Table of Contents

Section 103 & 104 – SCOPE OF WORK & CONTROL OF WORK ……………………………………………5

Section 109. — MEASUREMENT AND PAYMEN…………….…………………………….11

Section 151 - MOBILIZATION………………………………………………………………....,.1

Section 410 - SLURRY SEAL ………….......................………………………………………….2

Section 414 - ASPHALT PAVEMENT CRACK SEALING AND FILLING…………………...2

Section 702 - ASPHALT MATERIAL……………………………………………………………3

Section 703 - AGGREGATE…………………………………………………………………….10

Section 712 - Joint Material……………………………………………………………………….2

725 – MISCELLENEOUS MATERIAL

Table 410-1………………………………………………………………………………………..1

Table 410-2………………………………………………………………………………………..1

410 – SLURRY SEAL

Delete Subsection 410.01 and replace with the following:

410.01 This work consists of applying fiber reinforcement emulsified asphalt slurry seal mix on a pavement surface.

Delete Subsection 410.02 and replace with the following:

410.02 conform to the following subsections:

Chemical resistant glass fiber 725.17

Mineral filler 725.05

Polymer Modified Cationic Quickset (PMCQS-1h) 702.02

Slurry seal aggregate 703.10(a)

Water 725.01(c)

410.04 Composition of Mix (JMF). Delete paragraphs (c), (d), and (e) and replace with the following: Submit a written JMF for asphalt slurry seal which conforms to ISSA A105, Recommended Performance Guideline for Emulsified Asphalt Slurry Seal for approval at least 14 days before production. Include the following:

(e) Mineral filler. Mineral filler shall be Portland cement or hydrated lime that is free of lumps. The type of mineral filler shall be determined by the Contractor based on laboratory mix designs and will be considered part of the aggregate gradation.

Make the following changes to Subsection 410.10

Add the following to the second paragraph:

Add glass fibers by means of automatic injection into the micro-surfacing pug mill at a constant length and application rate. The fiber shall be added at a rate of 0.15 % - 0.40 % by dry weight of aggregate for bottom lifts and 0.05 % - 0.30 % by dry weight of aggregate for surface lifts.

725 – MISCELLENEOUS MATERIAL

Add the flowing to Subsection 725.017 Reinforcing Fibers:

(C) Use Road Chem Fiber 1 or equivalent, 3/8” +/- 1/8” in length. Conform to table 725-1

Table 725-1 Glass Fiber Requirements

Alkali and Acid Resistant Glass Fiber

Linear Weight of Roving (tex)

ISO 1889

Linear Weight of Strand (tex)

ISO 1889

Moisture Content (%)

ISO 3344

Specific Gravity

Softening Point (ºC)

Tensile Strength (MPa)

2500 min. 82 min.

0.35 max. 2.68 g/cm3 860 min. 1700 min.

4800 min. 100 min.

Section 103. — SCOPE OF WORK

103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

103.02 Disputes. Follow the requirements of FAR Clause 52.233-1 Disputes (Alternate I).

When requesting a CO's decision on an interpretation of contract terms for the recovery of increased costs;

quantify the amount and certify the amount if required by FAR Clause 52.233-1 Disputes (Alternate I).

Include an explanation of the interpretation of contract terms, the contract clause under which the claim is made, supporting documentation, and adequate cost data to support the amount claimed.

103.03 Value Engineering. Follow the requirements of FAR Clause 52.248-3 Value Engineering - Construction.

Before undertaking significant expenditures, submit a written description of the value engineering change proposal (VECP) concept. Within 14 days the CO will inform the Contractor as to whether the concept appears to be viable or if the concept is unacceptable. If the CO indicates that the concept appears to be viable, prepare and submit the formal VECP proposal.

103.04 Contractor Records. Upon request, provide records related to the contract to the Government for up to 3 years after final payment or for longer periods as provided by law.

Include a provision in subcontracts at all tiers giving the Government the same rights as provided above with respect to the subcontractor's records.

103.05 Partnering. To facilitate this contract, the CO offers to participate in a formal partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals. Partnering strives to resolve problems in a timely, professional, and non-adversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim process. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule.

Acceptance of this partnering offer by the Contractor is optional, and the partnership is bilateral.

If the partnering offer is accepted, mutually agree with the CO on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor representatives and the CO to attend a partnership development and team-building workshop usually between the time of award and the Notice to Proceed. Hold additional progress meetings upon mutual agreement.

The direct cost of partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings will be shared by the Contractor and Government. Secure and pay for facilities, professional fees, and miscellaneous requirements. Submit invoices to the CO. The Government will reimburse the Contractor for 50 percent of the agreed costs incurred for the partnering process. The Government’s share will not exceed $5,000.

Each party is responsible for making and paying for its own travel, lodging, and meal arrangements. No time extension for the completion of the project will be made for the use of partnering.

