This document is a Statement of Work (SOW) for the Orleans Mountain Lookout Road Repair Project in the Six Rivers National Forest, California. The project involves comprehensive road repair and maintenance on Forest Service Roads 10N01, 10N10, and Orleans Mountain Road, with work including removing and stockpiling aggregate base and rip rap, preparing damaged road surfaces, backfilling and compacting areas, reconditioning roadways and rolling dips, applying cold patch and asphalt chip-seal, and installing traffic control markers.

The project is located southeast of Highway 96 in the Orleans Ranger District, with a contract duration of 60 calendar days from the Notice to Proceed. The contractor will be responsible for providing all labor, equipment, and materials, with specific requirements including creating a uniform road surface, reshaping rolling dips, applying aggregate base, placing rip rap, and ensuring proper compaction and road finish. The estimated project value ranges between $500,000 and $1,000,000, and it is set aside as a Total Small Business opportunity under the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
6. Davis-Bacon Act WD # CA20250007.pdf PDF
5. Fire Plan.pdf PDF
3. Project Maps.pdf PDF
127EAW25R0040 - Orleans Mtn Lookout Road Repair.pdf PDF
4. Supplemental Specifications.pdf PDF
2. Schedule of Items.docx DOCX document
7. RFI Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SIX RIVERS NATIONAL FOREST

ORLEANS RANGER DISTRICT

10N01-10N10-ORLEANS MOUNTAIN LOOKOUT ROAD REPAIR PROJECT

Section C - DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK

C.1 Statement of Work

The Contractor shall furnish all equipment, and personnel necessary to repair sections of the road. The Contractor shall furnish all materials to complete the project.

Work includes: remove and stockpile aggregate base and rip rap, prepare surface of identified damaged areas, backfill damaged areas with aggregate base or rip rap where needed and compact, recondition and grade roadway, recondition rolling dips, place cold patch where needed to existing AC surface and compact, uniformly apply asphalt chip-seal, and install object markers for traffic control.

The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered incidental to and included in the payment for the items shown.

Specific Requirements for the Base and/or Option Items are:

• Recondition roadway by removing irregularities and shape to a uniform surface.

• Reshape rolling dips to the width and slopes shown in the plans.

• Backfill aggregate base on roadway to shape, compact, and finish the surface to the required lines, grade, elevation, and cross section.

• Prepare a smooth surface for placed rip rap to form a well-graded mass.

• Place or rearrange rip rap by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.

• Apply roadway aggregate base where needed on the AC pavement and compacting.

• Placing, shaping, and compacting cold patch to produce a surface that is smooth, dense and free of ruts, ridges, and loose material.

• Apply asphalt and aggregate uniformly at the optimum application rate determined from pre-chip seal preparatory phase.

• Correct excesses and deficiencies by adding or removing aggregate to achieve a uniform texture before the asphalt cures.

• Roll the surface to uniformly and thoroughly bond the aggregate over the full width of the roadway.

• Traffic control for public access and administrative travel. (See C.6-H Traffic Control Plan below)

C.2 Project Location

The project area is on the Orleans Ranger District of the Six Rivers National Forest, California. Forest Service

Road 10N01, 10N10, and Orlean Mountain Road are located southeast of Hwy 96.

Orleans: From Eureka take Highway 101 North to Highway 299 near Blue Lake, California. Take Highway 299 east to Willow Creek and make a left onto Highway 96 to reach the ranger station. The estimated time of travel is approximately 2 hours to the Orleans Ranger District Office.

10N01 and 10N10: From the Orleans Ranger District Office, travel east on state highway 96E toward County road

8Q 100. Form highway 96E, make a right onto county road 8Q 100 to reach Forest Servie road 10N01. Travel along 10N01 to reach 10N10.

Orleans Mountain Road: From the Orleans Ranger District Office, travel east on state highway 96E toward County road 8Q 100. Form highway 96E, make a right onto county road 8Q 100 to reach Forest Servie road 10N01. Travel along 10N01 to reach 10N10, and travel along 10N10 to reach Orleans Mountain Road.

C.3 Contract Time

The Contractor shall complete all work, including final site clean-up, within 60 calendar days from the Notice to

Proceed. Contract period shall not include time the Contractor is unable to safely access the work sits for reasons beyond the Contractor’s control including closure of access to the project area for fires, floods, other weather-related events or for the Government’s convenience.

C.4 Project Clean-up

Project site cleanup includes the removal and disposal of all project generated trash, debris, and residue off National

Forest Land in accordance with all applicable local, state, and federal regulations and requirements. Additional requirements are described in Section H

C.5 SPECIAL CONDITIONS AFFECTING THE WORK

A. Physical Conditions. Physical site conditions As Shown on the Drawings and in the specifications are the result of site investigations and surveys performed:

i. At the time of original construction and,

ii. During subsequent routine inspections.

