1-GLRA 2026 GCCS Expansion - Issued for Bid 2025-01-05.pdf

PDF 11 MB Posted

Attached to
Schilling Landfill Vertical Well Installation (Phase II)
Solicitation number
Not on record
Issued by
Pennsylvania

About this file

This document is a set of engineering drawings and specifications for the Schilling Landfill Vertical Well Installation (Phase II) project prepared by SCS Engineers for the Greater Lebanon Refuse Authority (GLRA) in Lebanon, Pennsylvania. The project involves the installation of vertical landfill gas (LFG) extraction wells, associated air and force main piping systems, protective cover grading, and well abandonment work at the Schilling Landfill located at 1800 Russell Road, Lebanon, Pennsylvania 17046. The scope of work includes installing four new vertical extraction wells (VWH049, VWH050, VWH051, and VWH052), redrilling nine existing wells, abandoning multiple existing wells and surface collector systems, installing new LFG header piping with air and force main lines, constructing road crossings with corrugated metal pipe, and installing air relief valves and leachate clean-out connections. All landfill gas conveyance piping is specified as SDR17 high-density polyethylene (HDPE) with minimum 5% slope, compressed air piping as SDR9 HDPE, and force main carrier piping as SDR11 HDPE. The drawings indicate all trench work requires a minimum 24 inches of cover over pipe, and all disturbed areas must be restored to original conditions. The issuance for bid date is January 5, 2026.

The document does not contain specific pricing information, contract terms, award dates, or financial details within the provided drawings and specifications. The engineering plans reference an April 2, 2025 survey by Hershey Surveying, Inc. and existing LFG system components from the June 26, 2023 as-built drawings. The project is registered with Pennsylvania and designed by Registered Professional Engineer Eric Randall Peterson (PE No. 077140) at SCS Engineers, located at 4330 Lewis Road, Suite 1, Harrisburg, Pennsylvania 17111. Construction notes emphasize coordination with the construction quality assurance (CQA) representative, owner, and LFG operator to minimize system shutdowns during implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREPARED FOR:

VERTICAL WELL INSTALLATION (PHASE II)

SCHILLING LANDFILL

LEBANON, PA 17046

GLRA LANDFILL

GREATER LEBANON REFUSE AUTHORITY

EXPLANATION OF "SECTION" OR "DETAIL" SYMBOL

N P R O J E C T D R A W I N G S

A N D

S P E C I F I C A T I O N S G L R A

G C C S

E X P A N S I O N G L R A

G C C S

E X P A N S I O N

C O V E R

S H E E T D W G l a y o u t

C O V E R p l o t t e d o n

P M

H e r v a t i n

C o l t o n

"SECTION" OR "DETAIL" IDENTIFICATION NUMBER

OR LETTER.

SHEET NUMBER ON

WHICH "SECTION" OR

"DETAIL" IS DRAWN.

GLRA

LANDFILLLEBANON COUNTY, PA

LOCATION MAP

USGS LEBANON, PA. QUADRANGLE

1000FT 2000FT

SCALE: 1:2000

500FT

HOR.

PROJECT LOCATION

1000FT

SHEET INDEX

1. COVER SHEET

2. EXISTING CONDITIONS SITE PLAN

3. PROPOSED SITE PLAN

4. PROTECTIVE COVER GRADES

5. WELL DRILLING DETAILS

6. EXTRACTION WELLHEAD DETAILS

7. GENERAL LFG DETAILS 1

8. GENERAL LFG DETAILS 2

9. ABANDONMENT DETAILS

10. DUAL EXTRACTION WELL DETAILS

PENNSYLVANIA

PREPARED BY:ISSUED FOR BID

01/05/2026

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q A

R

V W

B

Y

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

C T

I T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

J J S

J J S

C O

V E

R S

H E

E

PAD #1

PAD #7

PAD #5

PAD #3

PAD #2

PAD #6

PAD #4

PAD #7

PAD #5

D ra in

D ra in

GEOMEMBRANE CAP LIMITS

CLOSURE TURF CAP LIMITS

AIR PIPING

FORCE MAIN PIPING

AIR PIPING

AIR & FORCE MAIN PIPING

FORCE MAIN PIPING

HORIZONTAL COLLECTOR PIPING

AIR & FORCE MAIN PIPING

FORCE MAIN PIPING

EXISTING CELL LIMITS

LFG HEADER PIPING

HORIZONTAL COLLECTOR PIPING

GAS MONITORING PROBES

LEACHATE CLEANOUT RISERS

GAS MONITORING PROBES

LEACHATE CLEANOUT RISERS

HORIZONTAL COLLECTOR WELLHEADS

HORIZONTAL COLLECTOR WELLHEADS

BAROMETRIC DRAINS

EW-514 (SW)

