).

3. Pennsylvania Fish and Boat Commission Sign Requirements

B. Related Documents:

1. Document 00 21 13 - Instructions to Bidders

1.2 DECISION

A. A copy of the PA Prevailing Wage Decision is included in the Project Manual.

END OF SECTION 003100

Project Name: Boat Ramp Construction

General Description: This project will install a new boat ramp.

Project Locality Montgomery Borough

Awarding Agency: Montgomery Borough

Contract Award Date: 4/6/2026

Serial Number: 26-01068

Project Classification: Highway

Determination Date: 2/5/2026

Assigned Field Office: Scranton

Field Office Phone Number: (570)963-4577

Toll Free Phone Number: (877)214-3962

Project County: Lycoming County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 2/5/2026 Page 1 of 7

Project: 26-01068 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 7/1/2025 $39.08 $28.17 $67.25

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.63 $20.03 $60.66

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $42.48 $20.03 $62.51

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $36.84 $20.44 $57.28

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/4/2025 $32.23 $22.27 $54.50

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 6/1/2024 $37.78 $15.05 $52.83

Drywall Finisher 5/1/2024 $31.82 $24.75 $56.57

Drywall Finisher 5/1/2025 $33.24 $25.08 $58.32

Electricians 6/1/2025 $38.50 $26.76 $65.26

Electricians 6/1/2026 $41.57 $27.28 $68.85

Electricians 6/1/2027 $44.69 $27.95 $72.64

Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43

Elevator Constructor 1/1/2026 $61.26 $45.78 $107.04

Glazier 5/1/2024 $32.46 $20.93 $53.39

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Laborers (Class 01 - See notes) 5/1/2023 $23.08 $18.03 $41.11

Laborers (Class 02 - See notes) 5/1/2023 $25.08 $18.03 $43.11

Laborers (Class 03 - See notes) 4/30/2023 $26.98 $18.22 $45.20

Laborers (Class 04 - See notes) 4/30/2023 $28.48 $18.22 $46.70

Laborers (Class 05 - See notes) 4/30/2023 $28.98 $18.22 $47.20

Laborers (Class 06 - See notes) 5/1/2023 $25.08 $18.03 $43.11

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

Operators (Building, Class 01 - See Notes) 5/1/2024 $43.73 $30.08 $73.81

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2024 $45.98 $30.74 $76.72

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2024 $43.45 $29.99 $73.44

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/5/2026 Page 2 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2024 $45.70 $30.66 $76.36

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2024 $40.73 $29.18 $69.91

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2024 $39.59 $28.85 $68.44

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2024 $39.13 $28.73 $67.86

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2024 $38.26 $28.46 $66.72

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2024 $53.10 $34.27 $87.37

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2024 $52.75 $34.17 $86.92

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $31.32 $24.44 $55.76

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $35.58 $25.08 $60.66

Painters Class 3 (see notes) 5/1/2025 $42.67 $25.09 $67.76

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 6/1/2023 $37.81 $13.90 $51.71

Plasterers 6/1/2024 $38.46 $14.45 $52.91

Plumber/Pipefitter 5/1/2023 $41.36 $29.72 $71.08

Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21

Roofers 5/1/2024 $34.25 $21.89 $56.14

Roofers 5/1/2025 $36.10 $21.89 $57.99

Sheet Metal Workers 5/1/2024 $36.13 $31.23 $67.36

Sheet Metal Workers 5/1/2025 $37.30 $32.31 $69.61

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/5/2026 Page 3 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

Tile Setter 5/1/2025 $37.20 $19.24 $56.44

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/5/2026 Page 4 of 7

Project: 26-01068 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 5/1/2025 $36.87 $20.49 $57.36

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 6/1/2016 $32.43 $11.35 $43.78

Electric Lineman 1/1/2025 $66.33 $30.40 $96.73

Electric Lineman 9/1/2025 $68.06 $32.29 $100.35

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2024 $25.61 $19.49 $45.10

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 02 - See notes) 5/1/2024 $32.23 $19.49 $51.72

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 03 - See notes) 5/1/2024 $29.22 $19.49 $48.71

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 04 - See notes) 5/1/2024 $29.57 $19.49 $49.06

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 05 - See notes) 5/1/2024 $30.24 $19.49 $49.73

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 06 - See notes) 5/1/2024 $29.66 $19.49 $49.15

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 07 - See notes) 5/1/2024 $29.95 $19.49 $49.44

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 08 - See notes) 5/1/2024 $30.43 $19.49 $49.92

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2024 $42.30 $29.66 $71.96

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2024 $44.55 $30.32 $74.87

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2024 $42.02 $29.57 $71.59

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2024 $44.27 $30.24 $74.51

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2024 $39.11 $28.70 $67.81

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2024 $37.96 $28.38 $66.34

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 2/5/2026 Page 5 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2024 $37.51 $28.25 $65.76

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2024 $36.64 $27.98 $64.62

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2024 $51.39 $33.77 $85.16

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2024 $51.04 $33.67 $84.71

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2024 $41.41 $29.39 $70.80

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2024 $43.66 $30.07 $73.73

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2024 $40.24 $29.04 $69.28

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2024 $39.55 $28.83 $68.38

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2024 $39.10 $28.70 $67.80

Operators…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .