1.5_Schedule of Items_RiceRiverBridge.pdf

PDF 113 KB Posted

Attached to
Chippewa National Forest, Rice River Bridge Rehab
Solicitation number
12639220R0002
Issued by

About this file

This document contains a schedule of items for the Rice River Bridge Rehabilitation project. The Forest Service is soliciting bids to rehabilitate the Rice River Bridge located on the Deer River Ranger District of the Chippewa National Forest. Key work items include mobilization, construction surveying and staking, soil erosion and pollution control measures, clearing and grubbing, removal of existing asphalt and slotted drains, roadway excavation, embankment construction using compacted fill, placement of rip rap and aggregate base, and paving with geotextile. The project also involves replacing longitudinal deck planks, floor beams, and bridge railing as well as placing conserved topsoil, seeding, and installing temporary traffic control measures. Bids are due by July 15, 2022 and the contract is scheduled to be awarded on August 1, 2022.

View the file

Other files

File Type Posted
ConstructionRFP_FAC2020_04_01152020.docx DOCX document
1.4_SOW_RiceRiverBridge.pdf PDF
Wage Determination mn134.txt TXT text file
2.3_Drawings_RiceRiverBridge.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Unit Price Total Cost

LS

LS

15705 LS

Soil Erosion and pollution control

20101 LS

Clearing and grubbing, disposal method scattering

20302 EA

Removal of slotted drains

20303 LS

Removal of existing AC pavement, disposal method, removal from project

20401 CY

Roadway excavation

20416 LS

Conserved top soil

20420 CY

Embankment construction, compaction method 1, tolerance class A

25101 CY

Place rip rap, Class 1

30103 CY

MN class 5, aggregate base, grading D

Compaction method D

Chippewa NF

Tolerance A

Schedule of Items Rice River Bridge

Deer River Ranger District

Quantity

15101

Item / Description

1.00

Mobilization

1.00

1.00

15201 Construction Survey and Staking, Method l

2.00

1.00

Page 1 total

200.00

1.00

1.00

370.00

30.00

225.00

Unit Unit Price Total Cost

TON

41501 SY

Paving Geotextile

LF

55602 SY

Longitudinal deck plank replacement

62408 LS

Placing conserved topsoil

62551 LS

Seeding, Dry method

63501 LS

Temporary Traffic Control

Optional Bid Item 55602a SY

Longitudinal Deck plank replacment

55602b LF

Floor beams replaced

Chippewa NF

Schedule of Items Rice River Bridge

Deer River Ranger District

Item / Description Quantity

40103 220.00

MN Dot Level 2, Superpave

55601 78.00 Bridge Railing, Timber TL2

Total Project Cost

Page 2 total

1.00

1.00

1.00

1.00

1.00

1.00

110.00