VALVE

LFG SLIP WELL

ISOLATION VALVE

EXISTING CELL LIMITS

VERTWH002

LFG WELL

LFG SLIP WELL

LEACHATE CLEANOUT RISERS

HORIZONTAL COLLECTOR WELLHEADS

BAROMETRIC DRAINS

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

E X

IS

TI

N G

C O

N D

IT

IO

N S

S

IT

E P

LA

N

REFERENCES:

1. BACKGROUND TOPOGRAPHY AND SITE FEATURES PRODUCED FROM APRIL 2ND, 2025

SURVEY PROVIDED BY HERSHEY SURVEYING, INC. THE HORIZONTAL DATUM AND

VERTICAL DATUM SHOWN REFERENCE PENNSYLVANIA NAD83 STATE PLANE SOUTH

ZONE.

2. EXISTING LFG SYSTEM COMPONENTS TAKEN FROM SCS ENGINEERS DRAWING "GLRA

2023 GCCS AS-BUILT" DATED JUNE 26TH, 2023.

LEGEND

PAD #1

PAD #7

PAD #5

PAD #3

PAD #2

PAD #6

PAD #4

PAD #7

PAD #5

D ra in

D ra in

ARV

ARV

ARV

ARV

VWH036R

VWH033R

VWH038R

VWH034R

VWH049

VWH050

VWH051

VWH039R

VERTWH006R

VWH035R

VWH037R

VWH041RVWH052

VWH033

VWH036

VWH038

VWH034

VWH039

VERTWH006

VWH035

VWH041

VWH037

2" A

IR

2" FM

2" AIR

2" FM

2" A

IR

2" FM

2" AIR

2" FM

2" A

IR

2" F M

2" FM

2" A

IR

6"

6"

6"

6"

6"

6" 6"

6"

2" FM

ARV

NEW CMP ROAD CROSSING

NEW AIR RELIEF VALVE

NEW FM PIPING

NEW LFG WELL

NEW REDRILL WELL

VWH041R

VWH049

NEW LFG WELL

NEW REDRILL WELL

NEW WELL ABANDONMENT

VWH041R

VWH049

VERTWH006

NEW REDRILL WELL

NEW WELL ABANDONMENT

NEW SURFACE COLLECTOR ABANDONMENT

VWH041R

VERTWH006

PROPOSED 2026 CAPPING LIMITS

NEW LFG HEADER

NEW A&FM PIPING

NEW LFG HEADER

NEW A&FM PIPING

NEW LFG ISOLATION VALVE

NEW A&FM FLANGE

NEW CMP ROAD CROSSING

GEOMEMBRANE CAP LIMITS

CLOSURE TURF CAP LIMITS

AIR PIPING

FORCE MAIN PIPING

AIR PIPING

AIR & FORCE MAIN PIPING

FORCE MAIN PIPING

HORIZONTAL COLLECTOR PIPING

AIR & FORCE MAIN PIPING

FORCE MAIN PIPING

EXISTING CELL LIMITS

LFG HEADER PIPING

HORIZONTAL COLLECTOR PIPING

ARV

NEW AIR RELIEF VALVE

NEW FM PIPING

NEW AIR PIPING

NEW FM PIPING

NEW AIR PIPING

GAS MONITORING PROBES

LEACHATE CLEANOUT RISERS

GAS MONITORING PROBES

LEACHATE CLEANOUT RISERS

HORIZONTAL COLLECTOR WELLHEADS

HORIZONTAL COLLECTOR WELLHEADS

BAROMETRIC DRAINS

EW-514 (SW)

