1-IFB Churchill Borough 2026 GEDTF Sanitary Sewer Repairs.pdf
PDF 22 MB Posted
- Solicitation number
- US.226649
- Issued by
- Allegheny County, Chevy Chase Heights CDP, Pennsylvania
About this file
This is a comprehensive bid document and contract specification package for the Churchill Borough in Allegheny County, Pennsylvania, detailing sanitary sewer repair contracts managed by The Gateway Engineers, Inc. The project involves one excavation point repair, one manhole raise/adjustment, and four manhole-to-manhole CIPP (Cured-in-Place Pipe) lining repairs, along with associated work including CCTV verification, lateral reinstatement, protruding tap removal, traffic control, and site restoration. A mandatory pre-bid meeting is scheduled for March 26, 2026 at 10:30 a.m. at the Borough Building, with attendance required for bids to be considered responsive. Sealed proposals must be submitted electronically via PennBid before 10:00 a.m. on April 1, 2026, with public opening immediately thereafter. Substantial completion is required by October 15, 2026, and final completion by November 16, 2026, with liquidated damages of $500 per calendar day for delays. The contract will be awarded to the lowest responsible, responsive, and qualified bidder.
Pennsylvania Prevailing Wage rates are mandatory on this project. Bid security of ten percent of the total bid amount is required, with successful bidders obligated to provide performance and payment bonds equal to 100 percent of the contract price. Bids must include a lump sum for the excavation point repair, manhole raise, traffic control and mobilization; unit prices for CIPP lining per linear foot, heavy cleaning per linear foot, reinstatement of active laterals per unit, and removal of protruding taps per unit. The document specifies comprehensive requirements for submittals within fifteen days of Notice of Award, including construction schedules, equipment lists, traffic control plans, resident notification procedures, insurance certificates, and CIPP material certifications. All materials and equipment must be of good quality and new unless otherwise specified. The contractor is responsible for all disposal of excess materials at fully permitted off-site facilities, with no additional compensation for rock excavation or unforeseen subsurface conditions, and must maintain compliance with PennDOT standards, OSHA regulations, and all local, state, and federal requirements throughout the contract period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .