About this file
This document appears to be a Schedule of Items (SOI) for the Cheoah Assistant Ranger Dwelling Carport Replacement, Flammable Storage Building Replacement, Rattler Ford Storage Building Decommissioning, and Work Center Garage Door Replacement project.
The project requires the demolition and replacement of a carport, construction of a new flammable storage building, decommissioning of an existing storage building, and replacement of garage doors. The work will be performed at the Cheoah Assistant Ranger's Dwelling and the Rattler Ford Group Camp in Robbinsville, North Carolina. The period of performance is 180 days. A pre-bid site visit is scheduled for June 21, 2024, and questions are due by June 26, 2024. The solicitation is issued by the U.S. Department of Agriculture Forest Service. The SOI includes a detailed list of pay items and estimated quantities for the various project components, as well as options for the driveway paving, storage building demolition, and garage door replacement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cheoah Assistant Ranger Dwelling Carport Replacement, Flammable Storage Building Replacement, Rattler Ford Storage Building Decommissioning and Work Center Garage Door Replacement
04/25/2024
NFsNC
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
1 Mobilization and Bonding LSQ LS 1 $ $
Carport Demolition and Disposal
Including Foundation and 12 Ft. Section of asphalt pavement
LSQ LS 1 $ $
3 Foundation Slab Construction DQ CY 13 $ $
4 Section of Concrete Sidewalk Replacement LSQ LS 1 $ $
Installation of new UG Electrical Line from existing Load Center
Center at Dwelling to new Sub‐Panel at Carport
AQ LF 25 $ $
6 Carport Framing LSQ LS 1 $ $
7 Carport Siding, Soffits & Trim LSQ LS 1 $ $
8 Carport Roofing LSQ LS 1 $ $
9 Carport Insulation LSQ LS 1 $ $
10 Installation of 6” Seamless Gutters and 3x4 downspouts LSQ LS 1 $ $
11 Installation of Ext. Fiberglass Door, Vinyl Window and Hardware LSQ LS 1 $ $
12 Construction of Workbench LSQ LS 1 $ $
13 Building Electrical System Including Elect. Fixtures LSQ LS 1 $ $
14 Exterior & Interior Painting LSQ LS 1 $ $
Placement of 1‐1/2” compacted depth of NC DOT S9.5C
(Approximately 10 ft. wide x 12 ft. long)
CQ TON 1.1 $ $
Compacted Depth NC DOT ABC Stone Base
(Includes Driveway and Carport)
CQ TON 7 $ $
17 Installation of Silt Fence per detail AQ LF 120 $ $
18 Seeding, Mulching & Fertilizer LSQ LS 1 $ $
SCHEDULE OF ITEMS
Cheoah Ranger District
National Forests in North Carolina Graham County
BASE BID SCHEDULE ‐ Assistant Ranger House Carport Replacement
TOTAL PRICE ‐‐ FOR CARPORT BASE BID PAY ITEMS
4/25/2024 Page 1 of 3
Rattler Ford Storage Building Decommissioning and Work Center Garage Door Replacement
04/25/2024
NFsNC
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
19 Mobilization LSQ LS 1
20 Concrete Pad and Fuel Island Demolition & Disposal (40 TONS) LSQ LS 1 $ $
21 Foundation Slab Construction (15 CY) LSQ LS 1 $ $
Concrete Apron Construction (4 CY)
6’‐0” wide x 34’‐0” long
LSQ LS 1 $ $
23 Installation of new UG Electrical Service from existing MDP AQ LF 210 $ $
Installation of 200 Amp Nema 1 Safety Switch w/ 125 Amp
Fuses
LSQ LS 1 $ $
25 Masonry Walls Erection (800 CMU) LSQ LS 1 $ $
26 Installation of Block Vents (4 Units) LSQ LS 1 $ $
27 Building Roof: Trusses, Sheating & Shingles LSQ LS 1 $ $
Building Exterior Finish:2x4 Furring, Rigid Insulation, Lap Siding, Trim, Fascias, Soffits, Gable Ends Shingles
LSQ LS 1 $ $
Building Ceilings: 5/8 OSB sheating, 5/8” Cement Bd. ceiling
LSQ LS 1 $ $
30 Building Gutters LSQ LS 1 $ $
31 Installation of Ext. Metal Doors and Hardware LSQ LS 1 $ $
32 Building Electrical Load Center Lights. & Recept. LSQ LS 1 $ $
33 Explosion‐proof Heaters (2 Units) LSQ LS 1 $ $
34 Interior and Exterior Painting LSQ LS 1 $ $
35 Placement of 2” compacted depth NC DOT S9.5C CQ TON 16 $ $
36 6" Compacted Depth NC DOT ABC Stone Base CQ TON 32 $ $
37 Installation of Silt Fence per detail AQ FT 100 $ $
38 Seeding, Mulching & Fertilizer LSQ LS 1 $ $
BASE BID SCHEDULE ‐ Flammable Storage Building Replacement
TOTAL PRICE ‐‐ FOR FLAMMABLE STORAGE BULDING BASE BID PAY ITEMS
4/25/2024 Page 2 of 3
Rattler Ford Storage Building Decommissioning and Work Center Garage Door Replacement
04/25/2024
NFsNC
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
Paved Driveway Demolition and Disposal, approximately 10 ft.
wide x 40 ft. long, 1‐1/2” thick
LSQ LS 1 $ $
Placement of 3” min. loose depth of NC DOT ABC stone base, mixed with existing base and compacted
AQ TON 12 $ $
Placement of 1‐1/2” min. compacted depth of NC DOT S9.5C
Asphalt Pavement
AQ TON 40 $ $
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
42 Mobilization LSQ LS 1 $ $
43 Existing Rattler Ford Storage Shed Demolition & Disposal LSQ LS 1 $ $
PAY ITEM
NO.
DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
Replacement of Existing Garage Doors
Includes trim and painting, as described in SOW
LSQ LS 1 $ $
Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no addi onal payment will be made.
OPTION 3 BID SCHEDULE ‐ Cheoah Work Center Garage Doors
TOTAL PRICE ‐‐ FOR ALL BID PAY ITEMS
OPTION 1 BID SCHEDULE ‐ Assistant Ranger House Carport Replacement Driveway Paving
TOTAL PRICE ‐‐ FOR OPTION 1 BID PAY ITEMS
OPTION 2 BID SCHEDULE ‐ Rattler Ford Storage Building Demolition
TOTAL PRICE ‐‐ FOR OPTION 2 BID PAY ITEMS
4/25/2024 Page 3 of 3
File details come from the government source that posted it. Updated .