This is a Statement of Work (SOW) for the renovation of Building 37 into a laundry facility at the Port Isabel Service Processing Center (SPC) in Los Fresnos, TX. The project requires renovating an existing warehouse building to accommodate new commercial laundry operations, including installing 6 large electric washers (130lb capacity), 2 small electric washers (100lb capacity), 6 large gas dryers (170lb capacity), and 2 small gas dryers (70lb capacity).
The renovation scope includes selective demolition, interior construction, finishes, and upgrades to building systems including electrical, plumbing, HVAC, fire suppression, security, and telecommunications. Key requirements include replacing the standing seam metal roof, installing new LED lighting throughout, upgrading mechanical systems to handle increased heat loads and moisture, providing a new chemical storage room, and installing detention-grade fixtures and security features. The facility must be fully ABA accessible and meet ICE SPC Detention Construction Standards. The contractor must coordinate with ICE Security Division for all personnel access and maintain secure containment throughout construction. Sustainability requirements include compliance with International Energy Conservation Code and encouraged adherence to LEED principles, though certification is not required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1.2.1-RFI SHU.pdf | ||
| 1.1.3-PIDC SHU SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Port Isabel Detention Center - Secure Housing Unit (SHU) January 10, 2025
SECTION 01 10 01 Page 1
SECTION 01 10 01
OPTION 01: LAUNDRY RENOVATION
PART 1 GENERAL
1. GENERAL SCOPE OF WORK
The project requires the design and renovation of the existing Bldg. 37 to accommodate a new laundry operation at the Port Isabel Service Processing Center (SPC), Los Fresnos, TX. The work includes, but is not limited to, design, selective demolition of site and utility structure elements to accommodate the new laundry operation, building interior construction, finishes, interior and exterior painting, and building systems. Such systems include, but are not limited to electrical power, lighting, special systems, fire suppression systems, heating, air-conditioning and ventilating systems, security systems, telecommunications systems, plumbing systems, and alarm systems. All exterior building systems and equipment surfaces exposed to exterior environments must have protective coatings. All coatings, interior and exterior, must provide protection from ISO Corrosivity Category 5 conditions, or equivalent. It is intended to provide long term durability to the surfaces and coatings in the local environmental conditions. Coating colors will match adjacent architectural aesthetics. Site improvements include utility line connections, pavements, and extensions of existing campus systems to serve the building. A new pedestrian access through existing security fence into an existing sally port is to be included.
1.1 PROJECT DESCRIPTION
The project requires the design and renovation of an existing warehouse building to accommodate a laundry operation. The mechanical, electrical, and plumbing systems within the building will be upgraded as need to accommodate the new commercial sized washers and dryers. The roofing will be replaced with a standing seem metal roof.
Rusted and deteriorated flashing shall be replaced in order to provide roofing warranty as required. The perimeter and interior fencing will be modified to meet security needs.
This facility is to be fully ABA accessible.
1.2 SECURITY PROVISIONS / FORCE PROTECTION
All personnel accessing the SPC must be prior approved by the ICE Security Division.
Specific project security measures are provided elsewhere in these specifications.
The project is to be fully contained within a security fenced enclosure and access to the site is controlled via security protocols. The D-B Contractor must be responsible for constructing the perimeter security infrastructure needed to secure the site and its subsequent connection to the existing secure SPC campus and must tie into existing
ADallai Draft
SECTION 01 10 01 Page 2 fiber optic perimeter fence detection system in all fencing being altered or added.
Coordination with SPC personnel before removing or altering any fencing or security apparatus is required. All fencing removal and installation must be done with the plan to always provide containment at required levels.
1.3 SUSTAINABILITY
The project design and construction must comply with governing criteria as established by the International Energy Conservation Code. The design and construction are also encouraged to follow sustainability design principles as established by the U.S. Green Building Council’s LEED Certification Standards program, although such certification is not required.
2. CODES, STANDARDS AND CRITERIA
All codes, standards, and criteria are the same as those required for the SHU project.
3. CIVIL / SITE WORK
Bldg. 37 has existing utilities to provide for its current needs. The full extent of civil work for this project will consist of tie-ins to existing utility lines as needed to provide for the new laundry operation, and providing ADA accessible parking and an accessible entrance.
3.1. Site Pavement
3.1.1. Concrete Drive and Parking – A concrete drive and parking area will connect to the existing asphalt road and provide parking as required. Concrete drive will be connected at the asphalt road with the appropriate joint material and detail. Concrete slab will be sloped such that it drains precipitation in the amounts that can be expected from the local climate. The edge around the perimeter of the concrete slab shall be detailed to aid in absorption of rainwater into the adjacent soils.
3.1.1.1. The parking area will be designed for 10 passenger car parking spaces and two (2) parking spaces for delivery trucks, as are currently in use by the Detention Center. The concrete turn radii, thickness, reinforcement, and mixes shall be designed for the vehicle sizes and weights as well as the local weather and soil composition. Any reinforcement used in the sidewalks or slabs shall be epoxy coated. The concrete parking area will provide for loading and unloading operations at the existing loading dock and the existing loading ramp. The parking design shall provide ABA compliant parking spaces as required and access from those spaces to the building entrance doors.
SECTION 01 10 01 Page 3
3.1.2. Concrete Walkways - Provide Portland Cement Concrete (PCC) pavement for walkways.
3.1.3. Concrete walkways must be at least 5 feet wide. Walkways providing access to a building must be centered on the doorway served. Handicapped Access, all areas and facilities for this project are required to be accessible to physically disabled persons and must conform to the Architectural Barriers Act (ABA) Accessibility Standard for Federal Facilities. Handicap access to the facility must also be designed per ABA standards. Extruded curbs are not allowed. Handicap ramps must be provided (where required) and an ABA accessible route must be designated. The existing ramp connected to the building must be evaluated to ensure whether or not it meets ABA requirements.
3.2. Ground Penetrating Radar:
The Contractor will perform a Ground Penetrating Radar survey to locate underground utilities around the existing building before proceeding with site design. See SHU requirements for more detail.
3.3. Site Utilities
3.3.1. Sanitary Sewer System - If applicable for utility relocations, the Contractor must coordinate points of connection with the SPC. Sanitary sewer piping beneath the perimeter security fence must not exceed 8” diameter. The Contractor must connect to the existing sanitary sewer system. With exception to sanitary sewer piping beneath the perimeter security fence, the minimum sewer main size must be 8-inch and minimum sewer connections to buildings must be 6-inch. Provide two-way cleanouts every 100 feet along a sewer branch connection from a building and provide two-way cleanouts at the building connection. Manholes must be constructed of reinforced concrete or pre-cast reinforced concrete. Manhole covers located within areas accessible to detainees shall be bolted down with security fasteners.
Structures in pavement must be designed to handle H-20 loading. Structures in turfed areas can be constructed for lighter weight loading. The Contractor has the option of using PVC pipe or High- Density Polyethylene pipe for the sanitary sewer pipes. Profiles are required for underground sanitary sewer systems. See the attached site plan for utility requirements.
3.3.2. Water Distribution System –Valves must be installed on the water service lines near the connection point and on each service line to the building. For water mains, provide 2 valves at tees and 3 valves at crosses. The system must be designed with 20 PSI residual pressure under fire flow conditions, with adequate domestic supply.
SECTION 01 10 01 Page 4
The system must be designed to prevent possible water hammer effects. See the attached site plan for utility requirements.
3.3.3. Fire – Provide the connection to the existing onsite fire network and extend to
Bldg. 37. Provide a Post indicator Valve on the line feeding Bldg. 37.
Provide fire hydrant(s), if required, in an approvable location and of an acceptable model and nozzles per NFPA Section 18.5.
Provide fire hydrant(s), if required, at an acceptable height from the pavement per NFPA Section 18.5 with an adjacent valve and cover.
Verify capacity calculations of the existing fire line system. Conduct a fire flow tests for design of the building fire system.
3.4. Natural Gas – Natural Gas is currently connected to the building. Upgrade service line size for mechanical and plumbing design for gas-fed equipment.
3.5. Electrical – The Contractor must provide new electrical systems to supply all required loads or equivalent to the building, within the Port Isabel Detention Center campus. The electrical systems consist of power, lighting, telecommunications, fire alarm system, electronic security, grounding, and lightning protection.
3.6. Lighting General - Provide all exterior and interior lighting in accordance with the ICE
SPC Detention Construction Standards. Minimize the use of different light fixtures (luminaires) to simplify onsite inventory. Replace all current exterior and interior fixtures with compliant LED fixtures.
3.7. The Contactor must coordinate all utility outages through the COR with the SPC a minimum of ten (10) days before the proposed outage.
4. Communications
4.1. Telecommunications service must be provided via service entrance cables (see Site Utility Survey). Communications and its associated ventilation equipment will be housed in the electrical/communications room, in accordance with TIA/EIA 568, ICE Cabling Standards and the SPC Detention Construction Standards. Cabling and terminations must be in accordance with TIA/EIA.
5. Pedestrian Gates
Coordinate the installation of pedestrian gates with the COR.
SECTION 01 10 01 Page 5
6. ARCHITECTURE
6.1. Building Description:
The Laundry facility will be renovated within the existing Bldg. 37. The existing concrete flooring will remain, only modified as necessary to provide drainage to the new equipment as designed. The split face exterior CMU walls will remain, only to be modified or penetrated as necessary for the remainder of this Scope of Work to be implemented.
A new interior room will be built to house chemicals used in laundry operations. A list of chemicals will be provided. The room shall be designed based upon storage limitations of the chemicals stored and according to applicable regulations. All materials used to construct chemical storage room shall be able to resist moisture.
Resize existing Mechanical room to accommodate designed equipment.
6.2. Office of Professional Responsibility:
As the facility is required to provide a safe and secure environment, the Office of Professional Responsibility (OPR) is required to review and provide consultation on any new construction project at the Port Isabel Detention Center site. Consultation will be facilitated by the Government when plans are submitted for all reviews to assess its effects and, if necessary, resolve adverse effects. OPR will review the project and provide their comment(s) during the scheduled Government review periods of the schedule. The Contractor must comply with comments from these reviews within the scope of the contract. All comments must be resolved to the satisfaction of OPR prior to the submittal of the final design documents.
6.3. Ceilings:
Ceilings within the Laundry Bay will be left open to the structure above. All existing ceiling tile and grid to be replaced. Acoustical ceiling tiles within the office and the Male and Female restrooms shall be moisture resistant. The ceiling grid supporting the tiles shall also be of a type to endure moisture laden spaces.
6.4. Walls:
Must meet American Correctional Association (ACA) requirements.
Paint on interior walls shall be rated for exterior use, moisture resistant paint. Any gypsum board used shall be moisture resistant. Stainless-steel wall protection plates to prevent damage to the walls shall be installed to 48” AFF.
SECTION 01 10 01 Page 6
6.5. Roof:
Existing metal standing seam roof is to be replaced with a new metal standing seam roofing. Roofing to be rated for local conditions per the IBC. New gutters and downspouts shall be included. The gutters and downspout shall be sized based upon code listed rainfall amounts for the local area. The profile and color of the new roof is to match as closely as possible to existing metal standing seam roofs on the PIDC facility.
- All Roof components are to be manufactured by the same manufacturer.
- The installer must be a certified installer for at least the previous 5 years with the manufacturer.
- The installer must have installed at least 3 projects of similar size and scope with the same manufacturer and system that is being installed, within the last 3 years.
Installer must be certified by the manufacturer for the specific roof type used in writing to provide the warranty as required.
- Roof warranty be provided by the roofing manufacturer and cover the entire roofing system including all accessories and penetrations.
- Roof system provided must include:
- 20 year no dollar limit manufacturer’s watertight warranty.
- 20 year no dollar limit finish warranty.
- 20 year base metal or “material” warranty.
- 5 year “no Penal Sum” Warranty.
- 2 year installer’s warranty.
6.6. Floors:
Must meet American Correctional Association (ACA) requirements.
The flooring of all spaces, other than mechanical rooms and utility spaces, are to be finished with a mortar type epoxy resinous floor coating. The floor coating shall be 125- 250 mils thick with a 5:1 aggregate-to-resin ratio. Integral cove base shall be 4” high with a ½” radius at the junction of the floor to the wall. The surfaces where the epoxy floor coating is to be installed shall be prepared according to flooring manufacturer's instructions. Color of resin and aggregate to be selected from manufacturer’s standard colors. Surface of flooring shall be the highest anti-slip rating provided by the manufacturer.
6.7. Interior Finishes:
Interior Finish Materials must be in accordance with the SPC Detention Construction Standards.
SECTION 01 10 01 Page 7
6.8. Interior Equipment & FF&E: The contractor shall provide at a minimum the equipment and FF&E items listed below.
6.8.1. 6-Lg Electric Washers-130lb capacity (Currently-7-60lb electric washers, they take 35 min to wash a load)
6.8.2. 2-Sm Electric Washers-100lb capacity
6.8.3. 6-Lg Gas Dryers-170lb capacity (Currently-7-120lb gas dryers, take 1hr 10 min to dry a load)
6.8.4. 2-Sm Gas Dryers-70lb capacity
6.8.5. Rolling commercial laundry bins
6.8.5.1. Current inventory - 11bins @850 max capacity (2 bins unserviceable); 2 bins @450 max capacity
6.8.6. Six Stainless Steel Tables
6.8.6.1. 72” long with lockable wheels
6.8.6.2. Need to determine width
6.8.6.3. No folding ability or hang bars required
6.8.7. Commercial shelving
6.8.7.1. 25’ long for total requirement. Can be multiple units.
6.8.7.2. 2’ deep – each shelf
6.8.7.3. Secured to floor/wall
6.8.7.4. Height needs to be determined
6.8.8. Commercial trash receptacles
6.9. Signage
Interior Signage. Comply with requirements of ABA. Provide interior room identification signage for all rooms and emergency signage. Provide directional and informational signage as required.
Coordinate locations with User. Provide signage location plans and signage schedule as part of the design drawings. Final room numbers are to be accurate for final documents and Mechanical Electric and Plumbing MEP coordination for record drawings. Where Contractor provides schedules, labeling or key plans (for signage, lockset keying, electrical panel schedules, communications/data wiring, etc.), Contractor to use final room numbers if different from construction document room numbers.
SECTION 01 10 01 Page 8
6.10. Plumbing:
Plumbing system must be designed and installed in accordance with the International Plumbing Code (IPC). Indoor fixtures must be of the water saving type and approved for the intended use per the IPC. Hot water must be provided to new laundry equipment in addition to existing lavatories, and sinks. Maintain minimum storage tank temperature of 140F. Provide hot water to fixtures at temperatures per the IPC.
Current wash loads at the existing facility consist of a minimum of 20 loads per day with a maximum of 50 loads per day. Once this new facility is online the wash load from other buildings on the campus will be brought in to increase the total load washed through this facility.
Due to limited space to locate water heating equipment, high efficiency distributed water heating equipment approach is preferred. Refer to 6.8 for the minimum required contractor provided and installed equipment.
Eye Wash:
Locate permanently installed emergency eye wash/hand wash station in accordance with OSHA standards 1910 and 1926. Water temperature must meet OSHA requirements.
Provide a floor drain (with a trap primer) if a direct drain connection to the sewer is not provided.
7. FIRE PROTECTION
Provide full building sprinkler system as required by applicable code with coverage per NFPA 13. Use detention grade sprinkler heads throughout the facility.
7.1. Fire Alarm (FA) System:
7.1.1. Design and provide new fire alarm system as required by code.
8. HEATING VENTILATING AND AIR CONDITIONING (HVAC)
8.1. HVAC System:
The existing HVAC system has two sets of equipment. One system supplies the office and restrooms with air circulation. The HVAC system within the offices will be part of the over-all building commissioning to ensure that it and the enlarged warehouse HVAC system are operating properly. No other modification to the office HVAC is to take place. The other system conditions the warehouse space. The system that conditions the warehouse will need to be enlarged to account for the increase in heat load from the
SECTION 01 10 01 Page 9 washer and dryers, providing exhaust as required by the dryers, and removing moisture introduced by the washer machines. The new equipment and the existing equipment will need to be calibrated to work together to ensure required temperatures and humidity levels are present in all spaces.
Humidity must not exceed 60% RH.
8.2. Air Movement and Makeup Air:
Air handling units must run continuously during occupied hours at a minimum turnover rate of six (6) air changes per hour.
Refer to the appropriate ASHRAE handbooks for system design guidance on the prevention of mold and mildew.
Contractor shall provide ceiling mounted industrial circulation fans based upon building square feet and usage.
8.3. DDC (Direct Digital Control) Controls:
Provide a DDC control system for HVAC functions with building level control so that the system must continue to operate on stored programming even if communication with the graphical user interface (GUI) is lost. New system must be compatible with existing systems in the Admin and Processing buildings. Provide a complete graphical user interface in the Mechanical room. Provide a Windows-based laptop with all software (and interface cable/ports) necessary for troubleshooting and programming at controllers and/or GUI. Contractor must confirm plan with the Contracting Officer prior to start of construction.
8.4. Air handling Units – Location and Access
Mechanical room must be sized for ease of service, maintenance, and replacement of HVAC equipment. Design must be such that equipment is not “trapped” in the space.
Permissible Outdoor Equipment: Compressor-bearing equipment (or air-cooled condensers) may be installed outside and must be located in a secure fenced area with unrestricted airflow. Full, heavy-duty hail and trash guards must be provided. Guards must be substantial enough to prevent tampering.
8.5 Louvers
Air intake louvers must have bird screens and interior motor-operated dampers. Provide wind driven rain resistant performance (per AMCA 500- L) that is appropriate for the
SECTION 01 10 01 Page 10 locale. Louvers must be mounted as far above grade as possible and in no case must they be closer to the ground than 10 feet. Care should be taken to locate intakes and exhausts so that re-introduction of exhaust fumes cannot occur regardless of wind conditions. At a minimum conform to IBC and IMC standards for air intake locations.
8.6 Smoke Purge
HVAC systems or separate smoke purge systems must be capable of 100% outside air purge of all zones at the rate of six (6) air changes per hour. If separate systems are provided, they must be properly interlocked with the HVAC systems to ensure safe and proper operation in an emergency.
8.5. Balancing and Commissioning
Contractor must provide Testing and Balancing (TAB) specialist to assist Commissioning Agent. The Commissioning agent will be provided by the Government.
Commissioning Agent must be actively involved in the design phase of the project as well as during the commissioning process. TAB plan must be reviewed and approved by the Commissioning Agent and the Contracting Officer. Mechanical systems must be balanced and commissioned prior to final commissioning of the entire building.
9. ELECTRICAL
9.1. Electrical Systems:
The Contractor must coordinate with the COR to schedule installations in conjunction with the other work being performed. The Contractor must provide calculations in their Design Analysis to justify their design and its compliance with referenced criteria.
9.2. Lighting:
The Contractor must provide and install lighting fixtures in accordance with the IESNA Handbook and the SPC Detention Construction Standards. Wherever a conflict exists, the Functional spaces that are not covered in the IESNA Handbook must be in accordance with the SPC Detention Construction Standards. All lighting fixtures associated with the Bldg. 37 renovation must be removed and replaced with new LED fixtures. The Contractor must provide lighting calculations in their Design Analysis to justify placement of both emergency, exterior and interior lighting fixtures. There must be separate calculation zones such as: perimeter/security, building exterior, and site to be represented in the lighting calculations. Emergency lighting must be provided via 90min battery backup fixtures, per NFPA 101.
Exterior Lighting: New exterior lighting fixtures for the Bldg. 37 building must match the existing style and function of existing exterior fixtures.
SECTION 01 10 01 Page 11
Admin Area Lighting: Lighting for the offices and public areas must be in accordance with IESNA handbook. Lighting control must be done with occupancy sensors for the:
offices, restrooms, and other public areas. The occupancy sensors must have manual off capability.
9.3. Power:
The contractor must provide and install all necessary equipment, conduit, conductors, etc. to provide standby generator power and an uninterrupted power supply (UPS) to be able to generate power to the Bldg. 37 building where required by the SPC Detention Construction Standards.
This section overrides Part B, Division 16, paragraph B of the SPC Detention Construction Standards, in that two diesel generators are not required. The Contractor must provide and install one natural gas standby backup engine/generator, in accordance with NFPA 110. The engine generator must be sized to serve approximately 150% of the design load and to run at a maximum of 60 percent to 80 percent of the rated capacity after the effect of the inrush current declines. When sizing the generator, the initial voltage drop on generator output due to starting currents of loads must not exceed 15%.
The Generator will have an Automatic Transfer Switch that is located outside the secure perimeter with a maintenance bypass.
The Contractor must provide a permanently installed resistive load bank, sized at a minimum of 50 percent of generator rating. The load bank will be factory mounted to the radiator. Care should be taken in selecting materials that will tolerate the high temperatures associated with radiator-mounted load banks to include belts, flex connections, motors, sprinkler heads, etc. The load bank must provide a load add/shed feature that will maintain load levels at a minimum, including building load, of the generator manufacturer's recommended loads when operating at 50 percent of generator KW name plate. The load bank must have a minimum of four automatic load taps controlled by a load add/shed relay incorporated into the run circuit on the generator.
The Contractor must also provide and install power equipment outlined below:
9.3.1. Panelboards: Separate panelboards for: power & lighting, telecommunications, fire alarm, and physical security. If there is not sufficient room for multiple panels, then the Contractor must obtain written approval from the COR to combine electrical systems into fewer panelboards. Per NFPA 72, provisions must be made for fire alarm circuit breakers, and physical security system breakers so as to prevent their accidental switching.
SECTION 01 10 01 Page 12
9.3.2. Receptacles: New receptacles for washers and dryers. Electrical outlets and receptacles must be provided for the Bldg. 37 area in accordance with the SPC Detention Construction Standards. All new receptacles and cover plates must be matching. Provide "detention grade" receptacles and mounting screws.
10. Telecommunications System:
10.1. Electronic Security System:
Provide a stand-alone Security and Surveillance System for the new building. The Uninterrupted Power Supply System requirements stated here supersede the UPS requirements in Appendix C. SPC Detention Construction Standard. UPS must be provided for electronic and video surveillance systems. UPS must be racked mounted and provide 8 hours of backup power.
10.2. Security System requirements are located in 01 10 00 for the SHU.