1. Statement of Work.pdf
PDF 109 KB Posted
- Attached to
- 127EAW24R0026 - Meeks Barracks Foundation Federal contract opportunity
- Solicitation number
- 127EAW24R0026
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the Meeks Barracks Foundation project, which includes the construction of strip perimeter concrete footings, concrete piers, and upgrades to the floor framing system. The project is located in the Lake Tahoe Basin Management Unit (LTBMU) and is estimated to cost between $100,000 and $250,000. The work is to be completed between May 1st and November 1st, 2024, with the contractor required to begin work within 10 days of the Notice to Proceed. The solicitation is a Total Small Business Set-Aside, and all requests for information must be submitted by May 9th, 2022. The SOW includes details on the project location, work restrictions, required insurance, and applicable construction specifications. It also states that a pre-proposal site visit will not be held, and failure to inspect the site will not constitute grounds for a claim after contract award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2. Schedule.docx | DOCX document | |
| 6. Davis-Bacon Act WD # CA20240007.pdf | ||
| 3. Project Drawings.pdf | ||
| 4. Project Specifications.pdf | ||
| 5. Fire Plan.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 127EAW24R0026 - Meeks Barracks Foundation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C – Construction
12-05-01
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
The Meeks Barracks Foundation project includes the construction of strip perimeter concrete footings, concrete piers and upgrades to the floor framing system. This work includes but is not limited to all concrete footings/piers, carpentry for connection of building to new concrete footings/piers, repair of siding at the foundation, and installation of insulation within the foundation stem walls.
Project Location
From the Lake Tahoe Basin Management Unit’s Supervisor’s Office: travel northeast on College Ave toward Al Tahoe Blvd for 305 feet, turn left onto Al Tahoe Blvd for 0.4 miles, turn left onto Lake
Tahoe Blvd for 2.0 miles. Turn right onto CA-89 N/Emerald Bay RD for 16.4 miles, turn right into
7941 Emerald Bay Rd. Meeks Bay Resort and arrive at Meeks Barracks building. (39.03826, -
120.12418).
NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, SITE VISIT.)
Price Range
The Government's estimate is:
[ ] < $25,000
[ ] $25,000 to $100,000.
[ X ] $100,000 and $250,000.
[ ] $250,000 and $500,000.
[ ] $500,000 and $1,000,000.
[ ] $1,000,000 and $5,000,000.
[ ] $5,000,000 and $10,000,000
[ ] > $10,000,000
Estimated Start Date
June 1st, 2024
Contractor must begin work within 10 days of the effective date of the Notice to Proceed. See Section
F for additional information.
Restrictions on Work
1. Work on Meeks Barracks will be allowed from May 1st to November 1st, 2024.
2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous.
3. Construction activities will be restricted on all federal holidays. The job site must be in a condition to allow for heavy public use during these periods.
4. Work will be allowed during daylight hours Monday-Friday.
5. Weekend activities and alternate work hours may be approved by the CO on a case by case basis. A request to work on weekends or alternate hours must be submitted 7 days prior to scheduling to provide adequate time for review.
Worker's Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing (see also Section H, Camping Permit Compliance)
Camping is not permitted in US Forest Service campgrounds. Contractor [ ] will [X] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
Maps
See project location for description of route to project site.
Drawings and Specifications
Project Drawings: The following drawings are part of this solicitation:
Pope Foundation Plan
Pope Foundation Details
(Total of 2 Sheets)
Specifications:
[ X ] Construction Standard Institute (CSI) specifications
SECTION 03100 CONCRETE FORMWORK
SECTION 03200 CONCRETE REINFORCEMENT
SECTION 03300 CAST IN PLACE CONCRETE
SECTION 06100 ROUGH CARPENTRY
[ ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
FP-14 (US Customary Units)
This document is incorporated by reference and is available on the web in in PDF format.
https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf
[ ]1996 road and bridge specifications--
Standard Specifications applicable to this project can be found in Forest Service Specifications for
Construction of Roads & Bridges, August 1996 (EM-7720-100), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US
Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00660-2. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad
[ ] 1985 road and bridge specifications--
Standard Specifications applicable to this project can be found in Forest Service Specifications for
Construction of Roads & Bridges, April 1985, which is incorporated by reference. The publication is out of print. Contact the issuing office for copies of relevant specifications.
[ ] Trail specifications--
Standard Specifications applicable to this project can be found in Standard Specifications for
Construction and Maintenance of Trails, September 1996 (EM-7720-103), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US
Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00661-1. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad
Special Project Specifications are physically incorporated within this solicitation.
The following Standard and Special Project Specifications are applicable to this contract:
Supplemental Standard Specifications for Construction of Roads and
Bridges on Federal Highway Projects, FP-14 (US Customary Units)
Revision Date
101 Terms, Format, and Definitions 11-9-2016
102 Bid, Award, and Execution of Contract 11-9-2016
103 Scope of Work 11-9-2016
104 Control of Work 11-9-2016
106 Acceptance of Work 7-18-2017
107 Legal Relations and Responsibility to the Public 7-18-2017
108 Prosecution and Progress 11-9-2016
109 Measurement and Payment 11-9-2016
155 Scedules for Construcrtion Contracts 12-12-2016
The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
http://www.fs.fed.us/.ftproot/pub/acad http://www.fs.fed.us/.ftproot/pub/acad
File details come from the government source that posted it. Updated .