1-Montgomery Boat Ramp Front Ends.pdf

PDF 16 MB Posted

Attached to
BOAT RAMP CONSTRUCTION
Solicitation number
US.220811
Issued by
Lycoming County, Pennsylvania

About this file

This is a Project Manual and Bidding & Contract Documents package prepared by Larson Design Group for Montgomery Borough, Pennsylvania, detailing the construction of a boat ramp facility in Montgomery, PA. The project encompasses general construction work including demolition of the existing boat ramp, installation of a new concrete boat ramp, temporary cofferdam installation and removal, erosion and sediment control measures, construction of a concrete block building, installation of chemical storage tanks, and installation of chemical dosing pumps and related equipment. Sealed bids for Contract No. 1 - General Construction will be received electronically via PennBid until 2:00 PM local time on March 6, 2026. A pre-bid conference is scheduled for 10:00 AM on February 18, 2026, at the Montgomery Borough Office, 35 S. Main Street, Montgomery, PA 17752, with attendance encouraged but not mandatory. The contract specifies a substantial completion date of 180 calendar days after the contract times commence to run, with final completion within 210 calendar days. Liquidated damages are assessed at $1,500 per day for failure to achieve substantial completion and $1,000 per day for failure to complete remaining work following substantial completion.

Each bid must be accompanied by a certified check or bid bond in the amount of ten percent of the total bid. The project is funded through a grant from the Pennsylvania Fish and Boat Commission and the Owner. Contractors must comply with Pennsylvania Prevailing Wage Act requirements, with prevailing wage rates provided for various classifications. The contract requires performance and payment bonds, comprehensive insurance coverage including workers' compensation, commercial general liability with minimum limits of $2,000,000 general aggregate and $1,000,000 per occurrence, and automobile liability coverage. All work must comply with Pennsylvania Department of Environmental Protection Management of Fill Policy, and contractors are responsible for coordinating with public agencies for inspections. The Owner reserves the right to waive irregularities and reject any or all bids, awarding the contract to the lowest responsible bidder. Montgomery Borough is an Equal Opportunity Employer, and all contractors must comply with nondiscrimination and sexual harassment requirements under federal and Pennsylvania law.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .