About this file

This performance work statement outlines requirements for basewide electrical transformer testing services at Dover Air Force Base in Delaware. The contractor shall inspect and test approximately 124 transformers ranging from 112.5 to 2500 KVA, performing various electrical tests on transformers from 750 to 2500 KVA and oil sample tests on transformers from 112.5 to 2500 KVA. The contractor must provide qualified personnel, equipment, insurance, and follow all applicable safety and security requirements. The contractor shall submit a final report summarizing test results and recommendations within 30 days of completing the work.

View the file

Other files for this federal contract opportunity

Other files attached to Basewide Electrical Transformer Testing, newest first.
File Type Posted
Solicitation - FA449723R0007A Final.pdf PDF
Solicitation - FA449723R0007 Final.pdf PDF
2. Wage Determination #2015-4217, 31 May 2023.pdf PDF
3. Bid Schedule Basewide Electrical Transformer Testing 23 Jun 23.xlsx XLSX spreadsheet
4. Appendix B Basewide Electrical Transformer Testing 23 June 2023.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

BASEWIDE ELECTRICAL TRANSFORMER

TESTING

Dover Air Force Base, DE 6 July 2023

PERFORMANCE WORK STATEMENT

FOR

BASEWIDE ELECTRICAL TRANSFORMER TESTING

1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, material, supervision, specialty equipment, and insurance to professionally evaluate and test the electrical transformers identified in Appendix B that list the size and capacities on Dover Air Force Base.

1.1. BASIC SERVICES. The contractor shall inspect and test all electrical transformers identified in Appendix B.

1.2. The following tests shall be performed for (34 each) transformers as applicable:

- AC Power Factor Test (750 KVA - 2500 KVA Only)

- AC Excitation Test (750 KVA - 2500 KVA Only)

- DC Insulation Resistance Test (750 KVA - 2500 KVA Only)

- Turns Ratio Test (750 KVA - 2500 KVA Only)

1.3. Oil Sample Testing (90 each) transformers (112.5 KVA – 2500KVA) and perform the following tests on each sample:

- Water in Insulating Fluids ASTM D1533

- Interfacial Tension (IFT) ASTM D971

- Acid Number ASTM D974

- Color & Visual Examination ASTM D1500/1524

- Dielectric Breakdown ASTM D1816

- Specific Gravity ASTM D1298

- Dissolved Gas Analysis (DGA) ASTM D3612-C

*The purpose of the tests is to determine the basic electrical properties of the oil and if the oil is showing signs of decay.

The proposed services will be performed in accordance with the following: Institute of Electrical and Electronics Engineers, (IEEE), National Fire Protection Association, (NFPA), International Electrical Testing Association, (NETA), and National Electric Code, (NEC) requirements. The government will provide personnel in coordination with the 436 Civil Engineer Squadron (CES) Electrical Shop and the equipment to deenergize transformers prior to being tested by the contractor. The 436 CES Electric Shop will provide a list of facilities that will lose power for each transformer scheduled for electrical outage and testing. A representative of the 436th CES will coordinate a two-week notification with facility managers of those facilities affected by the scheduled power outages with times needed for each scheduled electrical outage. Additionally, base union representatives will need to be notified two weeks in advance of electrical outages as well.

1.2. DELIVERY SCHEDULE. The contractor shall provide a final report of all testing accomplished on the transformers listed in Appendix B within 30 days of completing the testing.

The final report will consist of the contractor’s checklist, summary of recommendations and immediate needs assessment, with documented discrepancies that require urgent action. The contractors report will be provided to the government in digital format (PDF or Word).

2. HOURS OF OPERATION. DAFB standard hours of operation are 0700 to 1600 Monday through Friday. Federally recognized holidays are to be observed and are considered off-days.

The Contractor may be requested to respond on off-days to include weekends for emergency services. The standard two-hour response requirement for emergency services applies regardless of workday or off-day status.

3.0. VEHICLES AND PASSES. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Forces Squadron, Pass and Registration and will comply with DAFB directives.

3.1. CONTRACTOR PERSONNEL. The contractor’s personnel shall conduct themselves in a professional manner. Contractor uniforms, badges, and appearance standards shall be commensurate with industry standards. The military uniform or any part thereof, may not be worn by Contractor’s employees while performing work under this contract.

3.2. RECORDS MANAGEMENT.

Records Management. The contractor understands that when creating, handling, and maintaining records for the Air Force, either electronic or paper, they must meet the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Manage Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of Records. In order to meet the requirement established IAW the above-mentioned regulations contact the Base Records Management Office {436 CS/SCXK, Bldg. 310) at (302) 677-3642 for guidance and training.

4. SECURITY AND SAFETY REQUIREMENTS. In performing any work under this contract on premises which are under the direct control of the Government, the Contractor shall conform to all safety rules and requirements prescribed in Air Force Pamphlet 91-210, Contract Safety and Public Law 91-596, The Occupational Safety and Health Act of 1970. Effective on the date of this contract, the contractor shall take such additional precautions as the Contracting Officer may reasonably require for security, safety, traffic fire, personnel clearances, and accident prevention purposes. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of the Contractor, Government Property and Government personnel performing or in any way coming in contact with the performance of this contract on such premises. These requirements are additional to and do not replace the standards promulgated by the Department of Labor under the Occupational Safety and Health (OSHA) Act. In the event of a conflict between the OSHA Standards and these requirements, the most stringent shall apply. Any violation of such rules and requirements, unless promptly corrected, as directed by the Contracting Officer, may be considered grounds for termination of this contract in accordance with the default provisions hereof.

4.1. SECURITY. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of DAFB. Employees are responsible for safeguarding all government property provided for contractor use.

4.1.1. At the close of each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.

4.1.2. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI).

4.1.3. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.

