1.1.4 - Statement of Work - EOV Rebranding, Painting and Body Work.docx

DOCX document 21 KB Posted

Attached to
Emergency Operations Vehicle (EOV) external body repairs Federal contract opportunity
Solicitation number
70FA5024RWX04497Y
Issued by
Federal Emergency Management Agency National Community Section

About this file

This document is a Statement of Work (SOW) for rebranding, painting, and performing external body repairs on the Emergency Operations Vehicle (EOV) for the Federal Emergency Management Agency (FEMA).

The SOW outlines the specific tasks required, including replacing damaged panels, removing and replacing air conditioning components, preparing and painting the trailer, and adding FEMA-provided decals. The work must be completed within 90 calendar days at the contractor's facility, located within 50 miles of Denton, TX. FEMA will conduct acceptance inspections of all work, and may require repair or replacement of nonconforming items at no additional cost. The related federal contract opportunity is a pre-solicitation for the required work, with a NAICS code of 811111 - General Automotive Repair and a small business size standard of $9M. Interested vendors are requested to provide a response or capability statement to the FEMA National Community Section.

View the file

Other files for this federal contract opportunity

Other files attached to Emergency Operations Vehicle (EOV) external body repairs, newest first.
File Type Posted
IMG_0143.jpg JPG image
IMG_0149.jpg JPG image
IMG_0148.jpg JPG image
IMG_0144.jpg JPG image
IMG_0147.jpg JPG image
IMG_0150.jpg JPG image
IMG_0145.jpg JPG image
IMG_0146.jpg JPG image
IMG_0142.jpg JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Department of Homeland Security (DHS) Federal Emergency Management Agency (FEMA)

PROJECT TITLE

Rebranding of the Emergency Operations Vehicle (EOV) external body and performing external repairs.

SPECIFIC TASKS

· Minus the vinyl adhesive backed logos, the contractor will provide all equipment, labor, materials, and any other accessories required to accomplish the items/tasks listed below.

· Contractor will do the necessary research to find the correct replacement panels for the A/C units on front and ensure the paint matches the rest of the trailer.

· Contractor will ensure all paneling and body equipment be compatible and interoperable with existing MERS equipment as specified in the scope of work.

· Contractor will be required to provide FEMA overview of all modifications associated with new installations at contractor’s location.

Scope of Work

Description of work

Additional Notes / Options

REPAIR DAMAGED LEFT SIDE OUTTER WALL.

REPLACE LEFT SIDE OUTTER SLIDE WALL LOWER ALUMINUM DOOR TRIM 16FT

Includes all securing hardware.

REPAIR LEFT SIDE LOWER BELLY BOX DOORS AND FRAME
Includes fasteners and welding supplies

REMOVE DECALS LEFT AND RIGHT SIDE

REMOVE AND REPLACE AIR CONDITIONER PANELS WITH NEW ONES.
Replace any broken or missing hardware.
PREP AND PAINT TRAILER COMPLETE PAINT FRAME. ADD BLUE DECAL AT R/S & L/S REAR
Decals provided by FEMA Printing

A/C housing parts

1. Outer slide wall door trim PN# NI68621, RPGP011

1. Right side lower honeycomb cover PN# N088457

1. Right side outer center panel cover PN# N168612

1. Right side outer panel cover PN# N168613

1. Right side center vent cover PN# N168616

1. Left side unit bottom pan PN# N168618

1. Left side front lower honeycomb cover PN# N168611

1. Left side outer lower honeycomb cover PN# N160159

1. Left side outer panel cover PN# N168610

DELIVERABLES/INSPECTION SCHEDULE

Mechanical Work Inspection and Approval:

· All specifications, configuration, and installation plans for the EOV work will be approved by the COR prior to start of the project;

· All mechanical work including modifications and installation of equipment in the EOV will be approved by the COR;

· After this section has been completed, the COR will inspect and approve all the work.

COR acceptance and final Inspection of all work to be performed:

· The COR and other subject matter experts from the MERS Detachment will conduct acceptance inspections of all mechanical work, modifications and installations.

· FEMA personnel will be authorized to perform scheduled and un-scheduled site visits to the contractor’s place of business to inspect the progress of the work that is being performed.

The Contractor shall only tender for acceptance for those items that conform to the requirements of this contract.

· The Government may require repair or replacement of nonconforming supplies or equipment at no increase in contract price. If repair or replacement will not correct the defects or if meeting the desired outcome is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.

PLACE OF PERFORMANCE

· The contractor will perform the work at their place of business.

5.0 SECURITY

· Contractor will be responsible for the security of all government property while in their custody.

6.0 PERIOD OF PERFORMANCE

· The period of performance for this award shall not exceed 90 calendar days from contract award date.