Section 104. — CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO). The CO may delegate authority to representatives to

103.06 Authority of the Contracting Officer (CO). The CO may delegate authority to representatives to decide on acceptability of work, progress of work, suspension of work, interpretation of the contract, and acceptable fulfillment of the contract. The term "CO" includes authorized representatives of the CO, including inspectors, acting within the limits of their authority as delegated by the CO.

103.07 Authority of Inspectors. Inspectors are authorized to inspect work including the preparation, fabrication, or manufacture of material for the project. The inspector is not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreman for the Contractor, or direct the Contractor's operations. The inspector has authority to identify non-conforming work until the issue can be referred to and decided by the CO. The inspector may take necessary action to prevent imminent and substantial risk of death or injury including stopping work.

103.08 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.

(a) General. Review and submit documents required to construct the work for accuracy, completeness, and compliance with the contract for approval by the CO. Documents submitted without evidence of Contractor approval may be returned for resubmission. Time for approval starts over when documents are returned for revision or if additional information is requested by the CO. Do not perform work related to submitted documents or drawings before approval of the CO. Obtain written approval before changing or deviating from the approved drawings.

(b) Documents other than drawings. Documents other than drawings include descriptive literature, illustrations, schedules, performance and test data, and similar material submitted by the Contractor to certify or explain, in detail, specific portions of the work required by the contract. Unless otherwise indicated in the contract, submit 3 paper copies and an electronic copy for review. Allow 14 days for approval by the CO unless otherwise specified.

1. Drawings. Drawings include:

a. Layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed;

b. Fabrication details for manufactured items and assemblies;

c. Installation and erection procedures;

d. Details of post-tensioning and other systems;

e. Detailed trench and excavation procedures that conform to OSHA requirements;

f. Traffic control implementation drawings; and

g. Methods for performing work near existing structures or other areas to be protected.

Show drawing dimensions in the same units as shown in the plans. Limit drawings to a maximum size of 24 by 36 inches (610 by 920 millimeters). Include on each drawing and calculation sheet, the project number, name, and other identification as shown in the contract.

Submit 3 paper sets of drawings, an electronic set of the drawings, and supporting calculations. Drawings will be reviewed in the order they are received. Allow 40 days for CO approval of railroad structure drawings and 30 days for approval of other drawings. Submit additional specific drawings for unique situations to clarify layout, construction details, or method when requested by the CO.

(b) Specific requirements for concrete and miscellaneous structures.

(1) Submit drawings for the following:

(a) Site-specific layouts for all wall types and gabion installations;

(b) Gabion and revet mattress details and installation procedures;

(c) Forms and falsework for cast-in-place non-bridge concrete structures and retaining walls less than or equal to 6 feet (1.8 meters) in height;

(d) Fabrication drawings for bridge railings and parapets;

(e) Fabrication drawings for prestressed members;

(f) Fabrication and installation drawings for expansion joint assemblies;

(g) Fabrication drawings for bearing assemblies;

(h) Construction joint location and concrete deck placement sequences not according to the plans;

(i) Erection diagrams for Soil-Corrugated Metal Structure interaction systems (multi-plate structures);

(j) Structural steel fabrication drawings;

(k) Utility hangar details;

(l) Fabrication and installation drawings for precast items; and

(m) Site-specific layouts for rockeries.

(2) Submit drawings that bear the seal and signature of a professional engineer proficient in the pertinent design field for the following:

(a) Forms and falsework for cast-in-place concrete structures greater than 6 feet (1.8 meters) in height;

(b) Shoring systems and cofferdams greater than 6 feet (1.8 meters) in height;

(c) Shoring systems that support traffic loadings;

(d) Bridge concrete forms, including deck forms; except for railings, parapets, and components less than 6 feet (1.8 meters) in height;

(e) Containment structures for bridge work;

(f) Girder erection plans;

(g) Partial demolition of structural bridge elements;

(h) Post-tensioning systems;

(i) Concrete box culvert and headwall details;

(j) Reinforced soil slopes details;

(k) Ground anchors, soil nail, rock bolt, driven pile, drilled shaft, and micropile assembly details, layout, and installation and testing procedures;

(l) MSE and tie back wall details;

(m) Alternate retaining wall details; and

(n) Details and installation procedures for proprietary wall systems.

(3) Submit drawings that bear the seal and signature of a professional engineer who is proficient in forms and falsework design and licensed in the state where the project will be constructed for the following:

(a) Falsework for structures with spans exceeding 16 feet (4.8 meters);

(b) Falsework for structures with heights exceeding 14 feet (4.3 meters);

(c) Falsework for structures where traffic, other than workers involved in constructing the structure, will travel under the structure; and

Temporary bridge structures for public use.

(c) As-built drawings. Use one set of Government-provided plans exclusively for as-built drawings. Use the color "red" to identify changes. Use approved methods to accurately and neatly record changes. Include details and notes on additional information discovered during construction. Note additions or revisions to the location, character, and dimensions of work. Strikeout details shown that are not applicable to the completed work.

As work progresses, continuously update plan sheets to reflect the as-built details. Check and initial plan sheets that were incorporated into the completed work without change. Include the following:

(1) Title sheet.

(a) "AS-BUILT DRAWINGS" (bold text);

(b) Name of Contractor;

(c) Name of CO’s on-site representative;

Project completion date;

(d) Revisions to project length;

(f) Revisions to begin and end stations of project;

(h) Revisions to index to sheets;

(i) Revisions to curve widening table;

(j) Strikeout schedules or options not awarded;

(k) A note stating "Work was constructed as designed unless otherwise noted."; and

Section 109. — MEASUREMENT AND PAYMENT

109.01 Measurement of Work. Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert measurements of work according to U.S. Customary (Metric) measure.

Unless otherwise specified, measure when the work is in-place and complete according to the contract.

Measure the actual work performed, except do not measure work outside the design limits or other adjusted or specified limits (staked limits). Measure structures to the lines according to the plans or to approved lines adjusted to fit field conditions.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the Section controlling the work being performed. Measurement of quantities for payment for the individual pay items will be based on the contract price for each pay item according to Table 109- 1.

Table 109-1 Decimal Accuracy of Quantities for Payment

Contract Price

Decimal Accuracy of Quantities for Payment

< $1.00 0 decimal ≥ $1.00 to < $100.00 1 decimal

≥ $100.00 to < $1000.00 2 decimals ≥ $1000.00 3 decimals

Decimal precision for measurement is one decimal beyond accuracy of quantities for payment.

Remeasure quantities if it has been determined that a portion of the work is acceptable, but has not been completed to the lines, grades, and dimensions shown in the plans or established by the CO.

Submit measurement notes within 24 hours of completing work that is in-place and complete according to the contract. For on-going work, submit measurement notes daily. When work is not complete, identify the measurement as being an interim measurement. Submit the final measurement when the installation is completed. Measurement notes form the basis of the Government’s receiving report; see Subsection 109.08(d). For lump sum pay items, submit documentation to support invoiced progress payment on a monthly basis.

Use an acceptable format for measurement records. As a minimum, include the following information:

(a) Project number and name;

(b) Pay item number and description;

(c) Date the work was performed;

(d) Location of the work;

(e) Measured quantity;

(f) Calculations made to arrive at the quantity;

(g) Supporting sketches and details as needed to clearly define the work performed and the quantity measured;

(h) Names of persons measuring the work;

(i) Identification as to whether the measurement is interim or final; and

(j) Signed certification statement by the persons taking the measurements and performing the calculations, that the measurements and calculations are correct.

109.02 Measurement Terms and Definitions. Unless otherwise specified, the following terms are defined as follows:

(a) Acre (Hectare). 43,560 square feet (10,000 square meters). Make longitudinal and transverse measurements for area computations horizontally. Do not make deductions from the area computation for individual fixtures having an area of 500 square feet (50 square meters) or less.

(b) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

(c) Cubic yard (Cubic meter).

(1) Cubic yard (Cubic meter) in-place. Measure solid volumes by a method approved by the CO or by the average end area method as follows:

(a) Take cross-sections of the original ground and use design or staked templates to determine end areas. Do not measure work outside of the lines or slopes established by the

CO;

(b) If a portion of the work is acceptable, but is not completed to the established lines and slopes; retake cross-sections or comparable measurements of that portion of the work. Use the remeasurements to calculate new end areas; and

(c) Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct quantities outside the designed or staked limits.

(2) Cubic yard (Cubic meter) in the hauling vehicle. Measure the cubic yard (cubic meter) volume in the hauling vehicle using three-dimensional measurements at the point of delivery. Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing on the volume of material to be hauled by each vehicle. Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.

Level selected loads. If leveling reveals the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the current leveled load volume is to the agreed volume. Payment will not be made for material in excess of the agreed volume.

Material measured in the hauling vehicle may be weighed and converted to cubic yards (cubic meters) for payment purposes if the conversion factors are mutually agreed to in writing.

(3) Cubic yard (Cubic meter) in the structure. Measure according to the lines of the structure as shown in the plans, except as altered by the CO to fit field conditions. Make no deduction for the volume occupied by reinforcing steel, anchors, weep holes, piling, or pipes less than 8 inches (200 millimeters) in diameter.

(4) Cubic yard (Cubic meter) by metering. Use an approved metering system.

(d) Day. A calendar day beginning and ending at midnight. Round portions of a day up to the full day.

(e) Each. One entire unit. Measure the actual number of units completed and accepted.

(f) Gallon (Liter). The quantity may be measured by the following methods:

(1) Measured volume container.

(2) Metered volume. Use an approved metering system.

(3) Commercially-packaged volumes.

(4) Measured by mass. Use an approved weighing device.

