1. PWS - 7471 Grounds Restoration.docx
DOCX document 2 MB Posted
- Attached to
- Ground Renovation Federal contract opportunity
- Solicitation number
- W911RZ25QA040
About this file
This Performance Work Statement (PWS) details ground restoration services for the 10th Special Forces Group (Airborne) Special Operation Mountain Warfare Training Center Climbing Tower. The project involves comprehensive ground renovation at buildings 7471 and 7477, including removing and leveling existing ground material, compacting ground to a Dynamic California Bearing Ratio of 10, placing 8 inches of road base, and installing two 24-inch diameter reinforced culverts rated to support traffic over 25 tons. The contractor will be responsible for procuring materials, coordinating manpower, and completing work within a 6-month period, with the government providing site access and millings.
The solicitation (W911RZ25QA040) is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Carson, Colorado. Key dates include a site visit on 16 September 2025 at 10:00AM MDT, request for information due 17 September 2025 at 11:00AM MDT, and quotes due 19 September 2025 at 12:00 PM MDT. The contract is firm-fixed-price, with the contractor required to warrant all work for one year from completion, maintain an adequate workforce, manage waste disposal, and submit weekly progress reports. The total improvement site is approximately 14,000 square feet, with specific requirements for surface elevation, slope, and road markings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis-Solicitation W911RZ25QA040.Amendment 1.df.pdf | ||
| Updated - PWS - 7471 Grounds Restoration09-17-25.docx | DOCX document | |
| Combined Synopsis-Solicitation W911RZ25QA040.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
10th Special Forces Group (Airborne) Special Operation Mountain Warfare Training Center Climbing Tower Grounds Restoration
FY25
NOTE TO OUR CUSTOMERS: THIS TEMPLATE MUST BE TAILORED FOR YOUR AGENCY BY INCLUDING YOUR UNIQUE REQUIREMENTS, QUANTITIES FOR WORKLOAD, SPECIFIC SURVEILLANCE TECHNIQUES, ETC. ANY QUESTIONS REGARDING THIS TEMPLATE SHOULD BE ADDRESSED WITH YOUR ASSIGNED ACQUISITION TEAM.
GENERAL INFORMATION IS PRESENTED IN BLUE ITALICS WITH PARENTHESIS BORDERS, WHILE FILL-IN GUIDANCE IS PRESENTED IN BLUE ITALICS WITH BRACKET BORDERS. PLEASE DELETE ALL BLUE ITALICS WHEN FINALIZING THE PWS.
Part 1
General Information
1. GENERAL: This is a services contract to provide renovation to the grounds of 7471 and 7477, the Special Operations Mountain Warfare Training Center (SOMWTC) Climbing Tower and climbing equipment. The Government shall exercise supervision over the contract service provider performing the services herein; however, an onsite project manager is still required by the contractor. Such contract service providers shall be accountable solely to the Contractor who in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, supervision, and other items and non-personal services necessary to perform maintenance and restoration to the climbing facility as defined in this PWS except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall meet the standards in this contract.
1.2 Background: The SOMWTC climbing grounds are aging and in need of continued maintenance and renovation to maintain usability and ensure the ability to continue safe and meaningful training.
1.3 Objectives: The objective of this contract is to ensure continued high quality, safety, and meaningful training is able to be performed by SOMWTC.
1.4 Scope: The contractor will procure all resources and materials needed to execute ground improvement renovations and modifications. The contractor will remove, dispose of, and level up to 8” of ground material in preparation for base course. The contractor will compact ground to DCBR (Dynamic California Bearing Ratio) of 10, if 10 cannot be achieved, the contractor will purchase and incorporate stabilizer until achieved. The contractor will purchase, place, and compact 8 inches of CDOT Class 6 road base. The contactor will transport millings provided by the government to the site, heat, moisten, re-bind, place, and compact until a smooth surface, a minimum of 3 inches thick, is present. The perimeter will have straight and orderly lines per outline attached and will be square to the grounds on site. There will be two reinforced 24-inch diameter culverts replaced side by side as notated. The culvert will be rated to support at a minimum, traffic greater than 25 tons and will span the road crossing, no less than 20 feet. No portions of the improved surface will be narrower than 20 feet. Culvert will have corrosion mitigation. The compacted pavement will have a minimum of 1 inch elevation above existing ground. The surface will be flat and sloped ¼ inch per 2 feet with natural terrain to maintain current runoff. The surface will be flush with all existing concrete pours and will be sealed between any existing hard surfaces such as sidewalks and curbs. The DPW Civil Infrastructure engineer and traffic engineer will validate all work is performed as prescribed. The contractor will warrant all work one year from the date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion.
1.5 Period of Performance: 6 months
1.6 General Information
1.6.1 Quality Control Plan (QCP): (Reserved)
1.6.1.1 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall submit their QC Plan as part of the contractor’s proposal if QCP will be evaluated. The QCP shall be submitted within thirty (30) days of contract award. After acceptance of the QCP, the contractor shall receive the contracting officer’s (KO) acceptance in writing of proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation.
1.6.1.2 The Quality Control Plan shall address as a minimum:
1.6.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the way inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS. This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work, including inspection and testing.
1.6.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.6.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.1.2.7 Operations Security (OPSEC) SOP/Plan Requirements: The Contractor shall implement and maintain an OPSEC program for preventing the disclosure of critical information or sensitive information which could jeopardize the Government’s ability to execute its mission or to adequately protect its personnel and/or equipment. The Contractor shall develop an OPSEC Standing Operating Procedure (SOP)/plan within 90 calendar days of contract award to the Contracting Officer Representative (COR) or Contracting Officer (KO) to be reviewed and approved by the Government OPSEC Officer on the supporting installation. The SOP must contain a training plan that includes an initial OPSEC brief, continuous awareness, and annual OPSEC training. Awareness/training includes, but is not limited to information disclosure via letters, conversations, photographs, resumes, electronic mail (e-mail), Social media/networking sites, dissemination of information and documents disposal. OPSEC Program shall fully comply with the provisions of AR 530-1, Operations Security.
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met. Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays: Work will not be performed on federal holidays and designated SOCOM training days without prior coordination.
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day |
Juneteenth
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 0900-1700 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at the 10th SFG(A) Compound, in the vicinity of building 7471 and 7477.
1.6.6 Type of Contract: FFP.
1.6.7 Security Requirements
1.6.7.1 Access and General Protection Policy and Procedures: All contractor employees, including subcontractor employees, requiring access to an Army or USSOCOM controlled installation, facility, or area shall comply with applicable security policies and procedures (provided by the government representative). This includes policies pertaining to the use or prohibition of electronic recorders, devices, cameras, etc. If the Contractor is required to take photographs or videos on a Government Installation, the Contractor must obtain written permission from the Senior Commander. The contractor shall also provide all information required for background checks to meet installation and access requirements to be completed by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, USSOCOM, USASOC and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should Force Protection Condition (FPCON) at any individual facility or installation change, the government may require changes in contractor security matters or processes.
1.6.7.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.3 AT Level I training: All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jkodirect.jten.mil.
1.6.7.4 Access and general protection/security policy and procedures Contractor and all associated sub-contractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.5 iWatch Training The contractor and all associated sub-contractors shall brief all employees on the local iWatch program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.6.7.6 For contracts that require a formal OPSEC program The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per ARS30-l.
For contracts that require OPSEC Training. Per AR 520-1, all contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty and annually thereafter.
Per AR 530-1, Operations Security: new contract employees and/or contracts of a specific duration requiring access to Fort Carson must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training. Contracts of a specific duration that exceed one year must complete annual OPSEC Level I training. OPSEC level I awareness training is available at the following website: https://securityawareness.usalearning.gov/opsec/
1.6.7.7 Controlled Unclassified Information (CUI) Contractors and all associated sub-contractor employees shall comply with safeguarding defense information and cyber incident reporting as listed in DFARS clause 252.204-7012 and must comply with NIST 800-171. The offeror shall verify summary level scores of a current NIST SP 800-171 DoD Assessment are posted in the Supplier Performance Risk System (SPRS) as required by DFARS 252.204-7019.
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer prior to start of contract performance. The Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.6.11 Contractor Travel: Contractors are responsible for their own travel to Fort Carson, Colorado, and travel in and around the area to include on-post and off-post.
1.6.12 Other Direct Costs: Contractors will be responsible for their own lodging, meals, and other costs associated with travel.
1.6.13 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious.
1.6.14 Information Assurance: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.6.15 Organizational Conflict of Interest (OCI) [There are two versions of OCI PWS language. The below paragraph is used when it is anticipated the Contractor will not have access to source selection information or other information that provides an unfair competitive advantage. The other version of the PWS language is found at Attachment 1.]: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor. The total contractor organization or a separate entity of it; such as an affiliate, division, or plant that performs its own purchasing.
2.1.2. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.3. Contracting Officer’s Representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people that are listed in the proposal.
2.1.7. Performance Work Statement (PWS). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.8. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.10. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
2.1.11. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.12. Shall. An imperative command: has a duty to or is required to. Denotes that a regulation must be followed unless the contracting officer has obtained a deviation.
2.1.13. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.14. Workday. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.15. Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
| ALMS | Army Learning Management System | |
| ANSI | American National Standards Institute | |
| AOR | Area of Responsibility | |
| AR | Army Regulation | |
| ATCTS | Army Training Certification Tracking System | |
| AT | Anti-Terrorism | |
| CAC | Common Access Card | |
| CFR | Code of Federal Regulations | |
| CI | Counterintelligence | |
| CLIN | Contract Line-Item Number | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer Representative | |
| DD Form 254 | Department of Defense Contract Security Requirement List | |
| DOD | Department of Defense | |
| DODD | Department of Defense Directive | |
| DODI | Department of Defense Instruction | |
| FAR | Federal Acquisition Regulation | |
| FHP | Force Health Protection | |
| FCG | Foreign Clearance Guide | |
| FY | Fiscal Year | |
| GFE | Government Furnished Equipment | |
| GFP | Government Furnished Property | |
| IA | Information Assurance | |
| IAW | In Accordance With | |
| IT | Information Technology | |
| JPAS | Joint Personnel Adjudication System | |
| JTR | Joint Travel Regulation | |
| KO | Contracting Officer | |
| LOA | Letter of Authorization | |
| NCIC-III | National Crime Information Center Interstate Identification Index | |
| NIST | National Institute of Standards and Technology | |
| ODC | Other Direct Costs | |
| OCI | Organizational Conflict of Interest | |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) | |
| ODC | Other Direct Costs | |
| OSHA | Occupational Safety and Health Administration | |
| OPSEC | Operation Security | |
| PIPO | Phase In/Phase Out | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QCP | Quality Control Program | |
| RA | Requiring Activity | |
| SCR | Service Contract Reporting | |
| SOP | Standard Operating Procedures | |
| SPOT | Synchronized Pre-deployment and Operational Tracker | |
| TE | Technical Exhibit | |
| TSDB | Terrorist Screening Data Base | |
| U.S.C. | United States Code |
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: N/A
3.2 Facilities: The Government will provide access to 10th Special Forces (Airborne) buildings and facilities for Contractors to conduct work.
3.3 Utilities: N/A
3.4 Equipment: N/A
3.5 Materials: The government will furnish millings as needed for this service. Transportation, preparation, and usage will be the responsibility of the contractor.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract.
PART 5
SPECIFIC TASKS
5. Specific Tasks: The contractor will procure all resources and materials needed to execute ground restoration. The contractor will warrant all work one year from date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon period of performance.
5.1. Basic Services. The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
5.1.1 Approximate boundaries of existing site for remediation. Improvement site is approximately 14,000 ft2
5.1.2 The contractor will remove, dispose of, and level up to 8” deep of existing ground material in preparation for base course.
5.1.3The contractor will compact ground to DCBR (Dynamic California Bearing Ratio) of 10, if 10 cannot be achieved, the contractor will purchase and incorporate stabilizer until achieved.
5.1.4 The contractor will purchase, place, and compact 8 inches of CDOT Class 6 road base.
5.1.5 The contactor will transport millings, provided by the government, to the site, heat, moisten, re-bind, place, and compact until a smooth surface, minimum of 3 inches thick, is present. The perimeter will have straight and orderly lines per outline attached and will be square to the grounds on site (existing hardscape).
5.1.6 Two reinforced 24-inch diameter culverts will be procured and replaced side by side as notated. Existing culvert will be removed and disposed of.
5.1.6.1 The culvert will be rated to support at a minimum, traffic greater than 25 tons and will span the road crossing, no less than 20 feet.
5.1.6.2 The culverts will have corrosion mitigation and will be placed at similar elevation to existing culvert.
5.1.7 No portions of the improved surface will be narrower than 20 feet.
5.1.8 The compacted pavement will have a minimum of 1 inch elevation above existing ground. The surface will be flat and sloped ¼ inch per 2 feet with natural terrain to maintain current runoff. The surface will be flush with all existing concrete pours and will be sealed between any existing hard surfaces such as sidewalks and curbs.
5.1.9 The DPW Civil Infrastructure Engineer and Traffic Engineer will validate all work is performed as prescribed and the contractor will warrant all work one year from the date of completion and closeout.
5.1.10 The perimeter of the improved surface will be painted with durable road marking paint and sealed appropriately. Additionally, 25-30 standard size parking spaces will be painted and sealed to most efficiently utilize the space and provide ease of access. This plan will be drafted by the contractor and approved by the group engineers and DPW chief infrastructure engineer.
5.2.1 Requirements. The contractors, subcontractors, and all personnel associated with the project must have appropriate access to Fort Carson.
5.3. Service Contract Reporting (SCR): The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 30 of each calendar year using http://sam.gov.
5.3.1 Progress Report: The Contractor shall submit a weekly progress report to the COR/ACOR that annotates the current progress and up to date timelines.
5.3.2 Damage Report: The Contractor shall submit a monthly damage report to the COR/ACOR that annotates the damage, corrective action, and date corrected.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1.1 DOD Commercial Use of Imagery Guidelines
6.1.2 AR 190-13, The Army Physical Security Program
6.1.3 Army Directive 2014-05, Policy and Implementation Procedures for CAC Credentialing Access for 6ncleared Contractors
6.1.4 DOD 5220.22-M, National Industrial Security Program Operating Manual
6.1.5 Defense Federal Acquisition Regulation Supplement (DFARS)
6.1.6 Joint Travel Regulation (JTR)
6.1.7 AR 735-5, Policies and Procedures for Property Accountability
6.1.8 DODD 8570.01, Information Assurance Training Certification and Workforce Management
6.1.9 DOD 8570.01-M, Information Assurance Workforce Improvement Program
6.1.10 AR 25-2, Information Assurance
6.1.11 DODI 2000.16 DoD Antiterrorism (AT) Program
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Attachments:
7.1.1 Attachment 1 – Performance Requirements Summary
7.2 Technical Exhibits:
7.2.1 Technical Exhibit A – Existing Climbing Structure
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
8.1. General. The Performance Requirements Summary in this section will be used to measure performance of services for the purpose of determining the continuation of service under this contract and any applicable payment deductions. The rights of the Government and remedies described in this section are in addition to all other rights and remedies set forth in this solicitation. The Government reserves its rights under the "Inspection of Services" and "Termination for Default" clauses of this contract. The Contractor shall not be relieved of full performance of the services hereunder and may be terminated for default based upon inadequate performance of services even if a deduction was previously taken for inadequate performance. Failure to meet standards may result in Contract Discrepancy Report (CDR) to document performance. The COR will recommend when a remedy through the CONTRACTING OFFICER should be initiated to address noted deficiencies.
8.1.1. Individual Tasks and Other Services. Requirements not included in the PRS remain subject to separate quality assurance evaluations. The absence from the PRS of any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the Government under any provision of this contract.
8.1.2 Explanation of the PRS. The PRS has been developed to cover required services rather than the individual performance of tasks. Each listed service will pass or fail based on the acceptability of the tasks which comprise that service.
8.2 PRS Table. The PRS included in this section will provide the following information:
8.2.1 Column Number 1. Column 1 lists the contract requirements by service outputs which breakdown the contract in areas considered necessary for acceptable contract performance. The Government will measure contract performance in each of these various areas to determine overall performance and contract payment. Each service on the PRS will evaluate IAW established AQLs. Also provided in this column is the reference para number (including all subsequent sub-para) of the contract that describes the required service.
8.2.2 Column Number 2. Column 2 lists the contract para (including all subsequent sub-para), which details the standards for each listed service.
8.2.3 Column Number 3. Column 3 lists the Allowable Quality Level (AQL) which determines the maximum allowable degree of deviation from perfect performance that may occur for each listed service before the Contractor will receive less than 100% of the maximum payment for the listed service. Definition of the lot size used as the basis for surveillance and for payment computation purposes is also included in this column.
8.2.4 Column Number 4. Column 4 lists the primary surveillance methods the Government will use to evaluate the Contractor's performance of each listed service.
8.3 Inspection Methods. The Government may use a variety of surveillance methods to evaluate the Contractor's performance. The Government may unilaterally change the type and frequency of inspections as it deems necessary. Both scheduled and unscheduled surveillance will be used to look at the total or parts of performance. Valid customer complaints will not be added to the defective samples found under random or planned sampling for the purposes of deductions in contract payment. The methods of surveillance that may be used are Random Sampling, Planned Sampling, Unscheduled Inspections, and Customer Comments. For the purpose of this contract, the word "sampling" is synonymous with the word "inspection".
8.3.1 Performance Evaluations. The Contractor shall have work complete and ready for inspection in accordance with all terms of the contract. The Government will perform monthly quality assurance inspections to measure overall performance and determine contract payment. Government inspections will be made according to the appropriate surveillance method(s), to compare Contractor's performance to contract requirements and standards. When the Contract Manager is not available during inspection to receive the results, acceptance or rejection of work will be made on the basis of the initial inspection.
8.3.2 Measuring Performance. The Government will use the PRS in this contract as the primary tool to measure contract performance. One defect constitutes failure of one inspection of one service listed on the PRS during an evaluation period.
8.3.3 Acceptable Performance. Contractor performance will be acceptable when all requirements have been met and the number of allowable defects has not been exceeding whether random or planned sampling techniques were used.
8.3.4 Unacceptable Performance. Services listed on the PRS will be unacceptable and rated defective when the number of recorded defects exceeds the allowable number of defects. Defects will result when performance does not meet contract provisions, or was not IAW contract requirements and standards, or was not completed by the specified time, or was not completed in its entirety. Once a defect has been identified it remains a defect, regardless of if it has been corrected.
8.4 Contract Discrepancy Report (CDR). When a PRS service is defective, the Government will issue the Contractor a CDR. The Contractor shall reply in writing by the suspense date explaining why performance was unacceptable and how recurrence of the problem will be prevented in the future. The Contracting Officer will evaluate the Contractor's explanation and determine if other remedies, e.g., partial payment, or contract termination is applicable.
8.4.1 Re-performance of Defective Work. Except as otherwise provided by this paragraph, the work required by the contract is of such a nature that defective or incomplete performance disclosed by Government inspection is not subject to correction by re-performance or late performance. The Contractor shall not be required or entitled to re-perform, perform late, or otherwise correct defective work for the purpose of avoiding a defect for the day of evaluation
8.4.2 Re-performance Requirements. At the sole election of the Government and upon notification to the Contractor, the Contractor may be required to re-perform or perform late any or all defective work. Where the Government elects, the Contractor shall be notified promptly after inspection that specified defective work will be re-performed or performed late and completed within the re-performance period specified by the Government. In such cases, the Government will re-inspect work designated for re-performance or late performance.
8.4.3 Conditions of Re-performance. Re-performed work shall comply with same requirements as initial work. The requirement for re-performing defective work will not alleviate the Contractor from responsibility to perform all other work IAW the terms of the contract. The Contractor's original inspection results will not be modified when work is re-performed IAW the contract. The Contractor may be held liable for any damages sustained by the Government, e.g., costs associated with re-inspection.
Performance Requirements Summary
Performance Objective (The Service required—usually a shall statement)
| Standard |
| Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”) |
| Method of Surveillance |
1. Contractor will have a valid contractor license, insurance, and bond.
Contractor will have a minimum of seven years of experience.
Contractor must be cleared by the Fort Carson Physical Security Office for access to Post and Registered in the RAPIDS program.
The contractor shall provide trained and qualified personnel resources materials and equipment to fulfill the requirements of this contract.
The contractor shall provide weekly updates and checklist for construction phases.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 2. The contractor will warrant all work one year from date of completion and closeout of said call order. Each call order will draft the specific parameters for any work that will be done on climbing facilities. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
3. The contractor will procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon call order period of performance.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
4. The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 5. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 6. The contractor will remove, dispose of, and level up to 8” deep of existing ground material in preparation for base course. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
7. The contractor will compact ground to DCBR (Dynamic California Bearing Ratio) of 10, if 10 cannot be achieved, the contractor will purchase and incorporate stabilizer until achieved.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
8. The contractor will purchase, place, and compact 8 inches of CDOT Class 6 road base.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
9. The contactor will transport millings provided by the government to the site, heat, moisten, re-bind, place, and compact until a smooth surface, minimum of 3 inches thick, is present. The perimeter will have straight and orderly lines per outline attached and will be square to the grounds on site (existing hardscape).
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 10. Two reinforced 24-inch diameter diameters will be procured and replaced side by side as notated. Existing culvert will be removed and disposed of. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 11. The culvert will be rated to support at a minimum, traffic greater than 25 tons and will span the road crossing, no less than 20 feet. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 12. The culverts will have corrosion mitigation and will be placed at similar elevation to existing culvert. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 13. No portions of the improved surface will be narrower than 20 feet. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
| 14. The compacted pavement will have a minimum of 1 inch elevation above existing ground. The surface will be flat and sloped ¼ inch per 2 feet with natural terrain to maintain current runoff. The surface will be flush with all existing concrete pours and will be sealed between any existing hard surfaces such as sidewalks and curbs. |
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
15. The DPW Civil Infrastructure Engineer and Traffic Engineer will validate all work is performed as prescribed and the contractor will warrant all work one year from the date of completion and closeout.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
16. Service Contract Reporting (SCR): The contractor shall report on all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
17. Progress Report: The Contractor shall submit a weekly progress report to the COR/ACOR that annotates the current progress and up to date timelines.
| Services meet the standards of PWS and applicable USA, OSHA, and ASME regulations. |
| 100% Compliance |
| 10th Group personnel will be present during all work. |
image1.png