The file's text, extracted by GovTribe without its formatting.
EXHIBIT C - PRICING TEMPLATE
RFP #1 FY27 - Dental Practice Management System
Instructions to Proposer. Complete all applicable fields. Pricing shall be comprehensive and shall include all costs necessary to provide, implement, migrate, configure, integrate, train, support, and maintain the proposed solution as described in the RFP. Clearly identify any assumptions, dependencies, minimum commitments, usage thresholds, third-party charges, or items not included in the stated price. Do not combine required and optional costs. All recurring costs shall be shown for a minimum of five years.
Prices shall be stated in U.S. dollars.
Identify whether each charge is one-time, annual, monthly, per user, per provider, per student, per transaction, usage-based, or otherwise calculated.
If a line item is included at no additional charge, enter “Included.” If not applicable, enter “N/A.” Do not leave required fields blank.
Optional products or services shall be separately identified and shall not be included in the evaluated base five-year total unless expressly requested by the College.
Identify all anticipated price increases, escalation factors, renewal caps, and the year in which each may first apply.
Pricing must identify all third-party licensing, payment processing, interfaces, travel, hardware, devices, storage, data-export, and other pass-through costs known or reasonably anticipated.
1. Vendor Information
| Vendor Information |
| Response |
Legal Vendor Name
Proposed Product / Platform
Primary Pricing Contact
Email / Telephone
Pricing Valid Through
Proposed Contract Term
Pricing Model Summary (e.g., subscription basis)
2. One-Time Implementation and Professional Services
| Item |
| Description |
| Basis / Assumptions |
| One-Time Cost |
| 2.1 |
| Implementation planning / project management |
| 2.2 |
| Discovery and workflow design |
| 2.3 |
| System configuration and build |
| 2.4 |
| Identity / security / SSO configuration |
| 2.6 |
| Testing and user acceptance testing support |
| 2.7 |
| Go-live / cutover support |
| 2.8 |
| Post-go-live stabilization / optimization |
| 2.9 |
| Other required implementation cost (describe) |
TOTAL ONE-TIME IMPLEMENTATION SERVICES
3. Data Migration
| Item |
| Description |
| Basis / Volume Assumption |
| One-Time Cost |
| 3.1 |
| Dentrix Enterprise patient/demographic data migration |
| 3.2 |
| Clinical notes, treatment history, charting, scheduling and attachments |
| 3.3 |
| TalEval student evaluation / competency data migration |
| 3.4 |
| Test migration(s), data mapping, validation and reconciliation |
| 3.5 |
| Cutover, rollback/contingency and post-go-live verification |
| 3.6 |
| Historical audit/log migration where available |
| 3.7 |
| Other data migration cost (describe) |
TOTAL DATA MIGRATION
4. Imaging Integration or Migration Vendor shall complete the option proposed. If proposing both approaches, price each separately.
| Item |
| Description |
| Basis / Assumptions |
| Cost |
| 4A.1 |
| DEXIS integration / interface / configuration |
| 4A.2 |
| DEXIS-related third-party licensing or connectors |
| 4A.3 |
| Kavo 3D panoramic machine integration / workflow, if separately priced |
| 4A.4 |
| Other required imaging integration cost (describe) |
OPTION A TOTAL - CONTINUED DEXIS INTEGRATION
| 4B.1 |
| Alternative imaging platform implementation / configuration |
| 4B.2 |
| Historical image and metadata migration |
| 4B.3 |
| Image migration validation / reconciliation |
| 4B.4 |
| Alternative imaging licenses / required third-party components |
| 4B.5 |
| Replacement acquisition workflow / device-related cost, if applicable |
| 4B.6 |
| Other required imaging migration cost (describe) |
OPTION B TOTAL - ALTERNATIVE IMAGING MIGRATION
5. Training
| Item |
| Description |
| Quantity / Basis |
| Cost |
| 5.1 |
| Administrator training |
| 5.2 |
| Faculty / instructor training |
| 5.3 |
| Clinical staff training |
| 5.4 |
| Student training resources |
| 5.5 |
| Train-the-trainer sessions |
| 5.6 |
| Written / quick-reference documentation |
| 5.7 |
| Recorded / video-based training resources |
| 5.8 |
| Training / sandbox environment setup |
| 5.9 |
| Additional training (describe) |
TOTAL TRAINING
6. Recurring Software, Hosting, Support and Maintenance
| Item |
| Recurring Cost Component |
| Pricing Basis |
| Year 1 |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| 6.1 |
| Core DPMS software subscription / licensing |
| 6.2 |
| Hosting / SaaS charges |
| 6.3 |
| Support and maintenance |
| 6.4 |
| Student competency / academic workflow module(s) |
| 6.5 |
| Imaging integration / imaging platform recurring charges |
| 6.6 |
| Reporting / analytics module(s) |
| 6.7 |
| Patient communications / SMS / email services |
| 6.8 |
| Storage / archive / backup charges |
| 6.9 |
| Required third-party recurring licenses |
| 6.10 |
| Other required recurring cost (describe) |
ANNUAL TOTAL
7. Transactional and Usage-Based Charges
| Item |
| Charge |
| Rate / Unit |
| Included Allowance |
| Notes |
| 7.2 |
| Electronic claims processing |
| 7.3 |
| Insurance eligibility verification |
| 7.4 |
| SMS / patient messaging overages |
| 7.5 |
| Data storage / archive overages |
| 7.6 |
| API / integration usage charges |
| 7.7 |
| Data export / retrieval charges |
| 7.8 |
| Other transaction or usage charge (describe) |
8. Optional Modules and Services
| Item |
| Optional Product / Service |
| One-Time Cost |
| Annual Cost |
| Pricing Basis / Notes |
| 8.1 |
| Optional module / service (describe) |
| 8.2 |
| Optional module / service (describe) |
| 8.3 |
| Optional module / service (describe) |
| 8.4 |
| Optional professional services / consulting |
| 8.5 |
| Additional training / refresher training |
9. Third-Party, Hardware, Travel and Pass-Through Costs
| Item |
| Description |
| One-Time Cost |
| Recurring Cost |
| Basis / Notes |
| 9.1 |
| Third-party software / licensing (describe) |
| 9.2 |
| Hardware / devices / peripherals, if required (describe) |
| 9.3 |
| Travel and related expenses, if applicable |
| 9.4 |
| Other pass-through cost (describe) |
10. Five-Year Total Cost of Ownership
| Ref. |
| Cost Component |
| Amount |
| A |
| One-Time implementation and professional services (Section 2) |
| B |
| Data migration (Section 3) |
| C |
| Selected imaging approach (Section 4) |
| E |
| Year 1 recurring costs (Section 6) |
| F |
| Year 2 recurring costs (Section 6) |
| G |
| Year 3 recurring costs (Section 6) |
| H |
| Year 4 recurring costs (Section 6) |
| I |
| Year 5 recurring costs (Section 6) |
| J |
| Required third-party/hardware/travel/pass-through costs (Section 9) |
BASE FIVE-YEAR TOTAL COST OF OWNERSHIP (A through J)
Note: Do not include optional items from Section 8 in the Base Five-Year Total unless the College specifically identifies an option as required through an addendum.
11. Price Escalation and Renewal Terms
| Pricing Term |
| Vendor Response |
First year in which a price increase may occur
Maximum annual percentage increase / cap
Index or methodology used, if applicable
Required advance notice of increase
Renewal pricing assumptions
Multi-year discount, if any
Other pricing conditions or minimum commitments
12. Pricing Assumptions, Exceptions and Exclusions List every pricing assumption, dependency, exclusion, volume assumption, required College responsibility, or condition that could affect the amounts stated in this Exhibit. Attach additional pages if necessary.
1. __________________________________________________________________________________
2. __________________________________________________________________________________
3. __________________________________________________________________________________
4. __________________________________________________________________________________
13. Vendor Certification The undersigned certifies that the pricing provided in this Exhibit is complete and accurate and includes all costs required to provide the proposed solution except those expressly identified as optional or excluded above.
Authorized Representative Name / Title
Signature
Date