This document is a set of construction drawings for roofing replacement work at the Los Angeles Air Route Traffic Control Center (ZLA ARTCC) Power Service Building, located at 2555 E Avenue P, Palmdale, California. The project is issued by the Federal Aviation Administration (FAA), Department of Transportation, and prepared for a 90% design review phase by the ATO Technical Operations Western Service Area.
The project encompasses roofing replacement across three separate roof areas (A, B, and C) covering the UPS/Battery Building, Switchgear Building, and E/G (110) Building. The work includes removal and replacement of existing built-up roofing systems with new 80-mil mechanically attached thermoplastic polyolefin (TPO) membrane over R-30 rigid insulation, new stainless steel coping and flashing, roof drain improvements with 11-inch diameter strainers, installation of new OSHA-compliant metal ladders, 30-inch wide roof walkway pads, fiberglass fall protection guardrails around roof perimeters A and B, and replacement of lightning protection systems. Work is phased separately for each roof area to minimize weather exposure. The contractor must comply with stringent FAA security requirements including PIV and yellow badge credentials, pre-approval of construction personnel, scheduled deliveries outside employee shift changes (6:30-8:00 AM and 2:30-4:00 PM), limited parking in designated staging areas, construction hours limited to 6:00 AM to 6:00 PM with 24-hour advance COR approval, minimum 10-day advance notice for noisy demolition, and mandatory weather-tight protection throughout all phases. All dimensions are approximate and require field verification prior to bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1.A. Specifications.pdf | ||
| 2. Wage Determination.pdf | ||
| 1.C. FAA-STD-019f.pdf | ||
| 697DCK-25-R-00449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Los Angeles Air Route Traffic Control Center
ZLA ARTCC
2555 E Avenue P, Palmdale, CA
POWER SERVICE BUILDING
ROOFING REPLACEMENT
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-G001
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
CONSTRUCTION STAGING AND WORK PHASING
POWER SERVICE BUILDING
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
AutoCAD SHX Text Department of Transportation
AutoCAD SHX Text Federal Aviation Administration
AutoCAD SHX Text
VICINITY MAP ZLA ARTCC PALMDALE, CALIFORNIA
AutoCAD SHX Text
(AVENUE P)
AutoCAD SHX Text
RANCHO VISTA
AutoCAD SHX Text
AVENUE P-8
AutoCAD SHX Text
AVENUE Q
AutoCAD SHX Text
15TH STREET EAST
AutoCAD SHX Text
20TH STREET EAST
AutoCAD SHX Text
25TH STREET EAST
AutoCAD SHX Text
30TH STREET EAST
AutoCAD SHX Text
PALMDALE BOULEVARD
AutoCAD SHX Text
METRO RAIL
AutoCAD SHX Text
SIERRA HWY
AutoCAD SHX Text
ANTELOPE VALLEY FREEWAY
AutoCAD SHX Text
PLANT 42
AutoCAD SHX Text
AIR FORCE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text DRAWING INDEX DRAWING NUMBER DRAWING TITLE DRAWING TITLE ZLA-21004951-G001 TITLE SHEET TITLE SHEET ZLA-21004951-C005 PHASING OF WORK PHASING OF WORK ZLA-21004951-C006 DEMOLITION DEMOLITION ZLA-21004951-C007 UPS & BATTERY BUILDING - AREA-A ROOF PLAN UPS & BATTERY BUILDING - AREA-A ROOF PLAN ZLA-21004951-C008 SWITCHGEAR BUILDING - AREA-B ROOF PLAN SWITCHGEAR BUILDING - AREA-B ROOF PLAN ZLA-21004951-C009 E/G (110) BUILDING - AREA-C ROOF PLAN E/G (110) BUILDING - AREA-C ROOF PLAN ZLA-21004951-C010 ROOFING DETAILS ROOFING DETAILS ZLA-21004951-C011 ROOFING DETAILS ROOFING DETAILS ZLA-21004951-C012 ROOF WALKWAY PADS ROOF WALKWAY PADS ZLA-21004951-C013 FALL PROTECTION AND LIGHTNING PROTECTION FALL PROTECTION AND LIGHTNING PROTECTION ZLA-21004951-E101 LIGHTNING PROTECTIONLIGHTNING PROTECTION
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C005
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
CONSTRUCTION STAGING AND WORK PHASING
POWER SERVICE BUILDING
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/16" = 1'-0"
10' 20' 30'08' 40'
WORK PHASING
CONTRACTOR SHALL ONLY REMOVE ITEMS THAT CAN BE REPLACED ON THE
SAME DAY, INCLUDING BUT NOT LIMITED TO ROOF ACCESS LADDERS AND
STORM DRAIN INLETS.
EACH ROOF SHALL BE COMPLETED SEPARATELY OF THE OTHER ROOFS. THE
PREPARATION, DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE
COORDINATED WITH THE CONTRACTOR OFFICER'S REPRESENTATIVE (COR)
PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
PHASE I - ROOF AREAS A, B, AND C
CLEAN STORM DRAIN PIPES AND DOWNSPOUTS. SNAKE OR HYDRO-JET ALL
ROOF DRAINS TO ENSURE PIPES ARE CLEAN AND CLEAR OF DEBRIS.
PHASE II - ROOF AREA A
REMOVE AND REPLACE ROOFING MATERIAL ABOVE THE UPS/BATTERY BUILDING.
PHASE III - ROOF AREA B
REMOVE AND REPLACE ROOFING MATERIAL ABOVE THE SWITCHGEAR BUILDING.
REMOVE EXISTING ANTENNAS AND ASSOCIATED HARDWARE, PLYWOOD
MATERIAL AND CONCRETE BLOCKS FROM THE ROOF SURFACE.
PHASE IV - ROOF AREA C
REMOVE AND REPLACE ROOFING MATERIAL ABOVE THE E/G (110) BUILDING.
PHASE V - ROOF AREAS A, B, AND C
REMOVE AND REPLACE THE EXISTING ROOF ACCESS LADDERS.
THE ABOVE OUTLINED PHASING OF PREPARATION, DEMOLITION AND
CONSTRUCTION WORK SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR). CHANGES TO THE PHASING OF
PREPARATION, DEMOLITION AND CONSTRUCTION ACTIVITIES MAY BY SUBMITTED
BY THE CONTRACTOR TO THE COR, AND MAY ONLY BE APPLIED WITH THE PRIOR
APPROVAL OF THE COR.
CONSTRUCTION STAGING NOTES
A. CONSTRUCTION ACCESS
A1. CONTRACTOR'S VEHICLES, PEDESTRIANS AND ALL DELIVERIES TO THE SITE SHALL BE
MADE THROUGH THE MAIN FAA SECURITY GATE. AT NO TIME SHALL ACCESS, INCLUDING
BUT NOT LIMITED TO PEDESTRIAN ACCESS, BE MADE THROUGH ANY OTHER MEANS EXCEPT
AS OUTLINED ABOVE. THE FACILITY GATE IS MANNED 24/7.
A2. ALL DELIVERIES SHALL BE SCHEDULED IN ADVANCE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR), AND AT TIMES OTHER THAN EMPLOYEE SHIFT CHANGES. THE FAA
SHIFT CHANGES OCCUR FROM 6:30 AM TO 8:00 AM AND FROM 2:30 PM TO 4:00 PM.
A3. CONTRACTOR PARKING SHALL BE LIMITED TO THE STAGING AREA PRE-DETERMINED
AND AGREED UPON WITH THE COR.
A4. CONTRACTOR SHALL PROVIDE SIGNAGE INDICATE ACCESS ROUTES FOR
CONSTRUCTION EMPLOYEES AND DELIVERIES ONSITE. CONTRACTOR SHALL PROVIDE ALL
NECESSARY BARRICADES, LIGHTS, AND FENCING TO PROTECT, WARN AND DIRECT
PEDESTRIANS AND VEHICLES NEAR THE WORK AREAS.
B. FAA SECURITY REQUIREMENTS
B1. THE CONTRACTOR SHALL BE REQUIRED TO OBTAIN A CONTRACTOR PIV BADGE FOR THE
PROJECT SUPERINTENDENT AND CONTRACTOR YELLOW BADGE FOR CONSTRUCTION
PERSONNEL AND SUB-CONTRACTORS. THE PIV BADGE ALLOWS THE CONTRACTOR LIMITED
ACCESS TO THE GROUNDS AND THE ABILITY TO ESCORT AUTHORIZED VISITORS TO THE
GROUNDS AND WORK SITE. THE FAA EMPLOYEES WILL NOT ESCORT CONTRACTOR
EMPLOYEES UNLESS COORDINATED AND APPROVED BY THE COR.
B2. A LIST OF CONSTRUCTION PERSONNEL SHALL BE PROVIDED TO THE COR IN ADVANCE
OF THE ARRIVAL OF THE CONSTRUCTION PERSONNEL TO THE SITE. EACH CONSTRUCTION
EMPLOYEE SHALL CHECK-IN AND CHECK-OUT AT THE MAIN GATE. THE CONTRACTOR
SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR THE CONDUCT OF THEIR
EMPLOYEES WHILE ON SITE. ALL CONTRACTOR'S VEHICLES SHALL BE CLEARLY MARKED AS
SUCH.
B3. ACCESS FOR ALL CONSTRUCTION PERSONNEL IS LIMITED TO THE CONSTRUCTION AREA
AND DESIGNATED ACCESS ROUTE AT ALL TIMES.
B4. FAA ESCORTS MAY BE REQUIRED FOR CONSTRUCTION PERSONNEL IN CERTAIN AREAS.
CONTRACTOR SHALL COORDINATE ALL WORK OUTSIDE DESIGNATED AREAS WITH THE COR.
C. CONSTRUCTION MATERIAL STORAGE
C1. STORAGE OF CONSTRUCTION MATERIALS, TOOLS AND TRAILERS ONSITE SHALL BE
LIMITED TO THE STAGING AREA. MATERIALS SHALL BE NEATLY STORED AND PROTECTED
AT ALL TIMES. A CONSTRUCTION FENCE SHALL BE INSTALLED IF INSTRUCTED BY THE COR.
C2. THE CONSTRUCTION STAGING AREA EXACT SIZE AND LOCATION IS TO BE DETERMINED
AT THE PRE-CONSTRUCTION CONFERENCE/MEETING BY THE FAA, AND COMMUNICATED TO
THE CONTRACTOR.
C3. CONSTRUCTION LIGHTNING MUST BE PROVIDED BY THE CONTRACTOR AS REQUIRED
TO ADEQUATELY ILLUMINATE BOTH STAGING AND WORKGIN AREAS FOR SAFE WORKING
CONDITIONS. ALL LIGHTING SHALL BE APPROVED BY THE COR PRIOR TO USE.
D. CONSTRUCTION DEBRIS
D1. MAXIMIZE USE OF SOURCE REDUCTION AND RECYCLING PROCEDURES OUTLINED IN
ASTM D 5834. A MINIMUM OF 50 PERCENT BY WEIGHT OF TOTAL PROJECT SOLID WASTE TO
BE DIVERTED FROM LANDFILLS.
E. CONSTRUCTION OFFICE
E1. CONTRACTOR TRAILER (IF NEEDED) SHALL BE INSTALLED IN THE PREDETERMINED
STAGING AREA ONLY. ALL SPECIFIC MATERIAL, FENCING, VEHICLES AND TRAILER
LOCATIONS SHALL BE DETERMINED BY THE COR. THE CONTRACTOR IS RESPONSIBLE TO
PROVIDE ALL NECESSARY UTILITIES FOR CONSTRUCTION USE.
G. TEMPORARY FACILITIES
G1. PORTABLE CHEMICAL TOILETS SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED
WITHIN THE STAGING AREA AT THE CONTRACTOR'S EXPENSE.
H. DEMOLITION AND CONSTRUCTION HOURS.
H1. THE CONTRACTOR SHALL NOT INTERFERE WITH THE FUNCTION OF THE FACILITY.
DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED.
H2. SCHEDULE ALL NOISY DEMOLITION A MINIMUM OF 10 DAYS IN ADVANCE WITH THE COR.
H3. CONSTRUCTION HOURS ARE TO BE LIMITED BETWEEN THE HOURS OF 6:00 AM AND 6:00
PM - CONTRACTOR TO COORDINATE AND RECEIVE COR APPROVAL OF ACTUAL WORK
HOURS AT LEAST 24 HOURS IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES.
I. PARKING LOT REPAIR
I1. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REPAIR ALL PAVED SURFACES
DAMAGED DURING THE CONSTRUCTION ACTIVITIES TO THE ORIGINAL CONDITION.
B. EQUIPMENT PROTECTION
J1. IT IS MANDATORY THAT THE CONTRACTOR PROTECT ALL NEW AND EXISTING FAA
ROOFTOP MECHANICAL EQUIPMENT BOTH INSIDE AND OUTSIDE THE BUILDING FROM
DAMAGE CAUSED BY IMPACTS, WATER, DEBRIS OR DUST. THE FAA SHALL HAVE 24 HOUR
ACCESS TO THE PROTECTED EQUIPMENT.
J2. CONTRACTOR SHALL RECEIVE APPROVAL FROM THE COR PRIOR TO USING POWER
SUPPLIES DURING WORK ACTIVITIES.
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF AREA C E/G (110) BUILDING
AutoCAD SHX Text
ROOF AREA B SWITCHGEAR BUILDING
AutoCAD SHX Text
ROOF AREA A UPS/BATTERY BUILDING
AutoCAD SHX Text
ROOF PLAN PHASING OF WORK
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE I
AutoCAD SHX Text
PHASE V
AutoCAD SHX Text
PHASE V
PHASE V
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C006
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
DEMOLITION PLAN
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/8" = 1'-0"
8' 16'08'
DEMOLITION NOTES
1. REMOVE AND DISPOSE THE EXISTING ROOFING SYSTEM AND ASSOCIATED
INSULATION DOWN TO THE METAL DECK FOR AREA A, AREA B AND AREA C
ROOFS. CONTRACTOR SHALL ALSO REMOVE AND DISPOSE ALL FLASHING,
COPING, CURBS AND ASSOCIATED ITEMS. PROTECT IN PLACE EXISTING
METAL ROOF DECKING.
2. REMOVE AND DISPOSE OF EXISTING 3-INCH DIAMETER ROOF DRAIN WITH
11-INCH DIAMETER METAL DOME (10 TOTAL). SNAKE OR HYDRO-JET ALL
ROOF DRAINS TO ENSURE PIPES ARE CLEAN AND CLEAR OF DEBRIS.
3. REMOVE AND DISPOSE OF EXISTING LIGHTNING PROTECTION SYSTEM
ALONG THE PERIMETER OF THE ROOF AREAS B AND C.
4. REMOVE AND DISPOSE OF EXISTING METAL LADDER.
5. REMOVE AND DISPOSE OF EXISTING, CONCRETE SPLASH BLOCKS BELOW
THE EXISTING OUTLETS OF ROOF DOWNSPOUTS (3 TOTAL).
6. PROTECT IN PLACE EXISTING ROOF PENETRATIONS, INCLUDING EXISTING
VENTS, AND ANY OTHER MECHANICAL HARDWARE NOT MARKED FOR
REMOVAL AND/OR REPLACEMENT.
7. REMOVE ANTENNAS, SATELLITE DISH, BASE PLATES, CONCRETE BLOCKS,
PLYWOOD AND ANY OTHER LOOSE/ABANDONED DEBRIS FROM ROOF AREA
A, B AND C.
8. REMOVE EXISTING ROOF EXHAUST FAN AND ASSOCIATED CURB.
GENERAL NOTES
A. THE EXISTING ZLA ARTCC UPS/BATTERY BUILDING (AREA A), SWITCHGEAR
BUILDING (AREA B) AND E/G (110) BUILDING (AREA C) ROOF IS COMPOSED OF
BUILT-UP ROOFS WITH AN APPROXIMATE 5-INCH THICK INSULATION ON
METAL DECKING.
B. WORK ON THE THREE ROOFS SHALL BE COMPLETED IN PHASES, IN ORDER
TO MINIMIZE EXPOSURE OF OPENED UP ROOF SECTIONS TO WEATHER AND
ENVIRONMENTAL ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING THE WORK TO AVOID INCLEMENT WEATHER, INCLUDING BUT
NOT LIMITED TO PRECIPITATION AND HIGH WINDS. CONTRACTOR SHALL
FOLLOW PHASING PLAN OF CONSTRUCTION AND COORDINATE ANY
NECESSARY CHANGES WITH THE COR.
C. CONTRACTOR SHALL VERIFY THE OVERALL THICKNESS OF THE EXISTING
ROOFING SYSTEM PRIOR TO REMOVAL TO ENSURE CORRECT INSTALLATION
OF THE NEW ROOFING SYSTEM AND MITIGATE ANY POTENTIAL IMPACTS.
D. ALL QUANTITIES DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY ALL DIMENSIONS
PRIOR TO SUBMITTING A CONSTRUCTION BID.
E. CONTRACTOR SHALL PROTECT IN PLACE THE EXISTING ROOF MOUNTED
EQUIPMENT, INCLUDING BUT NOT LIMITED TO VENT PENETRATIONS,
DRAINAGE INLETS AND ASSOCIATED HARDWARE, ADJACENT WALLS, DOORS,
AND BUILDING FEATURES THAT ARE NOT TO SPECIFICALLY IDENTIFIED FOR
REPLACEMENT IN THIS DRAWING SET.
F. CONTRACTOR SHALL ONLY REMOVE ITEMS THAT CAN BE REPLACED ON THE
SAME DAY, INCLUDING BUT NOT LIMITED TO ROOF ACCESS LADDERS AND
STORM DRAIN INLETS.
G. CONTRACTOR SHALL PLUG ROOF DRAINS DURING THE DEMOLITION AND
CONSTRUCTION PHASES IN ORDER TO PREVENT DEBRIS FROM ENTERING
AND CLOGGING DRAIN PIPES. THE CONTRACTOR SHALL REMOVE THE ROOF
DRAIN PLUGS UPON WORK COMPLETION.
H. PROVIDE WEATHER TIGHT PROTECTION TO BUILDING IN ORDER TO AVOID
WEATHER DAMAGE PRIOR, DURING AND AFTER CONSTRUCTION ACTIVITIES
SCALE: 1/8" = 1'-0"
8' 16'08'
SCALE: 1/8" = 1'-0"
8' 16'08'
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF AREA A LOW ROOF PLAN UPS/BATTERY BUILDING
AutoCAD SHX Text
ROOF AREA C LOW ROOF PLAN E/G (110) BUILDING
AutoCAD SHX Text
ROOF AREA B HIGH ROOF PLAN SWITCHGEAR BUILDING
AutoCAD SHX Text
EXISTING, CAPPED AND ABANDONED ROOF EXHAUST FAN
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
ROOF DRAINAGE SCUPPERS
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text N
AutoCAD SHX Text N
ROOF DRAINAGE SCUPPER
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C007
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
UPS & BATTERY BUILDING
ROOF AREA A PLAN
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/4" = 1'-0"
4' 8'04'
GENERAL NOTES
A. PROVIDE WEATHER TIGHT PROTECTION TO BUILDING IN ORDER TO AVOID
WEATHER DAMAGE PRIOR, DURING AND AFTER CONSTRUCTION ACTIVITIES.
B. ALL DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE AND ARE TO BE
FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO PROVIDING A CONSTRUCTION
BID.
C. EXISTING HEIGHT OF THE BUILDING FORM GRADE LEVEL TO THE TOP OF THE
ROOF PARAPET OF ROOF AREA-A IS APPROXIMATELY 21.3-FEET.
D. INSTALL NEW ROOFING SYSTEM. INSTALL NEW 80 MIL., MECHANICALLY
ATTACHED THERMOPLASTIC POLYOLEFIN (TPO) ROOF MEMBRANE OVER
UNDERLAYMENT AND R-30 RIGID INSULATION. INSTALLATION INCLUDES ALL
NECESSARY FLASHING, END CAPS, CURBS, CRICKETS, AND OTHER
ASSOCIATED MATERIALS.
E. ROOFING DRAINAGE SLOPE:
THE ROOFING DRAINAGE SLOPE SHALL FOLLOW THE NATURAL SLOPE OF THE
EXISTING METAL DECK.
ROOF INSULATION:
THE INSULATION SHALL BE TAPERED AS IT APPROACHES THE EDGE OF THE
ROOFS TO AVOID IMPACT TO THE EXISTING SCUPPERS AND TO ENSURE THAT
BUILD-UP OF THE NEW CRICKETS DOES NOT EXTEND BEYOND THE TOP OF
THE ROOF PARAPETS.
ROOF CRICKETS:
NEW CRICKETS SHALL BE OF 1/2-INCH PER FOOT (4.16%) MINIMUM SLOPE.
CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL OF ALL INSULATION
TAPERING AND THICKNESS TO ENSURE THAT THERE ARE NO IMPACTS TO ANY
EXISTING FIXTURES ON THE ROOF.
F. CONTRACTOR SHALL ENSURE THAT ODORS FROM THE MECHANICALLY
ATTACHED SYSTEM SHALL NOT ENTER THE BUILDING OR ADJACENT
BUILDINGS. CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL PLAN
COVERING MITIGATION OF ODORS ASSOCIATED WITH CONSTRUCTION
MATERIALS AND ACTIVITIES TO BE PERFORMED. ANY FUMES WILL
ADVERSELY IMPACT THE FACILITY.
G. CONTRACTOR SHALL CONDUCT A DETAILED INSPECTION OF ALL OF THE ROOF
SYSTEM COMPONENTS PRIOR TO ANY WORK OR ORDERING OF ANY
MATERIALS. THE DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE.
CONTRACTOR SHALL FIELD-VERIFY ALL MEASUREMENTS (INCLUDING, BUT
NOT LIMITED TO THICKNESS) AND ANY SPECIAL DETAILS PRIOR TO ANY
FABRICATION AND ORDER OF MATERIALS.
CONSTRUCTION NOTES
1. PROVIDE AND INSTALL NEW 80-MIL, MECHANICALLY ATTACHED,
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING MEMBRANE SYSTEM FOR ROOF
AREAS A, B, AND C OF THE POWER SERVICE BUILDING (PSB).
2. PROVIDE AND INSTALL 11-INCH DIAMETER ROOF DRAIN STRAINERS.
3. PROVIDE AND INSTALL STAINLESS STEEL DRAIN SCUPPERS FOR TPO CLAD
ROOF.
4. PROVIDE AND INSTALL NEW 18-GAUGE STAINLESS STEEL COPING. FIELD
VERIFY ALL FLASHING, COPING DIMENSIONS THROUGHOUT.
5. PROVIDE AND INSTALL NEW, OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) COMPLIANT METAL LADDER, WITH FLAT,
SLIP-RESISTANT RUNGS. MATCH LOCATION OF THE EXISTING METAL LADDER.
6. PROVIDE AND INSTALL NEW, CONCRETE SPLASH BLOCKS BELOW THE 3-INCH
DOWNSPOUTS FROM ROOF AREA B ROOF (3 TOTAL).
7. REPLACE EXISTING ROOF EXHAUST FAN AND CURB WITH METAL DECKING AND
SEAL DECK WHEN CURB IS REMOVED.
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF RIDGE
AutoCAD SHX Text
ROOF AREA A LOW ROOF PLAN UPS/BATTERY BUILDING
AutoCAD SHX Text
ROOF CRICKET
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
EXISTING, CAPPED AND ABANDONED ROOF EXHAUST FAN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
SLOPE (TYP.)
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C008
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
SWITCHGEAR BUILDING
ROOF AREA B PLAN
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/4" = 1'-0"
4' 8'04'
GENERAL NOTES
A. PROVIDE WEATHER TIGHT PROTECTION TO BUILDING IN ORDER TO AVOID
WEATHER DAMAGE PRIOR, DURING AND AFTER CONSTRUCTION ACTIVITIES.
B. ALL DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE AND ARE TO BE
FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO PROVIDING A
CONSTRUCTION BID.
C. EXISTING HEIGHT OF THE BUILDING FORM GRADE LEVEL TO THE TOP OF
THE ROOF PARAPET OF ROOF AREA-B IS APPROXIMATELY 35.3-FEET.
D. INSTALL NEW ROOFING SYSTEM. INSTALL NEW 80 MIL., MECHANICALLY
ATTACHED THERMOPLASTIC POLYOLEFIN (TPO) ROOF MEMBRANE OVER
UNDERLAYMENT AND R-30 RIGID INSULATION. INSTALLATION INCLUDES ALL
NECESSARY FLASHING, END CAPS, CURBS, CRICKETS, AND OTHER
ASSOCIATED MATERIALS.
E. ROOFING DRAINAGE SLOPE:
THE ROOFING DRAINAGE SLOPE SHALL FOLLOW THE NATURAL SLOPE OF
THE EXISTING METAL DECK.
ROOF INSULATION:
THE INSULATION SHALL BE TAPERED AS IT APPROACHES THE EDGE OF THE
ROOFS TO AVOID IMPACT TO THE EXISTING SCUPPERS AND TO ENSURE
THAT BUILD-UP OF THE NEW CRICKETS DOES NOT EXTEND BEYOND THE
TOP OF THE ROOF PARAPETS.
CONSTRUCTION NOTES
1. PROVIDE AND INSTALL NEW 80-MIL, MECHANICALLY ATTACHED, TPO
ROOFING MEMBRANE SYSTEM FOR ROOF AREAS A, B, AND C OF THE PSB.
2. PROVIDE AND INSTALL 11-INCH DIAMETER ROOF DRAIN STRAINERS.
3. PROVIDE AND INSTALL STAINLESS STEEL DRAIN SCUPPERS FOR TPO CLAD
ROOF.
4. PROVIDE AND INSTALL NEW 18-GAUGE STAINLESS STEEL COPING. FIELD
VERIFY ALL FLASHING, COPING DIMENSIONS THROUGHOUT.
5. PROVIDE AND INSTALL NEW, OSHA COMPLIANT, METAL LADDER, WITH FLAT,
SLIP-RESISTANT RUNGS. MATCH LOCATION OF THE EXISTING METAL
LADDER.
GENERAL NOTES (CONTINUNED)
ROOF CRICKETS:
NEW CRICKETS SHALL BE OF 1/2-INCH PER FOOT (4.16%) MINIMUM SLOPE.
CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL OF ALL INSULATION
TAPERING AND THICKNESS TO ENSURE THAT THERE ARE NO IMPACTS TO ANY
EXISTING FIXTURES ON THE ROOF.
A. CONTRACTOR SHALL ENSURE THAT ODORS FROM THE MECHANICALLY
ATTACHED SYSTEM SHALL NOT ENTER THE BUILDING OR ADJACENT
BUILDINGS. CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL PLAN
COVERING MITIGATION OF ODORS ASSOCIATED WITH CONSTRUCTION
MATERIALS AND ACTIVITIES TO BE PERFORMED. ANY FUMES WILL
ADVERSELY IMPACT THE FACILITY.
B. CONTRACTOR SHALL CONDUCT A DETAILED INSPECTION OF ALL OF THE
ROOF SYSTEM COMPONENTS PRIOR TO ANY WORK OR ORDERING OF ANY
MATERIALS. THE DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE.
CONTRACTOR SHALL FIELD-VERIFY ALL MEASUREMENTS (INCLUDING, BUT
NOT LIMITED TO THICKNESS) AND ANY SPECIAL DETAILS PRIOR TO ANY
FABRICATION AND ORDER OF MATERIALS.
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF AREA B HIGH ROOF PLAN SWITCHGEAR BUILDING
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF VENT
AutoCAD SHX Text
ROOF DRAINAGE SCUPPER
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
SLOPE (TYP.)
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C009
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
E/G (110) BUILDING
ROOF AREA C PLAN
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
21004951
SCALE: 1/4" = 1'-0"
4' 8'04'
GENERAL NOTES
A. PROVIDE WEATHER TIGHT PROTECTION TO BUILDING IN ORDER TO AVOID
WEATHER DAMAGE PRIOR, DURING AND AFTER CONSTRUCTION ACTIVITIES.
B. ALL DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE AND ARE TO BE
FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO PROVIDING A
CONSTRUCTION BID.
C. EXISTING HEIGHT OF THE BUILDING FORM GRADE LEVEL TO THE TOP OF
THE ROOF PARAPET OF ROOF AREA C IS APPROXIMATELY 21.3-FEET.
D. INSTALL NEW ROOFING SYSTEM. INSTALL NEW 80 MIL., MECHANICALLY
ATTACHED THERMOPLASTIC POLYOLEFIN (TPO) ROOF MEMBRANE OVER
UNDERLAYMENT AND R-30 RIGID INSULATION. INSTALLATION INCLUDES ALL
NECESSARY FLASHING, END CAPS, CURBS, CRICKETS, AND OTHER
ASSOCIATED MATERIALS.
E. ROOFING DRAINAGE SLOPE:
THE ROOFING DRAINAGE SLOPE SHALL FOLLOW THE NATURAL SLOPE OF
THE EXISTING METAL DECK.
ROOF INSULATION:
THE INSULATION SHALL BE TAPERED AS IT APPROACHES THE EDGE OF THE
ROOFS TO AVOID IMPACT TO THE EXISTING SCUPPERS AND TO ENSURE
THAT BUILD-UP OF THE NEW CRICKETS DOES NOT EXTEND BEYOND THE
TOP OF THE ROOF PARAPETS.
ROOF CRICKETS:
NEW CRICKETS SHALL BE OF 1/2-INCH PER FOOT (4.16%) MINIMUM SLOPE.
CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL OF ALL INSULATION
TAPERING AND THICKNESS TO ENSURE THAT THERE ARE NO IMPACTS TO
ANY EXISTING FIXTURES ON THE ROOF.
F. CONTRACTOR SHALL ENSURE THAT ODORS FROM THE MECHANICALLY
ATTACHED SYSTEM SHALL NOT ENTER THE BUILDING OR ADJACENT
BUILDINGS. CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL PLAN
COVERING MITIGATION OF ODORS ASSOCIATED WITH CONSTRUCTION
MATERIALS AND ACTIVITIES TO BE PERFORMED. ANY FUMES WILL
ADVERSELY IMPACT THE FACILITY.
G. CONTRACTOR SHALL CONDUCT A DETAILED INSPECTION OF ALL OF THE
ROOF SYSTEM COMPONENTS PRIOR TO ANY WORK OR ORDERING OF ANY
MATERIALS. THE DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE.
CONTRACTOR SHALL FIELD-VERIFY ALL MEASUREMENTS (INCLUDING, BUT
NOT LIMITED TO THICKNESS) AND ANY SPECIAL DETAILS PRIOR TO ANY
FABRICATION AND ORDER OF MATERIALS.
CONSTRUCTION NOTES
1. PROVIDE AND INSTALL NEW 80-MIL, MECHANICALLY ATTACHED, TPO
ROOFING MEMBRANE SYSTEM FOR ROOF AREAS A, B, AND C OF THE PSB.
2. PROVIDE AND INSTALL 11-INCH DIAMETER ROOF DRAIN STRAINERS.
3. PROVIDE AND INSTALL STAINLESS STEEL DRAIN SCUPPERS FOR TPO CLAD
ROOF.
4. PROVIDE AND INSTALL NEW 18-GAUGE STAINLESS STEEL COPING. FIELD
VERIFY ALL FLASHING, COPING DIMENSIONS THROUGHOUT.
5. PROVIDE AND INSTALL NEW, OSHA COMPLIANT, METAL LADDER, WITH FLAT,
SLIP-RESISTANT RUNGS. MATCH LOCATION OF THE EXISTING METAL
LADDER.
6. PROVIDE AND INSTALL NEW, OSHA COMPLIANT, METAL LADDER, WITH FLAT,
SLIP-RESISTANT RUNGS. COORDINATE LOCATION OF LADDER INSTALLATION
WITH THE COR.
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF AREA C LOW ROOF PLAN E/G (110) BUILDING
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
SLOPE 2% MIN
AutoCAD SHX Text
ROOF FLUE
AutoCAD SHX Text
ROOF FLUE
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
SLOPE (TYP.)
AutoCAD SHX Text
MECHANICALLY FASTENED SEAM DETAIL - NOT TO SCALE
AutoCAD SHX Text
PVC T-JOINT COVER CENTERED OVER JOINT
AutoCAD SHX Text HOT AIR WELD, 1-1/2" (4cm) MIN.
AutoCAD SHX Text
FASTENER & SEAM FASTENING PLATE, MAX. 6" O.C.
AutoCAD SHX Text
AutoCAD SHX Text
MEMBRANE
AutoCAD SHX Text
AutoCAD SHX Text
MEMBRANE
AutoCAD SHX Text
AutoCAD SHX Text
MEMBRANE
AutoCAD SHX Text 5-1/2" (14cm) APPROX.
AutoCAD SHX Text 1/2" (1.5cm) APPROX.
AutoCAD SHX Text NOTE: 1. POSITION SEAM FASTENING PLATES POSITION SEAM FASTENING PLATES BEYOND NON-REINFORCED ENCAPSULATED EDGE.
AutoCAD SHX Text NOTE: 1. POSITION SEAM FASTENING PLATES BEYOND POSITION SEAM FASTENING PLATES BEYOND NON-REINFORCED ENCAPSULATED EDGE.
AutoCAD SHX Text
MEMBRANE EDGE
AutoCAD SHX Text FACTORY PRINTED FASTENER SPACING GUIDE MARKS ON ROOF MEMBRANE @ 6" (15.3cm) O.C.
AutoCAD SHX Text
PRE-PRINTED LINE FOR MEMBRANE OVERLAP
AutoCAD SHX Text 5-1/2" (14 cm)-1/2" (14 cm)1/2" (14 cm)" (14 cm) (14 cm)
AutoCAD SHX Text HOT AIR WELDED SEAM AREA 1-1/2" (3.8cm) WIDE
AutoCAD SHX Text 2-3/8" (6.1cm)
AutoCAD SHX Text
PRE-PRINTED LINE FOR MEMBRANE OVERLAP
AutoCAD SHX Text 1/2" (1.5cm) APPROX.
AutoCAD SHX Text 6" (15.3cm)
GUIDE MARKS
2" (51cm)
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C010
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
ROOFING DETAILS
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
CAUTION
AutoCAD SHX Text
TPO REINFORCED MEMBRANE
AutoCAD SHX Text CARLISLE FASTENER & SEAM FASTENING PLATE, MAX. 12" (30cm) O.C. SEE SEE TABLE BELOW.
AutoCAD SHX Text HOT AIR WELD, 1-1/2" (4cm) MIN.
AutoCAD SHX Text
SEE U-9 U-9 U-9 TERMINATION (ABOVE ANTICIPATED WATER LEVEL)
AutoCAD SHX Text 1/2"-1" (1.5-2.5cm)
AutoCAD SHX Text NOTES: 1. CARE MUST BE TAKEN TO PRESS THE MEMBRANE TIGHTLY INTO THE CARE MUST BE TAKEN TO PRESS THE MEMBRANE TIGHTLY INTO THE ANGLE CHANGE. PLACING THE PLATES TIGHT INTO THE ANGLE CHANGE WILL HELP HOLD THE MEMBRANE IN THE PROPER POSITION. 2. APPROXIMATELY 1/8" (0.5cm) DIAMETER BEAD OF CUT-EDGE SEALANT APPROXIMATELY 1/8" (0.5cm) DIAMETER BEAD OF CUT-EDGE SEALANT IS REQUIRED ON CUT EDGES OF REINFORCED TPO MEMBRANE. 3. CONTRACTOR TO COORDINATE FASTENER INSTALLATION WITH CONDUIT CONTRACTOR TO COORDINATE FASTENER INSTALLATION WITH CONDUIT AND EQUIPMENT FASTENED TO METAL DECKING INSIDE BUILDING
AutoCAD SHX Text
TPO BONDING ADHESIVE
AutoCAD SHX Text FASTENERS AND PLATES ARE REQUIRED AT 6" (15cm) O.C. WIND SPEED COVERAGE OF 90 MPH. DESIRED MANUFACTURER'S WARRANTY COVERAGE OF 30 YEARS
AutoCAD SHX Text
AutoCAD SHX Text 1/2"-1" (1.5-2.5cm)
AutoCAD SHX Text
AutoCAD SHX Text <18"(46cm) BONDING ADHESIVE NOT REQUIRED
AutoCAD SHX Text <12"(30cm) BONDING ADHESIVE NOT REQUIRED
AutoCAD SHX Text
PARAPET COPING
AutoCAD SHX Text
TERMINATION BAR
AutoCAD SHX Text
COUNTER FLASHING
AutoCAD SHX Text
XXXXXXXX
AutoCAD SHX Text
OPTION: BASE FLASHING, FASTENED INTO WALL
AutoCAD SHX Text
PARAPET BASE FLASHING: FASTENED INTO DECK OR WALL DETAIL - NOT TO SCALE
AutoCAD SHX Text
WATER CUT-OFF MASTIC
AutoCAD SHX Text
CLAMPING RING
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. ROOF DRAIN SIZE AND NUMBER OF DRAINS SHALL ROOF DRAIN SIZE AND NUMBER OF DRAINS SHALL BE IN ACCORDANCE WITH THE LOCAL CODES. 2. THE HOLE IN THE MEMBRANE SHALL EXCEED THE THE HOLE IN THE MEMBRANE SHALL EXCEED THE EXCEED THE THE DIAMETER OF THE DRAIN PIPE, BUT SHALL BE NO LESS THAN 1/2" (1.5cm) FROM THE ATTACHMENT POINTS OF THE DRAIN CLAMPING RING. 3. ALL BOLTS OR CLAMPS MUST BE IN PLACE TO ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT COMPRESSION ON WATER CUT-OFF MASTIC. 4. REMOVE EXISTING LEAD, FLASHING MATERIAL & REMOVE EXISTING LEAD, FLASHING MATERIAL & ENSURE THE DRAIN RING IS COMPLETELY CLEAN DOWN TO BARE METAL. 5. ROOF DRAINS SHALL BE CAST IRON WITH ROOF DRAINS SHALL BE CAST IRON WITH CORROSION RESISTANT COATING.
GREATER THAN DIMENSION "X"
AutoCAD SHX Text MIN. 1/2" (1.5cm)
AutoCAD SHX Text
DIMENSION "X"
AutoCAD SHX Text
DRAIN PIPE
AutoCAD SHX Text
AutoCAD SHX Text xxx
AutoCAD SHX Text
SLOPE UP TO 3":12" RATIO IN DRAIN SUMP
AutoCAD SHX Text <25%
AutoCAD SHX Text <14°
AutoCAD SHX Text <14°
AutoCAD SHX Text
ROOF DRAIN DETAIL - NOT TO SCALE
AutoCAD SHX Text
PARAPET FLASHING WITH PRESSURE SENSITIVE RUSS DETAIL - NOT TO SCALE
AutoCAD SHX Text NOTE: 1. IN A CASE WHERE FASTENERS MUST BE FASTENED INTO THE VERTICAL SURFACE, CARE MUST BE IN A CASE WHERE FASTENERS MUST BE FASTENED INTO THE VERTICAL SURFACE, CARE MUST BE TAKEN TO PRESS THE PRESSURE-SENSITIVE REINFORCED UNIVERSAL SECUREMENT STRIP (RUSS), AS WELL AS THE MEMBRANE, TIGHTLY INTO THE ANGLE CHANGE TO MAXIMIZE CONTACT BETWEEN THE TAPE AND MEMBRANE. MEMBRANE MUST BE ADHERED TO THE FULL WIDTH OF THE TAPE. PLACING THE PLATES TIGHT INTO THE ANGLE CHANGE WILL HELP HOLD THE PRESSURE-SENSITIVE RUSS IN THE PROPER POSITION.
AutoCAD SHX Text 6" (15cm) WIDE SURE-WELD PRESSURE-SENSITIVE RUSS STRIP
AutoCAD SHX Text
CAUTION
AutoCAD SHX Text
TPO PRIMER APPLIED ON BACK SIDE OF TPO MEMBRANE
AutoCAD SHX Text
TPO BONDING ADHESIVE
AutoCAD SHX Text CARLISLE FASTENER & SEAM FASTENING PLATE, MAX. 12" (30cm) O.C. SEE TABLE BELOW.
AutoCAD SHX Text
SEE U-9 U-9 U-9 TERMINATION (ABOVE ANTICIPATED WATER LEVEL)
AutoCAD SHX Text 1/2" (1.5cm)
AutoCAD SHX Text
AutoCAD SHX Text 6" (15cm) WIDE PS RUSS
AutoCAD SHX Text CARLISLE FASTENER & SEAM FASTENING PLATE, MAX. 12" (30cm) O.C.
AutoCAD SHX Text
SURE-WELD MEMBRANE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SURE-WELD MEMBRANE
AutoCAD SHX Text D
AutoCAD SHX Text
CUT LINE
AutoCAD SHX Text
STOP CUT
AutoCAD SHX Text
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
MEMBRANE
AutoCAD SHX Text
FOLD
AutoCAD SHX Text
AutoCAD SHX Text
SURE-WELD MEMBRANE
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. THE CUT SECTION OF THE CUT SECTION OF VERTICAL MEMBRANE WILL BE FOLDED UNDER THE FIELD MEMBRANE AS SHOWN IN STEP 4. STEP 4. . 2. APPLY INSIDE CORNER IN APPLY INSIDE CORNER IN ACCORDANCE WITH CARLISLE DETAILS U-15A OR U-15B.
AutoCAD SHX Text
PRE-APPLIED PS TAPE
AutoCAD SHX Text
HOT AIR WELD FLAP IN STEP 7STEP 7
AutoCAD SHX Text
SURE-WELD BONDING ADHESIVE
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text cm
AutoCAD SHX Text
DIMENSIONS
AutoCAD SHX Text 9"
AutoCAD SHX Text
AutoCAD SHX Text 12"
AutoCAD SHX Text
AutoCAD SHX Text
MIN.
AutoCAD SHX Text C
AutoCAD SHX Text 1/8"
AutoCAD SHX Text 0.5
AutoCAD SHX Text B
AutoCAD SHX Text
TO
AutoCAD SHX Text
MIN.
AutoCAD SHX Text 1"
AutoCAD SHX Text 2.5
AutoCAD SHX Text
MAX.
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
MIN.
AutoCAD SHX Text D
AutoCAD SHX Text
TPO PRIMER
AutoCAD SHX Text
CUT AT 45°
AutoCAD SHX Text E
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
HOT AIR WELD
AutoCAD SHX Text
AutoCAD SHX Text
FIELD FABRICATED SCUPPER WITH COATED METAL DETAIL - NOT TO SCALE
AutoCAD SHX Text
WOOD NAILER
AutoCAD SHX Text NOTES: 1. WOOD NAILERS ARE INSTALLED AT SCUPPERS TO WOOD NAILERS ARE INSTALLED AT SCUPPERS TO SECURE METAL SLEEVE AND MUST EXTEND PAST THE WIDTH OF METAL SLEEVE FLANGE. 2. METAL SCUPPER BOX MUST HAVE FOLDED FLANGE METAL SCUPPER BOX MUST HAVE FOLDED FLANGE CORNERS FULLY COVERED BY OUTSIDE CORNER FLASHING. 3. WATER CUT-OFF MASTIC UNDER SCUPPER FLANGES WATER CUT-OFF MASTIC UNDER SCUPPER FLANGES MUST BE UNDER CONSTANT COMPRESSION. 4. SCUPPER FLANGES MUST BE TOTALLY COVERED BY SCUPPER FLANGES MUST BE TOTALLY COVERED BY NON-REINFORCED FLASHING WITH MINIMUM 2" (5cm) COVERAGE PAST NAIL HEAD. 5. ALL WOOD USED FOR NAILERS SHALL BE FIRE ALL WOOD USED FOR NAILERS SHALL BE FIRE RETARDANT PRESSURE TREATED LUMBER FOR OUTDOOR USE. 6. MATCH EXISTING WIDTH AND HEIGHT OF ROOF DRAIN MATCH EXISTING WIDTH AND HEIGHT OF ROOF DRAIN SCUPPERS. CONTRACTOR TO FIELD VERIFY SIZE, LOCATION AND ORIENTATION.
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text HOT AIR WELD 1-1/2" (4cm) MIN.
AutoCAD SHX Text
TPO NON-REINFORCED FLASHING
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text
WATER CUT-OFF MASTIC
AutoCAD SHX Text
AutoCAD SHX Text
SEALANT (BY OTHERS)
AutoCAD SHX Text
FIELD-FABRICATED TPO COATED METAL SCUPPER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REFER TO APPLICABLE DETAIL(S) IN LATEST EDITION OF SMACNA
AutoCAD SHX Text
TPO BONDING ADHESIVE
AutoCAD SHX Text
XXX
AutoCAD SHX Text HOT AIR WELD, 1-1/2" (4cm) MIN.
AutoCAD SHX Text
TPO NON-REINFORCED FLASHING
AutoCAD SHX Text
TPO PRE-MOULDED OUTSIDE CORNER FLASHING
AutoCAD SHX Text FASTENERS AND PLATES ARE REQUIRED AT 6" (15cm) O.C. WIND SPEED COVERAGE OF 90 MPH. DESIRED MANUFACTURER'S WARRANTY COVERAGE OF 30 YEARS
AutoCAD SHX Text
FIELD FABRICATED SCUPPER WITH COATED METAL
AutoCAD SHX Text
ONE PIECE FLASHING BOOT
AutoCAD SHX Text
CONTINUOUS CLEAT WITH SLOTTED HOLES
AutoCAD SHX Text 8"
8"
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C011
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
ROOFING DETAILS
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
MEMBRANE TERMINATIONS DETAIL - NOT TO SCALE
AutoCAD SHX Text NOTE: 1. WHEN MECHANICAL FASTENERS ARE WHEN MECHANICAL FASTENERS ARE USED TO PENETRATE THE METAL COUNTER-FLASHING, USE EPDM WASHERS, APPLY WATER CUT-OFF MASTIC UNDER THE COUNTER-FLASHING OR CAULK THE FASTENER HEADS.
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text
SINGLE-PLY SEALANT OR SEALANT
AutoCAD SHX Text
METAL COUNTER-FLASHING WITH LEAD WEDGES, AS REQUIRED
AutoCAD SHX Text FASTEN MEMBRANE @ 12" (30cm) O.C. MAX. USE GALVANIZED WASHERS, MIN. 1", (2.54cm) DIAMETER
AutoCAD SHX Text
SINGLE-PLY SEALANT OR SEALANT
AutoCAD SHX Text
TERMINATION BAR
AutoCAD SHX Text MIN. 1/4" (1cm)
AutoCAD SHX Text MAX. 1/2" (1.5cm)
AutoCAD SHX Text NOTES: 1. APPLY ON HARD SMOOTH APPLY ON HARD SMOOTH SURFACE ONLY; NOT FOR USE ON EXPOSED WOOD. 2. DO NOT WRAP TERMINATION BAR DO NOT WRAP TERMINATION BAR AROUND CORNERS. 3. DETAIL 9D MUST BE USED AT DETAIL 9D MUST BE USED AT 9D MUST BE USED AT MUST BE USED AT VERTICAL JOINTS IN PANEL WALLS.
AutoCAD SHX Text A
AutoCAD SHX Text
THREADED FASTENERS OR CARLISLE HP TERM BAR NAIL-IN
AutoCAD SHX Text
MECHANICAL TERMINATION WITH COUNTER FLASHING
AutoCAD SHX Text
APPLICABLE BONDING ADHESIVE
AutoCAD SHX Text
XXX
AutoCAD SHX Text
WATER CUT-OFF MASTIC- MUST BE HELD UNDER CONSTANT COMPRESSION.
AutoCAD SHX Text MAX. 1" (2.54cm)
AutoCAD SHX Text ±1" (2.54cm)
AutoCAD SHX Text
CORNER
AutoCAD SHX Text
COUNTER FLASHING TERMINATION
AutoCAD SHX Text
METAL COUNTER-FLASHING WITH LEAD WEDGES, AS REQUIRED (BY OTHERS).
AutoCAD SHX Text
METAL CAP, SLOPE DOWNWARD TOWARDS ROOF
AutoCAD SHX Text
EXTEND MEMBRANE BELOW THE JOINT
AutoCAD SHX Text NOTES: 1. MEMBRANE MUST BE EXTENDED TO CORNERS TO PROVIDE COMPLETE COVERAGE OF THE TOP WALL SURFACE. MEMBRANE MUST BE EXTENDED TO CORNERS TO PROVIDE COMPLETE COVERAGE OF THE TOP WALL SURFACE. 2. ALL WOOD USED FOR NAILERS SHALL BE FIRE RETARDANT PRESSURE TREATED LUMBER FOR OUTDOOR USE.ALL WOOD USED FOR NAILERS SHALL BE FIRE RETARDANT PRESSURE TREATED LUMBER FOR OUTDOOR USE.
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
SHEET METAL COPING
AutoCAD SHX Text E
AutoCAD SHX Text
MASONRY COPINGS
AutoCAD SHX Text
WATER CUT-OFF MASTIC AROUND DOWEL OR ANCHOR
AutoCAD SHX Text 3D
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
DOWEL OR ANCHORAGE
AutoCAD SHX Text
SEALANT UNDER THE MEMBRANE LIP
AutoCAD SHX Text
MAKE RECEIVER FOR FUTURE COUNTER FLASHING FOR FUTURE RE-ROOFING
AutoCAD SHX Text
MASONRY COPING
AutoCAD SHX Text
APPROVED ADHESIVE ON SMOOTH SURFACE
AutoCAD SHX Text
XXXX
AutoCAD SHX Text
SHEET METAL THROUGH-WALL FLASHING. BEND AND EXTEND DOWNWARD
AutoCAD SHX Text
APPLICABLE BONDING ADHESIVE
AutoCAD SHX Text
XXX
AutoCAD SHX Text
WATER CUT-OFF MASTIC- MUST BE HELD UNDER CONSTANT COMPRESSION.
AutoCAD SHX Text NOTES: 1. MEMBRANE MUST BE EXTENDED MEMBRANE MUST BE EXTENDED AT CORNERS TO PROVIDE COMPLETE COVERAGE OF THE TOP WALL SURFACE. 2. REFER TO MANUFACTURER'S REFER TO MANUFACTURER'S STEP-BY-STEP INSTRUCTION PROCEDURES. 3. ALL WOOD USED FOR NAILERS ALL WOOD USED FOR NAILERS SHALL BE FIRE RETARDANT PRESSURE TREATED LUMBER FOR OUTDOOR USE.
AutoCAD SHX Text
SEALANT
AutoCAD SHX Text 1" (2.5cm)
AutoCAD SHX Text NOTES: 1. THIS DETAIL IS RECOMMENDED FOR ANY PROJECT THIS DETAIL IS RECOMMENDED FOR ANY PROJECT REGARDLESS OF WARRANTY. . 2. CONTINUOUS COUNTER FLASHING REQUIRED FOR CONTINUOUS COUNTER FLASHING REQUIRED FOR WARRANTY PROJECTS EXCEEDING 20-YEARS. 3. VERTICAL JOINTS IN THE PRE-CAST PANEL AS VERTICAL JOINTS IN THE PRE-CAST PANEL AS WELL AS ALL GAPS AT THE JUNCTION OF THE TILT-UP PANEL AND ROOF DECK MUST BE FULLY SEALED TO PREVENT AIR INFILTRATION. 4. APPLY ON HARD SMOOTH SURFACE ONLY. APPLY ON HARD SMOOTH SURFACE ONLY.
AutoCAD SHX Text
SEALANT
AutoCAD SHX Text
METAL COUNTER FLASHING
AutoCAD SHX Text 0.5" (1.5cm)
AutoCAD SHX Text
APPLICABLE BONDING ADHESIVE
AutoCAD SHX Text
XXX
AutoCAD SHX Text
WATER CUT-OFF MASTIC- MUST BE HELD UNDER CONSTANT COMPRESSION.
AutoCAD SHX Text C
AutoCAD SHX Text
MECHANICAL TERMINATION AT VERTICAL JOINTS
AutoCAD SHX Text
WALL PANEL JOINTS
AutoCAD SHX Text
ROOF MEMBRANE AT TERMINATION LEVEL
AutoCAD SHX Text
SURE-SEAL TERMINATION BAR
AutoCAD SHX Text 20 GA. GALVANIZED ANCHOR CLIPS @ 6 FEET (180cm) O.C.
AutoCAD SHX Text
CONCEALED SPLICE PLATE AT EACH JOINT OF COPING
AutoCAD SHX Text
HEX-HEAD FASTENERS
COPING
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C012
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
WALKWAY PADS
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/8" = 1'-0"
8' 16'08'
GENERAL NOTES
A. PROVIDE WEATHER TIGHT PROTECTION TO BUILDING IN ORDER TO AVOID
WEATHER DAMAGE PRIOR, DURING AND AFTER CONSTRUCTION ACTIVITIES.
B. ALL DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE AND ARE TO BE
FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO PROVIDING A
CONSTRUCTION BID.
C. EXISTING HEIGHT OF THE BUILDING FORM GRADE LEVEL TO THE TOP OF
THE ROOF PARAPET IS APPROXIMATELY 21.3-FEET FOR ROOF AREA-A,
35.3-FEET FOR ROOF AREA-B, AND 22.0Z E -FEET FOR ROOF AREA AREA-C .
D. INSTALL NEW ROOFING SYSTEM. INSTALL NEW 80 MIL., MECHANICALLY
ATTACHED THERMOPLASTIC POLYOLEFIN (TPO) ROOF MEMBRANE OVER
UNDERLAYMENT AND R-30 RIGID INSULATION. INSTALLATION INCLUDES ALL
NECESSARY FLASHING, END CAPS, CURBS, CRICKETS, AND OTHER
ASSOCIATED MATERIALS.
E. ROOFING DRAINAGE SLOPE:
THE ROOFING DRAINAGE SLOPE SHALL FOLLOW THE NATURAL SLOPE OF
THE EXISTING METAL DECK.
ROOF INSULATION:
THE INSULATION SHALL BE TAPERED AS IT APPROACHES THE EDGE OF THE
ROOFS TO AVOID IMPACT TO THE EXISTING SCUPPERS AND TO ENSURE
THAT BUILD-UP OF THE NEW CRICKETS DOES NOT EXTEND BEYOND THE
TOP OF THE ROOF PARAPETS.
ROOF CRICKETS:
NEW CRICKETS SHALL BE OF 1/2-INCH PER FOOT (4.16%) MINIMUM SLOPE.
CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL OF ALL INSULATION
TAPERING AND THICKNESS TO ENSURE THAT THERE ARE NO IMPACTS TO
ANY EXISTING FIXTURES ON THE ROOF.
F. CONTRACTOR SHALL ENSURE THAT ODORS FROM THE MECHANICALLY
ATTACHED SYSTEM SHALL NOT ENTER THE BUILDING OR ADJACENT
BUILDINGS. CONTRACTOR SHALL PROVIDE A DETAILED SUBMITTAL PLAN
COVERING MITIGATION OF ODORS ASSOCIATED WITH CONSTRUCTION
MATERIALS AND ACTIVITIES TO BE PERFORMED. ANY FUMES WILL
ADVERSELY IMPACT THE FACILITY.
G. CONTRACTOR SHALL CONDUCT A DETAILED INSPECTION OF ALL OF THE
ROOF SYSTEM COMPONENTS PRIOR TO ANY WORK OR ORDERING OF ANY
MATERIALS. THE DIMENSIONS PROVIDED HEREIN ARE APPROXIMATE.
CONTRACTOR SHALL FIELD-VERIFY ALL MEASUREMENTS (INCLUDING, BUT
NOT LIMITED TO THICKNESS) AND ANY SPECIAL DETAILS PRIOR TO ANY
FABRICATION AND ORDER OF MATERIALS.
CONSTRUCTION NOTES
8. PROVIDE AND INSTALL NEW, 30-INCH WIDE ROOF WALKWAY PADS WITH
TRACTION SURFACING AS SHOWN.
AutoCAD SHX Text N
AutoCAD SHX Text
ROOF AREA A LOW ROOF PLAN UPS/BATTERY BUILDING
AutoCAD SHX Text
ROOF AREA C LOW ROOF PLAN E/G (110) BUILDING
ROOF AREA B HIGH ROOF PLAN SWITCHGEAR BUILDING
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-C013
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
FALL PROTECTION
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/16" = 1'-0"
10' 20' 30'08' 40'
CONSTRUCTION NOTES
8. PROVIDE AND INSTALL NEW, MOVEABLE, FIBERGLASS GUARDRAIL SYSTEM
AROUND THE PERIMETER OF ROOF AREAS A AND B. THE GUARDRAIL
SYSTEM SHALL BE COMPLIANT WITH OSHA 29 CFR 1926.502, AND INCLUDE
GATES TO FACILITATE PEDESTRIAN ACCESS TO AND FROM THE METAL
LADDERS AS SHOWN. RESOLVE ANY DRAINAGE OR LEVELING ISSUES WITH
NEW ROOF CONFIGURATION. SAFETY RAILING BASES NEED TO BE
COORDINATED WITH ROOF DRAINS AND OTHER OBSTACLES TO LAY FLAT ON
ROOF AND NOT ON TOP OF DRAINS OR OTHER ITEMS.REVIEW ANY
APPLICABLE CHANGES WITH THE COR AND OBTAIN COR APPROVAL PRIOR
TO FINAL INSTALLATION. ALL MODULAR BASES SHALL LAY ON EPDM
PADDING SELECTED FROM THE SAME SOURCE OF GUARDRAIL
MANUFACTURER TO PROTECT THE ROOFING MEMBRANE FROM DAMAGE.
USE DIFFERENT LENGTH GUARDRAIL SECTIONS TO ACCOMMODATE SITE
CONDITIONS AND AVOID CONFLICTS WITH EXISTING FEATURES SUCH AS
ROOF VENTS, ROOF DRAIN INLETS, ETC.
GENERAL NOTES
A. THE MINIMUM HEIGHT OF THE GUARDRAILS ABOVE THE ADJACENT SURFACE
OF THE ROOF SHALL BE 42 INCHES. THE GUARDRAIL SYSTEM MUST BE
ABLE TO SUPPORT A 200-POUND LOAD APPLIED IN ANY DIRECTION.
RAILINGS MUST BE FABRICATED FROM FIBERGLASS MATERIAL.
B. ALL EXTRA FALL PROTECTION COMPONENTS AND ACCESSORIES,
INCLUDING, BUT NOT LIMITED TO GATES, SUPPORTS, PADDING, ETC., MUST
BE SOURCES FROM THE SAME MANUFACTURER.
C. UPON FINAL INSTALLATION OF GUARDRAILS, THE CONTRACTOR SHALL
PROVIDE A BASE MOVER TO TRANSPORT BASE PLATES FOR FUTURE USE IN
OTHER AREAS.
AutoCAD SHX Text N
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text
ROOF PLAN GUARDRAIL
AutoCAD SHX Text
ROOF AREA C E/G (110) BUILDING
AutoCAD SHX Text
ROOF AREA B SWITCHGEAR BUILDING
AutoCAD SHX Text
ROOF AREA A UPS/BATTERY BUILDING
AutoCAD SHX Text X001
AutoCAD SHX Text
AutoCAD SHX Text X001
AutoCAD SHX Text
AutoCAD SHX Text X001
AutoCAD SHX Text
AutoCAD SHX Text X001
AutoCAD SHX Text
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text 10'
AutoCAD SHX Text 10'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 10'
AutoCAD SHX Text 10'
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
BASE
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text
BASE
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
BASE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FALL PROTECTION GUARDRAIL - MID-SECTION DETAIL
AutoCAD SHX Text C013
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FALL PROTECTION GUARDRAIL - END-SECTION DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FALL PROTECTION GUARDRAIL - BASE DETAIL
AutoCAD SHX Text C013
AutoCAD SHX Text
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GUARDRAIL ASSEMBLY - ISOMETRIC VIEW
AutoCAD SHX Text C013
AutoCAD SHX Text
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
FIBERGLASS RAIL
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text
RECEIVER BASE
AutoCAD SHX Text 1 "38"
1 "38"
CONSTRUCTION NOTES
9. PROVIDE AND INSTALL NEW, LIGHTNING PROTECTION COMPONENTS
FOLLOWING THE EXISTING CONFIGURATION UNLESS OTHERWISE DIRECTED
BY THE COR. SOME COMPONENTS WILL NEED TO BE ADJUSTED FOR THE 5-
FOOT HEIGHT REQUIREMENT, AND ALL PERIMETER AIR TERMINALS SHALL
HAVE A MINIMUM 24-INCH HEIGHT. CONNECT ALL METAL COMPONENTS ON
THE ROOF, INCLUDING, BUT NOT LIMITED TO VENTS, ROOF DRAIN INLETS,
AND EXTERIOR PARAPET WALL OR GUARDRAIL AS APPLICABLE. REPLACE
ALL EXISTING LIGHTNING PROTECTION CONDUCTORS AND AIR TERMINALS
IN ACCORDANCE WITH STANDARD: FAA-STD-19F.
10. INSTALL 24" AIR TERMINALS (HARGER PART #1224CUAT) AT THE ENDS OF
THE HAND RAIL RUNS, AT CORNERS, AND AT INTERVALS NOT EXCEEDING
20 FEET. AIR TERMINALS SHALL BE INSTALLED SO THAT THEY
PROTRUDE A MINIMUM OF 18" ABOVE THE GUARDRAIL SYSTEM.
11. INSTALL AIR TERMINALS MOUNTS TO THE HAND RAIL SYSTEM WITH PIPE
CLAMP AIR TERMINAL MOUNTS (HARGER PART #CPRB1.5/2AT12) FROM THE
UPPERMOST LOCATION OF THE VERTICAL GUARDRAIL MEMBER.
12. BOND ALL NEW TERMINALS MOUNTED ON THE GUARDRAILS TO THE
EXISTING LIGHTNING PROTECTION SYSTEM.
13. BOND EACH SECTION OF GUARDRAIL BASE PLATES TOGETHER
WITH A CLASS II LIGHTNING CONDUCTOR WITH A MECHANICAL
ATTACHMENTS.
14. AT THE ENDS AND CORNERS (LOCATIONS WHERE THE GUARDRAIL SYSTEM
TURNS) OF EACH GUARDRAIL SECTION, THE LIGHTNING CONDUCTORS FOR
THE BASE PLATES SHALL BE EXOTHERMIC WELDED TO THE EXISTING
LIGHTNING PROTECTION SYSTEM. THE LIGHTING CONDUCTORS SHALL BE
SWEPT IN BOTH DIRECTIONS WITH 8" RADIUS BENDS.
GENERAL NOTES
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
MM/DD/YYYY
ELYZZA MAGNO
PLATFORM MANAGER
C.T.
PALMDALE
ZLA-21004951-E101
A.P.
A.P.
AIR ROUTE TRAFFIC CONTROL CENTER
ROOFING REPLACEMENT
LIGHTNING PROTECTION
POWER SERVICE BUILDING (ROOF AREAS A, B, AND C)
fil e.
dw g
ISSU ORG
ORGANIZATION
D
ES
IG
N
R
EV
IE
W
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
CALIFORNIALOS ANGELES AIR TRAFFIC CONTROL CENTER
THIS DRAWING PRODUCED ON THE WSA REGION AUTOCAD SYSTEM
CANG TRAN
PROJECT ENGINEER
21004951
SCALE: 1/16" = 1'-0"
10' 20' 30'08' 40'
AutoCAD SHX Text A. INSTALLATION SHALL MEET THE REQUIREMENTS OF FAA-STD-019F. INSTALLATION SHALL MEET THE REQUIREMENTS OF FAA-STD-019F.
AutoCAD SHX Text
ROOF PLAN LIGHTNING PROTECTION
AutoCAD SHX Text
ROOF AREA C E/G (110) BUILDING
AutoCAD SHX Text
ROOF AREA B SWITCHGEAR BUILDING
AutoCAD SHX Text N
AutoCAD SHX Text
THOMPSON CAT #572BT POINT X24" COPPER
AutoCAD SHX Text
THOMPSON SWIVEL CONNECTOR CAT #27 (SEE NOTE 3)
AutoCAD SHX Text
ADHESIVE POINT BASE CAT #688 TOP OF PARAPET
AutoCAD SHX Text
COPPER CONDUCTOR CAT #29X
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LIGHTNING PROTECTION - CABLE HOLDER DETAIL
AutoCAD SHX Text E101
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LIGHTNING PROTECTION - CABLE HOLDER DETAIL
AutoCAD SHX Text E101
AutoCAD SHX Text
AutoCAD SHX Text
THOMPSON COPPER CONDUCTOR CAT #29X
AutoCAD SHX Text THOMPSON CAT #186X ADHESIVE CABLE HOLDER FOR FLAT ROOFS. THE ATTACHMENT IS PERMANENTLY HELD IN PLACE WITH THOMPSON CAT #731 ADHESIVE
AutoCAD SHX Text
LIGHTNING CONDUCTOR ON TOP OF PARAPET WALL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LIGHTNING PROTECTION - ELEVATION VIEW
AutoCAD SHX Text E101
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LIGHTNING PROTECTION - PLAN VIEW
AutoCAD SHX Text E101
AutoCAD SHX Text
AutoCAD SHX Text
PARAPET WALL
AutoCAD SHX Text
LIGHTNING CONDUCTOR
AutoCAD SHX Text 20'
20'
| ZLA-D-21004951-G001 |
| ZLA-D-21004951-C005 |
| ZLA-D-21004951-C006 |
| ZLA-D-21004951-C007 |
| ZLA-D-21004951-C008 |
| ZLA-D-21004951-C009 |
| ZLA-D-21004951-C010 |
| ZLA-D-21004951-C011 |
| ZLA-D-21004951-C012 |
| ZLA-D-21004951-C013 |
| ZLA-D-21004951-E101 |