VALVE

LFG SLIP WELL

ISOLATION VALVE

EXISTING CELL LIMITS

VERTWH002

LFG WELL

LFG SLIP WELL

LEACHATE CLEANOUT RISERS

HORIZONTAL COLLECTOR WELLHEADS

BAROMETRIC DRAINS

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

P R

O P

O S

E D

S

IT

E P

LA

N

LEGEND

REFERENCES:

1. BACKGROUND TOPOGRAPHY AND SITE FEATURES PRODUCED FROM APRIL 2ND, 2025

SURVEY PROVIDED BY HERSHEY SURVEYING, INC. THE HORIZONTAL DATUM AND

VERTICAL DATUM SHOWN REFERENCE PENNSYLVANIA NAD83 STATE PLANE SOUTH

ZONE.

2. EXISTING LFG SYSTEM COMPONENTS TAKEN FROM SCS ENGINEERS DRAWING "GLRA

2023 GCCS AS-BUILT" DATED JUNE 26TH, 2023.

CONSTRUCTION NOTES:

1. TOPOGRAPHY DOES NOT NECESSARILY REFLECT CURRENT CONDITIONS IN ALL AREAS

AND IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.

2. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION.

3. ALL PROPOSED LANDFILL GAS CONVEYANCE PIPING SHALL BE INSTALLED AT A

MINIMUM OF 5% SLOPE (UNLESS APPROVED BY ENGINEER) IN THE DIRECTION

INDICATED. EXCAVATE TRENCH AS DEEP AS NECESSARY TO ACHIEVE MINIMUM

SLOPE. NO ADDITIONAL PAYMENT WILL BE ALLOWED FOR TRENCH EXCAVATION TO

MAINTAIN SLOPE.

4. TRENCH IS TO HAVE A MINIMUM OF 24 INCHES OF COVER OVER TOP OF THE PIPE,

UNLESS OTHERWISE NOTED.

5. ALL LANDFILL GAS CONVEYANCE PIPING SHALL BE SDR17 HDPE, SIZE AS INDICATED.

ALL COMPRESSED AIR PIPING SHALL BE SDR9 HDPE, AND ALL FORCE MAIN CARRIER

PIPING SHALL BE SDR11 HDPE.

6. ALL DISTURBED AREAS TO BE RESTORED TO ORIGINAL CONDITIONS.

7. COORDINATE ALL TIE-INS AND SYSTEM SHUTDOWNS WITH CQA REPRESENTATIVE,

OWNER, AND LFGE OPERATOR. SYSTEM SHUTDOWNS AND/OR ISOLATIONS SHALL BE

MINIMIZED.

INSTALL 12"Ø ROAD

CROSSING (TYP. 3)

INSTALL NEW AIR RELIEF VALVE

NEAR NEW WELL (TYP. 4)

INSTALL NEW VERTICAL

EXTRACTION WELL (TYP. 4)

INSTALL NEW 2"Ø AIR AND 2"Ø

FORCE MAIN TO NEW WELL (TYP.)

INSTALL NEW VERTICAL EXTRACTION

WELL AND ABANDON EXISTING

VERTICAL EXTRACTION WELL (TYP. 9)

ABANDON EXISTING FORCE MAIN PIPING AND

TERMINATE WITH A BUTT CAP. INSTALL NEW

FORCE MAIN DISCHARGE TO CLEAN OUT

TIE IN NEW FORCE MAIN

NEAR CLEAN OUT RISER

CO-14

INSTALL 6"Ø CMP ROAD

CROSSING (TYP. 6)

TIE-IN TO EXISTING VACUUM

RISER AT PAD5W

INSTALL NEW AIR PIPING FROM

WELL VWH040 TO VWH051

ABANDON STANDARD WELL AND

EXTEND VACUUM TO NEW WELL

(TYP. 5)

ABANDON VACUUM AND AIR AND

FORCE MAIN RISERS AT EXISTING

WELL VWH034

CONTINUE AIR AND FORCE MAIN FROM VWH008 TO

NEW WELL. INSTALL NEW VACUUM PIPING IN COMMON

TRENCH AND TIE-IN TO VACUUM RISER AT HZWH0026

INSTALL NEW 6"Ø GAS

CONVEYANCE PIPING TO NEW

WELL VWH035R AND ABANDON

EXISTING WELL

TIE IN TO EXISTING

VACUUM RISER AT

10000_12

ABANDON EXISTING FORCE MAIN PIPING TO

WELL VWH033 AND TERMINATE WITH A BUTT CAP.