4.1.4. All contractors and subcontractors when working in a Controlled, Restricted, or other sensitive area must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

4.2. CONTRACTOR BADGE POLICIES. All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the Contracting Officer Representative. The Contracting Squadron Office or base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW OPlan 31-101. As a minimum the ORM will be submitted 10-days prior to the requested date of employment.

4.2.1. All contactor employees who’ll be granted unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the criminal background check.

4.2.2. DAFB Contractor badges will be issued for the period of performance. In the event a badge is lost or stolen, immediately contact the 436 SFS, Pass and Registration office. The badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436 SFS, Pass and Registration office and submit a new request for badge before a new badge can be reissued.

4.2.3. Base Contracting Office or base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Office.

4.3. INSTALLATION ACCESS. 10 days prior to arrival the contractor shall submit to the COR a list of personnel to include name, date of birth, drivers license number, and state of issue that need base access to accomplish this work. A background check will be accomplished for those personnel needing base access and an access pass will be issued for them. All vehicles for contractor personnel will require current proof of vehicle registration and insurance for entry onto DAFB for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their issued access pass.

All contractor personnel must show a valid driver’s license, or State issued identification card for base access. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of the access pass.

4.3.1. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.

4.3.2. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.

4.3.3. During Higher FPCONs (Charlie and Delta) the base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended as the direction of the Installation Commander.

4.4. FLIGHTLINE DRIVING. Contractors will have to adhere to the provisions in DAFBI 13-202 if operating on the airfield.

5. HAZMAT REQUIREMENTS: The contractor shall submit Material Safety Data Sheets (MSDS) of all chemicals planned for use on DAFB.

5.1. Purpose. As required by AFI 32-7086, paragraphs 2.5.5.2.4, 2.5.5.2.8 and 2.5.5.2.9;

requires DAFB to account for all hazardous materials (HAZMATs) brought on the facility to include contractors as well as providing procedures for the reporting of those items.

5.1.1. This part outlines actions to be taken by the contractor in the request for approval of hazardous materials prior to initiating field activities associated with the subject project and the reporting of approved hazardous materials usage during contract performance.

5.1.2. Compliance with this part is mandatory and contactor failure to comply will result in the contractor not being allowed to bring any hazardous materials on DAFB. Contractors must also comply with mandatory Federal, State and local guidelines, regarding storage and management of hazardous materials, failure to comply can result in legal action by Federal, State or local enforcement officers against the offender.

5.2. RESPONSIBILITIES: Contractor Reported Usage of HAZMAT.

5.2.1. Contractors must submit to the associated Contracting Office the information and supporting documentation including Material Safety Data Sheets (MSDSs) necessary to obtain HAZMAT usage authorization. Report data on the HAZMAT used during the performance of the contract at intervals and in the format specified by DAFB.

5.2.2. The contractor shall provide a completed DAFB HAZMAT Chemical Worksheet (Appendix A) for each HAZMAT to be used during the duration of the contract to include MSDS. This list of all HAZMATs shall be provided at the beginning of the contract. Any additional HAZMATs required during the course of the contract shall be requested for approval at that time. In addition, the quantity of chemicals expended will be reported to the DAFB Hazardous Materials Pharmacy (HAZMART) by filling out the Contractor’s Monthly Report (Appendix B) for HAZMATS. Both the Worksheet and Monthly Report forms shall be provided upon award of contract.

5.3. WASTE and HAZARDOUS WASTE REMOVAL: The contractor shall dispose of all wastes generated in the performance of their task. No hazardous waste or solid waste materials shall be placed in any trash receptacle on DAFB. The Contractor must comply with all federal, state, and local regulations regarding the transport and disposal of any and all hazardous wastes generated as a result of maintaining and repairing fire extinguishing and fire alarm systems under this contract.

5.4. MATERIALS. All materials used in the performance of services on the installation shall be in compliance with industry standards, local, Federal, and State laws, and will be used according to manufacturers’ recommendations. Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards. The Contractor will submit Material Safety Data Sheets on all materials to be used fifteen (15) days prior use for approval by the COR and the Environmental Flight Hazardous Waste Coordinator.

6.0. ANTITERRORISM AWARENESS LEVEL I TRAINING. DoD Contractors supporting a Base Service Contract (e.g., Custodial Services, Ground Maintenance, etc.) are highly encouraged to complete AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Advanced Distributed Learning System (ADLS) site or the Defense Technical Information Center (DTIC) at https://atlevel1.dtic.mil/ for individuals without access to government Non-classified Internet Protocol Router Network (NIPRNET) computer and who do not possess a CAC card.

https://atlevel1.dtic.mil/

APPENDIX A

Contractor Name:

[Company preforming the w ork] Contract Number and Title:

Project Number (FJXT):

Estimated Start Date: Estimated Completion Date:

Shop Code (DV):

[To be completed by base personnel]

PROCESS CODE:

[To be completed by Bioenvironmental Engineering]

National Stock Number (NSN), or Part Number:

Manufacture:

Material Name: Size:

[Be Specif ic] [ounces, gallons or pounds,etc.] Amount used: Container type:

[Per w eek, month, year] [box, bottle, can, tube, drum etc.] Unit of Issue: Units per container:

[each, dozen, kit, etc.] [2 ea., one dz., 3 part kit, etc.] Will the process be performed inside or outside?

Will the process be performed on equipment, structure or aircraft?

Physical location of process proformance:

Location Of stored Material:

Is a Hazardous Waste Generated? YES NO If yes, how is waste disposed:

[remarks] Is a site digram available? YES NO [remarks] Does the site have a listing of base procedures for reporting a spill? YES NO [remarks]

This request requires both the contractors and QAE signature for processing.

Contractor and Title:

Phone: Date:

Government Representative:

Phone: Date: