1. Statement of Work.pdf

PDF 208 KB Posted

Attached to
127EAW22R0010 - Wildomar Campground Toilet
Solicitation number
127EAW22R0010
Issued by

View the file

Other files

File Type Posted
7. RFI Form.docx DOCX document
127EAW22R0010.pdf PDF
6. Davis-Bacon Act WD # CA20210025.pdf PDF
5. Schedule.docx DOCX document
3. Site Plan.pdf PDF
4. Fire Plan.pdf PDF
2. Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA UPGRADE TO RECREATION FACILITIES AT WILDOMAR CAMPGROUND CXT AND

SIDEWALK 2021

STATEMENT OF WORK SECTION C - 1

SECTION C

STATEMENT OF WORK

C.1 SCOPE OF WORK

Base Bid: Wildomar Campground – Work shall include demolition of one (1) existing two unit vault masonry toilet building, walkway and all associated features. Furnish and install one (1) Tioga CXT 2-unit vault toilet building or approved equal. The contractor is responsible for placement of CXT building order, all site preparation, coordination of CXT delivery and installation, all required access and clearances, design of accessible walkways and building/site layout, and install of new vault toilet building and concrete walkways. Contractor shall cut down two tree for access for toilet building install and proper functioning of the vault toilet technology. Stumps to be cut and ground down to grade level so as to not be a trip hazard.

Contractor’s Design Proposal to include: building/site layout, elevation and grades for accessible concrete walkways and finish floor of new CXT vault toilet building, concrete walkway around new building, including backfill, base and subbase materials, concrete materials, and finish grades around walkways.

Design to include all pertinent data required to understand the quality of components, dimensional relationships, dimensions, integration with other materials, assembly techniques, structural aspects, tolerances, compaction requirements, sampling and testing, color, finish, texture, and other such characteristics as may be necessary to fully describe the finished product.

Construction elements of design to include, but are not limited to: site work, surveying, staking, demolition, clearing and grubbing, grading, excavation, placement, compaction and finish grading, best management practices (BMP’s), earthwork, aggregate base or required base and subbase materials, portland cement concrete, concrete reinforcement, sampling and testing, and all other design requirements.

Accessible walkways, building shall meet the minimum requirements of Americans With Disabilities and Architectural Barriers Act guidelines (ADAABA) and the Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).

The new vault toilet building including walkways shall be placed in the same footprint location of existing vault toilet building to minimize ground disturbance at the site. Cut back slopes will not be allowed. All work shall be performed in a manner to minimize ground disturbance.

The new vault building may be ordered prior to the issuance of the notice to proceed. The purchase order form for the new buildings shall be submitted to the Contracting Officer (CO) for review and acceptance prior to placement of building order.

A Forest Service archeological monitor shall be onsite during all ground disturbance and vegetation clearance. The contractor shall work closely with the Contracting Officer Representative (COR) to schedule required archeological oversight.

STATEMENT OF WORK SECTION C - 2

Total work time is 31 calendar days from the issuance of the Notice to Proceed.

C.2 PROJECT LOCATION

Wildomar Campground – Riverside County, Trabuco Ranger District

From Interstate 15 travel west on Highway 74 ~9.5 miles to Killen Truck Trail. Turn left on Killen Truck Trail and travel ~ 11 miles. The Wildomar Campground is on the left. From Interstate 5 travel east on Highway 74 ~22.5 miles to Killen Truck Trail. Turn right on Killen Truck Trail and travel ~11 miles. The Wildomar Campground is on the left.

C.3 FOREST CONTACT

For information regarding site conditions, contact Tammie Mather at (858) 674-2972 between the hours of 8:00 am and 4:00 pm, Monday through Friday, except legal holidays.

C.4 PROJECT MANAGEMENT

The contractor shall appoint a Project Manager and/or Engineer to coordinate all Contractor’s activities during construction and to liaise with the Contracting Officer Representative (COR) and/or Contracting Officer (CO), and Project Engineer for the USDA Forest Service. Engineer/Architect and Surveyor shall be licensed in the State of California. Contractor shall designate in writing an on-site superintendent to be on-site at all times that any construction activities take place and to coordinate all site work and activities.

C.5 GENERAL INFORMATION

C.5 - 1 Parking and Storage

The Contractor shall coordinate parking of their vehicles and temporary storage of equipment and materials with the Contracting Officer. Contractor shall have all heavy equipment washed prior to entering the project area to remove soil, seeds and plant material from noxious weeds to prevent the introduction and spread of weeds not already present on Trabuco Ranger District or the Cleveland National Forest. Inspections shall be coordinated and scheduled with the Contracting Officer’s Representative.

C.6 SPECIFICATIONS

The Construction Specification Institute (CSI) specifications applicable to this contract are listed below:

00 01 10 TABLE OF CONTENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

STATEMENT OF WORK SECTION C - 3

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 23 SURVEY AND LAYOUT DATA

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SUBMITTALS

01 40 00 QUALITY REQUIREMENTS

01 41 00 REGULATORY REQUIREMENTS

01 57 24 STORMWATER POLLUTION CONTROL

01 71 13 MOBILIZATION

01 74 00 CLEANING AND WASTE MANAGEMENT

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

02 41 00 DEMOLITION

03 11 00 CONRETE FORMING

03 20 00 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE CONCRETE

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

32 30 00 SITE IMPROVEMENTS

C.7 DELIVERABLES

C.7-1 Fire Plan

See the Fire Plan for fire restrictions and requirements, emergency contact information, and fire project activity levels.

C.7-2 Work Plan

The Contractor(s) shall provide the Government with two (2) copies of the Work Plan for the project prior to mobilization. This Work Plan shall include, but is not limited to, the following:

• Contractor’s Design Proposal

• A description of how the work will be performed.

• Specific exclusions/ assumptions regarding the specific work to be performed.

• A listing of personnel, including subcontractor(s), working on the project.

• A list of equipment proposed for use on the project.

• A Project Work Schedule.

• Detailed cost estimate/ cost breakdown of work to be performed per Specification Section that can be used for partial payments as work is completed and accepted.

• Description of what material(s) or method of concrete washout will be used on the project.

C.7-3 Storm Water Management Plan

STATEMENT OF WORK SECTION C - 4

Contractor shall develop an Erosion Control/Storm Water Control Plan. Contractor shall identify all types and specific locations of erosion control measures.

C.7-4 Construction Waste Management Plan

Contractor shall develop a proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this contract, including hazardous materials.

C.7-5 Spill Prevention Control and Countermeasures (SPCC), spill response plan and an emergency response plan for refueling and servicing vehicles.

Identify and use suitable measures around vehicle service, storage and refueling areas, and waste dumps to fully contain spills and avoid or minimize soil contamination and seepage to groundwater. Use suitable measures to avoid spilling fuels, lubricants, cleaners, and other chemicals during handling and transporting. Report spills to the Contracting Officer’s Representative and initiate suitable cleanup action in accordance with applicable State and Federal laws, rules, and regulations.

C.7-6 Sampling, Testing, and Abatement Work Plan

Contractor shall develop a Sampling, Testing and Abatement Work Plan for lead based paint, and asbestos abatement.

END OF STATEMENT OF WORK