TIE0IN FORCE MAIN DISCHARGE TO

EXISTING SOUTHWESTERN CLEAN OUT

NEW LFG WELL

VWH052

VWH036R

VWH033R

VWH038R

VWH034R

VWH049

VWH050

VWH051

VWH039R

VERTWH006R

VWH035R

VWH037R

VWH041RVWH052

NEW REDRILL WELL

VWH041R

VWH049

NEW ABANDONMENT WELL

EXISTING LEACHATE COLLECTION RISERS

EXISTING LEACHATE COLLECTION PIPE

BASE GRADE/TOP OF PROTECTIVE COVER

BASE GRADE/TOP OF PROTECTIVE COVER

EXISTING GRADE ELEVATION

EXISTING GRADE ELEVATION

FINAL GRADE ELEVATION

FINAL GRADE ELEVATION

PROPOSED BOREHOLE DEPTH

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

P R

O

TE

C

TI

V E

C O

V E

R G

R A

D E

S

WELL DRILLING NOTES:

1. PROPOSED BOREHOLE DEPTHS ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

DRILLING SHALL NOT COMMENCE UNTIL A SURVEY HAS BEEN COMPLETED AND THE

ISSUED FOR CONSTRUCTION WELL SCHEDULE HAS BEEN REVIEWED AND SIGNED BY

ALL PARTIES.

REFERENCES:

1. PROTECTIVE COVER GRADES TAKEN FROM DRAWING TITLED "GLRA STONE BASE SOUTH

PADS 1-7 (DEC 2022)" BY GLRA DATED SEPTEMBER 2008.

2. FINAL COVER GRADES TAKEN FROM SCS ENGINEERS DRAWING TITLED "GLRA FINAL

GRADES (PERMIT)" BY SCS ENGINEERS DATED MARCH 15TH, 2023.

3. EXISTING TOPOGRAPHY TAKEN FROM DRAWING TITLED DRAWING HSI-SURVBASE (APRIL

2025) BY HERSHEY SURVEYING INC. DATED APRIL 2ND, 2025.

LEGEND

STANDARD VERTICAL EXTRACTION WELL

WELL BORE REINFORCEMENT GRATE DETAIL

PERFORATED PIPE DETAIL

DRAFT WELL SCHEDULE

5 4

"∅ REBAR SPACED

6"x6"

P E R F O R A T E D

P I P E

L E N G T H

V A R I E S

S E E

W E L L

S C H E D U L E

S O L I D

P I P E

L E N G T H

V A R I E S

S E E

W E L L

S C H E D U L E

36"∅ BOREHOLE MIN.

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

W E

LL

D

R

IL

LI

N

G D

E

TA

IL

S

STANDARD EXTRACTION WELLHEAD DETAIL 1

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

E X

TR

A

C

TI

O N

W E

LL

H

E A

D D

E

TA

IL

LFG HEADER, AIRLINE & FORCEMAIN TRENCH DETAIL 5

CONSTRUCTION SUMMARY CHECKLIST 1

AIR & FORCE MAIN TIE-IN AT EXISTING WELL 4

TIE-IN TO EXISTING LATERAL RISER 2

3'-0" MIN.