The Government makes no representations related to site conditions except as specifically noted in the drawings or the specifications. No inferences shall be made by the offeror or contractor. A topographic survey was not completed at the site; therefore, grading plans and wall layout are approximate and will require field adjustment.

B. Work Hours. The approved work week is: five days (Monday-Friday), between 6:00 AM and 6:00 PM, Pacific Time. Any schedule for site work on federal holidays, Saturdays, Sundays, and outside the times stated above shall be submitted to, and approved by, the Contract Officer prior to such work being performed. The Contracting Officer shall be notified within 24 hours of any emergency work needed to be performed outside the approved work week.

C. Highway Permits. Contractor is responsible for securing any overload and over-size/width limit permits required for the transport of materials or equipment to the project site. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site.

D. Toilets. There are no facilities at or near the project site. The Contractor shall provide all necessary sanitation facilities as required by this contract, OSHA, and the State of California regulations.

E. Camping. Camping is not permitted on Government land except as may be specifically allowed by the

Contracting Officer. Camping is permitted in established Forest Service campgrounds with the permission of the concessioner.

Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises.

Any non-compliance will result in suspension of work until compliance is achieved.

F. Water. Limited quantities of non-potable water for the project construction can be drafted from local streams. Use Best Management Practices and do not block public access. Suction hoses/pipes shall have a

3/8” of less screen. Specific Requirements apply to drafting from live stream. Information can be obtained from the Orleans Ranger District Office.

G. Security. Contractor is responsible for the Contractor’s equipment and materials owned or supplied to the site. Lost, damaged, or stolen equipment or materials shall be replaced at the contractor’s expense. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. The contractor shall be responsible for signing, limiting public access, and safety of the public and/or government employees at the site. All refuse shall be properly stored or removed from the site at the end of each day.

The Government will identify up an area for the contractor’s use as staging and storage areas.

H. Public Access and Traffic Control. See Section H

I. Burning Permits. Contractor is subject to all rules and regulations governing the onsite burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Project Fire Prevention Plans. There will be no general burning activity as part of this contract.

J. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, seeds, mud, grease, and oil buildup from all equipment surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with the approved Storm Water/Pollution Prevention Plans. Such plans shall be submitted in accordance with requirements of Section G, Submittals.

The Contractor shall be responsible for protecting existing resources and improvements and replace those improvements if damaged during this project. The Contractor shall ensure all activities conform the Sub-section C.9 below.

Protection of heritage sites shall be in accordance with provisions of Section H

C.6 EQUIPMENT CLEANING & NOXIOUS WEED-FREE CERTIFICATION

The Contracting Officer will coordinate with the contractor for an inspection of equipment prior to delivery or travel on to Forest Service land. For the purposes of this contract, all “Off-road equipment” includes all vehicles and equipment operating off paved roadways. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required. This requirement is not applied to passenger vehicles making intermittent or casual visits to the site.

If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest

Service system lands which do not contain noxious weeds as determined by the local District Ranger.

C.7 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS

The Standard Specifications for this project are contained within the “Standard Specifications for Construction of

Roads and Bridges on Federal Highway Projects” FP-14 U.S. Customary Units. Copies of this document are available at the Federal Highway Administration web site at https://flh.fhwa.dot.gov/resources/specs/ in either

Microsoft Word (.doc) or Adobe Acrobat (.pdf) format.

Supplemental Project Specifications are included in full text as an attachment in Section J of the contract, and are intended to amend, supplement, or replace the FP-14 Standard Specifications. All specifications not included in the specification listing, but referenced by listed specifications, are applicable.

NOTE: Offerors are cautioned to carefully review these Standard and Supplemental Project Specifications prior to submission of proposals. All specifications in the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP-14 U.S. Customary Units are binding on the parties signing the contract.

Special Project Specifications are physically incorporated within this solicitation, beginning after the list of applicable Standard Project Specifications.

https://flh.fhwa.dot.gov/resources/specs/

The following Standard Specifications for the Construction of Roads and Bridges on Federal Highway

Projects issued in 2014 (FP-14) are applicable to this contract:

