This Statement of Work (SOW) describes requirements for waterborne hull cleaning, video inspection, and zinc anode renewal services for the USCGC CLARENCE SUTPHIN. The contractor must conduct a pier-side underwater body inspection and cleaning to remove marine growth and restore the vessel's cathodic protection system. Work includes inspecting U/W hull plating, coating systems, transducers/sonar domes, drive systems, appendages, and cathodic protection components. The contractor must document findings using detailed inspection forms and produce an audio-video report with narration. Government-furnished zinc anodes and hardware are provided for renewal, including stern tube anodes (28 units), sea chest grate anodes (4 units), propeller zinc plates (2 units), and bow thruster anodes (13 units). Performance of work must occur at the vessel's location in Singapore (Toll Offshore Petroleum Services, berthed at SLOY5) during either the Primary period (17–18 September 2026) or Secondary period (21–22 September 2026), with offerors required to confirm availability at proposal submission.

Security requirements mandate that all contractor personnel possess valid REAL ID-compliant identification or acceptable Department of Homeland Security-approved alternative credentials for base access; failure to comply may result in performance delays that do not constitute excusable delays. The contractor must employ certified diving personnel compliant with 29 CFR 1910.401-440, provide a tender team and support equipment, furnish protective coverings to prevent contamination, provide 24-hour advance notice before diving operations, and coordinate continuously with the Coast Guard Inspector. References include Coast Guard technical drawings, maintenance procedure cards B10015.D and B10018.D, and Surface Forces Logistics Center standard specifications. Mixed gas diving and live boating are prohibited. Upon completion of inspection within 24 hours, the contractor must submit a CFR indicating recommended cleaning and submit written reports and two DVDs of the video inspection to the Contracting Officer's Representative (COR).

View the file

Other files

File Type Posted
27878 FAR CLAUSES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

USCGC CLARENCE SUTPHIN Waterborne Hull Clean and Inspect, Zinc Anode Renewal

1. Background and Current Observed Issues

USCGC CLARENCE SUTPHIN requires a pier-side waterborne hull cleaning, video inspection, and renewal of depleted zinc anodes to remove operational marine growth and restore the vessel's cathodic protection system.

Work Items:

1. U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes

2. REFERENCES:

Listed within each work item, as applicable. Available upon request.

3. REQUIREMENTS

See each work item for requirements.

4. PERIOD OF PERFORMANCE (POP)

The Government has established two potential POPs for this requirement, listed below. The Primary POP is the Government's preferred schedule. The Secondary POP serves strictly as an authorized backup schedule. All required services shall be completed during one of these two specified periods.

Proposal Submission Requirement: Offerors must explicitly state and confirm their availability to perform the required services during either Primary POP or Secondary POP at the time of proposal submission.

Primary: 17-18 September 2026 Secondary: 21-22 September 2026

5. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC CLARENCE SUTPHIN located at below address:

CGC CLARENCE SUTPHIN

Toll Offshore Petroleum Services Singapore 508988 Berthed at SLOY5

POC: CWO-2 Shaine Wells Cell: +1 (541) 637-9411 Email: Shaine.M.Wells@uscg.mil

6. SECURITY REQUIREMENTS

All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.

Work Item 1: U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to conduct a hull inspection and cleaning of the vessel’s U/W body and renewal of all bolted-on anodes in accordance with the referenced maintenance procedure cards. Affected surfaces or components include, but are not limited to the following:

U/W hull plating.

U/W body coating system.

Transducer(s)/sonar dome.

Drive Systems

Appendages

Cathodic Protection

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY

N Anode, stern tube P/N: Z0020202H3

NIIN: 016445483

28 ea.

N Nut, Self-Locking P/N: 90715A145

NIIN: 015085774

2 Bx *24 in a bx

N Anode, Sea Chest Grate P/N: GA-4

NIIN: 016476179

4 ea.

N Screw, Prop zinc plate P/N: 950756

NIIN: 016340210

8 ea.

N Screw, Sea Chest Grate Anode, P/N: 93190A634

NIIN: 016197182

4 ea.

N Screw Cap, Stern Tube Covers

P/N: 90585A626

NIIN: 016161107

42 ea.

N Zinc plate, propeller P/N: 950733

NIIN: 016278941

2 ea.

N Anode, Bow Thruster, Gear Case, Bolt On

P/N: 1081226

NIIN: 123561870

1 ea.

N Anode, Bow Thruster, Tunnel, Bolt On

P/N: CM2000Z

NIIN: 200126334

12 ea.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D

Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan

Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion

Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures

Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details

Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate)

Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2007, Commercial Diving Operations

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 The Contractor must provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures are commenced, meet with the COR and the Coast Guard Inspector, to discuss diving safety requirements and the securing of cutter machinery, as applicable.

3.2 Pre-diving clearance. The Contractor must ensure that the diving team obtains clearance from the Officer-of-the-Deck before beginning diving operations. Ensure the Coast Guard Inspector has capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of this work item.

3.2.1 The Contractor must, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.

3.3 Hull inspection requirements - general. The Contractor must survey the entire U/W body of the vessel to inspect for abnormal conditions or situations, which may include, but not be limited to the below listed.

NOTE

At Contractor’s request, Ship’s force will secure and tag out the cathodic protection system, main engines, steering gear, generator set, A/C unit, fire pumps, and all other machinery which may cause a hazard while a diver is in the water.

WARNING

Mixed gas diving and live boating are not permitted.

Hull plating and appendage damages.

Coating system defects or failures.

Welding corrosion and erosion.

Deformation in appendages.

Zinc performance.

3.3.1 Hull plating. The Contractor must inspect the exterior condition of the hull for presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action. Inspect for deformation along the stem and keel areas, condition of butt-welded seams, doubler plates, lap seams, and any signs of damaged plating or unusual waviness in the plating.

3.3.2 Coating system inspection. The Contractor must inspect the condition of the U/W body coating system, for signs of the following:

Peeling.

Blistering.

Abrasion.

3.3.2.1 Use the guidelines provided in Table I (Paint Deterioration Ratings (PDR) for Antifouling/Anticorrosion (AF/AC) Paint System) and Table 2 (Fouling Ratings (FR) In Order of Increasing Severity) to assist in proper documentation of the coating system degradation and fouling rate, respectively.

TABLE 1 - PAINT DETERIORATION RATINGS (PDR) FORANTIFOULING/ANTICORROSION

(AF/AC) PAINT SYSTEM

PAINT

DETERIORATION

RATING (PDR)

DESCRIPTION

10 AF paint intact, red in color or with mottled pattern of light green and red.

20 AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint.

30 AF paint missing from slightly curved or flat areas to expose AC paint.

40 AF paint missing from intact blisters to expose AC paint.

50 AF blisters ruptured to expose intact AC paint.

60 AF/AC paint missing or peeling to expose steel substrate, no corrosion present.

70 AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present.

80 Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present.

90 Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage.

100 Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate.

TABLE 2 - FOULING RATINGS (FR) IN ORDER OF INCREASING SEVERITY

TYPE FOULING

RATING

(FR)

DESCRIPTION

Soft 0 A clean, foul-free surface; red and/or black AF paint or a bare metal surface.

Soft 10 Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling.

Soft 20 Slime as dark green patches with yellow or brown colored areas (advanced slime).

Bare metal and painted surfaces may by obscured by the fouling.

Soft 30 Grass as filaments up to 3 inches (76 mm) in length, projections up to 1/4 inch (6.4

mm) in height; or a flat network of filaments, green, yellow, or brown in color; or soft non calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to 1/4 inch (6.4 mm) in height. The fouling cannot be easily wiped off by hand.

Hard 40 Calcareous fouling in the form of tubeworms I less than ¼ inch in diameter or height.

Hard 50 Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height.

Hard 60 Combination of tubeworms barnacles, less I than ¼ inch (6.4 mm) in diameter or height.

Hard 70 Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height.

Hard 80 Tubeworms closely packed together and growing upright away from surface.

Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells appear clean or white in color.

Hard 90 Dense growth of tubeworms with barnacles, ¼ inch or greater in height; Calcareous shells brown in color (oysters and mussels); or with slime or grass overlay.

Composite 100 All forms of fouling present, Soft and Hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth.

3.3.3 Sea chests and other hull penetrations. The Contractor must accomplish the following:

Inspect all sea chests and other hull penetrations for signs of any obstructions/marine growth in the openings that might prevent proper suction and discharge of water.

Inspect for bare metal areas (surrounding penetrations) and for bare metal pitting.

Inspect for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolt.

3.3.4 Propeller and shaft associated components. The Contractor must inspect the condition of the propeller shafts, struts, fairwaters, and rope guards. Note any loose or missing fairwater or rope guard fasteners.

3.3.4.1 Inspect propellers for corrosion, pitting, erosion, fouling, cracks, dings, curls, and nicks by side and blade.

3.3.4.2 Inspect the condition of the struts, keel drain plugs, rudders, rudder stocks, and rudder bearings, including any damage, pitting on leading and trailing edges of the rudder, and the presence of drain plugs.

3.3.5 Transducers. The Contractor must inspect the general condition of the fathometer transducer.

Record condition of rubber coating and amount of marine growth present. Note in the inspection report any cuts, gouges, or other surface defects found.

3.3.6 Cathodic protection system. The contractor must inspect the general condition and performance of the cathodic protection system. Record condition of zinc anodes on Table 7, Zinc Wastage.

3.4 Inspection documentation. The Contractor must document the hull survey as follows:

3.4.1 Written report. The Contractor must record the U/W body coating system fouling rating on the attached “Pre-Clean Bio-fouling Inspection Data” Form.

3.4.1.1 Note all inspection findings and observations, as applicable, on attached observations on the following attached inspection data forms, as applicable, on the attached: “Diver Hull Inspection Data”

Form.

3.4.1.2 In addition to completing the” Diver Hull Inspection Data” Form, do the following, as applicable:

Document condition of running gear on attached “Running Gear Inspection Data” Form for each shaft.

Document propeller condition on attached “Propeller Inspection Data” Form for each propeller.

Document condition of rudders on attached “Port and Starboard Rudder Data Inspection” Form.

Document condition of all U/W zincs on Table 7, Zinc Wastage.

3.4.2 Audio-video report. In addition to the written documentations specified above, The Contractor must produce an audio-video report, with narration, of all inspected surfaces. Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.

3.4.3 Documentation submission. Within 24 hours after the completion of the diver inspection, The Contractor must do the following:

3.4.3.1 Submit a CFR indicating the amount of recommended U/W body surface cleaning, if any.

3.4.3.2 Submit both, the written and audio-video reports to the COR. Submit the audio-video report on two digital video discs (DVD) formatted to USCG requirements.

3.4.3.2.1 Ensure that all video equipment have the following characteristics/functions:

Remote video/sound recorder.

Suitability for underwater use.

Auto-focus and auto-exposure.

Color pictures.

Two-way communication devices, to allow for communication and recording of communications between the diver operating the video camera and the Person-in-Charge, COR, and Coast Guard Inspector.

Audio/visual cables long enough to transmit the video picture and two-way communications to the recorder and monitor.

Online video monitor large enough, to allow the Person-in-Charge, the COR, and the Coast Guard Inspector to observe the video picture.

Sufficient lighting to ensure a quality color video picture and depth of field.

A yardstick or other suitable linear measuring device with clear measurement marks which can be read from the monitor.

3.4.3.2. 2 Closely monitor the video and sound quality during the survey, to ensure that the pictures on the monitor and the communication sounds remain of high quality. When either video or audio quality deteriorates, ensure that the survey is temporarily halted, until all problems have been corrected.

3.5. Hull cleaning requirements. Contractor must employ suitable means to clean the designated U/W body surfaces free of all marine growth, debris, and all other surface contaminants. The Contractor must ensure the following:

3.5.1 Ensure that existing U/W body coating system or non-coated surfaces do not incur any damage during cleaning process.

4. NOTES

4.1 Unit responsibilities. The ship's force will tag-out systems in accordance with COMDINST M9077.1 (series) and MPC B10015.D including the below.

All propulsion machinery and shafting, including auxiliary propulsion machinery such as the bow thruster, and all steering machinery whenever the diver is in the water.

All underwater body transducers, including the sonar equipment, for the duration of the underwater inspection operation.

All active cathodic protection equipment for the duration of the underwater inspection operation.

Each sea suction while the diver is inspecting the sea suction's sea chest strainer.

4.2 Mailing of video record. Upon receipt, the EPO will retain the diver report and underwater video inspection locally and forward a copy to the Engineering Section of the Product Line Division to which the vessel is assigned.

4.3 MPC Completion. Cutter EPO is responsible for ensuring MPC’s B10015.D and B10018.D are properly completed and submitted.

TABLE 6. DIVER HULL INSPECTION DATA (CONT.)

DIVER HULL INSPECTION DATA (CONTINUED)

5. SONAR DOME

□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □CUTS □LAYER SEPARATION □WIRE PILES EXPOSED

6. PROPULSION SHAFTING

VISIBLE BARE METAL □ YES □ NO RUST BLEEDING □ YES □NO PITTING □ YES □NO

CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE):

7. STRUTS AND BEARING HOUSING

PERCENT BARE METAL: STARBOARD PORT

MAIN % %

INTERMEDIATE % %

PDR

CONDITION OF STRUT LEADING AND TRAILING EDGES:

CONDITION OF ROPE GUARDS:

CONDITION OF FAIRWATERS:

8. RUDDER

CONDITION SUMMARY:

9. PROPELLERS

PROP #1: NICKS □ NO DAMCAUGRELS□ DAMAGE SHOWN ONCRAATCTKASC–HELADRDGREASWT ICNRGASCK LENGTH in.

PROP #2: NICKS CURLS CRACKS – LARGEST CRACK LENGTH in.

PROP #3: NICKS CURLS CRACKS – LARGEST CRACK LENGTH in.

PROP #4: NICKS CURLS CRACKS – LARGEST CRACK LENGTH in.

PROPELLERS NUMBERED STARBOARD TO PORT.

Diving Supervisor:

Ship’s Engineer:

□ NO DAMAGE □ DAMAGE SHOWN ON

STARBOARD

ATTACHED DRAWINGS

PORT

PERCENT BARE METAL % %

PDR

ACCESS PLATES INTACT? □ YES □ NO □ YES □ NO

WAS RUDDER SOUNDED? □ YES □ NO □ YES □ NO

ANY SIGNS OF FLOODING? □ YES □ NO □ YES □ NO

ANY SIGNS OF DROPPING? □ YES □ NO □ YES □ NO

TABLE 7. ZINC WASTAGE

FIGURE 1. PROPELLER INSPECTION DATA

FIGURE 2. STARBOARD RUNNING GEAR INSPECTION

FIGURE 3. PORT AND STARBOARD RUDDER INSPECTION