DISTANCE TO BE 4'-0" LONGER THAN ROAD WIDTH

EXISTING STORM WATER BENCH OR ACCESS ROAD

ROAD CROSSING DETAIL 6

LEACHATE CLEAN-OUT 14 CONNECTION DETAIL 3

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

G E

N E

R A

L

LF

G D

E

TA

IL

S

FORCE MAIN CONNECTION INSTALLATION

FM AND AIR LATERAL DETAIL

FORCE MAIN AIR RELEASE VALVE AT NEW WELL 1

SOUTHWESTERN CLEAN-OUT CONNECTION DETAIL 4

TOP VIEW

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

G E

N E

R A

L

LF

G D

E

TA

IL

S

TIE-IN TO EXISTING LFG AND AFM PIPING AT STANDARD WELL ABANDONMENT 1

TIE-IN TO EXISTING LFG PIPING AT STANDARD WELL ABANDONMENT 2

EXISTING STANDARD WELL ABANDONMENT

FORCE MAIN ABANDONMENT 3

TIE-IN TO EXISTING LFG PIPING AT STANDARD WELL AND AFM ABANDONMENT

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

A B

A N

D O

N M

E N

T D

E

TA

IL

PLAN VIEWSIDE VIEW

PROPOSED PUMP INSTALL LIST 1

REGULATOR & DISCHARGE LINE 4

DUAL EXTRACTION WELL AIR

PUMP INSTALLATION DETAIL 2

DUAL EXTRACTION WELL

COMPRESSED AIR & FORCE MAIN TOP PACKAGES 3

DRAWING NO.

SCALE:

DATE:

P R

O J

N

O

D S

N

B

Y

D W

N

B

Y

C H

K

B

Y

Q

A P

P

B

Y

S H

E E

T

T

I T

L E

P R

O J E

T

L E

N

R E

V I S

I O

N D

A T

E

CADD FILE:

C L

I E

N T

S C

S E

N G

IN

E

E R

S S

TE

A

R N

S , C

O N

R A

D A

N D

S C

H M

ID

T

C O

N S

U

LT

IN

G

E N

G

IN

E E

R S

, I N

C

L E

W

IS

R D

. S U

IT

E

, H

A R

R

IS

B U

R G

, P A

P

H

7)

-5

S

C S

E N

G

IN

E E

R S

.C O

M of 10

11/21/2025

AS NOTED

GLRA 2026

S C

H

IL

LI

N

G L

A N

D

FI

LL

V

E R

TI

C

A L

W E

LL

IN

S

TA

LL

A

TI

O

N

P H

A S

E

II

G R

E A

TE

R

L E

B A

N O

N R

E

FU

S E

A U

TH

O

R

IT

Y

R

U S

S E

LL

R

D

LE

B A

N O

N , P

E N

N S

Y

LV

A N

IA

ISSUED FOR BID

01/05/2026

C

O

M

M

O

N

WE

A

L

T

H

O

F

P

E

N

N

S

Y L

V

A

N

I

A

REGISTERED

PROFESSIONAL

ENGINEER

NO. 077140

ERIC RANDALL PETERSON

D U

A L

E X

TR

A

C

TI

O N

W E

LL

D

E

TA

IL

GLRA 2025 GCCS Expansion COVER SHEET-1 - COVER
Sheets and Views
1 - COVER
GLRA 2025 GCCS Expansion PROPOSED DESIGN v0.3-2. EXISTING CONDITIONS SITE PLAN
Sheets and Views
2. EXISTING CONDITIONS SITE PLAN
GLRA 2025 GCCS Expansion PROPOSED DESIGN v0.3-3. PROPOSED SITE PLAN
Sheets and Views
3. PROPOSED SITE PLAN
GLRA 2025 GCCS Expansion PROPOSED DESIGN v0.3-4. PROTECTIVE COVER GRADES
Sheets and Views
4. PROTECTIVE COVER GRADES
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-5. WELL DRILLING DETAILS
Sheets and Views
5. WELL DRILLING DETAILS
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-6. EXTRACTION WELLHEAD DETAILS
Sheets and Views
6. EXTRACTION WELLHEAD DETAILS
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-7. GENERAL LFG DETAILS 1
Sheets and Views
7. GENERAL LFG DETAILS 1
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-8. GENERAL LFG DETAILS 2
Sheets and Views
8. GENERAL LFG DETAILS 2
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-9. ABANDONMENT DETAILS
Sheets and Views
9. ABANDONMENT DETAILS
GLRA 2025 GCCS Expansion DESIGN DETAILS v0.2-10. DUAL EXTRACTION WELL DETAILS
Sheets and Views
10. DUAL EXTRACTION WELL DETAILS

File details come from the government source that posted it. Updated .