APPLICABLE FP-14 STANDARD SPECIFICATIONS DATE

Section 101. — TERMS, FORMAT, AND DEFINITIONS 2014

Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT 2014

Section 103. — SCOPE OF WORK 2014

Section 104. — CONTROL OF WORK 2014

Section 106. — ACCEPTANCE OF WORK 2014

Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC 2014

Section 108. — PROSECUTION AND PROGRESS 2014

Section 109. — MEASUREMENT AND PAYMENT 2014

Section 151. — MOBILIZATION 2014

Section 152. — CONSTRUCTION SURVEY AND STAKING 2014

Section 153. — CONTRACTOR QUALITY CONTROL 2014

Section 154. — CONTRACTOR SAMPLING AND TESTING 2014

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS 2014

Section 156. — PUBLIC TRAFFIC 2014

Section 251. — RIPRAP 2014

Section 302. — MINOR CRUSHED AGGREGATE 2014

Section 303. — ROAD RECONDITIONING 2014

Section 310. — COLD IN-PLACE RECYCLED ASPHALT BASE COURSE 2014

Section 407. — CHIP SEAL 2014

Section 412. — ASPHALT TACK COAT 2014

Section 635. — TEMPORARY TRAFFIC CONTROL 2014

The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

The following Forest Service Supplemental Specifications (FSSS) to the FP-14 are applicable to this contract:

Description Revision Date

Preface 5/14/2020

101 - Terms, Format, and Definitions 11/9/2016

101.01 Meaning of Terms 11/9/2016

101.03 Abbreviations. 11/9/2016

101.04 Definitions. 1/22/2020

102 - Bid, Award, and Execution of Contract 11/9/2016

103 - Scope of Work 11/9/2016

104 - Control of Work 11/9/2016

104.06 Use of Roads by Contractor 11/9/2016

106 - Acceptance of Work

106.01 Conformity with Contract Requirements. 7/18/2017

106.02 Visual Inspection 11/9/2016

106.07 Partial and Final Acceptance 11/1/2016

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims. 7/18/2017

108 - Prosecution and Progress 11/9/2016

109 - Measurement and Payment 11/9/2026

109.01 Measurement of Work 2/22/2019

109.02 Measurement Terms and Definitions 11/9/2016

155 - Schedules for Construction Contracts 11/9/2016

203 - Removal of Structures and Obstructions

203.04 (b) General. 11/2/2016

203.05 Disposing of Material. 9/10/2018

302 – Minor Crushed Aggregate

302.04 Placing Crushed Aggregate

302.05 Compacting and Finishing Crushed Aggregate

412 – Asphalt Tack Coat

412.05 Weather Limitations

703 – Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

SECTION F – SUBMITTAL REQUIREMENTS

SUBMITTALS

The following submittals are required for this project: Title

Referenced by Specification No

Time of Government Approval After Submittal

Erosion control plan FP-14 157 14 days

Hazardous Spill Plan FP-14 107 14 days

Fire Plan Fire Protection and Suppression 14 days

Construction Schedule FAR 52.236-15 14 days

Safety Plan FAR 52.236-13 14 days

Traffic Control Plan FP-14 156 14 days

MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project: Title

Referenced by Specification No

Time of Government Approval After Submittal

Cold Patch Mix Design 306.03 30 days

Chip Seal Qualifications 407.03 14 days

Chip Seal Composition 407.04 14 days

Chip Seal Control Strip 407.08 14 days

Chip Seal Production 407.10 Daily

SECTION H - SPECIAL CONTRACT REQUIREMENTS

Use of Premises

(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman.

(b) A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment; however, the fence shall be removed, and the site restored prior to final acceptance of the contract.

(c) When the Contractor’s operations require a temporary electrical power distribution system, the system shall comply with the National Electrical Code, applicable local codes, and utility regulations. The Contractor shall make all arrangements with the serving utility for temporary power and shall pay the serving utility for all applicable fees and power consumed.

(d) Potable water and sanitary facilities are NOT available for use during construction.

(e) The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract.

(f) The Contractor is responsible for all road maintenance and repair work caused by their operations.

Road No. Road Miles Authorizations, Restrictions or

Requirements

Maintenance

Required

10N01 6 None Construction

10N10 10 None Construction

Orleans Mtn Lookout

TBD None Construction

Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over-width permits.

Forest Service overload permits for this project may be obtained from the Orleans District

Ranger.

Heritage/Archeology

(a) In the event that cultural resources are discovered during implementation, all work in the area shall cease and the Forest Heritage Program Manager shall be notified immediately.

Any inadvertent discoveries within the project boundary shall be protected utilizing Standard Protection Measures as stipulated in the First Amended Region 5 Programmatic Agreement

(2018 R5 PA).

(b) Should inadvertent effects to or unanticipated discoveries of human remains be made on

Region 5 lands, the County Coroner (California Health and Safety Code 7050.5(b)) shall be notified immediately. If the remains are determined to be Native American or if Native

American cultural items pursuant to NAGPRA are uncovered, the provisions of NAGPRA and its regulations at 43 CFR 10 and ARPA at 43 CFR 7 shall be followed on federal lands (R5 PA

Stipulation 7.9 (a)).