1. GoBig G-Z IRSC Solicitation DRAFT.pdf

PDF 1 MB Posted

Attached to
Go Big G-Z Stewardship IRSC - Region 6, Fremont-Winema NF, Chiloquin RD
Solicitation number
12363N22Q4111
Issued by

About this file

This document outlines requirements for a stewardship integrated resource service contract to be awarded by the U.S. Forest Service. The contract will dramatically increase the pace and scale of forest restoration treatment across approximately 66,362 gross acres near Chiloquin and Sprague River, Oregon to mitigate wildfire risk. The contractor will be responsible for developing implementation plans and maps, laying out treatment units, completing timber cruising, and performing all on-the-ground timber removal, service work, and road maintenance activities by December 31, 2030. Work will include layout, designation of retention areas, timber cruising, and completion of timber removal and service only units across four treatment areas. A pre-solicitation meeting will be held on April 18, 2023 for prospective contractors to discuss requirements. The final request for quotes is expected to be issued on or around May 8, 2023, with award using best value source selection and resulting in a firm-fixed price commercial services contract.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Go Big G-Z Stewardship IRSC Fremont-Winema National Forest

Page 1 of 83 Chiloquin Ranger District

GENERAL INFORMATION:

Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section 50 for instructions on preparing your proposal and pricing. Submit technical proposals and price proposals separately, via email, to the individual(s) shown in box 28 of page 1.

All Contractors must be actively registered in the System for Award Management (SAM) https://SAM.gov to be eligible for award under this solicitation. Registration in SAM is a free service – you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.

SCHEDULE OF ITEMS

MANDATORY WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK ACTIVITIES

UNIT

ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

Project Area Implementation Plan of

66,362 Gross Acres:

Design Detailed Logging Plan, Road

Analysis Plan, Service Treatment Plan, and

Implementation Maps

Lump

Sum 1 $ $

Locate, Flag, and GPS Known Cultural

Sites Each 275 $ $

3 Flag, Tag, Paint and GPS Boundaries Feet 184,800* $ $

4 Flag and GPS Boundaries Feet 200,000* $ $

5 Medium and Large Tree Clump

Marking in Timber Removal Units

Acres 21,539*

Total All Mandatory Service Items $

OPTIONAL WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK ACTIVITIES

UNIT

ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

Timber Treatment Area 1

Cruise Design/Plan

Lump

Sum

Cruise with Final Volume Estimate

Lump

Sum

8a Cut and Remove Included Timber Acre 5,385* N/A N/A

8b Remove Non-Saw Timber Products Tons 20,000** $ $

Item will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

Removal Cost (loading/chipping and trucking): $______/ton

Delivered Value: $_______/ton https://sam.gov/

Page 2 of 83 Chiloquin Ranger District

9a Service Only Unit - Cut, Skid and

Deck Non-Saw Timber – Low

Complexity

Acre 2,500*

9b Service Only Unit - Cut, Skid and

Deck Non-Saw Timber – High

Complexity

Acre 2,500*

10a Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – Low

Complexity

Acre 2,500*

10b Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – High

Complexity

Acre 2,500*

Timber Treatment Area 2

Cruise Design/Plan

Lump

Sum

Cruise with Final Volume Estimate

Lump

Sum

13a Cut and Remove Included Timber Acre 5,385* N/A N/A

13b Remove Non-Saw Timber Products Tons 20,000** $ $

Item will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

Removal Cost (loading/chipping and trucking): $______/ton

14a Service Only Unit - Cut, Skid and

Complexity

Acre 2,500*

14b Service Only Unit - Cut, Skid and

Deck Non-Saw Timber – High

Complexity

Acre 2,500*

15a Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – Low

Complexity

Acre 2,500*

15b Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – High

Complexity

Acre 2,500*

Timber Treatment Area 3

Cruise Design/Plan

Lump

Sum

Cruise with Final Volume Estimate

Lump

Sum

18a Cut and Remove Included Timber Acre 5,385* N/A N/A

Page 3 of 83 Chiloquin Ranger District

18b Remove Non-Saw Timber Products Tons 20,000** $ $

Item will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

19a Service Only Unit - Cut, Skid and

Complexity

Acre 2,500*

19b Service Only Unit - Cut, Skid and

Deck Non-Saw Timber – High

Complexity

Acre 2,500*

20a Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – Low

Complexity

Acre 2,500*

20b Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – High

Complexity

Acre 2,500*

Timber Treatment Area 4

Cruise Design/Plan

Lump

Sum

Cruise with Final Volume Estimate

Lump

Sum

23a Cut and Remove Included Timber Acre 5,385* N/A N/A

23b Remove Non-Saw Timber Products Tons 20,000** $ $

Item will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

24a Service Only Unit - Cut, Skid and

Complexity

Acre 2,500*

24b Service Only Unit - Cut, Skid and

Deck Non-Saw Timber – High

Complexity

Acre 2,500*

25a Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – Low

Complexity

Acre 2,500*

25b Timber Removal Units - Cut, Skid and Deck Non-Saw Timber – High

Complexity

Acre 2,500*

Service Only Optional Items

Page 4 of 83 Chiloquin Ranger District

26a Plantation Units – Cut, Skid and

Complexity

Acre 2,500*

26b Plantation Units – Cut, Skid and

Deck Non-Saw Timber – High

Complexity

Acre 2,500*

27a Service Only Unit - Mechanical Cut and Pile of Non-Saw Timber – Low

Complexity

Acre 2,500*

27b Service Only Unit - Mechanical Cut and Pile of Non-Saw Timber – High

Complexity

Acre 2,500*

28a Hand Thin/Hand Pile – Low

Complexity

Acre 3,000*

28b Hand Thin/Hand Pile – Medium

Complexity

Acre 500*

28c Hand Thin/Hand Pile – High

Complexity

Acre 500*

29 Meadow Units - Fell, Lop, And

Scatter

Acre 550

30a Mastication – Low Complexity Acre 2,500* $ $

30b Mastication – High Complexity Acre 2,500* $ $

31 Road Reconstruction

(a) Mobilization Lump

Sum

12*

(b) Construction Survey &

Staking, Method I, Tolerance B

Lump

Sum 20*

(c) Clearing & Grubbing, disposal method; limbs (g), logs (i), stumps (f)

Mile 75*

(d) Drianage Excavation, Type -

Water Bar, Driveable Each

50*

(e) Drainage Excavation, Type -

Swale Each

(f) Drainage Excavation, Type -

Critical Dip Each

(g) Drainage Excavation, Type -

Lead Off Ditch Each

(h) Drainage Excavation, Type -

Rolling Dip Each

(i) 48” Corrugated Metal Pipe, round steel, 0.064” thick

LF

200*

(j) 18" Corrugated Metal Pipe, round steel, 0.064" thick

LF

400*

Page 5 of 83 Chiloquin Ranger District

(k) Cleaning Culverts in Place Each

(l) Roadway Excavation - Curve

Widening

Lump

Sum

Transport of Surplus/Excess

Products Ton $ $

Total All Optional Service Items

TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

SPECIES PRODUCT QUANTITY

UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

Timber Treatment Area 1

CS Saw TBD from Cruise

82,600*** Tons TBD from Appraisal

$8.00***

CS Non-saw 20,000** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 1**** $

Total Value – All Products Treatment Area 1 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Timber Treatment Area 2

CS Saw TBD from Cruise

82,600*** Tons TBD from Appraisal

$8.00***

CS Non-saw 20,000** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 2**** $

Total Value – All Products Treatment Area 2 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Timber Treatment Area 3

CS Saw TBD from Cruise

82,600*** Tons TBD from Appraisal

$8.00***

Page 6 of 83 Chiloquin Ranger District

Enter delivered saw log value (paid by mill) to be used in determining appraised timber rates:

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Notes: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements. Unit prices prevail. Price Proposals MUST be provided on ALL Items in

Schedules: Mandatory Work, Optional Work and Total Value Bid Premium for all Timber Products for each Treatment Area, except for Optional Item 32 which is not required to receive award. Option

Item 32 allows contractors to market surplus wood products outside the local area.

Contractors are required to submit a primary proposal for all work as shown in the SOI on 4

Treatment Areas. Contractors proposing to complete work in less than 4 Treatment Areas or that have an alternative plan must submit a second Alternative price proposal and Alternative technical proposal.

*Total quantities are unknown and shown as estimated gross quantity. Completion and acceptance of

Item 1 will determine true needed quantities for all other Items. The use of “Stepladder Pricing” enables the Government to establish Firm-Fixed Pricing at time of award for all Items based on differing complexity. Contractor shall provide a fixed price per Item based on the estimated quantity

CS Non-saw 20,000** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 3**** $

Total Value – All Products Treatment Area 3 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Timber Treatment Area 4

CS Saw TBD from Cruise

82,600*** Tons TBD from Appraisal

$8.00***

CS Non-saw 20,000** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 4**** $

Total Value – All Products Treatment Area 4 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Page 7 of 83 Chiloquin Ranger District shown and the complexity level as described in Appendix A. Awarded Firm-Fixed unit prices prevail and WILL NOT be renegotiated or changed in future modifications to adjust quantities once known.

**Total tons of non-saw products awarded to be removed shall be negotiated and populated via modification after cruise is completed for each Timber Treatment Area. Awards made for non-saw product removal will be set as a capped tonnage for payment per Treatment Area.

***The estimated gross acres of commercial timber using GIS is approximately 21,540 acres with an estimated gross timber volume of 330,400 tons. This was calculated assuming 2.5 MBF/acre.

Approximately 13.5 MMBF per Timber Treatment Area is assumed. Divided equally for evaluation purposes, each Timber Treatment Area assumes 82,600 gross tons.

Advertised timber rates from past two years on the West-Zone of the Fremont-Winema NF have a range of $0.25 – $19.50/ton or equivalent unit of measure, with a rounded average of $8.00/ton. A preliminary timber appraisal was completed on a gross volume estimate for entire project indicating an advertised rate of $7.93/ton that has been rounded for evaluation purposes to $8.00/ton to match the recent historical average.

****Contractors shall provide a Total Value Bid Premium for all products per treatment area

≥$0.00. The Total Value Bid Premium for each Treatment Area will be distributed evenly over all final awarded products (non-saw and saw timber) per treatment area to have one combined rate for all products per Treatment Area. This will allow maximum flexibility to contractors in marketing all products. To reduce risk to both parties due to over/under-run of products, cruising standards have been increased to “Tree Measurement” maximum allowed error. Timber products will be scaled due to the use of Designation by Prescription and virtual boundaries.

If the final appraised Timber Rate for Saw timber is between $0.25/ton and $19.50/ton, Total Value

Bid Premiums shall be binding and applied in full. If appraised timber rate is greater than

$19.50/ton, Bid Premiums shall be lowered incrementally until not applicable. Appraised Timber

Rates below $0.25/ton, potentially indicating deficit conditions, will either prompt reassessment of treatment units for that Treatment Area to bring appraised Rates above $0.25 or Bid Premiums will be waived.

For evaluation of price proposals, FS will calculate the Total Value of all products per Treatment

Area based on the assumptions shown in the Timber Removal Price Schedule and the Total Value

Bid Premium offer. The following calculation will be used for both evaluation of proposals as well as when determining final single timber rate per Treatment Area:

[(Saw Volume * Saw Minimum Rate) + (Non-saw volume * $0.01) + Total Value Bid Premium] = Total Value of all products

(Saw Volume + Non-saw Volume)

An in-person pre-solicitation meeting for question and answers is scheduled for April 18, 2023 to discuss the objectives of this contract. The meeting will be at 0800 PT at the Chiloquin Ranger

District. A Microsoft Teams link will be provided on request for vendors that cannot attend.

PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH DECEMBER 31, 2030

Page 8 of 83 Chiloquin Ranger District

LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Project Description and Work

Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in

Stewardship Credits and Appropriated Funds.

All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority. Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.

1. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (DEC 2022)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Government wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition

Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of

God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The

Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice. (Using IPP now) See #44.

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.202-1#FAR_52_202_1

Page 9 of 83 Chiloquin Ranger District

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line-item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person(s) to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-

System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for

Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment. -

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act

(31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the

Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.212-5#FAR_52_212_5

Page 10 of 83 Chiloquin Ranger District

(C) Affected line item or subline item, if applicable; and

(D) Contractor point(s) of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within thirty (30) days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the

Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the

Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in

FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/33.211#FAR_33_211 https://www.acquisition.gov/far/32.607-2#FAR_32_607_2 https://www.acquisition.gov/far/32.608-2#FAR_32_608_2

Page 11 of 83 Chiloquin Ranger District audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State, and local laws, executive orders, rules, and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31

U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18

U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety

Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws

Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.212-5#FAR_52_212_5 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items

Page 12 of 83 Chiloquin Ranger District comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the

Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

ADDENDUM TO FAR 52.212-4 The following clauses are hereby incorporated by reference or full text as appropriate:

NUMBER TITLE DATE

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN OCT 2022

52.236-2 DIFFERING SITE CONDITIONS APR 1984

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984

52.236-5 MATERIAL AND WORKMANSHIP APR 1984

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984

52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991

52.236-8 OTHER CONTRACTS APR 1984

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS APR 1984

52.236-10 OPERATIONS AND STORAGE AREAS APR 1984

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984

52.236-12 CLEANING UP APR 1984

52.236-13 ACCIDENT PREVENTION (ALTERNATE I) NOV 1991

52.236-17 LAYOUT OF WORK APR 1984

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997

52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995

52.242-14 SUSPENSION OF WORK APR 1984

52.245-1 GOVERNMENT PROPERTY SEP 2021

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

452.236-71 PROHIBITION AGAINST THE USE OF LEAD-PAINT NOV 1996

452.236-73 ARCHEOLOGICAL OR HISTORIC SITES FEB 1988

452.236-76 SAMPLES AND CERTIFICATES FEB 1988

2. FAR 52.217-7 – Option for Increased Quantity – Separately Priced Line Item

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance prior to contract expiration. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

3. PROJECT DESCRIPTION

Page 13 of 83 Chiloquin Ranger District

(a) The intent of the project is to dramatically increase the pace and scale of forest restoration treatment to mitigate risk of catastrophic wildfire. The objective of this project is:

1. For the contractor to complete the end-results from NEPA handoff through final completion of the project area.

2. Contractors shall identify what work activities are needed across all project acres to meet the desired end-result objectives that shall be presented in maps and a detailed Implementation Plan prior to commencing layout.

3. After the initial Implementation Plan (Design Detailed Logging Plan, Road Analysis Plan, Service

Treatment Plan, and Contract Area Maps) has been accepted and approved, contractors will then:

a) layout Timber Removal and Service Only treatment units.

b) designate retention areas and clump marking or other clump retention designation.

c) complete timber cruises for each identified timber removal treatment area.

d) complete all on the ground timber removal and service work activities.

e) complete all required road maintenance and road re-construction for product removal.

(b) Resulting Contract – Any resultant contract will be a commercial services contract with requirements for timber removal.

(c) Project Location- In all or portions of T33S R10E Sec 13-16, 21-29, 31-36. T33S R11E Sec 7-11, 13-24, 27-31. T34S R9E Sec 1, 2, 10-12, 13-17, 20-29, 32-36, T34S R10E Sec 1-36. T34S R9E Sec

6, 18, 19, 29-31, T35S R9E Sec 1-6, 9-12. T35S R10E Sec 1-12, 17, 16. R35S R11E Sec 6, 7.

4. SPECIFICATIONS

General specifications for each Contract Activity individually described by an item number in the Schedule of

Service Items can be found in Appendix A. Specifications for timber removal can be found in Appendix B and associated road plans and specifications in Appendix C for Stewardship related projects. Incidental construction or reconstruction specified road work plans, drawings, exhibits, and specifications can be found in Appendix D.

5. CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

Page 14 of 83 Chiloquin Ranger District

6. ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

7. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

8. FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Dec 31, 2030. The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by

Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal

Specifications in Appendix B and/or C and as approved by the Contracting Officer.

9. AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this contract is from date of award through Dec 31, 2030 - unless proposed to be shorter by contractor and an award is made based on the shortened Period of Performance.

The following is the Forest Services desired schedule and will be used to determine/track if contractor will successfully complete all work on time. Failure to meet the following timelines may result in Optional work Items not being awarded. Continued failure to meet the desired schedule below may result in

Termination for Cause for failure to perform.

Item 1 Completed by September 30, 2023

Items 2, 3, 4, 5, 6 and 7 Associated with Treatment Area 1 Completed by August 31, 2024

Items 8 – 10 Completed by Dec 31, 2026

Items 2, 3, 4, 5, 11, and 12 Associated with Treatment Area 2 Completed by August 31, 2025

Items 13 - 15 Completed by Dec 31, 2027

Items 2, 3, 4, 5, 16, and 17 Associated with Treatment Area 3 Completed by August 31, 2026

Items 18 - 20 Completed by Dec 31, 2028

Items 2, 3, 4, 5, 21, and 22 Associated with Treatment Area 4 Completed by August 31, 2027

Items 23 - 25 Completed by Dec 31, 2029

Page 15 of 83 Chiloquin Ranger District

10. SCHEDULES AND REPORTS

Pursuant to contract requirements, the following submittals are required within 10 days after issuance of a

Notice to Proceed for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:

ITEM DESCRIPTION

Proposed progress schedule showing starting and completion dates of various phases of the work.

List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting

Officers Written approval prior to starting work on the project. Large businesses must submit a Small

Business Sub-Contracting Plan as required per FAR 52.209-9. Plan shall be submitted after award.

Traffic Control Plan

Designation of Contractor personnel describing responsibilities and authorities

All schedules and reports shall be submitted to the COR.

11. PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with the specifications set forth under Measurable Performance

Standards.

When harvesting operations are underway, the value of work completed and timber removed will be documented monthly in the Forest Products Financial System which will produce a Statement of Accounts.

12. STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the Schedule of Supplies/

Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the

Schedule. Earned credits may be used to pay for timber value included in Schedule of Items. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

13. ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for

Stewardship Activities will be made with Stewardship Credits as indicated in the award document.

Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest

Service. No credits will be established for work performed as indicated in the Schedule of Items and Appendix B

Timber Removal Specification if appropriated agency monies are used or unless otherwise agreed.

Page 16 of 83 Chiloquin Ranger District

14. TIMBER PAYMENT GUARANTEE

(1) General—(a) To guarantee payment for timber scheduled for removal under the IRSC, Contractor may earn Stewardship Credits in advance of removal, or provide a Timber Payment Guarantee in the form of an acceptable surety payment bond, cash payment, or a deposit in a Federal Depository negotiable securities of the

United States.

(b) Any earned Stewardship Credits and alternate Timber Payment Guarantee together will maintain a minimum unobligated balance equal to the applicable charges for timber the Forest Service estimates will be cut in 60 calendar days plus the value of any outstanding charges, or equal to the total value of the timber that has not been paid for.

(c) Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

(2) A Timber Payment Guarantee for a single contract shall be provided utilizing FS Form 6500-12.

(3) Blanket Surety Bond—(a) Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for timber from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for payment guarantee.

(b) The amount of such bond or deposited securities shall be allocated to such contracts by the Forest

Service. The Contractor will provide the contact information for the Forest Service representative administering the Blanket Surety Bond.

(c) When there is to be no timber cutting hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract shall be reallocated to other contracts at Contractor’s request.

(d) A Timber Payment Guarantee for multiple contracts (Blanket Guarantee) shall be provided utilizing

FS Form 6500-12a.

(4) Letters of Credit for Payment Bond—Contractor may use letters of credit in lieu of a surety bond for payment bond purposes when approved by Contracting Officer.

15. EXCESS STEWARDSHIP CREDITS

In the event there are excess (unused) established Stewardship Credits when all of the included timber has been cut and removed the Forest Service, at its option, shall either add more timber or make cash payment for the unused credits.

16. EXCESS TIMBER VALUE

Page 17 of 83 Chiloquin Ranger District

In the event the value of the included timber exceeds the total value of all of the mandatory activities plus the ordered Optional activities, the Contractor shall make cash payment for the excess timber value.

17. REFUND OF EXCESS CASH

If at any time the credit balance of the Integrated Resource Statement of Account exceeds the charges for timber removed to date and for timber that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “TIMBER PAYMENT

GUARANTEE” before additional timber may be cut.

18. FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

19. AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at the Chiloquin Ranger District.

20. FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.

(b) Additional informational material made available to contractors including but not limited to: environmental documentation, timber cruise data, maps, access permits, etc.

21. USE OF PREMISES : AGAR 452.236-72 USE OF PREMISES (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. (b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (i) dispose of solid waste in accordance with applicable Federal, State and local regulations.

Page 18 of 83 Chiloquin Ranger District

The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform his contract in such a manner as not to interrupt or interfere with the conduct of Government business.

Before any camp is opened or operated on National Forest land or lands administered by the Forest Service, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such permission, if granted, will be without charge to the Contractor.

The Contractor shall request permission (in writing) from the appropriate Ranger District to use campsites. If permission is granted, the District Ranger's letter shall specify all conditions and requirements.

It is further stipulated that in addition to clean-up of any camp sites, the Contractor is required to remove all his equipment from National Forest land before final acceptance and payment of the project.

Portable chemical toilets, self-contained holding tanks, approved pit or vault toilets which meet State Code are required.

22. AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager

Project Planner/Coordinator

Forester/Cruiser

Logging Supervisor

Archaeologist

Service Treatment Supervisor

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the

Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

23. EMPLOYMENT OF ELIGIBLE WORKERS

This contract is subject to the Agricultural Worker Protection Act (MSPA), 29 United States Code (U.S.C)

1801-1872, and to the U.S. Department of Labor (DOL) regulations implementing MSPA 29 Code of

Federal Regulations (CFR) Part 500. MSPA eliminates activities detrimental to migrant and seasonal

Page 19 of 83 Chiloquin Ranger District agricultural workers, requires registration of Farm Labor Contractors, and ensures necessary protection for the workers. Information regarding MSPA can be found at https://www.dol.gov/agencies/whd/agriculture/mspa.

If workers are hired under the H-2B program, (8 CFR Section 274A provisions of the Immigration and

Nationality Act (INA) for the admission of nonimmigrants to the U.S. to perform temporary labor or services) a Temporary Employment Certification issued by the Office of Foreign Labor Certification

(OFLC) in the Department of Labor Employment and Training Administration is required.

For further information on the requirements of the H-2B program, visit OFLC's website at https://www.dol.gov/agencies/eta/foreign-labor.

Compliance with MSPA and the INA is a material condition of this contract. If the contractor employs any unauthorized worker(s) during the performance of this contract that violates section 274A of the

INA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.

1. Definitions

A. H-2B worker: as used in this part means a nonimmigrant holding a visa authorizing the individual to legally work in the US to perform temporary labor or services. A worker with an H-

2B visa (H-2B worker) may also be considered a migrant agricultural worker under MSPA depending on the type and nature of work performed.

2. Migrant Agricultural Worker and Seasonal Agricultural Worker: as used in this part means individuals employed for agricultural (including forestry) work on a seasonal or temporary basis.

a) A worker, moving from one seasonal activity to another, is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year.

b) An overnight absence from the migrant workers permanent place of residence is required.

c) Members of the contractor's immediate family are not considered migrant or seasonal workers.

Immediate family includes:

▪ Spouse

▪ Children, stepchildren, or foster children

▪ Parents, stepparents, or foster parents, or

▪ Brothers and sisters

3. Farm Labor Contractor (FLC). As used in this part means a person including an individual, partnership, association, joint stock company or a corporation, who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .