1.1 - SOW for 12T Vertical Field Magnet.docx
DOCX document 50 KB Posted
- Solicitation number
- 1333ND20QNB610475
About this file
This document is a statement of work for the procurement of a 12 Tesla cryogen-free superconducting magnet with an integrated dilution refrigerator. The National Institute of Standards and Technology requires this equipment to operate without liquid helium at the NIST Center for Neutron Research user facility. The magnet and closed-cycle refrigerators must cool to below 4 Kelvin and maintain temperature stability during sample changes within specified time limits. The system must include circulation pumps for an optimized 3He/4He mixture provided by NIST, with vacuum spaces leak-tight to 1 x 10-9 atm-cm3/sec and two calibrated sample positioners. The solicitation number is 1333ND20QNB610475 for this procurement by the Department of Commerce National Institute of Standards and Technology.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 - 12 TESLA CRYOMAGNET Questions.pdf | ||
| 1.3 - Dimensional Plan View of MACS Mezzanine.docx | DOCX document | |
| 1.4 - NCNR Standard Pinout Ribbon Wire.docx | DOCX document | |
| 1333ND20QNB610475 - 12T Cryomagnet RFQ.pdf | ||
| 1.2 - Symbol Diagram.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for 12T Vertical Field Magnet with Integrated Dilution Refrigerator
Statement of Work for 12T Vertical Field Magnet with Integrated Dilution Refrigerator
Background The Department of Commerce and the National Institute of Standards and Technology (NIST) have developed a major national facility for neutron scattering. The NIST Center for Neutron Research (NCNR) is a user facility serving the needs of over 900 visiting researchers per year who come to perform neutron scattering experiments.
Measuring the magnetic field dependent properties of materials is a critical part of the NCNR mission, which often requires the use of liquid helium to cryogenically cool the magnet and the sample materials. Liquid helium is a non-renewable resource and the financial cost of using it is increasing every year. To operate more sustainably a transition to cryogen-free systems, i.e. “dry magnets” is desirable. Dry magnets use a closed-cycle refrigerator (CCR) to conductively cool the magnet coils, requiring no addition of any cryogens at any time during preparation, operation, or recovery from magnet quench. This sample environment equipment must operate with high reliability and accuracy across the wide range of instruments and sample measurement conditions, be simple and safe to operate, with safeguards to protect both the equipment and personnel during operation.
Purpose The objective of this procurement is to purchase one 12 Tesla cryogen-free superconducting magnet with an integrated dilution refrigerator for sample environment operation at all appropriate neutron user instruments at the NCNR.
Attachments
1.1. Symbol Diagram for variables shown in Additional Physical Dimensions Table
1.2. Dimensional Plan View of MACS Mezzanine
1.3. NCNR standard pinout ribbon wire
Specification
1.4. Cooling System Properties
1.4.1. The entire magnet and sample cooling system must be cryogen free (no liquid helium or liquid nitrogen required) and should only require an initial charge of Helium gas to initialize a self-cooling cryogenic system.
1.4.2. The closed-cycle refrigerators must include 1-2 cold heads, 2-4 helium gas flexlines, and 1-2 air-cooled compressors. No recirculating water packs, or external water service connections are permitted. No multi-part indoor/outdoor air units are permitted.
1.4.3. Circulating helium for the dilution refrigerator:
1.4.3.1. NCNR will provide the 3He gas for the 3He/4He mixture.
1.4.3.2. Gas will be shipped to the contractor. Contractor must schedule delivery time and location with government’s technical representative.
1.4.3.3. The 3He/4He mixture must be optimized by the contractor and the contractor must document the total amount of 3He gas in the system. The contractor must return all unused 3He gas with the system delivery. It is acceptable to have the remainder of the 3He to be returned in the “mixture” form if the mixture is documented.
1.4.3.4. Circulating helium must have a reliable LN2 dewar and trap for filtering the mixture, to remove impurities. There must be a mechanism to regenerate the trap.
1.4.3.5. Circulation pumps for the 3He/4He mixture must be oil-free and sealed (aka “dry”), Kashiyama Neodry Series, or equivalent. Minimum rate 500 L/min.
1.4.3.6. All circulating helium must be isolated from the inner volume of the VTI (variable temperature interface) at all times. Design system so that circulating helium cannot mix with the helium for sample change.
1.4.4. There is no allowed increase in magnet temperature more than 1 Kelvin during sample change (as long as this temperature rise does not interfere with the super conducting phase of the magnet). The system must have sufficient cooling power to independently cool the magnet coils and the sample space.
1.4.5. All vacuum spaces must be leak-tight to 1 x 10-9 atm-cm3/sec.
1.4.6. Two sample positioners (sample sticks/probe):
1.4.6.1. Each sample positioner must have a sensor calibrated for 0.02 - 40 K.
1.4.6.2. If sample positioner requires to be lifted with crane, the crane lifting must be in accordance with Standard Engineering codes requirements. A lift test certification is required.
1.4.7. Must meet the following parameters:
| Description |
| Units |
| Minimum Acceptable Value |
| Maximum Acceptable Value |
| Cooling time, magnet, room temperature to 4K |
| hours |
| Sample Change Time (from insertion at 300 K to reach 4K) |
| hours |
| Sample Change Time (from insertion at 300 K to reach <0.050 K) |
| hours |
| Maximum sample temperature |
| Kelvin |
| 100 |
| Minimum sample temperature |
| Kelvin |
.050 +/- 0.001K
| Cooling Power @100mK |
| Micro-Watts |
| 100 |
| Stability at minimum sample temperature |
| Hours |
| 48 |
| Cabling Length (length from the magnet to the control cart) |
| meters |
| 7.5 |
| 10 |
| Hosing Length (length from the magnet to the control cart) |
| meters |
| 6 |
| 10 |
| Sock heater power, if Sock is present. |
| Watts |
| 25 |
| 50 |
| VTI needle valve heater power, if needle valve is present. |
| Watts |
| 25 |
| 50 |
1.5. Magnet Properties
1.5.1. Magnetic field direction at the sample position must be vertical.
1.5.2. The magnet coils must be symmetric.
1.5.3. The coils may be either tapered or non-tapered. Tapered is preferred.
1.5.4. The magnet coils must be supported sufficiently to withstand radial and axial forces due to ferromagnetic materials in the surrounding environment.
1.5.5. The contractor must provide stray field models for the magnet.
1.5.6. NIST will provide analysis of forces due to the surrounding environment.
1.5.7. The magnet coils must be shielded by neutron absorbing materials, and the shielding must not contain any cadmium near the split.
1.5.8. Maximum Aluminum in Beam Path: MABP is the uniform total thickness of aluminum alloy in the beam path from outside the cryostat to the sample and then exiting the cryostat, for the entire azimuthal beam path access window (w). MABP does not include any thickness of ancillary equipment inserted into the well, such as the sample can, sample itself, or any other ancillary equipment placed in the magnet sample well.
1.5.8.1. The sample position is defined as the intersection of the neutron beam centerline and the central axis of the magnet.
1.5.8.2. Dark Angle (DA): All connections between the magnet coil split sections must be concentrated in a single azimuthal section no larger than DA=360-w degrees.
1.5.8.3. Azimuthal Beam Path Window (w): Single azimuthal section through which the neutron beam can pass to the sample position and out again without encountering any material except aluminum and the sample.
