1. RFQ Sheets - KSPAN 100% BOM By Contract.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Earth work, concrete and rebar material Federal contract opportunity
Solicitation number
W9124V23Q0011
Issued by
Department of the Army Montana Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Earth work, concrete and rebar material, newest first.
File Type Posted
2. Rebar Statement of Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract 3 - Concrete & Base

Contract - Concrete & Base Material
Total
DescriptionU/IEstimated QtyUnit PriceTotal Cost
Structural 4000 PSI w/4-6% Air entrainment Concrete FootersCY67
3/4" minus structural fillCY1766
3" minus structural fillCY107
Structural 4000 PSI w/4-6% Air entrainment Concrete Stem WallsCY167
Structural 4000 PSI w/4-6% Air entrainment Concrete Stem Wall CapsCY31
Structural 4000 PSI w/4-6% Air entrainment Concrete Floor / Exterior PadsCY392
Delivery to jobsite, Fort Harrison (Helena), MTLS1

Contract 4 - Rebar & Steel Contract - General Construction Material Contract - Rebar & Steel

Total$0.00Total
Recommended VendorsPower TownsendHome DepotLowes
Item No.BOM TypeShop DesignatorBOM ComponentDescriptionU/IQtyUnit PriceTotal Cost
ERROR:#REF!InitialDirtSteel#5 Rebar 20' sticksPounds46372
ERROR:#REF!InitialDirtSteelProvide and Bend Rebar per SOWpounds7927
ERROR:#REF!InitialStructuresSteel3/4" Schedule 40 Black Iron Pipe - 10' LengthEA33
ERROR:#REF!InitialStructuresSteelAngle Iron 3"x3"x1/4" - 20' LongEA28
ERROR:#REF!InitialDirtSteel7 ft. x 42 in.x 1/8" Remesh SheetEA8
ERROR:#REF!InitialStructuresSteel4"x4"x20' square tubing - .25" thickEA6
ERROR:#REF!InitialStructuresSteel2"x4"x20' rectangular tubing - .25" thickEA2
Delivery to jobsite, Fort Harrison (Helena), MTLS1

Contract 5 - Concrete Pumping

Contract - Concrete Pumping
Total
DescriptionMethod of ProcurementRotationU/IQtyUnit PriceTotal Cost
Concrete Line Truck (min 220' horizontal capability)
Mobilize & Mileage - Fort Harrison, MT (Outside of Helena, MT)Mobilizations4
Total Maximum Concrete Pumped (all mobs combined)CY347
Maximum Number of Hours (8 hours per mobilization)Hrs.32
Concrete Arial Pump Truck (30 meter minumum)
Mobilize & Mileage - Fort Harrison, MT (Outside of Helena, MT)Mobilizations8
Total Maximum Concrete Pumped (all mobs combined)CY265
Maximum Number of Hours (8 hours per mobilization)Hrs.8

File details come from the government source that posted it. Updated .