When asphalt material is measured by the gallon (liter), measure the volume at 60 °F (15 °C) or correct the volume to 60 °F (15 °C) using recognized standard correction factors.

(g) Hour. 60 minutes. Measure the actual number of hours ordered by the CO and performed by the Contractor. Round portions of an hour up to the next half hour. Measure time in excess of 40 hours per week at the same rate as the first 40 hours.

(h) Linear foot (Meter). As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.

(i) Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that pay item. The quantity is designated as "All". Estimated quantities of lump sum work shown in the contract are approximate.

(j) M-gallon. 1,000 gallons. Measure according to Subsection 109.02(f).

(k) Mile (Kilometer). 5,280 linear feet (1000 meters). Measure horizontally along the centerline of each roadway, approach road, or ramp.

(l) Month. A month as defined by the Gregorian calendar. Measure portions of a month by prorating based on the total days worked.

(m) Pound (Kilogram). Measure according to Subsection 109.03. If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.

(n) Slurry unit. Approximately 1,000 gallons (4000 liters) of water plus the specified material. Four (ten) slurry units contain material to cover one acre (hectare). Measure according to Subsection 109.02(f).

(o) Square foot and Square yard (Square meter). 1 square yard equals 9 square feet. Measurements for area computations will be made horizontally or vertically to the surface being measured. No deductions from the area computation will be made for individual fixtures having area of 9 square feet (1 square meter) or less.

(p) Thousand board feet measure, MFBM. 1000 board feet. Measurement equal to 1,000 feet of wood that is 12 inches wide and 1 inch thick.

(q) Ton (Metric ton). 2,000 pounds avoirdupois (1000 kilograms). Measure according to Subsection 109.03.

No adjustment in a contract price will be made for variations in quantity due to differences in the specific gravity or moisture content.

Use net-certified scale masses or masses based on certified volumes in the case of rail shipments as a basis of measurement subject to correction when asphalt material is lost from the car or the distributor, wasted, or otherwise not incorporated in the work. When asphalt material is shipped by truck or transport, net-certified masses, subject to correction for loss or foaming, may be used for computing quantities.

When emulsified asphalt is converted from volume to mass, use a factor of 240 gallons per ton (1000 liters per metric ton) regardless of temperature.

When asphalt binder for asphalt concrete pavement is stored in tanks devoted exclusively to the project, base quantities on invoices. When asphalt binder for asphalt concrete pavement is not stored in tanks devoted exclusively to the project or when the validity of the quantity requested for payment is in question; base quantities on the asphalt content determined by testing.

(r) Week. A 7 day period beginning and ending at the same designated time. Measure portions of a week by prorating based on the total days worked.

109.03 Weighing Procedures and Devices. Batch masses may be acceptable for determination of pay quantities when an approved automatic weighing, cycling, and monitoring system is included as part of the batching equipment.

When a weighing device is determined to indicate less than true mass; no additional payment will be made for material previously weighed and recorded. When a weighing device is determined to indicate more than true mass; material received after the last previously correct weighing accuracy test will be reduced by the percentage of error in excess of 0.5 percent.

When material is proportioned or measured and paid for by mass, provide one of the following:

(a) Commercial weighing system. Use permanently-installed and certified commercial scales.

(b) Invoices. If bulk material is shipped by truck or rail and is not passed through a mixing plant, submit a supplier's invoice with net mass or volume converted to mass. Periodic check weighing may be required.

(c) Project weighing system. Furnish, erect, and maintain acceptable automatic digital scales. Provide scales that record mass at least to the nearest 100 pounds (50 kilograms). Maintain the scale accuracy to within 0.5 percent of the correct mass throughout the range of use.

Do not use spring balances.

Install and maintain platform scales with the platform level with rigid bulkheads at each end. Make the platform of sufficient length to permit simultaneous weighing of all axle loads of the hauling vehicle. Coupled vehicles may be weighed separately or together according to Subsection 2.20, paragraph UR.3.3, Single-Draft Vehicle Weighing of NIST Handbook 44, Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices.

Install and maintain belt-conveyor scales according to Subsection 2.21, Belt-Conveyor Scale Systems of NIST Handbook 44.

Before production on the project, after relocation, and at least once per year; have the weighing portion of the system checked and certified by the State Bureau of Weights and Measures or a private scale service certified by the Bureau of Weights and Measures. Seal the system to prevent tampering or other adjustment after certification.

Attach an automatic printer to the scale that is programmed or otherwise equipped to prevent manual override of all mass information. For weighed pay quantities, program the printer to provide the following information for each weighing:

(1) Project number and name;

(2) Pay item number and description;

(3) Date;

(4) Time;

(5) Ticket number;

(6) Haul unit number;

(7) Net mass in load at least to the nearest 100 pounds (50 kilograms);

(8) Subtotal net mass for each haul unit since the beginning of the shift; and

(9) Accumulated total net mass for all haul units since the beginning of the shift.

If a printer malfunctions or breaks down, the Contractor may manually weigh and record masses for up to 48 hours provided the method of weighing meets other contract requirements.

Furnish competent scale operators to operate the system.

When platform scales are used, weigh empty haul units at least twice per day.

Use an approved format for the mass records. Submit the original records and a written certification as to the accuracy of the masses at the end of each shift.

109.04 Receiving Procedures. When the method of measurement requires weighing or volume measurement in the hauling vehicle, furnish a person to direct the spreading and distribution of material and to record the location and placement of the material on the project. During the placement, maintain a record of each delivery and document it in an acceptable manner. Include the following as applicable:

(a) Project number and name;

(b) Pay item number and description;

(c) Location where placed;

(d) Date;

(e) Load number;

(f) Truck identification;

(g) Time of arrival;

(h) Mass or volume; and

(i) Spread person's signature.

Use an approved format for the delivery records. Submit the original records and a written certification of the delivery of the material at the end of each shift.

109.05 Scope of Payment. Payment for contract work is provided, either directly or indirectly, under the pay items listed in the bid schedule.

(a) Direct payment. Payment is provided directly under a pay item listed in the bid schedule when one of the following applies:

(1) The work is measured in the Measurement Subsection of the Section ordering the work and the bid schedule contains a pay item for the work from the Section ordering the work.

(2) The Measurement Subsection of the Section ordering the work, references another Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.

(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items listed in the bid schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement Subsection of the Section ordering the work.

Compensation provided by the pay items included in the bid schedule is full payment for performing contract work in a complete and acceptable manner. Risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the pay items.

Work measured and paid for under one pay item will not be paid for under other pay items.

The quantities listed in the bid schedule are approximate unless designated as a contract quantity. Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work.

Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.

109.06 Pricing of Adjustments. Determine costs according to FAR Part 31 Contract Cost Principles and Procedures. Follow the requirements of FAR clauses providing for an equitable price adjustment.

If agreement on price and time cannot be reached, the CO may make a unilateral determination.

If the work will delay contract completion, request a contract time extension according to Subsection 108.03.

(a) Proposal.

(1) General. Submit a written proposal for each line item of the work or a lump sum for the total work. Identify the major elements of the work, the quantity of the element, and its contribution to the proposed price. Submit further breakdowns if requested by the CO.

(2) Data. Submit information as requested by the CO to the extent necessary to permit the CO to determine the reasonableness of the proposed price.

(3) Cost or pricing data. When the contract modification exceeds the amount indicated in FAR Clause 52.214-27 Price Reduction for Defective Cost or Pricing Data - Modifications - Sealed Bidding, FAR Clause 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data, or FAR Clause 52.215-11 Price Reduction for Defective Cost or Pricing Data - Modifications, and the CO has determined that an exception does not apply, submit cost or pricing data.

Submit cost or pricing data, as defined in FAR Subpart 2.1—Definitions, for the Contractor and each major subcontractor.

Submit with the cost or pricing data a written proposal for pricing the work according to Subsection 109.06(a)(1). See FAR Subpart 15.4—Contract Pricing and FAR Table 15-2— Instructions for Submitting Cost/Price Proposals when Certified Cost or Pricing Data are Required for guidance.

Certify cost or pricing data according to FAR Subpart 15.4, upon completion of negotiations.

(b) Post-work pricing. When a contract modification is not forward priced, it requires a change order and a supplemental agreement reflecting the resulting equitable adjustment. When negotiating the price of a contract modification after all or most of the work has been performed, submit the following:

(1) Direct costs.

(a) Material. Include invoices showing the cost of material delivered to the work.

(b) Labor. Show basic hourly wage rates, fringe benefits, applicable payroll costs (that is FICA, FUTA, worker's compensation, insurance, and tax levies), paid subsistence, and travel costs for each labor classification and foreman employed in the adjusted work.

(c) Equipment. Include a complete descriptive listing of equipment including make, model, and year of manufacture.

Support rented or leased equipment costs with invoices. Determine allowable ownership and operating costs for Contractor- and subcontractor-owned equipment as follows:

(1) Use actual equipment cost data when such data can be determined from the Contractor's or subcontractor's ownership and operating cost records.

(2) When actual costs cannot be determined, use the rates shown in the U.S. Army Corps of Engineers Construction Equipment Ownership and Operating Expense Schedule (CEOOES) for the region where costs are incurred. Adjust the rates for used equipment and for other variable parameters used in the schedules.

(3) Compute standby costs from acceptable ownership records or when actual costs cannot be determined according to CEOOES. Do not exceed 8 hours in a 24-hour period or 40 hours in a week. Do not include standby for periods when the equipment would have otherwise been in an idle status or for equipment that was not in operational condition.

(d) Other direct costs. Include documentation or invoices to support other direct costs incurred that are not included above (such as bonds, mobilization, demobilization, permits, and royalties).

(e) Production rates. Include actual hours of performance on a daily basis for each labor classification and for each piece of equipment. Include production rate information reflecting the actual work occurring on an approved Contractor daily record document.

(f) Subcontract costs. Include supporting data as required above.

(2) Overhead. Identify overhead rates and include supporting data, which justifies the rates. List the types of costs which are included in overhead. Identify the cost pools to which overhead is applied. Apply the overhead costs to the appropriate pool.

Limit Contractor overhead applied to subcontractor payments to 5 percent unless a higher percentage is justified.

(3) Profit. Include a reasonable profit, except when precluded by the FAR.

For work priced after all or most of the work is performed, profit is limited to 10 percent of the total cost. Due to the limited risk in post-work pricing, a lower profit percentage may be determined by a profit analysis according to FAR Subpart 15.404-4 Profit.

109.07 Eliminated Work. Follow the requirements of FAR Clause 52.243-4 Changes.

Work may be eliminated from the contract without invalidating the contract. The Contractor is entitled to compensation for direct costs incurred before the date of elimination of work plus profit and overhead on the direct incurred costs. Anticipated profit and overhead expense on the eliminated work will not be compensated.

109.08 Progress Payments. Follow the requirements of FAR Clause 52.232-5 Payments under Fixed-Price Construction Contracts and FAR Clause 52.232-27 Prompt Payment for Construction Contracts.

(a) General. Only invoice payments will be made under this contract. Invoice payments include progress payments made monthly as work is accomplished and the final payment made upon final acceptance. Only one progress payment will be made each month. No progress payment will be made in a month in which the work accomplished results in a net payment of less than $1,000. Full or partial progress payment will be withheld until a construction schedule or schedule update is approved by the

CO.

(b) Closing date and invoice submittal date. The closing date for progress payments will be designated by the CO. Include work performed after the closing date in the following month’s invoice.

Submit invoices to the designated billing office.

(c) Invoice requirements. Submit the invoice to the Government’s designated billing office with the following items in the invoice:

(1) The information required in FAR Clause 52.232-27(a)(2).

(2) A tabulation of total quantities and contract prices of work accomplished or completed on each pay item. Do not include quantities unless field note documentation for those quantities were submitted by the closing date. Do not include quantities of work involving material for which test reports required under Section 153, Section 154, or certifications required by Subsection 106.03 are, or will be, past due as of the closing date.

(3) The certification required by FAR Clause 52.232-5(c) and if applicable, the notice required by FAR Clause 52.232-5(d). Provide an original signature on the certification. Facsimiles are unacceptable.

(4) If applicable, a copy of the notices that are required by FAR Clause 52.232-27(e)(5) and (g).

(5) The amount included for work performed by each subcontractor under the contract.

(6) The total amount of each subcontract under the contract.

(7) The amounts previously paid to each subcontractor under the contract.

(8) Adjustments to the proposed total payment that relate to the quantity and quality of pay items. Adjustments for the following may be made by the Government after validation of the invoice:

(a) Retent resulting from a failure to maintain acceptable progress;

(b) Retent resulting from violations of the labor provisions;

(c) Retent pending completion of incomplete work, other "no pay" work, and verification of final quantities;

(d) Obligations to the Government (such as excess testing cost or the cost of corrective work) pursuant to FAR Clause 52.246-12(g); or

(e) Liquidated damages for failure to complete work on time.

(d) Government’s receiving report. The Government’s receiving report will be developed using the measurement notes received by the CO and determined acceptable. Within 7 days after the closing date, the CO will be available by appointment at the Government’s designated billing office to advise the Contractor of quantities and contract prices appearing on the Government’s receiving report.

(e) Processing progress payment requests. No payment will be made for work unless field note documentation for the work was submitted.

(1) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c) and the quantities and contract prices shown on the Contractor’s invoice agree with the corresponding quantities and contract prices shown on the Government’s receiving report; the invoice will be paid.

(2) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c) or if quantities or contract prices shown on the Contractor’s invoice exceed the corresponding quantities and contract prices shown on the Government’s receiving report; the invoice is defective and the Contractor will be notified according to FAR Clause 52.232-27(a)(2). Defective invoices will be returned to the Contractor within 7 days after receipt by the Government’s designated billing office. Correct and resubmit returned invoices. If the defects are minor, the Contractor may elect, in writing, to accept the quantities and contract prices shown on the Government’s receiving report for payment.

(f) Partial payments. Progress payments may include partial payment for material to be incorporated in the work according to FAR Clause 52.232-5(b)(2), provided the material meets the requirements of the contract and is delivered on, or in the vicinity of, the project site or stored in acceptable storage places.

Partial payment for material does not constitute acceptance of the material for use in completing items of work. Partial payments will not be made for living or perishable material until incorporated into the project.

Individual and cumulative partial payments for preparatory work and material will not exceed the lesser of:

(1) 80 percent of the contract price for the pay item; or

(2) 100 percent of amount supported by copies of invoices submitted.

The quantity paid will not exceed the corresponding quantity estimated in the contract. The CO may adjust partial payments as necessary to protect the Government.

(g) Retainage. Follow the requirements of FAR Clause 52.232-5 Payments under Fixed Price Construction Contracts.

(1) Satisfactory progress includes performance of all work under the contract including submittals, schedules, certifications, reports, and drawings. When satisfactory progress has not been made, the CO may retain a maximum of 10 percent of the amount the progress payment until satisfactory progress has been made.

(2) After substantial completion of the contract, the CO may retain an amount adequate for protection of the Government.

109.09 Final Payment. Follow the requirements of FAR Clause 52.232-5 Payment under Fixed-Price Construction Contracts and FAR Clause 52.232-27 Prompt Payment for Construction.

Upon final acceptance and verification of final pay records, the Government will send a SF 1034, Public Voucher for Purchases and Services other than Personal (final voucher) and a release of claims document.

Execute both the voucher and the release of claims, and return the documents to the Government for payment. The date of approval by the Government of the final voucher for payment constitutes the date of final settlement of the contract.

If unresolved claims exist or claims are proposed, reserve the right to the claims by listing a description of each claim and the amount being claimed on the release of claims document.

Failure to execute and return the voucher and release of claims document within 90 days after receipt will constitute execution of the documents and the release of claims against the Government arising by virtue of the contract. In this event, the day after 90 days from receipt constitutes the date of final settlement of the contract.

Section 151. — MOBILIZATION

Description

51.01 This work consists of moving personnel, equipment, material, and incidentals to the project and erforming work necessary before beginning work at the project site. This work also includes obtaining ermits, insurance, and bonds.

Measurement

51.02 Measure the Section 151 items listed in the bid schedule according to Subsection 109.02.

Payment

51.03 The accepted quantities will be paid at the contract price per unit of measurement for the Section 51 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Progress payments for mobilization by the lump sum will be paid as follows:

(a) Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from pay items (not including mobilization), 50 percent of the mobilization pay item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from pay items (not including mobilization), 100 percent of the mobilization pay item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization pay item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Section 410. —SLURRY SEAL

410.01 This work consists of applying an emulsified asphalt slurry seal mix on a pavement surface.

Material

410.02 Conform to the following Subsections:

Emulsified asphalt 702.02 Mineral filler 725.05 Slurry seal aggregate 703.10(a) Water 725.01(c)

Construction Requirements

410.03 Qualifications. See Subsection 407.03.

410.04 Composition of Mix (JMF). Submit a written JMF for asphalt slurry seal which conforms to ISSA A105, Recommended Performance Guideline for Emulsified Asphalt Slurry Seal for approval at least 30 days before production. Include the following:

(a) Aggregate gradation values. Percent passing for each sieve size for the aggregate blend;

(b) Emulsified asphalt content. Residual asphalt content, as a percent by mass of dry aggregate;

(c) Aggregate samples. 80-pound (35-kilogram) sample of each aggregate;

(d) Emulsified asphalt sample. 1-gallon (4-liter) sample with a production certification conforming to Subsection 106.03(a); and

(e) Mineral filler samples. 10-pound (5-kilogram) sample of each proposed mineral filler.

(f)

410.05 Equipment.

(a) Mixing equipment. Conform to the requirements of ISSA A105.

(b) Mechanical-type single squeegee spreader box.

(1) Attaches to the mixer;

(2) Flexible squeegee in contact with the pavement surface to prevent loss of material;

(3) Adjustable to ensure a uniform spread over varying grades and crowns;

(4) Adjustable in width with a flexible strike-off; and

(5) Augers for uniform flow to edges.

(c) Sweeper. See Subsection 409.05(c).Section 410 340

(d) Pneumatic-tire rollers. See Subsection 409.05(d).

(e) Auxiliary equipment. See Subsection 409.05(e).

Other equipment of proven performance may be used in addition to or instead of this equipment when approved by the CO.

410.06 Surface Preparation. See Subsection 406.04(a).

410.07 Weather Limitations. See Subsection 409.07.

410.08 Calibration. Calibrate each mixing unit according to ISSA A105 in the presence of the CO.

410.09 Production Start-Up Procedures. See Subsection 409.09.

410.10 Application. Mix the material according to ISSA A105. Fog the surface with water in front of the spreader.

Blend the additives with the aggregate. Pre-wet the aggregate in the pugmill before mixing with the emulsified asphalt Mix the surfacing material a maximum of 4 minutes. Ensure the mix is of uniform consistency as it leaves the mixer and conforms to the approved JMF. Adjust mineral filler and emulsified asphalt content during construction when approved by the CO to adjust for variations in field conditions.

Clean the spreader box before the start of each work shift.

Carry sufficient mix in the spreader to completely cover the surface. Spread the mix with a mechanical-type single squeegee spreader box. In areas not accessible to the spreader box, use hand squeegees to work the mix.

Remove streaks and transverse ripples as defined by ISSA A105 from the finished surface.

Provide straight lines along curbs and shoulders and do not allow runoff on these areas. Provide straight and neat starting and ending joints by masking surfaces at the start, end, and other locations as directed by the CO.

For transverse joints, use a butt joint. Use building paper placed over previously placed slurry seal or other suitable method to avoid double placement of slurry seal. Remove ridges or bumps in the finished surface.

For longitudinal joints, place joints on lane lines. Use half passes and odd-width passes only in turnouts and parking areas. Do not use half passes for the last pass in paved areas. Overlap longitudinal joints no more than 3 inches (75 millimeters). Limit the elevation difference at joints to less than ¼ inch (6 millimeters).

Begin rolling after the mixture has cured to the point where it will not pick up on the roller tires. Roll parking areas and turnouts with at least two full-coverage passes with the roller.

Allow treated areas to cure completely before opening to traffic. Cure is complete when clear water can be pressed out of the mix with a piece of paper without discoloring the paper.

Remove and dispose of material spills and associated debris at the end of each shift according to Subsection 203.05(a) and (d).

Two weeks to one month after completion of slurry seal application. Sweep and pick up the loose material from the entire treated surface. Dispose of swept material according to Subsection 203.05(a).

410.11 Acceptance. See Table 410-1 for sampling, testing, and acceptance requirements.

Emulsified asphalt will be evaluated under Subsections 106.03 and 106.04. Furnish a production certification with each load of emulsified asphalt.

Slurry seal aggregate will be evaluated under Subsections 106.02 and 106.04.

Mineral filler will be evaluated under Subsections 106.02 and 106.03.

Construction of the slurry seal will be evaluated under Subsections 106.02 and 106.04.

410.12 Measure the Section 410 pay items listed in the bid schedule according to Subsection 109.02 for each day’s production.

410.13 The accepted quantities will be paid at the contract price per unit of measurement for the Section 410 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Section 414. — ASPHALT PAVEMENT CRACK SEALING AND FILLING

414.01 This work consists of routing, cleaning, sealing, and filling cracks in asphalt pavement surfaces.

Material

414.02 Conform to the following Section and Subsection:

Asphalt concrete 403 Joint sealants and crack fillers (hot applied) 712.01(a)

Construction Requirements

414.03 Equipment. Furnish equipment with the following capabilities:

(a) Router. A power rotary impact router or vertical spindle router capable of creating a reservoir to the required depth and width without damaging adjacent pavement.

(b) Air lance. A hot compressed air lance capable of providing clean, oil-free compressed air at a volume of 100 cubic feet (2.8 cubic meters) per minute, a pressure of 120 pounds per square inch (830 kilopascals), and a temperature of 2000 °F (1100 °C).

(c) Application wand. A wand attached to a heated hose attached to a heated material chamber that maintains material temperature within manufacturer’s tolerances. Supply proper wand tips for desired application.

(d) Heating kettle. An indirect-heating double boiler capable of constant and effective agitation. Fill the space between the inner and outer shells with oil or other heat transfer medium. Provide an accurate and calibrated thermometer with a range from 200 to 600 °F in 5 °F graduations (90 to 320 °C in 2 °C graduations) located so the material temperature can be safely checked.

(e) Squeegee or screed. A hand-held squeegee or screed of appropriate configuration for filling cracks flush with the surface, underfilling cracks to recess below the surface, or overfilling cracks to an overband shape.

(f) Compressor. A compressor capable of producing oil- and water-free air at a minimum rate of 100 cubic feet (2.8 cubic meters) per minute with a minimum continuous line pressure of 125 pounds per square inch (860 kilopascals).

414.04 Routing. Rout, clean, and seal cracks in a continuous operation. Do not allow traffic to close or damage routed cracks.

Rout ⅛- to ½-inch (3- to 13-millimeter) wide cracks to produce vertical, intact walls and a flat bottom with a reservoir centered over the crack. Make the reservoir two to three times the width of the crack.

Rout cracks to a depth of ½ to ¾ inches (13 to 19 millimeters).

414.05 Cleaning. Prevent debris from entering waterways, travel lanes open to public traffic, or areas designated not to be disturbed. Remove dirt, dust, and other deleterious material from the crack walls and cavity using a stream of air or other approved methods. Blow or brush dry material off the pavement surface.

414.06 Sealing and Filling. Dry the crack surfaces with the hot air lance before sealing or filling. Do not seal or fill cracks when the pavement surface temperature is below 35 °F (2 °C) and weather conditions are rainy or foggy.

(a) Sealing (routed cracks or cracks averaging ¼ to 1 inch (6 to 25 millimeters) wide). Submit a copy of and adhere to the manufacturer’s recommendations for heating and applying the hot…