1.5.8.4. Only uniformly distributed, high purity aluminum alloy is permitted in the Azimuthal Beam Path Window.
1.5.9. Persistent mode not permitted; magnet must always run in direct current mode.
1.5.10. Must meet the following parameters:
| Symbol |
| Description |
| Units |
| Minimum Acceptable Value |
| Maximum Acceptable Value |
| dMF |
| Magnetic field homogeneity (DSV is diameter spherical volume) |
no worse than 0.6% in 1cm dsv and 1% in 2cm dsv
| MF |
| Max operating central magnetic field along the magnet axis and at the center of split, bipolar. |
| Tesla |
| +/- 12 |
| 5 Gauss radius at max field |
| meters |
| Maximum axial force on the magnet at maximum field due to magnetic materials in the external environment. |
| Pounds (lbs.) |
| 600 |
| Maximum lateral force on the magnet at maximum field due to magnetic materials in the external environment |
| Pounds (lbs.) |
| 200 |
| a |
| Accessible vertical acceptance angle onto a sample of height S'. The sample will be fully illuminated by a neutron beam with this vertical divergence angle (no shadowing by aluminum thickness greater than the MABP) |
| angular degrees |
| 8 |
(i.e. 4 degrees above and below beam path)
| S |
| Split accessible directly through the beam height. This is the height of the minimal aluminum beam path (MABP) for zero vertical divergence angle neutron beam. |
| millimeters |
| 35 |
| S' |
| Height of a sample which will be fully illuminated by a beam with vertical divergence angled a with no shadowing by aluminum thickness greater than the MABP. |
| millimeters |
| 20 |
| Sample space inner diameter |
| millimeters |
| 30 |
| DA |
| Dark Angle. |
| angular degrees |
| w |
| Azimuthal beam path access window |
| angular degrees |
| 320 |
| MABP |
| Maximum Aluminum in Beam Path: total thickness of aluminum alloy in the beam path. |
| millimeters |
Additional Physical Dimensions (see attached Symbol Diagram)
| Symbol |
| Description |
| Units |
| Minimum Acceptable Value |
| Maximum Acceptable Value |
| Fixed |
Value
| d |
| Maximum outer diameter lower section including mounting flange |
| millimeters |
| D |
| Maximum outer diameter upper section |
| millimeters |
| h |
| Distance from mounting surface to beam (split plate) including the mounting adapter flange (p) which must bolt to a goniometer. Prior to design, the adapter plate bolt pattern will be provided. |
| millimeters |
+/-1mm
| h' |
| Distance from beam (split plane) up to flange where outer diameter increases |
| millimeters |
| 450 |
| p |
| Thickness of NCNR-provided adapter plate |
| millimeters |
+/-1mm
| Allowed distance from sample in which no magnetic materials are present. (polarized beam requirement) |
| millimeters |
| 224 |
| T' |
| Total system height, from goniometer surface to VTI vacuum flange. Excluding cart. |
| millimeters |
| Facility Doorway Height, for cart design |
| millimeters |
| Facility Doorway Width, for cart design |
| millimeters |
1.6. Control and Communication
1.6.1. System must include temperature controller to monitor, control, and log all temperature sensors.
1.6.2. AC Resistance Bridge and temperature controller optimized for <50mK temperature control:
1.6.2.1. Lakeshore 372
1.6.2.2. 4 channels for temperature measurement.
1.6.2.3. Relay box with 16 inputs to scan all sensors at a user defined rate.
1.6.2.4. The temperature controller(s) ramp rate must enable the temperature on the sample to be linearly varied to cool or warm the sample at a user defined rate ranging from 0.1 K/min or lower to 5 K/min or larger and have a temperature stability of ± 500 mK or better over the entire operating range.
1.6.3. Control interface of the gas handling system must be touch screen.
1.6.3.1. Must provide Software control of valves and flow rates. Source code must be provided.
1.6.4. System must include 6 temperature sensors on the magnet, Cernox CX-1030, or equivalent:
1.6.4.1. Low magnetic field- induced errors, ΔT/T (%) < 1% at 4.2K and 12T
1.6.4.2. Excellent resistance to ionizing radiation
1.6.4.3. Temperature range 1.0 K to 325 K
1.6.4.4. Contractor must provide the wiring pinouts and curves for all sensors.
1.6.5. System must include 2 RuO2 temperature sensors on the mixing chamber:
1.6.5.1. One sensor must be calibrated for 0.02 K-100 K.
1.6.5.2. One sensor must be calibrated for 0.3 K-300 K.
1.6.5.3. Excellent resistance to ionizing radiation.
1.6.5.4. Small magneto resistance and linear with magnetic field at base temperature.
1.6.5.5. If the temperature sensor’s readings shift more than 5% due to magnetic field application, then temperature calibration per magnetic field ramping is required for the sensor.
1.6.6. System must include at least 1 RuO2 sensor each for the 1K Pot and the Still.
1.6.7. System must include one 24 pin fischer connector for sensors and heaters using NCNR standard pinout ribbon wire. Contractor must provide the airside cable.
1.6.8. System must include one 24 pin fischer connector for NCNR internal use with standard pinout to ribbon wire. Contractor must provide the airside cable.
1.6.9. Must provide Software controlled temperature protection for magnet. Source code must be provided.
1.7. Electrical Requirements
1.7.1. Electrical power requirement. The Contractor must provide the system with cables and plugs for direct connection to electrical service. The system must be configured to operate using one or more of the following available electrical services:
1.7.1.1. 250 Volt/ 3-phase/ 60 Amp, NEMA 15-60 plug (no more than 2 total)
1.7.1.2. 208 Volt/ 3-phase/ 30 Amp, NEMA L21-30 plug (no more than 2 total)
1.7.1.3. 220 Volt/ 1-phase/ 30 Amp, NEMA L7-30 plug
1.7.1.4. 120 Volt/ 1-phase/ 20 Amp, NEMA 5-20 plug
1.7.2. Maximum steady state power consumption for the closed-cycle refrigerator:
1.7.2.1. 20.7 kWatts for 250 V/3-phase/ 60 Amp service
1.7.2.2. 8.7 kWatts for 208 V/3-phase/ 30 Amp service
1.7.2.3. 5.3 kWatts for 220 V/1-phase/ 30 Amp service
1.7.2.4. 1.9 kWatts for 120 V/1-phase/ 20 Amp service
1.8. Additional Requirements
1.8.1. Contractor must design a cart (trolley) for the system, such that all components of the system are fully contained within the transportable cart:
1.8.1.1. The entire system must pass through doorways with the specified minimum dimensions (see dimensions in Additional Physical Dimensions Table above).
1.8.1.2. Footprint of the system cart is limited by the mezzanine space at MACS. Dimensional plan view of the mezzanine will be provided by NCNR.
1.8.2. Cart must be designed for crane lifting and be in accordance Standard Engineering code requirements. A lift test certification is required.
1.8.3. Contractor must design the magnet for crane lifting in accordance with Standard Engineering code requirements. A lift test certification is required.
1.9. Deliverables
1.9.1. Conceptual design documents and drawings (*.pdf format) includes a draft schedule. Draft schedule must include the date by which the contractor will require delivery of the Helium-3 provided by NIST. Due with bid for project.
1.9.2. Kickoff meeting. No later than 2 weeks after award of contract.
1.9.3. Preliminary design documents and drawings (*.pdf format). Must include temperature sensor information such as sensor type, tolerances, location of installation, and curves. Due 12 weeks after award of contract.
1.9.4. Structural Analysis Report (*.pdf format). The structural analysis of the support structure for the superconducting magnet system will validate that the design meets the vertical and horizonal force requirements. The structural analysis must show that the design meets these requirements with a minimum safety factor of 2.0. Due 18 weeks after award of contract.
1.9.5. Fringe/Stray Field Analysis Report (*.pdf format). Due 18 weeks after award of contract.
1.9.6. Two (2) hard copies of all final documentation (calculations, reports, drawings and final schedule) and user manual. User-manual must include (at a minimum) operation, maintenance, bill of materials, list of recommended spare parts and troubleshooting instructions. Due 2 weeks after final acceptance testing.
1.9.7. All final design documents and user-manual (*.pdf format). Due 2 weeks after final acceptance testing.
1.9.8. Note: conceptual through final design steps must be presented to the government’s technical representative. The contractor may proceed to the next step after the previous step has been reviewed and approved by the government's technical representative.
1.9.9. Conduct bi-weekly status and planning meetings (kickoff meeting being the first one) from award of contract to completion of the contract. Meetings can be done via conference or video call. Contractor must send written summaries (*.pdf format) after each meeting to NIST for review and concurrence. Meeting schedule may be modified as necessary by mutual agreement between the contractor and the government’s technical representative.
1.9.10. Factory Acceptance Testing (FAT). The factory test report must be delivered to NIST not later than 16 months after award of contract, and prior to shipping the system to NIST. The test report serves to validate that specifications have been met prior to delivery to NIST.
1.9.10.1. NIST personnel plan to be present for the FAT, from warm system to base temperature.
1.9.10.1.1. Duration of visit between 5 to 15 days, as necessary.
1.9.10.1.2. Training for up to 2 NIST personnel provided during the FAT. Training will include preparation, operation, and maintenance of the magnet system.
1.9.10.2. The factory test report must provide the following information at a minimum:
1.9.10.2.1. Helium leak test on the vacuum shroud at room temperature and at operating temperature for the superconducting magnet.
1.9.10.2.2. Record of temperature sensor outputs for all magnet system sensors during the cooldown and warmup tests.
1.9.10.2.3. Cool-down time from room temperature to magnet operating temperature.
1.9.10.2.4. Maximum magnetic field achieved. The magnetic field must be maintained at maximum value for a minimum of 8 hours to be considered a successful test.
1.9.10.2.5. Current in the magnet power supply at maximum field.
1.9.10.2.6. Ramping times from zero field to 80% of maximum field, and from zero field to +/- 100% of maximum field.
1.9.10.2.7. Magnetic field homogeneity at the sample position.
1.9.10.2.8. Fringe field measurements that confirm the fringe field map that was provided in the design.
1.9.10.2.9. Information regarding magnet quenches that may have occurred during testing. This will include the field at which quench occurred, and any anomalous behavior leading up to the quench.
1.9.10.2.10. Timestamped record of temperature sensor outputs for all dilution refrigerator sensors and sample sensors during the sample cooldown and warmup tests.
1.9.10.2.10.1. Cool-down of the sample from room temperature to operating temperature.
1.9.10.2.10.2. Hold time for the sample at base temperature for a period of no less than 48 hours at base temperature.
1.9.10.2.10.3. Warming the sample from operating temperature to room temperature and back to operating temperature for sample change.
1.9.11. The magnet system must be delivered, installed, and tested by the contractor at NCNR.
1.9.11.1. The contractor must coordinate with NCNR for the installation.
1.9.11.2. The contractor must be responsible for unpacking the system, performing the setup, installation, and on-site testing. NIST will provide space, electrical power, vacuum pumps, a helium leak detector, a magnetic field sensor, and force gauges. Upon award, any further requirements must be communicated by the contractor prior to arrival.
1.9.11.3. The contractor must provide the recirculating pumps.
1.9.12. Training, in addition to training that may or may not have occurred during the FAT, must occur upon acceptable installation. Training for up to 4 NIST personnel must be provided by the contractor. Training must include preparation, operation, and maintenance of the magnet system.
1.9.13. Installation test report. At the conclusion of installation, the contractor must provide an installation test report. This report must include the following information at a minimum.
1.9.13.1. Helium leak test on the vacuum shroud at room temperature and at operating temperature for the superconducting magnet.
1.9.13.2. Cool-down time from room temperature to magnet operating temperature.
1.9.13.3. Maximum magnetic field achieved. The magnetic field must be maintained at maximum value for a minimum of 8 hours to be considered a successful test.
1.9.13.4. Current in the magnet power supply at maximum field.
1.9.13.5. A table of ramp rates every 1T, and ramping times from zero field to +/- 80% of maximum field, and from zero field to +/-100% of maximum field.
1.9.13.6. Magnetic field homogeneity at the sample position.
1.9.13.7. Fringe field measurements that confirm the fringe field map that was provided in the design.
1.9.13.8. Force test measurements that confirm the forces on the magnet as provided in the design.
1.9.13.9. Information regarding magnet quenches that may have occurred during testing. This will include the field at which quench occurred, and any anomalous behavior leading up to the quench.
1.9.13.10. Timestamped record of temperature sensor outputs for all dilution refrigerator sensors and sample sensors during the sample cooldown and warmup tests.
1.9.13.10.1. Cool-down of the sample from room temperature to operating temperature.
1.9.13.10.2. Hold time for the sample at base temperature for a period of no less than 48 hours at base temperature.
1.9.13.10.3. Warming the sample from operating temperature to room temperature and back to operating temperature for sample change.
1.9.14. Supply two (2) hard copies of final documentation and user-manual including (at a minimum) operation, maintenance, bill of materials, list of recommended spare parts and troubleshooting instructions.
1.9.15. Supply final documentation and user-manual in *.pdf format.
Government Responsibilities
1.10. Review and approve conceptual (due with bid), preliminary and final design proposals. No more than 30 days for each review period.
1.11. Provide access to NCNR including experiment areas (work areas). Each individual worker must attend NCNR Radiation Safety Training (1/2-day class) prior to working in a work area.
1.12. Provide the 3He gas for the 3He/4He mixture.
1.13. Assist contractor (provide crane operator, inspect for shipping damage and lost or missing equipment and dispose of shipping and packing material) in unpacking and inspection of the equipment delivered to NIST. The three-week period commencing with the unpacking and inspection of the equipment delivered to NIST will be used for acceptance testing.
Delivery The Contractor must provide and deliver all equipment and documentation (both electronic and hardcopy) specified herein to NIST within the period of performance.
Periods of Performance The period of performance for the requested task must be 20 months from award of contract.
Place of Delivery of Performance FOB NIST Gaithersburg
Warranty
1.14. A 1 (one) year standard warranty period is required.
1.15. An extended warranty period of 1 (one) year beginning at the end of the standard warranty period is requested as an option.
1.16. All warranties must cover all deliverables, parts, and labor. Over the phone technical assistance, and site visits.
1.17. Software updates for compliance with operating system to be included as part of warranties.
1.18. Contractor must respond to all warranty requests within 24 hours of request.
1 | Page
File details come from the government source that posted it. Updated .